Susanna Douglas
- Listed as
- architect
- Firm
- Susanna Douglas Architecture
- Based in
- San Francisco
- On San Francisco permits
- Dec 2015 to Aug 2025
14 permits since 2000 (architect on 14 permits): 9 completed, 5 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 26, 2025 | Completed final sign-off Jan 2026 | 5 Turquoise Wy | Kam's Construction Inc | kitchen remodel in-kind w/out changed plumbing location, add a subpanel in 2nd floor; install new cabinet & countertop; remove partition wallsDetails
kitchen remodel in-kind w/out changed plumbing location, add a subpanel in 2nd floor; install new cabinet & countertop; remove partition walls | $52,000 |
| Nov 10, 2022 | Completed final sign-off May 2023 | 482 20th Av | Ben Hardy & Company | revision to bpa#202012020056, reduction of scope to interior renov of (1)bath & (1.5)bath, replace some windows, stucco in-kind front only. no change to building volume, no structural work. this scope is less than original permitted scope. this scope replaces previously permitted scope.Details
revision to bpa#202012020056, reduction of scope to interior renov of (1)bath & (1.5)bath, replace some windows, stucco in-kind front only. no change to building volume, no structural work. this scope is less than original permitted scope. this scope replaces previously permitted scope. | |
| Apr 26, 2022 | Never finaled issued Apr 2022, no final | 330 Magellan Av | Terry Mc Daniel Construction | revision to pa 2021-0426-9346 - new furnace, electrical changes, updated energy calcs. no change to exterior enveope or building footprint. no change to habitable areaDetails
revision to pa 2021-0426-9346 - new furnace, electrical changes, updated energy calcs. no change to exterior enveope or building footprint. no change to habitable area | $5,000 |
| Dec 23, 2021 | Completed final sign-off Feb 2023 | 83 Apollo St | Cht Properties Development | 1/f remodel. additional habitable square feet are proposed at 1/f within the existing footprint to create a lounge/office, bathroom, and study nook. redesign of windows and doors at rear facade at 1/f. no work on the front facade. no change in bldg footprint, volume or height.Details
1/f remodel. additional habitable square feet are proposed at 1/f within the existing footprint to create a lounge/office, bathroom, and study nook. redesign of windows and doors at rear facade at 1/f. no work on the front facade. no change in bldg footprint, volume or height. | $52,000 |
| Apr 26, 2021 | Completed final sign-off Jul 2023 | 330 Magellan Av | Terry Mc Daniel Construction | interior wall changes. remodel 2.5 baths. lofting (e) upper floor ceilings. structural roof reinforcement. remove 2 front steps & lower front door at exterior. replace doors & windows. remove side entrance door & stair. no change in sqft & bldg height. new skylights.Details
interior wall changes. remodel 2.5 baths. lofting (e) upper floor ceilings. structural roof reinforcement. remove 2 front steps & lower front door at exterior. replace doors & windows. remove side entrance door & stair. no change in sqft & bldg height. new skylights. | $150,000 |
| Mar 30, 2021 | Completed final sign-off Nov 2021 | 1872 Turk St | Terry Mc Daniel Construction | remodel of (e) bathrm in single unit (this address) of 4 unit condo building. includeing window changes in bathroom at east elevation also provide additional recessed lighting in entry, dining rm, & hallway. no work in common area or changes in ft or volume, habitable sq ft, and no changes in frontDetails
remodel of (e) bathrm in single unit (this address) of 4 unit condo building. includeing window changes in bathroom at east elevation also provide additional recessed lighting in entry, dining rm, & hallway. no work in common area or changes in ft or volume, habitable sq ft, and no changes in front | $30,500 |
| Dec 2, 2020 | Never finaled issued Apr 2021, no final | 255 Anderson St | Custom 6 Builders | revision to pa 201912179817. changes to project include (n) slab on grade at laundry and bath 2, revisions to windows/doors, (n) skylight, plan changes at laundry and bath 2, electrical revisions.Details
revision to pa 201912179817. changes to project include (n) slab on grade at laundry and bath 2, revisions to windows/doors, (n) skylight, plan changes at laundry and bath 2, electrical revisions. | $5,500 |
| Dec 2, 2020 | Completed final sign-off Jan 2026 | 482 20th Av | Ben Hardy & Company | interior renovation of (e) kitchen, bath, & powder room. create new bathroom at (e) sunroom. replacements of and modifications to (e) exterior windows & doors, and to interior door openings. no change to building footprint or envelope, or to habitable sq. ft.Details
interior renovation of (e) kitchen, bath, & powder room. create new bathroom at (e) sunroom. replacements of and modifications to (e) exterior windows & doors, and to interior door openings. no change to building footprint or envelope, or to habitable sq. ft. | $110,000 |
| Jun 24, 2019 | Never finaled issued Jun 2021, no final | 337 Douglass St | Custom 6 Builders | horizontal & vertical to (e) sfh. vertical of approx 3' @ rear portion of roof. horizontal of 14' @ rear & at sw corner @ front. new interior stair. renovated kitchen & bath & new bathrooms. addition of new bedroom & entertainment room. rear yard retaining walls. deck & pool. replace fence.Details
horizontal & vertical to (e) sfh. vertical of approx 3' @ rear portion of roof. horizontal of 14' @ rear & at sw corner @ front. new interior stair. renovated kitchen & bath & new bathrooms. addition of new bedroom & entertainment room. rear yard retaining walls. deck & pool. replace fence. | $300,000 |
| Jun 16, 2017 | Completed final sign-off Nov 2017 | 4425 Kirkham St | renovation of interior including creating habitable space at grnd lvl, including media rm, bathroom & storage rm. minor structural stregthening. replaceing furnace & w/hDetails
renovation of interior including creating habitable space at grnd lvl, including media rm, bathroom & storage rm. minor structural stregthening. replaceing furnace & w/h | $98,000 | |
| Dec 30, 2016 | Never finaled issued Jun 2019, no final | 458 Anderson St | Mueller Construction, The Construction Guy Inc | upgrade level bathrm, add habitable sqf at the garage level w/i existing footprint, add new stair from garage level to main level, removable two existing bahtrms, two new skylights and two new windows at new dormer, remove ceiling at upper level for cathedrap ceiling.Details
upgrade level bathrm, add habitable sqf at the garage level w/i existing footprint, add new stair from garage level to main level, removable two existing bahtrms, two new skylights and two new windows at new dormer, remove ceiling at upper level for cathedrap ceiling. | $175,000 |
| Dec 30, 2016 | Completed final sign-off Jan 2021 | 2518 14th Av | Kieran O'carroll Construction, Custom 6 Builders | per unit legalization ordinance 43-14, includes interior remodel at 1st fl unit to comply w/ code as required by ordinance, replacement of less than 50% portion of decking at 2nd fl, replace portion of driveway w/ permeable surface & provide landscaping.Details
per unit legalization ordinance 43-14, includes interior remodel at 1st fl unit to comply w/ code as required by ordinance, replacement of less than 50% portion of decking at 2nd fl, replace portion of driveway w/ permeable surface & provide landscaping. | $118,500 |
| Dec 30, 2016 | Completed final sign-off Mar 2018 | 2518 14th Av | Kieran O'carroll Construction, Custom 6 Builders | volumtary seismic upgrade at 1st floor. at 2nd floor, expand existing toilet room to indlude sink and provide a new closet.Details
volumtary seismic upgrade at 1st floor. at 2nd floor, expand existing toilet room to indlude sink and provide a new closet. | $118,500 |
| Dec 10, 2015 | Never finaled issued Jun 2017, no final | 247 Rose St | new habitable roof deck w/outdoor kitchen, privacy screens, and shading structure. new stair to roof w/new steir enclosure. n/a for maher ordinance 155-13.Details
new habitable roof deck w/outdoor kitchen, privacy screens, and shading structure. new stair to roof w/new steir enclosure. n/a for maher ordinance 155-13. | $65,000 |