The Construction Guy Inc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2013 to Sep 2017
- Last 24 months
- 0 permits filed
14 permits since 2000: 12 completed, 2 never finaled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 14, 2017 | Completed final sign-off Sep 2017 | 225 Banks St | revision to permit # 201609137585, install (n) direct vent furnace in lieu of radiant floor heatingDetails
revision to permit # 201609137585, install (n) direct vent furnace in lieu of radiant floor heating | |
| May 9, 2017 | Completed final sign-off Oct 2017 | 53 Christopher Dr | replace stucco on back of house. replace 2 window and 1 door in like kind. not visible from street.Details
replace stucco on back of house. replace 2 window and 1 door in like kind. not visible from street. | $7,000 |
| Dec 30, 2016 | Never finaled issued Jun 2019, no final | 458 Anderson St | upgrade level bathrm, add habitable sqf at the garage level w/i existing footprint, add new stair from garage level to main level, removable two existing bahtrms, two new skylights and two new windows at new dormer, remove ceiling at upper level for cathedrap ceiling.Details
upgrade level bathrm, add habitable sqf at the garage level w/i existing footprint, add new stair from garage level to main level, removable two existing bahtrms, two new skylights and two new windows at new dormer, remove ceiling at upper level for cathedrap ceiling. | $175,000 |
| Nov 21, 2016 | Completed final sign-off Jan 2019 | 878 32nd Av | all work at 878 - 32nd ave - reallocate ground floor social hall into media room & family room. new stairs conecting(e)media room on ground floor to 2nd floor. remove 2nd floor laundry. new lighting & electrical outlets on ground floor & stairs.Details
all work at 878 - 32nd ave - reallocate ground floor social hall into media room & family room. new stairs conecting(e)media room on ground floor to 2nd floor. remove 2nd floor laundry. new lighting & electrical outlets on ground floor & stairs. | $25,000 |
| Sep 26, 2016 | Completed final sign-off Feb 2017 | 878 32nd Av | demolish extg wall on 2nd floor. new posts and footings.Details
demolish extg wall on 2nd floor. new posts and footings. | $4,000 |
| Sep 13, 2016 | Completed final sign-off Sep 2017 | 225 Banks St | revision to pa 201607283680, install new retaining wall in front of (e) retaining wall. provide walls on 2nd flr as shown. provide and install radiant floor fan (2) bedrooms, living rm & kitchen on 2nd floor.Details
revision to pa 201607283680, install new retaining wall in front of (e) retaining wall. provide walls on 2nd flr as shown. provide and install radiant floor fan (2) bedrooms, living rm & kitchen on 2nd floor. | $22,000 |
| Jul 28, 2016 | Completed final sign-off Sep 2017 | 225 Banks St | 2nd floor - relocate bathroom, new kitchen cabinets, relocate range & sink. provide exhaust fan for range. new plumbing & electrical for kitchen & bathrooms. 1st floor - add 1/2 bath & laundry, move closet walls in bedrooms. legalize (e) full bath and bedroom @ 1st floorsDetails
2nd floor - relocate bathroom, new kitchen cabinets, relocate range & sink. provide exhaust fan for range. new plumbing & electrical for kitchen & bathrooms. 1st floor - add 1/2 bath & laundry, move closet walls in bedrooms. legalize (e) full bath and bedroom @ 1st floors | $20,000 |
| Oct 27, 2015 | Completed final sign-off Nov 2016 | 29 Bradford St | interior renovation with no change to extg bldg footprint. create new habitable sq ft on ground level, reducing size of garage. new foundation upgrades and other structural upgrades for removal of walls upstairs. relocate kitchen and bath upstairs and provide nw bath downstairs.Details
interior renovation with no change to extg bldg footprint. create new habitable sq ft on ground level, reducing size of garage. new foundation upgrades and other structural upgrades for removal of walls upstairs. relocate kitchen and bath upstairs and provide nw bath downstairs. | $150,000 |
| May 18, 2015 | Completed final sign-off Aug 2015 | 655 Corbett Av | unit # 206:demo kitchen cabnts, countertops & assoc items. demo 2(e) bath: tile, vanities, tub. install kitchen cabinets, extend elec circuits for countertops and fridg, connect sink & garbage disposal & dw to (e) plumb. provide & install new floor & wall tile, toilet in (e) location. vanities in ..Details
unit # 206:demo kitchen cabnts, countertops & assoc items. demo 2(e) bath: tile, vanities, tub. install kitchen cabinets, extend elec circuits for countertops and fridg, connect sink & garbage disposal & dw to (e) plumb. provide & install new floor & wall tile, toilet in (e) location. vanities in .. | $35,000 |
| Dec 12, 2014 | Never finaled issued Jul 2016, no final | 1076 Rhode Island St | addition of upper fl above (e) 2 levels (40'x25'), lower level addition of (40'x25')rear addition of 10'for(e)+(n)bldg and 12'x15' bump out in rear bldg. const kitchen for each unit along w/ 6 bathrms and living space.Details
addition of upper fl above (e) 2 levels (40'x25'), lower level addition of (40'x25')rear addition of 10'for(e)+(n)bldg and 12'x15' bump out in rear bldg. const kitchen for each unit along w/ 6 bathrms and living space. | $200,000 |
| Jul 9, 2014 | Completed final sign-off Nov 2014 | 1765 09th Av | demolish (e) cabinets, countertop, sink, reuse (e) dishwasher, oven, cooktop & refrigerator. demolish non structural wall between kitchen & dining room, install (n) cabinets in same location and (n) base cabinets where (e) wall was, install (n) outlet, reuse (e) circuit, new shut off valves for h/cDetails
demolish (e) cabinets, countertop, sink, reuse (e) dishwasher, oven, cooktop & refrigerator. demolish non structural wall between kitchen & dining room, install (n) cabinets in same location and (n) base cabinets where (e) wall was, install (n) outlet, reuse (e) circuit, new shut off valves for h/c | $8,000 |
| May 14, 2014 | Completed final sign-off Dec 2014 | 458 Anderson St | front bldg: renovation to kitchen, alterations to interior walls, new siding in select locations, replace windows and entry doors, repair to decks, replace in kind entry stair and guardrailDetails
front bldg: renovation to kitchen, alterations to interior walls, new siding in select locations, replace windows and entry doors, repair to decks, replace in kind entry stair and guardrail | $87,000 |
| May 14, 2014 | Completed final sign-off May 2015 | 458 Anderson St | remove interior walls and eplace front door to unit, new siding, 1 wall portionDetails
remove interior walls and eplace front door to unit, new siding, 1 wall portion | $3,000 |
| Dec 19, 2013 | Completed final sign-off Nov 2014 | 556 Chenery St | remodel kitchen & 2 bathrooms. demolish & replace (e) cabinets, flooring & windows & door in like kind. provide elec circuit for garbage disposal @ kitchen. demolish (e) toilet, vanity, shower/tub tile & shower valve & install (n) toilet, shower tile, floor tile, shower valve & vanity in like kind.Details
remodel kitchen & 2 bathrooms. demolish & replace (e) cabinets, flooring & windows & door in like kind. provide elec circuit for garbage disposal @ kitchen. demolish (e) toilet, vanity, shower/tub tile & shower valve & install (n) toilet, shower tile, floor tile, shower valve & vanity in like kind. | $30,000 |