Sheldon Eaton
- Listed as
- architect, authorized agent-others
- Firm
- Vicinity Architects
- Based in
- San Francisco
- On San Francisco permits
- Aug 2022 to Sep 2026
23 permits since 2000 (architect on 21 permits, authorized agent-others on 2 permits): 12 completed, 9 in progress, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 25, 2026 | In progress filed Sep 2026, not yet issued | 247 El Camino Del Mar | proposed encroachment of (n)pillars, gate and fence into sidewalk planter to clear (e) mature cypress tree along front property line (n) pillar lighting and intercom. sidewalk encroachment permit 25mse-00352.Details
proposed encroachment of (n)pillars, gate and fence into sidewalk planter to clear (e) mature cypress tree along front property line (n) pillar lighting and intercom. sidewalk encroachment permit 25mse-00352. | $10,000 | |
| May 1, 2026 | Completed final sign-off Jul 2026 | 2491 47th Av | Nathan Cole Construction | main level kitchen wall removal w/ patched finishes.Details
main level kitchen wall removal w/ patched finishes. | $20,000 |
| Apr 6, 2026 | Completed final sign-off Apr 2026 | 284 Noe St | Dba Golden Gate Termite, Diodati Inc | revision 202602035073- removal of scope of work to include remove sink and cabinets and remain storage area.Details
revision 202602035073- removal of scope of work to include remove sink and cabinets and remain storage area. | |
| Mar 25, 2026 | In progress filed Mar 2026, not yet issued | 163 Rae Av | recognition of (e) upper 3rd lvl adu unit #165 in an (e) 3-story sfd. main unit #163 on lower 2 lvls includes ground lvl kitchenette and proposed partitioned front bedroom with front window replacement.Details
recognition of (e) upper 3rd lvl adu unit #165 in an (e) 3-story sfd. main unit #163 on lower 2 lvls includes ground lvl kitchenette and proposed partitioned front bedroom with front window replacement. | $18,000 | |
| Feb 25, 2026 | In progress filed Feb 2026, not yet issued | 206 Bridgeview Dr | replace unpermitted exterior entry lightwell roofinfill and recognize existing unpermitted lower level adu 206a. new closet enclosure of existing interior stair, new fire-rated floor, ceiling, and wall separations, and new adu entry through garage. new exterior stair from upper unit 206 to rear yardDetails
replace unpermitted exterior entry lightwell roofinfill and recognize existing unpermitted lower level adu 206a. new closet enclosure of existing interior stair, new fire-rated floor, ceiling, and wall separations, and new adu entry through garage. new exterior stair from upper unit 206 to rear yard | $21,000 | |
| Feb 3, 2026 | Completed final sign-off Apr 2026 | 284 Noe St | Dba Golden Gate Termite, Diodati Inc | unit 284: ground level bookstore ti to replace previous pet store in (e) 2 story mixed use bldg with upper residential unit 280, not included. new back of house area, sinks, appliances and finishes. new front bookshelves, seating, and lighting. existing restroom, office, storage and mech to remainDetails
unit 284: ground level bookstore ti to replace previous pet store in (e) 2 story mixed use bldg with upper residential unit 280, not included. new back of house area, sinks, appliances and finishes. new front bookshelves, seating, and lighting. existing restroom, office, storage and mech to remain | $32,000 |
| Dec 22, 2025 | In progress issued Mar 2026 | 2254 Fulton St | We Do Construction Inc. | upper unit 2254: kitchen and bath remodel of an existing 4-story duplex, including shifted walls, openings, and fixtures, and new pantryDetails
upper unit 2254: kitchen and bath remodel of an existing 4-story duplex, including shifted walls, openings, and fixtures, and new pantry | $40,000 |
| Nov 25, 2025 | In progress filed Nov 2025, not yet issued | 1234 Palou Av | 2-story addition with new g/f accessory dwelling unit & upper main level bed & bath add.raise (e) dwelling over 2ft to create new habitbale g/f ceiling ht. reconfig front entry & stair support a new upper balcony w/ adu street front access below.Details
2-story addition with new g/f accessory dwelling unit & upper main level bed & bath add.raise (e) dwelling over 2ft to create new habitbale g/f ceiling ht. reconfig front entry & stair support a new upper balcony w/ adu street front access below. | $460,000 | |
| Aug 8, 2025 | Completed final sign-off May 2026 | 2771 37th Av | Alum Rock Construction | 2-story single family home interior remodel including a lower level bedroom, remodel with closet and bathroom addition. a separated bonus room includes enlarged openings to a remodeled rear deck. upper interior improvements include a bathroom remodel , half bathroom addition and kitchen remodelDetails
2-story single family home interior remodel including a lower level bedroom, remodel with closet and bathroom addition. a separated bonus room includes enlarged openings to a remodeled rear deck. upper interior improvements include a bathroom remodel , half bathroom addition and kitchen remodel | $95,000 |
| Jul 11, 2025 | In progress filed Jul 2025, not yet issued | 663 02nd Av | rear deck remodel and extension with lower (e) hot tub landing. new rear garage man door to replace existing window. no work to building front or interior.Details
rear deck remodel and extension with lower (e) hot tub landing. new rear garage man door to replace existing window. no work to building front or interior. | $26,500 | |
| May 21, 2025 | In progress issued May 2026 | 683 San Jose Av | Marquez Builders | proposed ground level adu (unit 2) interior addition & upper (unit 1) kitchen remodel. new foundation & lowered concrete floor slab. removed chimney for kitchen expansion. new ground level rear openings & lower yard. project seeks state adu program.Details
proposed ground level adu (unit 2) interior addition & upper (unit 1) kitchen remodel. new foundation & lowered concrete floor slab. removed chimney for kitchen expansion. new ground level rear openings & lower yard. project seeks state adu program. | $310,000 |
| Apr 4, 2025 | Completed final sign-off Aug 2025 | 324 27th St | Alchemy Builders Inc | lower unit 324 kitchen remodel & wall removal. bath remodel & new exhaust fan. no work garage basement or upper unit 322Details
lower unit 324 kitchen remodel & wall removal. bath remodel & new exhaust fan. no work garage basement or upper unit 322 | $22,000 |
| Mar 18, 2025 | In progress issued Jul 2025 | 206 Andover St | Urbnbuild Inc | remodel (e) sfh.foundation replacement & ground floor main bedroom, bath, & closet remodel, reclaiming (e) garage space. (n) interior stair locatin & kitchen remodel. (n) millwork and interior finishes and fixtures throuhgout (n) fiber cement siding, (n) windows and doors, reduce rear deck sizeDetails
remodel (e) sfh.foundation replacement & ground floor main bedroom, bath, & closet remodel, reclaiming (e) garage space. (n) interior stair locatin & kitchen remodel. (n) millwork and interior finishes and fixtures throuhgout (n) fiber cement siding, (n) windows and doors, reduce rear deck size | $1,000,000 |
| Nov 26, 2024 | Completed final sign-off Aug 2025 | 1776 Sacramento St | Alum Rock Construction | unit 704- proposed interor remodel of the top floor corner condo in an (e) 7 story mixed use buliding. (n) millwork, light fixtures, and w&d. extended main closet and remodeled bathrooms. (n) buffet sink and (n) window treatmentDetails
unit 704- proposed interor remodel of the top floor corner condo in an (e) 7 story mixed use buliding. (n) millwork, light fixtures, and w&d. extended main closet and remodeled bathrooms. (n) buffet sink and (n) window treatment | $70,000 |
| Oct 7, 2024 | Completed final sign-off Mar 2025 | 5000 03rd St | Big Blue Construction | ti of (e) single story building with upper storage space remodel includes (2) new accessible restrooms and a new front desk.Details
ti of (e) single story building with upper storage space remodel includes (2) new accessible restrooms and a new front desk. | $48,000 |
| Jul 3, 2024 | In progress issued May 2026 | 225 Lee Av | to comply with nov 202424637 rear solarium addition. minor revisions include infilling a fire rated property line wall. adding ventilation & new awning. recent wall heaters and outlets adjusted accordingly.project also seeks to reclassify the existing rear office as a bedroom and the existing rearDetails
to comply with nov 202424637 rear solarium addition. minor revisions include infilling a fire rated property line wall. adding ventilation & new awning. recent wall heaters and outlets adjusted accordingly.project also seeks to reclassify the existing rear office as a bedroom and the existing rear | $27,000 | |
| Feb 8, 2024 | Completed final sign-off May 2024 | 358 Missouri St | Marquez Builders | ti to upper level unit to include addition of partition wall in living room to add w&d hookups and (n) addition of half bathroom at 3rd level. remodel (e) full bathroom with new finishes and fixtures and remodel kitchen in kind with new fixtures and finishes. new paint throughout unit, as needDetails
ti to upper level unit to include addition of partition wall in living room to add w&d hookups and (n) addition of half bathroom at 3rd level. remodel (e) full bathroom with new finishes and fixtures and remodel kitchen in kind with new fixtures and finishes. new paint throughout unit, as need | $75,000 |
| Nov 21, 2023 | Completed final sign-off Feb 2024 | 1921 Grant Av | Nathan Cole Construction | proposed enlarge opening to an existing wall demising a kitchen & dining room in the upper unit of a 2-story over garage duplex. no work to bldg exterior or lower unit.Details
proposed enlarge opening to an existing wall demising a kitchen & dining room in the upper unit of a 2-story over garage duplex. no work to bldg exterior or lower unit. | $9,000 |
| Sep 22, 2023 | Never finaled filed Sep 2023, never issued | 3434 Balboa St | to comply with abe program ord 51-16. abe 201911128028 front door swing adjustment to provide push and pull side clearance for abe programDetails
to comply with abe program ord 51-16. abe 201911128028 front door swing adjustment to provide push and pull side clearance for abe program | $1,000 | |
| Jun 20, 2023 | Expired or cancelled cancelled Jan 2026 | 562 Monterey Bl | North Star Plumbing & Development Inc | t.i. of (e) vacant commercial space to facial studio, install new plumbing/electricalDetails
t.i. of (e) vacant commercial space to facial studio, install new plumbing/electrical | $50,000 |
| Jun 1, 2023 | Completed final sign-off Mar 2024 | 25 Joice St | Handyman Heroes Inc. | new interior partition to demise an (e) bedroom to create a (n) office in (e) 1000sf g/f unit of a 3story multi-family residential building. new room entry doors replace (e) & (n) partition inclues switches to (n) receptables. no work to building exterior.Details
new interior partition to demise an (e) bedroom to create a (n) office in (e) 1000sf g/f unit of a 3story multi-family residential building. new room entry doors replace (e) & (n) partition inclues switches to (n) receptables. no work to building exterior. | $9,999 |
| Jan 20, 2023 | Completed final sign-off Jul 2023 | 1125 20th St | S O G Construction | proposed east facade windows to the upper unit of an (e)(2) unit over garage multi-family residential building on corner lot. east wall & windows are adjacent to an existing public right of way.Details
proposed east facade windows to the upper unit of an (e)(2) unit over garage multi-family residential building on corner lot. east wall & windows are adjacent to an existing public right of way. | $40,000 |
| Aug 15, 2022 | Completed final sign-off Jan 2025 | 779 18th Av | Marquez Builders | 2-story addition, attached to (e) 3-story single-family residence. new study & library connected to (e) ground level laundry room & 2nd level kitchen. new bathroom, sleeping area, & provisions for a future kitchen on ground level, connected to above with new interior stair & elevator.Details
2-story addition, attached to (e) 3-story single-family residence. new study & library connected to (e) ground level laundry room & 2nd level kitchen. new bathroom, sleeping area, & provisions for a future kitchen on ground level, connected to above with new interior stair & elevator. | $500,000 |