Marquez Builders
- Based in
- San Francisco
- On San Francisco permits
- Aug 2022 to Aug 2026
- Last 24 months
- 10 permits filed
28 permits since 2000: 19 completed, 9 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 6, 2026 | In progress issued Aug 2026 | 683 San Jose Av | revision to 2025-0418-4740 to change concrete pouring plan on neighbors side to do one section to 5'6" max width at time.Details
revision to 2025-0418-4740 to change concrete pouring plan on neighbors side to do one section to 5'6" max width at time. | $12,000 |
| Mar 17, 2026 | In progress filed Mar 2026, not yet issued | 1234 Palou Av | new deck.Details
new deck. | $5,000 |
| Mar 2, 2026 | In progress issued Mar 2026 | 831 27th St | revision 202508072549 to include raise (e) window opening (vertically ) located on balacony facing front. add awning to hang over rear patio doors and waterproofing. relocate and infill (e) bedroom windows from south side and create (n) opening for windows on east side of propertyDetails
revision 202508072549 to include raise (e) window opening (vertically ) located on balacony facing front. add awning to hang over rear patio doors and waterproofing. relocate and infill (e) bedroom windows from south side and create (n) opening for windows on east side of property | $4,200 |
| Dec 1, 2025 | In progress issued May 2026 | 460 Fair Oaks St | expand unit on level 1 (#462a) to add a bathroom and relocate bedrooms. interior remodel/reconfigure level 2 (#460) & level 3 (#462). add new 297 sqft roof deck.Details
expand unit on level 1 (#462a) to add a bathroom and relocate bedrooms. interior remodel/reconfigure level 2 (#460) & level 3 (#462). add new 297 sqft roof deck. | $429,000 |
| Nov 26, 2025 | In progress issued Dec 2025 | 831 27th St | revision to pa # 202508072549: add peaked skylight & flat skylight over stairs. revise retaining walls at the ground fl per structuralDetails
revision to pa # 202508072549: add peaked skylight & flat skylight over stairs. revise retaining walls at the ground fl per structural | $14,500 |
| Nov 19, 2025 | Completed final sign-off Jan 2026 | 22 Jersey St | to obtain final inspection for work approved under pa#202407237122. all work is completeDetails
to obtain final inspection for work approved under pa#202407237122. all work is complete | |
| Aug 7, 2025 | In progress issued Aug 2025 | 831 27th St | reconfigure the ground floor layout to add a (n) bedroom & closets. excavate 23 cu.yrd to add a (n) storage/laundry room. remove (e) skylights, remodel kitchen in place. increase 238 sf habitable area.Details
reconfigure the ground floor layout to add a (n) bedroom & closets. excavate 23 cu.yrd to add a (n) storage/laundry room. remove (e) skylights, remodel kitchen in place. increase 238 sf habitable area. | $65,000 |
| Jun 5, 2025 | Completed final sign-off Aug 2025 | 156 Putnam St | revision to pa 202502049643 cut concrete stem wall for two door openingDetails
revision to pa 202502049643 cut concrete stem wall for two door opening | $1,000 |
| May 21, 2025 | In progress issued May 2026 | 683 San Jose Av | proposed ground level adu (unit 2) interior addition & upper (unit 1) kitchen remodel. new foundation & lowered concrete floor slab. removed chimney for kitchen expansion. new ground level rear openings & lower yard. project seeks state adu program.Details
proposed ground level adu (unit 2) interior addition & upper (unit 1) kitchen remodel. new foundation & lowered concrete floor slab. removed chimney for kitchen expansion. new ground level rear openings & lower yard. project seeks state adu program. | $310,000 |
| Apr 25, 2025 | In progress issued Aug 2025 | 831 27th St | 2nd/fl- primary suite reconfigure bath and closet spaces, add rear facing window in bath. second bathroom replace tub with shower, replace fixtures and finishes. relocate skylight to be min 5 ft from property line. no work visible from street.Details
2nd/fl- primary suite reconfigure bath and closet spaces, add rear facing window in bath. second bathroom replace tub with shower, replace fixtures and finishes. relocate skylight to be min 5 ft from property line. no work visible from street. | $27,000 |
| Aug 22, 2024 | Completed final sign-off Jan 2025 | 515 Noriega St | removed asbestos siding at backyard. install new siding and five windows all at the rear facade. painting front and back of the house.Details
removed asbestos siding at backyard. install new siding and five windows all at the rear facade. painting front and back of the house. | $18,000 |
| Jul 23, 2024 | In progress issued Sep 2024 | 22 Jersey St | install new elevator inside a new 1-hour rated elevator shaft enclosureDetails
install new elevator inside a new 1-hour rated elevator shaft enclosure | $31,500 |
| Jul 15, 2024 | Completed final sign-off Sep 2024 | 2829 Greenwich St | remove non-structural partition walls at bedroom patch drywall and update lighting as needed. bedroom to remain.Details
remove non-structural partition walls at bedroom patch drywall and update lighting as needed. bedroom to remain. | $1,200 |
| Jun 21, 2024 | Completed final sign-off Jan 2025 | 569 Hill St | rev to pa# 2023-1219-2779 to change the 6x6 posts as previously specified to 4x4 posts as okayed by the structural engineer. voluntary strengthening of roof framing.Details
rev to pa# 2023-1219-2779 to change the 6x6 posts as previously specified to 4x4 posts as okayed by the structural engineer. voluntary strengthening of roof framing. | |
| Apr 5, 2024 | Completed final sign-off Dec 2024 | 569 Hill St | replace (11) windows in kind wood clad windows w glazing u-factor of 0.36 max & shgc of .19 max (10) street facing windowsDetails
replace (11) windows in kind wood clad windows w glazing u-factor of 0.36 max & shgc of .19 max (10) street facing windows | $2,000 |
| Feb 8, 2024 | Completed final sign-off May 2024 | 358 Missouri St | ti to upper level unit to include addition of partition wall in living room to add w&d hookups and (n) addition of half bathroom at 3rd level. remodel (e) full bathroom with new finishes and fixtures and remodel kitchen in kind with new fixtures and finishes. new paint throughout unit, as needDetails
ti to upper level unit to include addition of partition wall in living room to add w&d hookups and (n) addition of half bathroom at 3rd level. remodel (e) full bathroom with new finishes and fixtures and remodel kitchen in kind with new fixtures and finishes. new paint throughout unit, as need | $75,000 |
| Dec 19, 2023 | Completed final sign-off Jan 2025 | 569 Hill St | level 1: no work. level 2: new wall, infill extg wall at family room, remove interior partitions and reconfigure kitchen. level 3: new laudry, reconfigure bedrooms and bath 2. new primary bath. roof: new skylight.Details
level 1: no work. level 2: new wall, infill extg wall at family room, remove interior partitions and reconfigure kitchen. level 3: new laudry, reconfigure bedrooms and bath 2. new primary bath. roof: new skylight. | $125,000 |
| Nov 29, 2023 | Completed final sign-off Jan 2025 | 779 18th Av | revision to pa #202208150561. retaining wall size change structural detail 7s301, reduce ceiling joist from 2x8 to 2x6 first floor to second floorDetails
revision to pa #202208150561. retaining wall size change structural detail 7s301, reduce ceiling joist from 2x8 to 2x6 first floor to second floor | $7,000 |
| Oct 20, 2023 | Completed final sign-off Jan 2024 | 2288 Filbert St | remodel (e)bathroom to upgrade plumbing fixtures, electrical fixtures, (n)drywall for gypsum replacement only, (n)door to replace (e)door at same location of bathroom and paint. replace (e)window in-kind at bathroom not visible from street. no new wall and no (e)wall relocation. light cec 150.0(k)5.Details
remodel (e)bathroom to upgrade plumbing fixtures, electrical fixtures, (n)drywall for gypsum replacement only, (n)door to replace (e)door at same location of bathroom and paint. replace (e)window in-kind at bathroom not visible from street. no new wall and no (e)wall relocation. light cec 150.0(k)5. | $15,000 |
| Sep 20, 2023 | Completed final sign-off Nov 2023 | 520 Chestnut St | #101: install kitchen cabinets counter tops, patch drywall 1 ft through out living area, match paint and new drywall.repair due to water damageDetails
#101: install kitchen cabinets counter tops, patch drywall 1 ft through out living area, match paint and new drywall.repair due to water damage | $15,000 |
| Sep 8, 2023 | Completed final sign-off Dec 2023 | 663 02nd Av | add 2 new footings 15" x 24", 2 new shearwalls on top of new footing, convert 3 e wall into shearwallsDetails
add 2 new footings 15" x 24", 2 new shearwalls on top of new footing, convert 3 e wall into shearwalls | $15,000 |
| Jul 14, 2023 | Completed final sign-off Nov 2024 | 3801 Balboa St | repair water damage to teacher's lounge bathroom: bath fixtures and finishes. repair wood decay due to water damage(non structural). all current electrical: gfi, led lighting, etc.Details
repair water damage to teacher's lounge bathroom: bath fixtures and finishes. repair wood decay due to water damage(non structural). all current electrical: gfi, led lighting, etc. | $5,000 |
| Apr 19, 2023 | Completed final sign-off May 2023 | 142 Yale St | revision to permit# 202304115442: remove siding from back of the house, install stucco. reinstall (2) windows and (2) sliding doors. repair in kind.Details
revision to permit# 202304115442: remove siding from back of the house, install stucco. reinstall (2) windows and (2) sliding doors. repair in kind. | $8,000 |
| Apr 11, 2023 | Completed final sign-off Oct 2023 | 1234 Palou Av | backyard work: clean, remove concrete paths, new concrete paths.Details
backyard work: clean, remove concrete paths, new concrete paths. | $4,000 |
| Apr 11, 2023 | Completed final sign-off May 2023 | 142 Yale St | replace back of the house siding, replacing it in same.Details
replace back of the house siding, replacing it in same. | $8,000 |
| Mar 20, 2023 | Completed final sign-off Sep 2023 | 20 Linda St | replace (6) windows at the front of the building, repair some stucco around windows, paint front of unit. wood windows to be replaced in kind with wood hung (keeping same proportions) and having og lugsDetails
replace (6) windows at the front of the building, repair some stucco around windows, paint front of unit. wood windows to be replaced in kind with wood hung (keeping same proportions) and having og lugs | $10,000 |
| Mar 20, 2023 | Completed final sign-off Sep 2023 | 22 Linda St | paint the front of the unit, repair stucco, repair roof above windows (unit#20)Details
paint the front of the unit, repair stucco, repair roof above windows (unit#20) | $3,000 |
| Aug 15, 2022 | Completed final sign-off Jan 2025 | 779 18th Av | 2-story addition, attached to (e) 3-story single-family residence. new study & library connected to (e) ground level laundry room & 2nd level kitchen. new bathroom, sleeping area, & provisions for a future kitchen on ground level, connected to above with new interior stair & elevator.Details
2-story addition, attached to (e) 3-story single-family residence. new study & library connected to (e) ground level laundry room & 2nd level kitchen. new bathroom, sleeping area, & provisions for a future kitchen on ground level, connected to above with new interior stair & elevator. | $500,000 |