Alum Rock Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2023 to Oct 2026
- Last 24 months
- 3 permits filed
5 permits since 2000: 4 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 5, 2026 | In progress issued Oct 2026 | 92 Henry St | to obtain final inspection for work approved under pa#: 202304044990, 202403077364, and 202508213671Details
to obtain final inspection for work approved under pa#: 202304044990, 202403077364, and 202508213671 | |
| Aug 8, 2025 | Completed final sign-off May 2026 | 2771 37th Av | 2-story single family home interior remodel including a lower level bedroom, remodel with closet and bathroom addition. a separated bonus room includes enlarged openings to a remodeled rear deck. upper interior improvements include a bathroom remodel , half bathroom addition and kitchen remodelDetails
2-story single family home interior remodel including a lower level bedroom, remodel with closet and bathroom addition. a separated bonus room includes enlarged openings to a remodeled rear deck. upper interior improvements include a bathroom remodel , half bathroom addition and kitchen remodel | $95,000 |
| Nov 26, 2024 | Completed final sign-off Aug 2025 | 1776 Sacramento St | unit 704- proposed interor remodel of the top floor corner condo in an (e) 7 story mixed use buliding. (n) millwork, light fixtures, and w&d. extended main closet and remodeled bathrooms. (n) buffet sink and (n) window treatmentDetails
unit 704- proposed interor remodel of the top floor corner condo in an (e) 7 story mixed use buliding. (n) millwork, light fixtures, and w&d. extended main closet and remodeled bathrooms. (n) buffet sink and (n) window treatment | $70,000 |
| Jul 23, 2024 | Completed final sign-off Dec 2024 | 1936 Great Hy | remove and demo old cabinets and countertops. replace sinks and stove and outlets. hood replacement, floor/tile replacement. drywall repairs as needed. all work at one kitchen on 2nd floor.Details
remove and demo old cabinets and countertops. replace sinks and stove and outlets. hood replacement, floor/tile replacement. drywall repairs as needed. all work at one kitchen on 2nd floor. | $40,000 |
| Aug 14, 2023 | Completed final sign-off Jan 2024 | 739 Shrader St | bathroom remodel, replace tile, shower, vanity, and toiletDetails
bathroom remodel, replace tile, shower, vanity, and toilet | $6,500 |