Seosamh O'briain
- Listed as
- contractor, engineer, subcontractor
- Firm
- Ace Drilling & Excavation
- Based in
- San Francisco
- On San Francisco permits
- Feb 2006 to Aug 2026
241 permits since 2000 (contractor on 235 permits, subcontractor on 5 permits, engineer on 2 permits): 152 completed, 8 in progress, 45 never finaled, 36 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 241.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 12, 2026 | In progress issued Aug 2026 | 167 20th Av | Ace Drilling & Excavation | revision to pa #202410082505. changing " t" retaining wall to "l"Details
revision to pa #202410082505. changing " t" retaining wall to "l" | |
| Apr 15, 2026 | In progress issued Apr 2026 | 2766 Green St | Ace Drilling & Excavation | install underpinning at locations shown on sh 2.0 to allow excavation for new development at 2770 green st. does not affect public right of way.Details
install underpinning at locations shown on sh 2.0 to allow excavation for new development at 2770 green st. does not affect public right of way. | $50,000 |
| May 2, 2025 | In progress issued Nov 2025 | 452 Fair Oaks St | Abbeyside Construction Inc, Ace Drilling & Excavation | scope of work includes expanding unit 452 from 2nd fl to the 1st floor & reconfiguring it with 2 beds & two & 1/2 baths,kitchen,dining,library,& living areas,unit 454 reconfigured with 2 beds,3 baths,kitchen & dining room with roof deck & yard access stair,one story rear horizontal addition.Details
scope of work includes expanding unit 452 from 2nd fl to the 1st floor & reconfiguring it with 2 beds & two & 1/2 baths,kitchen,dining,library,& living areas,unit 454 reconfigured with 2 beds,3 baths,kitchen & dining room with roof deck & yard access stair,one story rear horizontal addition. | $300,000 |
| Apr 17, 2025 | In progress issued Dec 2025 | 3500 21st St | Bryce C B Construction Inc | 1/fl- excavation and conversion of non habitiable space to conditioned habitable space. addition of (n) bedroom, laundry room, and office. minor remodel to (e) kitchen and living room at 2/fl. remodel (e) primary closet and (e) office on 3/fl. install (n) skylight in modified roof framing.Details
1/fl- excavation and conversion of non habitiable space to conditioned habitable space. addition of (n) bedroom, laundry room, and office. minor remodel to (e) kitchen and living room at 2/fl. remodel (e) primary closet and (e) office on 3/fl. install (n) skylight in modified roof framing. | $257,293 |
| Jan 14, 2025 | In progress issued Jan 2025 | 9 Joy St | Ace Drilling & Excavation | to obtain final inspection for work approved under permit application #202008101491 & 202305127707. all work is complete.Details
to obtain final inspection for work approved under permit application #202008101491 & 202305127707. all work is complete. | $100,000 |
| Oct 21, 2024 | Expired or cancelled cancelled Feb 2026 | 42 Homestead St | Ace Drilling & Excavation | install temporary shoring, consisting of cantilever soldier beams, along the property line of the rear yard of the subject property to allow excavation of construction of new patio as part of the residential remodel.Details
install temporary shoring, consisting of cantilever soldier beams, along the property line of the rear yard of the subject property to allow excavation of construction of new patio as part of the residential remodel. | $58,000 |
| Sep 11, 2024 | Completed final sign-off Sep 2026 | 372 Laidley St | Spiers & Sons Inc | foundation replacement at (e) basement. excavate for 8ft ceilihg ht. new rear patio and stairs. revision to pa 202306260858- field changes to drilled piers and relocate gas meter.Details
foundation replacement at (e) basement. excavate for 8ft ceilihg ht. new rear patio and stairs. revision to pa 202306260858- field changes to drilled piers and relocate gas meter. | $150,000 |
| Apr 26, 2024 | In progress filed Apr 2024, not yet issued | 4545 20th St | Mc Grath Construction, Ace Drilling & Excavation | revision to pa 201711214504: altering number and size of soldier piles. altering reinforcing steel in permanent concrete structure.Details
revision to pa 201711214504: altering number and size of soldier piles. altering reinforcing steel in permanent concrete structure. | |
| Jul 14, 2023 | In progress issued Apr 2024 | 6 Caine Av | Tipco Construction Inc | erect a 2 story, 2 dwelling bldg with 1 basement, type vbDetails
erect a 2 story, 2 dwelling bldg with 1 basement, type vb | $900,000 |
| May 12, 2023 | Never finaled issued May 2023, no final | 9 Joy St | Ace Drilling & Excavation | ref pa# 202012301913. replace glass railing at roof deck with metal railings (42" high + 4" o.c. balusters)Details
ref pa# 202012301913. replace glass railing at roof deck with metal railings (42" high + 4" o.c. balusters) | |
| May 12, 2023 | Completed final sign-off Aug 2024 | 15 Joy St | Ace Drilling & Excavation | ref pa# 202012301906. replace glass railing at roof deck with metal railings (42" high + 4" o.c. balusters)Details
ref pa# 202012301906. replace glass railing at roof deck with metal railings (42" high + 4" o.c. balusters) | |
| May 12, 2023 | Completed final sign-off Aug 2024 | 21 Joy St | Ace Drilling & Excavation | ref pa# 202101062180. replace glass railing at roof deck with metal railings (42" high + 4" o.c. balusters)Details
ref pa# 202101062180. replace glass railing at roof deck with metal railings (42" high + 4" o.c. balusters) | |
| Feb 1, 2023 | Never finaled issued Apr 2023, no final | 470 Avenue H | Ace Drilling & Excavation | asbestos removal from interior walls, floors, and ceilingDetails
asbestos removal from interior walls, floors, and ceiling | $20,000 |
| Dec 15, 2022 | Completed final sign-off Jan 2023 | 400 Franconia St | Ace Drilling & Excavation | emergency demo in response to emergency order #111049-e.Details
emergency demo in response to emergency order #111049-e. | $15,000 |
| Jul 5, 2022 | Never finaled issued Jun 2023, no final | 154 Liberty St | R & D Construction Co Inc, Ace Drilling & Excavation | interior remodel of an extg 2 story over basement duplex. remodel interior and expand lower 1 bedroom unit at first floor to basement level. remodel upper 2nd fl unit. no exterior changesDetails
interior remodel of an extg 2 story over basement duplex. remodel interior and expand lower 1 bedroom unit at first floor to basement level. remodel upper 2nd fl unit. no exterior changes | $200,000 |
| Jun 10, 2022 | Never finaled issued Jun 2022, no final | 154 Liberty St | Ace Drilling & Excavation | replace all brick foundation and slab on grade.Details
replace all brick foundation and slab on grade. | $150,000 |
| Apr 26, 2022 | Completed final sign-off Sep 2023 | 470 Avenue H | Ace Drilling & Excavation | treasure island. building# 99. to demolish 1 story commercial building.Details
treasure island. building# 99. to demolish 1 story commercial building. | $100,000 |
| Nov 23, 2021 | Expired or cancelled expired May 2026 | 4135 California St | Seamus Collins Construction, Inc., Ace Drilling & Excavation | provide temporary shoring to accommodate foundation installation using solder beams with tiebacks. reference pa#201612275923 s1.Details
provide temporary shoring to accommodate foundation installation using solder beams with tiebacks. reference pa#201612275923 s1. | $200,000 |
| Oct 4, 2021 | Never finaled issued Jun 2022, no final | 620 Avenue I | Ace Drilling & Excavation | demolition of building 261bDetails
demolition of building 261b | $20,000 |
| Oct 4, 2021 | Never finaled issued Jun 2022, no final | 620 Avenue I | Ace Drilling & Excavation | demolition of building 261aDetails
demolition of building 261a | $20,000 |
| Oct 4, 2021 | Never finaled issued Jun 2022, no final | 680 Avenue I | Ace Drilling & Excavation | demolition of building 261aDetails
demolition of building 261a | $20,000 |
| Sep 22, 2021 | Never finaled issued Sep 2021, no final | 129 Forest Side Av | Ace Drilling & Excavation | commencement of work not started under previously approved permit 201504305030Details
commencement of work not started under previously approved permit 201504305030 | $10,000 |
| Jun 28, 2021 | Expired or cancelled cancelled Jan 2026 | 68 Cayuga Av | Ace Drilling & Excavation | siding repair/ replacement to wood and windows rreplacement in-kind from vinyl to wood clad for all 4 sides of building.Details
siding repair/ replacement to wood and windows rreplacement in-kind from vinyl to wood clad for all 4 sides of building. | $40,000 |
| Apr 1, 2021 | Completed final sign-off Sep 2021 | 3270 18th St | Ace Drilling & Excavation | demolition of a type 5 2 story churchDetails
demolition of a type 5 2 story church | $92,000 |
| Jan 20, 2021 | Completed final sign-off Sep 2026 | 2011 Filbert St | demo existing 1 story type iii-a garage structure.Details
demo existing 1 story type iii-a garage structure. | $3,000 | |
| Jan 20, 2021 | Completed final sign-off Sep 2026 | 2011 Filbert St | Ace Drilling & Excavation | to erect 4 stories, no basement, type v-b, 2-unit residenceDetails
to erect 4 stories, no basement, type v-b, 2-unit residence | $1,675,000 |
| Nov 19, 2020 | Completed final sign-off Aug 2024 | 15 Joy St | Cullinane Plastering, Ace Drilling & Excavation | convert entire lowest floor of existing new (unbuilt) single family house to add a 1 bedroom aduDetails
convert entire lowest floor of existing new (unbuilt) single family house to add a 1 bedroom adu | $10,000 |
| Nov 19, 2020 | Never finaled issued Apr 2022, no final | 9 Joy St | Cullinane Plastering, Ace Drilling & Excavation | convert entire lowest floor of existing new (unbuilt) single family house to add a 1 bedroom aduDetails
convert entire lowest floor of existing new (unbuilt) single family house to add a 1 bedroom adu | $10,000 |
| Nov 19, 2020 | Completed final sign-off Jul 2024 | 21 Joy St | Cullinane Plastering, Ace Drilling & Excavation | convert entire lowest floor of existing new (unbuilt) single family house to add a 1 bedroom aduDetails
convert entire lowest floor of existing new (unbuilt) single family house to add a 1 bedroom adu | $10,000 |
| Nov 17, 2020 | Completed final sign-off May 2026 | 485 Day St | Obc Inc | horizontal expansion to rear vertical expansion, add (1) fl. remodel interior including kitchen, general layout. add (3) bedroom & (2) bathrooms @ the (n) 3rd fl. add an adu behind the (e) garage @ 1st fl. (n) windows & cement plaster @ front. (n) roof deck above 3rd flDetails
horizontal expansion to rear vertical expansion, add (1) fl. remodel interior including kitchen, general layout. add (3) bedroom & (2) bathrooms @ the (n) 3rd fl. add an adu behind the (e) garage @ 1st fl. (n) windows & cement plaster @ front. (n) roof deck above 3rd fl | $700,000 |
| Nov 5, 2020 | Never finaled issued May 2021, no final | 3452 Sacramento St | Ace Drilling & Excavation | rear building. to demolish 1 story, detach garage. ** maher: n/a **Details
rear building. to demolish 1 story, detach garage. ** maher: n/a ** | $6,500 |
| Sep 15, 2020 | Completed final sign-off Sep 2023 | 324 Cumberland St | Ace Drilling & Excavation, Forma Construction | temporary earth shoring system to accomodate foundation construction at 328 cumberland street. shoring consists of underpinning piers.Details
temporary earth shoring system to accomodate foundation construction at 328 cumberland street. shoring consists of underpinning piers. | $62,000 |
| Sep 1, 2020 | Completed final sign-off Sep 2023 | 328 Cumberland St | Ace Drilling & Excavation, Forma Construction | temporary earth shoring system to accomodate foundation construction. shoring consists of soldier beams, pressure treated lagging, and internal braces.Details
temporary earth shoring system to accomodate foundation construction. shoring consists of soldier beams, pressure treated lagging, and internal braces. | $73,000 |
| Aug 10, 2020 | Completed final sign-off Aug 2024 | 21 Joy St | Ace Drilling & Excavation | install temporary shoring for new development under pa 201506229594.Details
install temporary shoring for new development under pa 201506229594. | $100,000 |
| Aug 10, 2020 | Never finaled issued Aug 2020, no final | 9 Joy St | Ace Drilling & Excavation | install temporary shoring for new development under pa 201506229589Details
install temporary shoring for new development under pa 201506229589 | $100,000 |
| Jun 10, 2020 | Expired or cancelled expired Apr 2026 | 1715 Wawona St | Ace Drilling & Excavation | add a new deck @southwest side of property. add one master bedroom & bathroom, one family room and full bathroom on basement level. new staircase to connect basement to garage. convert (e) office into (n)guest room @ garage levelDetails
add a new deck @southwest side of property. add one master bedroom & bathroom, one family room and full bathroom on basement level. new staircase to connect basement to garage. convert (e) office into (n)guest room @ garage level | $350,000 |
| Mar 3, 2020 | Never finaled issued Mar 2020, no final | 2512 Quint St | Ace Drilling & Excavation | remodel kitchen & bathroom in-kindDetails
remodel kitchen & bathroom in-kind | $15,000 |
| Jan 14, 2020 | Never finaled issued Jan 2020, no final | 68 Cayuga Av | Ace Drilling & Excavation | repair partial exterior siding, 300sq ft. repair partial area of roof, 200sq ft. for bath - material in-kind.Details
repair partial exterior siding, 300sq ft. repair partial area of roof, 200sq ft. for bath - material in-kind. | $5,000 |
| Dec 17, 2019 | Completed final sign-off Jun 2020 | 320 11th St | Ace Drilling & Excavation | revision to pa#2019-0705-5183 for revise foundation detailDetails
revision to pa#2019-0705-5183 for revise foundation detail | $5,000 |
| Nov 27, 2019 | Never finaled issued Sep 2022, no final | 1610 Jerrold Av | Ace Drilling & Excavation | demolish a 1 story, no basement commercial buildingDetails
demolish a 1 story, no basement commercial building | $37,500 |
| Nov 26, 2019 | Completed final sign-off May 2021 | 559 Alvarado St | Ace Drilling & Excavation | relocate lower unit to gr fl(2 bedroom, kitchen, living rm, 1 full bath, laundry).2nd unit: 2nd fl, 3 bdrms, 2 full bath, laundry, infill lightwell 3rd fl: kitchen, living rm, office, powder rm,infill lightwell. 4th fl: dormers, workout room, storage, full bath. decks at rear, skylightsDetails
relocate lower unit to gr fl(2 bedroom, kitchen, living rm, 1 full bath, laundry).2nd unit: 2nd fl, 3 bdrms, 2 full bath, laundry, infill lightwell 3rd fl: kitchen, living rm, office, powder rm,infill lightwell. 4th fl: dormers, workout room, storage, full bath. decks at rear, skylights | $600,000 |
| Nov 13, 2019 | Never finaled issued Nov 2019, no final | 235 Capitol Av | Ace Drilling & Excavation | to obtain final inspection for work approved under pa 2012-0425-9123. all work is completeDetails
to obtain final inspection for work approved under pa 2012-0425-9123. all work is complete | |
| Oct 31, 2019 | Completed final sign-off Aug 2021 | 248 Colon Av | Cooke And Mccann Inc, Ace Drilling & Excavation | remodel 1st fl. add 2 bedrooms, den, 1 full bath & media room, relocate existing stair to connect 1st fl to 2nd fl. lower (e) rear yard to create (n) hardscape. windows to be alum wood clad.Details
remodel 1st fl. add 2 bedrooms, den, 1 full bath & media room, relocate existing stair to connect 1st fl to 2nd fl. lower (e) rear yard to create (n) hardscape. windows to be alum wood clad. | $250,000 |
| Oct 21, 2019 | Completed final sign-off Feb 2021 | 602 Mississippi St | A-1 Construction | excavate down to new patio & basement level from extg back yard & basement level sequentially using hand dug pits as per the demolition & sequencing plan. form new patio & basement level walls & foundation which are to extend up to extg basement level walls. ref app#201907236623Details
excavate down to new patio & basement level from extg back yard & basement level sequentially using hand dug pits as per the demolition & sequencing plan. form new patio & basement level walls & foundation which are to extend up to extg basement level walls. ref app#201907236623 | $50,000 |
| Oct 16, 2019 | Never finaled filed Oct 2019, never issued | 2512 Quint St | Cullinane Plastering, Ace Drilling & Excavation | adding (2) adu at ground floor. includes (2) studio units per ord #162-16 **maher n/a**Details
adding (2) adu at ground floor. includes (2) studio units per ord #162-16 **maher n/a** | $75,000 |
| Oct 11, 2019 | Completed final sign-off Jul 2020 | 2578 Mission St | Ace Drilling & Excavation | to obtain a final inspection for work approved under jpa#201502057622 & 201502208939. all work is complete.Details
to obtain a final inspection for work approved under jpa#201502057622 & 201502208939. all work is complete. | |
| Oct 10, 2019 | Completed final sign-off Jul 2020 | 1520 Leavenworth St | John O'donovan, Ace Drilling & Excavation | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $50,000 |
| Aug 6, 2019 | In progress issued Feb 2024 | 472 Greenwich St | Curran & Associates General Contractors, Ace Drilling & Excavation | vertical & horizontal addition of (e) 2-unit bldg. add 1-car garage. interior remodel. mep under separate permit. deferred submittals: whole house fire sprinklers/fire alarm under separate permit per sfbc 2015. provide nfpa-13r for (n) space & rated egres per fs-05.Details
vertical & horizontal addition of (e) 2-unit bldg. add 1-car garage. interior remodel. mep under separate permit. deferred submittals: whole house fire sprinklers/fire alarm under separate permit per sfbc 2015. provide nfpa-13r for (n) space & rated egres per fs-05. | $750,000 |
| Jul 26, 2019 | Completed final sign-off Oct 2022 | 361 Turk St | Ace Drilling & Excavation | temporary shoring, excavation and grading to prepare site for future construction under pa 201804136335Details
temporary shoring, excavation and grading to prepare site for future construction under pa 201804136335 | $300,000 |
| Jul 5, 2019 | Completed final sign-off Jun 2020 | 320 11th St | Ace Drilling & Excavation | provide underpinning on eastside of buildingDetails
provide underpinning on eastside of building | $10,000 |
| Jul 1, 2019 | Completed final sign-off Jun 2020 | 340 11th St | Ace Drilling & Excavation | provide shoring to north & south property to prepare for new building under pa #201504224291.Details
provide shoring to north & south property to prepare for new building under pa #201504224291. | $50,000 |
| Jul 1, 2019 | Completed final sign-off Jun 2020 | 354 11th St | Ace Drilling & Excavation | provide underpinning for existing footing.Details
provide underpinning for existing footing. | $10,000 |
| Jun 19, 2019 | Completed final sign-off Apr 2021 | 260 Castenada Av | Ace Drilling & Excavation | emergency demolition: emergency order #110471-e. demolish 1-story private garageDetails
emergency demolition: emergency order #110471-e. demolish 1-story private garage | $10,000 |
| Jun 7, 2019 | Completed final sign-off May 2022 | 955 Wisconsin St | Ace Drilling & Excavation | voluntary soft story retrofit per ab-094. potential permit for aduDetails
voluntary soft story retrofit per ab-094. potential permit for adu | $80,000 |
| May 1, 2019 | Completed final sign-off Sep 2020 | 4307 20th St | Narrowback Construction Co., Ace Drilling & Excavation | new rear yard retaining wall, concrete stairs @ grade and guardrailDetails
new rear yard retaining wall, concrete stairs @ grade and guardrail | $22,600 |
| Apr 2, 2019 | Completed final sign-off Jun 2025 | 1347 27th Av | Ace Drilling & Excavation | demolish a single family dwelling, no basement type vbDetails
demolish a single family dwelling, no basement type vb | $10,000 |
| Mar 12, 2019 | Completed final sign-off Jul 2020 | 2578 Mission St | Ace Drilling & Excavation | to renew two permits; 201608124935 & 201607142408. to finish remaining 20% of work to be completedDetails
to renew two permits; 201608124935 & 201607142408. to finish remaining 20% of work to be completed | $14,000 |
| Jan 11, 2019 | Never finaled issued Jan 2019, no final | 448 University St | Ace Drilling & Excavation | per emergency demo order# 110009-e; to demolish 1 story shorage shed.Details
per emergency demo order# 110009-e; to demolish 1 story shorage shed. | $7,000 |
| Jan 11, 2019 | Completed final sign-off Feb 2019 | 454 University St | Ace Drilling & Excavation | emergency order# 109993-e. to demolish 1 story storage shed.Details
emergency order# 109993-e. to demolish 1 story storage shed. | $10,000 |
| Oct 18, 2018 | Completed final sign-off Nov 2019 | 115 Rutledge St | A L V Construction Inc, Ace Drilling & Excavation | 1) at 1st floor: horizontal addition beneath extg habitable space. 2) new bathroom at 1st floor. 3)new deck at rear yard. 4)eliminate swing door at garage/hallway. 5)relocae washer/dryer to garage. 6)new windows & exterior doors.Details
1) at 1st floor: horizontal addition beneath extg habitable space. 2) new bathroom at 1st floor. 3)new deck at rear yard. 4)eliminate swing door at garage/hallway. 5)relocae washer/dryer to garage. 6)new windows & exterior doors. | $35,000 |
| Oct 16, 2018 | Completed final sign-off Dec 2020 | 3224 22nd St | Ace Drilling & Excavation | renewal of permit 201606069153- response to nov# 201620383, replace existing brick foundation along section of north and east property line, new underpinning hand dug pits at north property line. to be performed in alternating sections.Details
renewal of permit 201606069153- response to nov# 201620383, replace existing brick foundation along section of north and east property line, new underpinning hand dug pits at north property line. to be performed in alternating sections. | $50,000 |
| Jul 31, 2018 | Completed final sign-off Mar 2023 | 125 Lundy's Ln | Oarcon Inc, Ace Drilling & Excavation | revision to pa# 2017-1004-0417 to show as built condition. replace perimeter foundation. correct second floor ceiling joists.Details
revision to pa# 2017-1004-0417 to show as built condition. replace perimeter foundation. correct second floor ceiling joists. | |
| Jul 30, 2018 | Expired or cancelled cancelled Jul 2026 | 349 03rd Av | Ace Drilling & Excavation | to erect 4 stories, no basement, type v-a, 4 units multi family dwelling.Details
to erect 4 stories, no basement, type v-a, 4 units multi family dwelling. | $900,000 |
| Jul 30, 2018 | Expired or cancelled cancelled Jul 2026 | 349 03rd Av | Ace Drilling & Excavation | demolish 3-story single family residenceDetails
demolish 3-story single family residence | $10,000 |
| Jul 20, 2018 | Completed final sign-off Jan 2020 | 2514 23rd Av | Kirk G Construction, Ace Drilling & Excavation | provide installation sequence plan with permeation grout to accomodate foundation excavation.Details
provide installation sequence plan with permeation grout to accomodate foundation excavation. | $10,000 |
| Jul 6, 2018 | Completed final sign-off Apr 2025 | 501 Stanyan St | Ace Drilling & Excavation | emergency demolition to clubhouse at golden gate course. order #109617-e. to demolish one story type vn constructin club house building.Details
emergency demolition to clubhouse at golden gate course. order #109617-e. to demolish one story type vn constructin club house building. | $5,000 |
| Jun 29, 2018 | Completed final sign-off Nov 2020 | 198 Cresta Vista Dr | Custom Construction Enterprises, Ace Drilling & Excavation, O Donoghue Construction Inc. | voluntary ground floor seismic upgrade per sfebc chapter 4d:2016 cebc appendix a-4 basement shear of 100% of value required by current bldg code.Details
voluntary ground floor seismic upgrade per sfebc chapter 4d:2016 cebc appendix a-4 basement shear of 100% of value required by current bldg code. | $80,000 |
| May 21, 2018 | Completed final sign-off Oct 2018 | 800 Castro St | Concannon Construction Inc, Ace Drilling & Excavation | replacement of existing rear retaining wall.Details
replacement of existing rear retaining wall. | $12,000 |
| May 14, 2018 | Never finaled issued Jul 2018, no final | 1726 Mission St | Ace Drilling & Excavation | to demolish 2 stories, warehouse building. ** maher: n/a **Details
to demolish 2 stories, warehouse building. ** maher: n/a ** | $25,000 |
| May 14, 2018 | Never finaled issued Jul 2018, no final | 1730 Mission St | Ace Drilling & Excavation | to demolish 2 stories, warehouse building. ** maher: n/a **Details
to demolish 2 stories, warehouse building. ** maher: n/a ** | $25,000 |
| May 7, 2018 | Never finaled issued May 2018, no final | 381 Corbett Av | Ace Drilling & Excavation | revision to pa 2016-0315-2089 new soils report provided. foundation design upgraded to pier and grade beam system. no other changesDetails
revision to pa 2016-0315-2089 new soils report provided. foundation design upgraded to pier and grade beam system. no other changes | $25,000 |
| Apr 23, 2018 | Completed final sign-off May 2018 | 1455 Irving St | Ace Drilling & Excavation | demolish 1 story, type 3, service station. emergency order #109243-e, approv by d.lowrey/deputy director, e.sweeney/deputy director, t.hui/director. maher n/a.Details
demolish 1 story, type 3, service station. emergency order #109243-e, approv by d.lowrey/deputy director, e.sweeney/deputy director, t.hui/director. maher n/a. | $20,000 |
| Apr 2, 2018 | Completed final sign-off Aug 2020 | 1225 Douglass St | Obc Inc, Ace Drilling & Excavation | foundation strengtheningDetails
foundation strengthening | $80,000 |
| Mar 23, 2018 | Completed final sign-off Apr 2021 | 3701 Noriega St | Ace Drilling & Excavation | demolish 1-story canopy for gas station. (ref pa #2018-0223-2134 for gas station) ** maher: n/a **Details
demolish 1-story canopy for gas station. (ref pa #2018-0223-2134 for gas station) ** maher: n/a ** | $10,000 |
| Mar 22, 2018 | Completed final sign-off Mar 2019 | 1453 Hyde St | Lordan Construction, Ace Drilling & Excavation | foundation replacement, voluntary structural upgrade of basement floorDetails
foundation replacement, voluntary structural upgrade of basement floor | $100,000 |
| Mar 20, 2018 | Never finaled issued Mar 2018, no final | 381 Corbett Av | Ace Drilling & Excavation | exploratory demolition work only: work at exterior wood stairs and wood deck to happen in future. remove selected windows for dry rot exploration. investigae soil conditions.Details
exploratory demolition work only: work at exterior wood stairs and wood deck to happen in future. remove selected windows for dry rot exploration. investigae soil conditions. | $3,000 |
| Mar 2, 2018 | Completed final sign-off Jan 2019 | 540 De Haro St | Ace Drilling & Excavation | install temporary shoring along property to allow excavation for work under permit appllication #2015-0210-7867. n/a for maher.Details
install temporary shoring along property to allow excavation for work under permit appllication #2015-0210-7867. n/a for maher. | $350,000 |
| Mar 2, 2018 | Completed final sign-off Feb 2019 | 38 West Clay St | Brian Mac Namara Construction, Ace Drilling & Excavation | expansion of (e) basement -444 sq ft to add new bathroo, laundry & family room, scope include remodel of kitchen & powder room, and bath on 2nbd flrDetails
expansion of (e) basement -444 sq ft to add new bathroo, laundry & family room, scope include remodel of kitchen & powder room, and bath on 2nbd flr | $800,000 |
| Feb 26, 2018 | Completed final sign-off Mar 2018 | 111 Williams Av | Ace Drilling & Excavation | to obtain final inspection for work approved under pa # 201512306135. all work is complete. n/a maherDetails
to obtain final inspection for work approved under pa # 201512306135. all work is complete. n/a maher | |
| Feb 23, 2018 | Completed final sign-off May 2023 | 4363 26th St | Gama Construction Inc, Ace Drilling & Excavation | vertical & horizontal additions to include: basement- entry, elevator, wine rm, garage. 1st flr - (4) bdrms, (3) baths, laundry. 2nd fl - living, dining, kitchen, 1/2 bath, decks. 3rd fl - family rm, office bath & deck.Details
vertical & horizontal additions to include: basement- entry, elevator, wine rm, garage. 1st flr - (4) bdrms, (3) baths, laundry. 2nd fl - living, dining, kitchen, 1/2 bath, decks. 3rd fl - family rm, office bath & deck. | $650,000 |
| Feb 23, 2018 | Completed final sign-off Apr 2021 | 3701 Noriega St | Ace Drilling & Excavation | demolish 1-story gas station. (ref pa #2018-0323-4152 for canopy) ** maher: n/a **Details
demolish 1-story gas station. (ref pa #2018-0323-4152 for canopy) ** maher: n/a ** | $50,000 |
| Feb 22, 2018 | Expired or cancelled expired Dec 2021 | 823 Fell St | Sf Contractor, Ace Drilling & Excavation | ground floor expansion of (e) garage & storage areas.Details
ground floor expansion of (e) garage & storage areas. | $50,000 |
| Jan 24, 2018 | Completed final sign-off Dec 2021 | 4230 18th St | Ace Drilling & Excavation | demolish 3-story restaurantDetails
demolish 3-story restaurant | $14,066 |
| Dec 4, 2017 | Completed final sign-off Mar 2018 | 967 Filbert St | Ace Drilling & Excavation, Bailey General Contracting Co Inc | revised scope of work pa 2017-0623-0181 excavate install soldier pile retaining wall. drill & install piers in front of existing retaining walls. ace drilling & excavation osha # 889820. comply w/ nov#201627882Details
revised scope of work pa 2017-0623-0181 excavate install soldier pile retaining wall. drill & install piers in front of existing retaining walls. ace drilling & excavation osha # 889820. comply w/ nov#201627882 | $20,000 |
| Oct 4, 2017 | Completed final sign-off Mar 2023 | 125 Lundy's Ln | Oarcon Inc, Ace Drilling & Excavation | expand (e) garage. convert (e) storage space to occupiable space. floor plan revision on 2nd fl. remove covered area of front porch. new metal railing.Details
expand (e) garage. convert (e) storage space to occupiable space. floor plan revision on 2nd fl. remove covered area of front porch. new metal railing. | $100,000 |
| Sep 1, 2017 | Completed final sign-off Apr 2019 | 901 Tennessee St | Achill Beg Construction Inc, Ace Drilling & Excavation | install soldier piles and frbe board shoring system with temporary railing at sidewalk to accommodate excavation for new basement to 10'-6" max dept at bottom of excavation. excavate and remove approx 3000 cy yds soil. provide temp de watering system if req. maherDetails
install soldier piles and frbe board shoring system with temporary railing at sidewalk to accommodate excavation for new basement to 10'-6" max dept at bottom of excavation. excavate and remove approx 3000 cy yds soil. provide temp de watering system if req. maher | $65,000 |
| Aug 30, 2017 | Completed final sign-off Jun 2020 | 3620 Cesar Chavez St | Ace Drilling & Excavation | demolition of 1-story office building.Details
demolition of 1-story office building. | $60,000 |
| Aug 22, 2017 | Expired or cancelled expired Sep 2018 | 313 Castro St | Kanler Inc, Ace Drilling & Excavation | revision to pa 2017-0501-5342 and 2017-0126-7992 - add laundry rm. on 2/f, add (2) (n) bathrooms in 3rd fl. add a retaining wall at the front of 1st fl.Details
revision to pa 2017-0501-5342 and 2017-0126-7992 - add laundry rm. on 2/f, add (2) (n) bathrooms in 3rd fl. add a retaining wall at the front of 1st fl. | $15,000 |
| Jun 27, 2017 | Completed final sign-off Aug 2018 | 37 Blake St | Ace Drilling & Excavation | provide temporary shoring consisting of soldier beams, lagging, walers and internal braces to accommodate foundation excavation.Details
provide temporary shoring consisting of soldier beams, lagging, walers and internal braces to accommodate foundation excavation. | $38,000 |
| Jun 23, 2017 | Completed final sign-off Mar 2018 | 967 Filbert St | Ace Drilling & Excavation, Bailey General Contracting Co Inc | revised scope of work for pa #201605268457 - excavate & install soldier pile retaining wall instead of concrete retaining wall. ace drilling and excavation. osha #884820. to comply w/complaint #201627882.Details
revised scope of work for pa #201605268457 - excavate & install soldier pile retaining wall instead of concrete retaining wall. ace drilling and excavation. osha #884820. to comply w/complaint #201627882. | $20,000 |
| Jun 9, 2017 | Completed final sign-off Jul 2017 | 2476 Diamond St | Ace Drilling & Excavation | demolish 2-story, type 5, single family dwelling building.Details
demolish 2-story, type 5, single family dwelling building. | $28,000 |
| Jun 8, 2017 | Completed final sign-off Feb 2020 | 340 11th St | Ace Drilling & Excavation | demolition of a 2-story commercial building with no basements. n/a for maher ordinance.Details
demolition of a 2-story commercial building with no basements. n/a for maher ordinance. | $100,000 |
| May 9, 2017 | Completed final sign-off Apr 2021 | 319 Kensington Wy | Ace Drilling & Excavation | excavate basement & 1st floor with bldg envelope, add office & 1/2 bath to basement. create deck at rear of 2nd floor, relocate two bedrooms to 1st floor. remodel ktichen & bathrooms, new stair. no change to bldg envelope or front facade.Details
excavate basement & 1st floor with bldg envelope, add office & 1/2 bath to basement. create deck at rear of 2nd floor, relocate two bedrooms to 1st floor. remodel ktichen & bathrooms, new stair. no change to bldg envelope or front facade. | $100,000 |
| Feb 28, 2017 | Completed final sign-off Jul 2018 | 319 Kensington Wy | Ace Drilling & Excavation | rebuild retaining wall in basement garage interior work only.Details
rebuild retaining wall in basement garage interior work only. | $50,000 |
| Feb 10, 2017 | Completed final sign-off Aug 2020 | 45 Alma St | Il Nido Designs Llc, Ace Drilling & Excavation | reference exprired permit#200709284086-s. horizontal and vertical addition to single family home with interior remodel lower garage floor. replace 8 wood windows at front in kind and restore wood siding to facade.Details
reference exprired permit#200709284086-s. horizontal and vertical addition to single family home with interior remodel lower garage floor. replace 8 wood windows at front in kind and restore wood siding to facade. | $600,000 |
| Jan 3, 2017 | Completed final sign-off Feb 2020 | 714 Rhode Island St | Ace Drilling & Excavation | demolish 2 story type 5 single family dwellingDetails
demolish 2 story type 5 single family dwelling | $65,000 |
| Jan 3, 2017 | Completed final sign-off Oct 2022 | 714 Rhode Island St | Ace Drilling & Excavation | erect a four-story above-grade, one-story below-grade, type 5-a two family dwellings (r-3). sprinklers to nfpa-13r on deferred submittal.Details
erect a four-story above-grade, one-story below-grade, type 5-a two family dwellings (r-3). sprinklers to nfpa-13r on deferred submittal. | $1,500,000 |
| Dec 14, 2016 | Completed final sign-off Feb 2018 | 1126 Dolores St | Ace Drilling & Excavation | temporary shoring and sequencing excavation for app#201507101139.Details
temporary shoring and sequencing excavation for app#201507101139. | $20,000 |
| Nov 21, 2016 | Never finaled issued Nov 2016, no final | 2535 Laguna St | Ace Drilling & Excavation | voulntary stabilization of the retaining wall of 2120 pacific ave through the back yard of sfd at 2535 laguna st. stabilization work consists of soil nails to the face of the wall maher naDetails
voulntary stabilization of the retaining wall of 2120 pacific ave through the back yard of sfd at 2535 laguna st. stabilization work consists of soil nails to the face of the wall maher na | $10,500 |
| Nov 21, 2016 | Never finaled issued Nov 2016, no final | 2120 Pacific Av | Ace Drilling & Excavation | voulntary stabilization of the retaining wall of 2120 pacific ave through the back yard of 2535 laguna st stabilization work consists of soil, nails added to the face of the wall. n/a for maher.Details
voulntary stabilization of the retaining wall of 2120 pacific ave through the back yard of 2535 laguna st stabilization work consists of soil, nails added to the face of the wall. n/a for maher. | $10,500 |