Sf Contractor
- Based in
- San Francisco
- On San Francisco permits
- Jun 2000 to Mar 2022
- Last 24 months
- 0 permits filed
108 permits since 2000: 71 completed, 20 never finaled, 17 expired or cancelled.
Of the 20 never-finaled permits, 5 are 5 to 10 years old, 15 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 108.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 24, 2022 | Completed final sign-off Jun 2022 | 1177 California St | unit #1608: install new kitchen cabinets / countertops in (e) layout. elec to include new compliant lighting switches / receptacles to code. repair (e) flooring. new appliances & fixtures. no structural.Details
unit #1608: install new kitchen cabinets / countertops in (e) layout. elec to include new compliant lighting switches / receptacles to code. repair (e) flooring. new appliances & fixtures. no structural. | $33,000 |
| Dec 30, 2021 | Completed final sign-off Dec 2021 | 823 Fell St | permit to final 2017-0914-8139. to obtain final inspection for work approved under pa#201709148139. all work is complete.Details
permit to final 2017-0914-8139. to obtain final inspection for work approved under pa#201709148139. all work is complete. | |
| Dec 28, 2021 | Completed final sign-off Dec 2021 | 823 Fell St | permit for final 2017-0914-8139 & 2018-0222-1999Details
permit for final 2017-0914-8139 & 2018-0222-1999 | |
| Aug 14, 2019 | Completed final sign-off Nov 2019 | 1177 California St | kitchen & bath remodel including cabinets, countertops, tile & trim. update plumbing & electrical to code. install lvp flooring over sound proofing. no structural work. kitchen 8x10. bath 5x9.Details
kitchen & bath remodel including cabinets, countertops, tile & trim. update plumbing & electrical to code. install lvp flooring over sound proofing. no structural work. kitchen 8x10. bath 5x9. | $44,000 |
| Mar 25, 2019 | Completed final sign-off Aug 2019 | 1177 California St | kitchen remodel, new cabinets, countertops, trim, and finishes. new sink, appliances, led lighting fixtures. no change in layout. no structural work.Details
kitchen remodel, new cabinets, countertops, trim, and finishes. new sink, appliances, led lighting fixtures. no change in layout. no structural work. | $22,500 |
| Nov 5, 2018 | Never finaled issued Nov 2018, no final | 1177 California St | work in unit 1819: convert existing tub with shower head to shower enclosure. new isolation valves on supply lines, new bath fixtures and trim. install low flow toilets to replace existing (2) no structural work and no wall layout changes. building was built prior to year 1991.Details
work in unit 1819: convert existing tub with shower head to shower enclosure. new isolation valves on supply lines, new bath fixtures and trim. install low flow toilets to replace existing (2) no structural work and no wall layout changes. building was built prior to year 1991. | $18,000 |
| Oct 10, 2018 | Completed final sign-off Aug 2019 | 1177 California St | remodel (2) bath rooms, fixtures & finishes, convert (2) tubs to shower enclosures, add washer dryer in existing closet, update plumbing & electrical to code. no structural workDetails
remodel (2) bath rooms, fixtures & finishes, convert (2) tubs to shower enclosures, add washer dryer in existing closet, update plumbing & electrical to code. no structural work | $60,000 |
| Sep 19, 2018 | Completed final sign-off Nov 2018 | 1177 California St | to obtain final inspection for work approved under pa#200211151566. all work is completeDetails
to obtain final inspection for work approved under pa#200211151566. all work is complete | |
| Aug 22, 2018 | Completed final sign-off Aug 2018 | 1080 Chestnut St | permit to final expired pa #201201182481Details
permit to final expired pa #201201182481 | |
| Apr 9, 2018 | Completed final sign-off Aug 2019 | 1177 California St | kitchen/bath remodel including cabinets, counter tops, tile, trim & finishes. update plumbing & electrical to code, no change in layout, no structural work.Details
kitchen/bath remodel including cabinets, counter tops, tile, trim & finishes. update plumbing & electrical to code, no change in layout, no structural work. | $44,000 |
| Feb 22, 2018 | Expired or cancelled expired Dec 2021 | 823 Fell St | ground floor expansion of (e) garage & storage areas.Details
ground floor expansion of (e) garage & storage areas. | $50,000 |
| Nov 22, 2017 | Never finaled issued Nov 2017, no final | 1177 California St | condo remodel to include new tub, 1 tub replaced with shower pan, add washer dryer, 3 bath vanities, reface kitchen cabinets, new countertops, fixtures, trim finishes, no structural workDetails
condo remodel to include new tub, 1 tub replaced with shower pan, add washer dryer, 3 bath vanities, reface kitchen cabinets, new countertops, fixtures, trim finishes, no structural work | $48,500 |
| Oct 19, 2017 | Completed final sign-off Jun 2021 | 1177 California St | unit 630: remodel to include water isolation valves, bath/kitchen cabinets, countertops, fixtures, appliances, replace but with shower pan, update plubming/electrical, install led lighting, new floor finishes, no structural work.Details
unit 630: remodel to include water isolation valves, bath/kitchen cabinets, countertops, fixtures, appliances, replace but with shower pan, update plubming/electrical, install led lighting, new floor finishes, no structural work. | $43,000 |
| Oct 18, 2017 | Never finaled issued Oct 2017, no final | 1177 California St | revision to previously issued pa #201706270483. new lighting fixtures, washer/dryer, connections to building mechanical systems. new int. doors, new finishes. no structural.Details
revision to previously issued pa #201706270483. new lighting fixtures, washer/dryer, connections to building mechanical systems. new int. doors, new finishes. no structural. | |
| Sep 14, 2017 | Expired or cancelled expired Dec 2021 | 823 Fell St | compliance with mandatory seismic retrofit program per 2016 iebc appendix a4.Details
compliance with mandatory seismic retrofit program per 2016 iebc appendix a4. | $40,000 |
| Jun 27, 2017 | Completed final sign-off Jul 2022 | 1177 California St | kitchen & bath remodel, cabinets, counter tops, tile, trim, update plumbing & electrical to code. no change in layout, no structural work.Details
kitchen & bath remodel, cabinets, counter tops, tile, trim, update plumbing & electrical to code. no change in layout, no structural work. | $44,000 |
| Jun 27, 2017 | Never finaled issued Jun 2017, no final | 1177 California St | kitchen & bath remodel, cabinets, counter tops, tile, trim, update plumbing & electrical to code. no change in layout, no structural work.Details
kitchen & bath remodel, cabinets, counter tops, tile, trim, update plumbing & electrical to code. no change in layout, no structural work. | $46,000 |
| Jun 23, 2017 | Expired or cancelled cancelled Jan 2026 | 1177 California St | kitchen and bath remodel, replace bath tub with shower pan. new cabinets, countertops, appliances, trim & tile. new flooring and paint. update plumbing and electrical to code. no structural. no change in layout.Details
kitchen and bath remodel, replace bath tub with shower pan. new cabinets, countertops, appliances, trim & tile. new flooring and paint. update plumbing and electrical to code. no structural. no change in layout. | $50,000 |
| May 8, 2017 | Never finaled issued May 2017, no final | 1177 California St | remodel kitchen & bathroom. update plumbing & electrical to code. no structural work. new floor finishes.Details
remodel kitchen & bathroom. update plumbing & electrical to code. no structural work. new floor finishes. | $48,000 |
| May 8, 2017 | Completed final sign-off Jul 2022 | 1177 California St | remodel kitchen & bathroom. update plumbing & electrical to code. no structural work. new floor finishes.Details
remodel kitchen & bathroom. update plumbing & electrical to code. no structural work. new floor finishes. | $50,000 |
| May 8, 2017 | Completed final sign-off Jun 2017 | 61 Carver St | partial bathroom remodel. no structural work new tub & tile. new fixtures & trim. add gfic where required.Details
partial bathroom remodel. no structural work new tub & tile. new fixtures & trim. add gfic where required. | $6,000 |
| Jan 4, 2017 | Completed final sign-off Jun 2017 | 1177 California St | unit # 501 -condo kitchen remodel: includes isolatjion valves, new cabinets, counter tops, appliances, and fixtures. no structural work, upgrade electrical/ plumbing to code.Details
unit # 501 -condo kitchen remodel: includes isolatjion valves, new cabinets, counter tops, appliances, and fixtures. no structural work, upgrade electrical/ plumbing to code. | $45,000 |
| Jan 4, 2017 | Completed final sign-off Jun 2017 | 1177 California St | condo remodel to include bath/kitchen cabinets, countertops, appliances, and fixtures. update plumbing and elctrical to code, install led lighting. install water isolation valves. no structural work.Details
condo remodel to include bath/kitchen cabinets, countertops, appliances, and fixtures. update plumbing and elctrical to code, install led lighting. install water isolation valves. no structural work. | $65,000 |
| Jan 4, 2017 | Completed final sign-off Jun 2017 | 1177 California St | apt 1704: condo remodel - new kitchen, counter tops/sink, replace doors/drawfront on existing cabinets, upgrade lighting, fixtures, trim, add cabinet,upgrade cook top/fridge. no structural work, new engineered floor in main room & bedroom.Details
apt 1704: condo remodel - new kitchen, counter tops/sink, replace doors/drawfront on existing cabinets, upgrade lighting, fixtures, trim, add cabinet,upgrade cook top/fridge. no structural work, new engineered floor in main room & bedroom. | $48,000 |
| Oct 3, 2016 | Completed final sign-off Jun 2017 | 1177 California St | replace kitchen cabinets & bath vanity in same layout. new coutertops, sinks/faucets/tub/shower trim/appliances/fixtures, electric upgrade to code, new led fixtures,gfic & arc fault.no structural work, new engineered floor,new tile in kitchen/bath/dressing room.paint & finishes, water isolation valvDetails
replace kitchen cabinets & bath vanity in same layout. new coutertops, sinks/faucets/tub/shower trim/appliances/fixtures, electric upgrade to code, new led fixtures,gfic & arc fault.no structural work, new engineered floor,new tile in kitchen/bath/dressing room.paint & finishes, water isolation valv | $49,000 |
| Oct 3, 2016 | Never finaled issued Oct 2016, no final | 1470 29th Av | bathroom remodel, new kitchen cabinets in same layout, new water main/furnace/main electric panel, replace shower pan & retile. new countertops, fixtures, appliances, add led lighting in kitchen & bath. update plumbing & electrical in work areas to code, repair & paint, refinish floors.Details
bathroom remodel, new kitchen cabinets in same layout, new water main/furnace/main electric panel, replace shower pan & retile. new countertops, fixtures, appliances, add led lighting in kitchen & bath. update plumbing & electrical in work areas to code, repair & paint, refinish floors. | $58,000 |
| Jul 11, 2016 | Completed final sign-off Oct 2016 | 1177 California St | new kitchen appliances in same layout, new kitchen flrng tile over sound proofing. convert tub bath to shower. new tile shower enclosure and tile floor over sound proofing in bath area. new shower valve. reduce hallway closet fixtures with elfa unit. no structural work. electric to code,Details
new kitchen appliances in same layout, new kitchen flrng tile over sound proofing. convert tub bath to shower. new tile shower enclosure and tile floor over sound proofing in bath area. new shower valve. reduce hallway closet fixtures with elfa unit. no structural work. electric to code, | $12,000 |
| May 26, 2016 | Completed final sign-off Oct 2016 | 1177 California St | install water isolation valves in kitchen & bath areas - replace kitchen & bath cabinets, appliances, countertops, sink, faucets; electrical to code, new compliant lighting; replace tub w/shower enclosure; new bath fixtures, tile; engineered wood flooring over sound pad, install quiet rock on commonDetails
install water isolation valves in kitchen & bath areas - replace kitchen & bath cabinets, appliances, countertops, sink, faucets; electrical to code, new compliant lighting; replace tub w/shower enclosure; new bath fixtures, tile; engineered wood flooring over sound pad, install quiet rock on common | $65,000 |
| Feb 12, 2016 | Never finaled issued Feb 2016, no final | 1177 California St | unite #423: replace bathtub/waste and bath enclosure tile, new floor tile at toilet area, new vanity sink, new kitchen/bath faucets, shower head. new engineered flooring in remainder of unit, replace some appliances, electrical to code, new led lighting, paint, new closet and doors. no structural.Details
unite #423: replace bathtub/waste and bath enclosure tile, new floor tile at toilet area, new vanity sink, new kitchen/bath faucets, shower head. new engineered flooring in remainder of unit, replace some appliances, electrical to code, new led lighting, paint, new closet and doors. no structural. | $28,000 |
| Jun 29, 2015 | Completed final sign-off Feb 2016 | 300 03rd St | unit 822 - replace kitchen & bath cabinets, no structural work. to comply with cec150.0(k)3 & 5Details
unit 822 - replace kitchen & bath cabinets, no structural work. to comply with cec150.0(k)3 & 5 | $26,000 |
| Jun 29, 2015 | Completed final sign-off Feb 2016 | 1177 California St | unit 204 - replace balth vanity, install isolation valves on water supply lines. convert tub bath to shower. new fixtures anf finishes. no structural work. to comply with cec150.0(k)5Details
unit 204 - replace balth vanity, install isolation valves on water supply lines. convert tub bath to shower. new fixtures anf finishes. no structural work. to comply with cec150.0(k)5 | $9,000 |
| Jun 29, 2015 | Never finaled issued Jun 2015, no final | 1177 California St | unit 823 - replace kitchen & balth cabinets, countertop, fixtures, apploances, and floor finisehs. comply with cec150.0(k)5Details
unit 823 - replace kitchen & balth cabinets, countertop, fixtures, apploances, and floor finisehs. comply with cec150.0(k)5 | $28,000 |
| Jun 29, 2015 | Completed final sign-off Feb 2016 | 601 Van Ness Av | unit 947 - replace kitchen & bath cabinets; no structural work. comply with cec150.0(k)3 & 5Details
unit 947 - replace kitchen & bath cabinets; no structural work. comply with cec150.0(k)3 & 5 | $42,000 |
| May 26, 2015 | Completed final sign-off Feb 2017 | 1177 California St | remodel existing 884 sq ft 2 story condo. replace flooring, remodek kitchen, baths, alter approx 30 lin ft of non structural walls, remove existing closet and fireplaceDetails
remodel existing 884 sq ft 2 story condo. replace flooring, remodek kitchen, baths, alter approx 30 lin ft of non structural walls, remove existing closet and fireplace | $61,880 |
| Oct 23, 2014 | Completed final sign-off Jul 2015 | 1177 California St | replace kitchen cabinets, appliances, bath vanity, tub/enclosure, countertops, faucets & fixtures in existing layout. update plumbing and electrical to current code, new light fixture in kitchen/bath. new floor surface in bath, new floating hardwood in remainder.Details
replace kitchen cabinets, appliances, bath vanity, tub/enclosure, countertops, faucets & fixtures in existing layout. update plumbing and electrical to current code, new light fixture in kitchen/bath. new floor surface in bath, new floating hardwood in remainder. | $25,000 |
| Sep 17, 2014 | Never finaled issued Sep 2014, no final | 490 Post St | suite 900 - light demolition of extg walls and counters. construction of 2 new assistants offices, relocation of interior doors. accessible upgrades to extg h.c. restroom. breakroom and hallways and to one exam room.Details
suite 900 - light demolition of extg walls and counters. construction of 2 new assistants offices, relocation of interior doors. accessible upgrades to extg h.c. restroom. breakroom and hallways and to one exam room. | $45,000 |
| Aug 4, 2014 | Completed final sign-off Mar 2015 | 1177 California St | #204- replace kitchen cabinets, appliances, countertops, sink & faucet, update electrical to code, new compliant led lighting 7 fixtures. no structural work - use existing layout for new cabinets. to comply with cec 150.0(k) 3Details
#204- replace kitchen cabinets, appliances, countertops, sink & faucet, update electrical to code, new compliant led lighting 7 fixtures. no structural work - use existing layout for new cabinets. to comply with cec 150.0(k) 3 | $40,000 |
| Mar 28, 2014 | Never finaled issued Mar 2014, no final | 1177 California St | demo (e) tub surround ,tub& vanity @bath, install isolation valves new tub waste & overflow new dense shield & water proofing, new tile at bath new floor the over soundproofing. update eletric to code, led lghting new trim fixtures carpet & paint.Details
demo (e) tub surround ,tub& vanity @bath, install isolation valves new tub waste & overflow new dense shield & water proofing, new tile at bath new floor the over soundproofing. update eletric to code, led lghting new trim fixtures carpet & paint. | $15,000 |
| Mar 28, 2014 | Completed final sign-off Aug 2014 | 1177 California St | installation of isolation valurs on hot & cold supply lines @kitchen &bath demo (e) tub surround.tub replace with new shower pan & wall tile new countertop,shower valve,faucets,fixtures,replace kitchen cabinets,appliances& counterrtops in same layout,update electrical to code new trim new lightingDetails
installation of isolation valurs on hot & cold supply lines @kitchen &bath demo (e) tub surround.tub replace with new shower pan & wall tile new countertop,shower valve,faucets,fixtures,replace kitchen cabinets,appliances& counterrtops in same layout,update electrical to code new trim new lighting | $25,000 |
| Mar 28, 2014 | Completed final sign-off Aug 2014 | 1177 California St | installation of isolation valves on hot & cold supply lines @kitchen &bath demo (e) tub surround.tub replace with new shower pan & wall tile new countertop,shower valve,faucets,fixtures,replace kitchen cabinets,appliances& counterrtops in same layout,update electrical to code new trim new lightingDetails
installation of isolation valves on hot & cold supply lines @kitchen &bath demo (e) tub surround.tub replace with new shower pan & wall tile new countertop,shower valve,faucets,fixtures,replace kitchen cabinets,appliances& counterrtops in same layout,update electrical to code new trim new lighting | $25,000 |
| Jan 6, 2014 | Completed final sign-off Oct 2014 | 1177 California St | bathroom remodel. replace interior doors using (e) hardware/frames. update electrical to code install led light in bath. no windows.Details
bathroom remodel. replace interior doors using (e) hardware/frames. update electrical to code install led light in bath. no windows. | $7,500 |
| Jan 6, 2014 | Completed final sign-off Aug 2014 | 1177 California St | bathroom & kitchen remodel. no windows.Details
bathroom & kitchen remodel. no windows. | $30,000 |
| Nov 26, 2013 | Completed final sign-off Dec 2013 | 1177 California St | to obtain final inspection for work approved under pa# 200510246375. all work is completeDetails
to obtain final inspection for work approved under pa# 200510246375. all work is complete | |
| Feb 4, 2013 | Completed final sign-off Mar 2015 | 1177 California St | finish upgrades to guest room w/new fixtures. extenstion to master bath by 60 sf. also finish upgrades. extension of hallway by 4.5 ft to allow access to bedrooms. no strucutral work or t-24 required.Details
finish upgrades to guest room w/new fixtures. extenstion to master bath by 60 sf. also finish upgrades. extension of hallway by 4.5 ft to allow access to bedrooms. no strucutral work or t-24 required. | $25,000 |
| Dec 19, 2012 | Never finaled issued Dec 2012, no final | 1 Daniel Burnham Ct | condo bath leaking. replace shower over tub with shower enclosure, new pan under seperate permit. ew tile and fixtures in shower & vanity snk. repalce vanity cabinets. no structural or changes in walls. plumbing under separate permit.Details
condo bath leaking. replace shower over tub with shower enclosure, new pan under seperate permit. ew tile and fixtures in shower & vanity snk. repalce vanity cabinets. no structural or changes in walls. plumbing under separate permit. | $7,800 |
| Oct 29, 2012 | Completed final sign-off Apr 2013 | 1177 California St | removal of bathroom door and adjacent closet. expansion of bathroom to include a new bidet. relocation of bathroom pocket foor. relocation of vanity. provide exhaust fan. remodel of existing kitchen.Details
removal of bathroom door and adjacent closet. expansion of bathroom to include a new bidet. relocation of bathroom pocket foor. relocation of vanity. provide exhaust fan. remodel of existing kitchen. | $25,000 |
| Jul 26, 2012 | Completed final sign-off Mar 2013 | 1177 California St | replace kitchen cabinets, 3 vanities, fixtures, appliances, finishes and countertops in (e) layout, update electrical & plumbing to code & add isolation valves, replace leaking shower enclosure, new tile finishes. no structural work, hardwood over sound pad on lower floor, carpet in balance, paintDetails
replace kitchen cabinets, 3 vanities, fixtures, appliances, finishes and countertops in (e) layout, update electrical & plumbing to code & add isolation valves, replace leaking shower enclosure, new tile finishes. no structural work, hardwood over sound pad on lower floor, carpet in balance, paint | $47,500 |
| May 24, 2012 | Completed final sign-off Nov 2012 | 1177 California St | rev. to 2012-0303-5694 - revise new wall construction to delete wall in hallway. replace existing acoustic ceiling tiles with new in existing grid system. new swismic 12 ga supports to existing light fixtures, grid and ceiling fixtures. provide new exit sign emergency lighting.Details
rev. to 2012-0303-5694 - revise new wall construction to delete wall in hallway. replace existing acoustic ceiling tiles with new in existing grid system. new swismic 12 ga supports to existing light fixtures, grid and ceiling fixtures. provide new exit sign emergency lighting. | $6,000 |
| Apr 20, 2012 | Completed final sign-off Apr 2013 | 2111 Hyde St | no structural work or changes in existing floor plan, new kitchen cabinets, countertops, appliances, fixtures & finishes. new vanities, counter top, fixtures, tile & finishes in 2 baths, install water supply isolation valves, update electrical to code, new leo lightings in kitchen & bath. repair &Details
no structural work or changes in existing floor plan, new kitchen cabinets, countertops, appliances, fixtures & finishes. new vanities, counter top, fixtures, tile & finishes in 2 baths, install water supply isolation valves, update electrical to code, new leo lightings in kitchen & bath. repair & | $68,500 |
| Mar 8, 2012 | Completed final sign-off Nov 2012 | 1177 California St | gr fl commercial office: construction of 14 lineal feet of full height partition, 1 hour. addition of new door and transom in existing opening. activation of existing sealed off door to create new exit.Details
gr fl commercial office: construction of 14 lineal feet of full height partition, 1 hour. addition of new door and transom in existing opening. activation of existing sealed off door to create new exit. | $6,000 |
| Jan 18, 2012 | Expired or cancelled expired Mar 2013 | 1080 Chestnut St | demo existing bath tub & surround, install isolation valves, new shower pan at fub location, new shower surround/door,shower valve/trinm,repl vanity faucet, sink, toilet in both master bath and powder rm, new counter tops, and appliances in kitchen using existing layout and cabinets, new flr finisheDetails
demo existing bath tub & surround, install isolation valves, new shower pan at fub location, new shower surround/door,shower valve/trinm,repl vanity faucet, sink, toilet in both master bath and powder rm, new counter tops, and appliances in kitchen using existing layout and cabinets, new flr finishe | $42,000 |
| Jan 18, 2012 | Completed final sign-off Sep 2012 | 1177 California St | replace kitchen cabinets and bath vanity, new counter tops, new faucets and sinks, new backsplash, install new kitchen appliances in existing layout, electrical and plumbing under sep permit to upgrade to current code. no structural work. kitchn/bath tile replDetails
replace kitchen cabinets and bath vanity, new counter tops, new faucets and sinks, new backsplash, install new kitchen appliances in existing layout, electrical and plumbing under sep permit to upgrade to current code. no structural work. kitchn/bath tile repl | $17,500 |
| Sep 28, 2011 | Never finaled issued Nov 2011, no final | 425 01st St | reference arch permit #201106238763. mechanical and plmg installations for a new employee break room. tie into extg services to complete installations.Details
reference arch permit #201106238763. mechanical and plmg installations for a new employee break room. tie into extg services to complete installations. | $25,000 |
| Jun 23, 2011 | Expired or cancelled expired Nov 2013 | 425 01st St | level 3:employee breakroom. complete finishes, fixtures, electrical and plumbing and mechanical.Details
level 3:employee breakroom. complete finishes, fixtures, electrical and plumbing and mechanical. | $47,500 |
| May 9, 2011 | Never finaled issued May 2011, no final | 1177 California St | demo (e) bath tub and surround, install isolation values and supplies, replace with shower pan, new wall tile, shower door. replace vanity and faucet. new tile @ bath floor. replace kitchen cabinets, countertops, appliances. new faucet, new back splash. replace (e) carpet with engineered woodDetails
demo (e) bath tub and surround, install isolation values and supplies, replace with shower pan, new wall tile, shower door. replace vanity and faucet. new tile @ bath floor. replace kitchen cabinets, countertops, appliances. new faucet, new back splash. replace (e) carpet with engineered wood | $29,500 |
| Apr 11, 2011 | Completed final sign-off May 2011 | 1177 California St | demo of approx 20 lin ft wall, kitchen pass through, cabinets with fix and finishes. install new bath, kitchen sinkDetails
demo of approx 20 lin ft wall, kitchen pass through, cabinets with fix and finishes. install new bath, kitchen sink | $35,000 |
| Feb 18, 2011 | Completed final sign-off Oct 2011 | 1 Daniel Burnham Ct | remodel in existing floor plan. replace kitchen cabinets, countertops, appliances, sink, faucet. replace vanity and sinks, faucets, shower valve in dressing and bath areas. new tile in bath, tub, surround floor plus kitchen floor. upgrade elec to code. replace lighting fix, add gfis new finishes,Details
remodel in existing floor plan. replace kitchen cabinets, countertops, appliances, sink, faucet. replace vanity and sinks, faucets, shower valve in dressing and bath areas. new tile in bath, tub, surround floor plus kitchen floor. upgrade elec to code. replace lighting fix, add gfis new finishes, | $48,000 |
| Feb 18, 2011 | Completed final sign-off Nov 2011 | 218 Monticello St | replace bath vanity, sink, faucet, tub, tub surround, dlooring in existing layout. replace kitchen cabinets, appliances, sink, faucet. plumbing repairs, upgrade to code. laundry sink in basement and shower valve. new floor finishes in kitchn and bath. gen repairs,int paintingDetails
replace bath vanity, sink, faucet, tub, tub surround, dlooring in existing layout. replace kitchen cabinets, appliances, sink, faucet. plumbing repairs, upgrade to code. laundry sink in basement and shower valve. new floor finishes in kitchn and bath. gen repairs,int painting | $30,000 |
| Dec 8, 2010 | Completed final sign-off May 2011 | 1177 California St | replace 2 bath vanities/countertops, install isolation valves, new angle stops on supply line, install 2 new medicine cabinet. in kitchen, install new countertops/sink/faucet/back splash over existing cabinets. install new microhood, update electrical to meet code. prep/paint. provide high efficencyDetails
replace 2 bath vanities/countertops, install isolation valves, new angle stops on supply line, install 2 new medicine cabinet. in kitchen, install new countertops/sink/faucet/back splash over existing cabinets. install new microhood, update electrical to meet code. prep/paint. provide high efficency | $5,000 |
| Oct 8, 2010 | Never finaled issued Oct 2010, no final | 1177 California St | bath remodel, repl existing tub with shower, new shower pan, new isolation valves, new pressure balanced, shower valve, new vanity, sink, faucet and low flow toilet, new floor finishes and wall finishes; upgrade electric with gfi, new switching, compliant lighting, no structural workDetails
bath remodel, repl existing tub with shower, new shower pan, new isolation valves, new pressure balanced, shower valve, new vanity, sink, faucet and low flow toilet, new floor finishes and wall finishes; upgrade electric with gfi, new switching, compliant lighting, no structural work | $19,000 |
| Jul 12, 2010 | Completed final sign-off Jul 2010 | 2059 Market St | work to abate notice of violaion complaint#201052346 dated 6/18-2010, replace existing entry door, closer, locksets with new identical unit, o/d door damaged beyond repairDetails
work to abate notice of violaion complaint#201052346 dated 6/18-2010, replace existing entry door, closer, locksets with new identical unit, o/d door damaged beyond repair | $3,500 |
| Jul 1, 2010 | Completed final sign-off Nov 2011 | 1170 Sacramento St | unit 31- 3rd fl. remove finish at master bath to determine source of water damage. repair or replace finishes as reqd. replace floor tile in powder rm. repair or replace tile in 2nd bath. no change in lay out. update plbgand elec. outlets to meet current code.Details
unit 31- 3rd fl. remove finish at master bath to determine source of water damage. repair or replace finishes as reqd. replace floor tile in powder rm. repair or replace tile in 2nd bath. no change in lay out. update plbgand elec. outlets to meet current code. | $7,000 |
| May 13, 2010 | Completed final sign-off May 2011 | 1177 California St | unit# 914. new vanities,sink,toilets in 2 bathrooms and powder rm. replace master bath tub w/shower pan.replace pocket doors at kitchen w/ open drway. new balanced shower/tub valves. new wall and fl finishes. replace (e) doors in (e) frames. replace kitch. cabs,sink,appliances.no struc.framing workDetails
unit# 914. new vanities,sink,toilets in 2 bathrooms and powder rm. replace master bath tub w/shower pan.replace pocket doors at kitchen w/ open drway. new balanced shower/tub valves. new wall and fl finishes. replace (e) doors in (e) frames. replace kitch. cabs,sink,appliances.no struc.framing work | $80,000 |
| Apr 9, 2010 | Expired or cancelled expired Nov 2011 | 1880 Jackson St | bathroom shower damaged by plumbing leak from above. demo shower area, assess damage, re-tile as required. shower valve replacement & possible shower pan work.Details
bathroom shower damaged by plumbing leak from above. demo shower area, assess damage, re-tile as required. shower valve replacement & possible shower pan work. | $7,500 |
| Nov 20, 2009 | Completed final sign-off Feb 2010 | 1755 Filbert St | remove & replace kitchen counterstops, sink, add circuits for replacement, washer/dryer. replace failed (fogged) glass panels in (e) windows in kind. install gfci where required in kitchen.Details
remove & replace kitchen counterstops, sink, add circuits for replacement, washer/dryer. replace failed (fogged) glass panels in (e) windows in kind. install gfci where required in kitchen. | $6,800 |
| Oct 6, 2009 | Completed final sign-off Jan 2010 | 1650 Jackson St | upgrade in same configuration ktichen countertops, new appliances, remove carpet, replace with floating eng. floor over sound pad, plbgs. under separate permit, new shower head, sing. paint throught. no structural, walls, windows, doors under this permit.Details
upgrade in same configuration ktichen countertops, new appliances, remove carpet, replace with floating eng. floor over sound pad, plbgs. under separate permit, new shower head, sing. paint throught. no structural, walls, windows, doors under this permit. | $9,000 |
| Jun 9, 2009 | Completed final sign-off Jul 2010 | 2111 Hyde St | bathromm and kitchen remodeling on 5th fl. includes non structural wall removal. replace 4 exterior windows to match originals, one window in light well, interior lighting and switching, and radiant heat in bath room.Details
bathromm and kitchen remodeling on 5th fl. includes non structural wall removal. replace 4 exterior windows to match originals, one window in light well, interior lighting and switching, and radiant heat in bath room. | $140,000 |
| May 15, 2009 | Completed final sign-off Aug 2009 | 1906 Filbert St | remove & replace shingle siding on front facade, repair exterior trim as required. rereoofing under seperate permit.Details
remove & replace shingle siding on front facade, repair exterior trim as required. rereoofing under seperate permit. | $12,500 |
| Apr 22, 2009 | Completed final sign-off Feb 2010 | 1177 California St | minor kitchen remodel-new dishwasher, sink, microhood, cabinets & counter tops. maintain (e) layout. replace refrigerator, add ice maker line. update electric circuitry to meet code requirements, add under cabinet lighting. new floor coverDetails
minor kitchen remodel-new dishwasher, sink, microhood, cabinets & counter tops. maintain (e) layout. replace refrigerator, add ice maker line. update electric circuitry to meet code requirements, add under cabinet lighting. new floor cover | $9,000 |
| Mar 27, 2009 | Completed final sign-off Feb 2010 | 532 Folsom St | to obtain final inspection for work approved under pa#2008/06/25/5341. all work has been completed.Details
to obtain final inspection for work approved under pa#2008/06/25/5341. all work has been completed. | |
| Dec 17, 2008 | Completed final sign-off Mar 2009 | 1177 California St | work @ unit# 803 only. replace existing tile bath tub surround. replace existing green board with denscheild. replace shower valve with pressure balance unit. add isolation valves on ht & cold feeds. replace 3 angle stops. no lgihting work.Details
work @ unit# 803 only. replace existing tile bath tub surround. replace existing green board with denscheild. replace shower valve with pressure balance unit. add isolation valves on ht & cold feeds. replace 3 angle stops. no lgihting work. | $4,000 |
| Sep 24, 2008 | Completed final sign-off Mar 2009 | 1177 California St | work @ unit# 325 (door 331) only. remove (e) vanity / sink in powder room. replace with stacked washer / dryer (condensing) unit & reduced with vanity. no changes to footprint of unit or fire rated walls.Details
work @ unit# 325 (door 331) only. remove (e) vanity / sink in powder room. replace with stacked washer / dryer (condensing) unit & reduced with vanity. no changes to footprint of unit or fire rated walls. | $10,000 |
| Sep 24, 2008 | Completed final sign-off Mar 2009 | 1177 California St | work @ unit# 633 only. new kitchen cabinets / appliances in existing footprint. replace shower overtub with shower. shower pan on separate permit. replace existing sink / lavy in kitchen / bath. no changes to mechanical or fire rated walls. connect to existing waste / supplies.Details
work @ unit# 633 only. new kitchen cabinets / appliances in existing footprint. replace shower overtub with shower. shower pan on separate permit. replace existing sink / lavy in kitchen / bath. no changes to mechanical or fire rated walls. connect to existing waste / supplies. | $17,200 |
| Apr 16, 2008 | Completed final sign-off Apr 2008 | 855 Folsom St | replace kitchen cabinets. utilize existing electric/plumbing. replace dishwasher and add air gap to modular counter unit. no doors, windows and stairs under this permit. no new lighting.Details
replace kitchen cabinets. utilize existing electric/plumbing. replace dishwasher and add air gap to modular counter unit. no doors, windows and stairs under this permit. no new lighting. | $5,500 |
| Feb 1, 2008 | Completed final sign-off Feb 2008 | 1500 Sutter St | comply with physical inspection report# 3r-4817. for administrative purpose only. no work required. all work performed under pa# 2007/09/28/3991 & pa# 2007/06/20/4489.Details
comply with physical inspection report# 3r-4817. for administrative purpose only. no work required. all work performed under pa# 2007/09/28/3991 & pa# 2007/06/20/4489. | |
| Mar 16, 2007 | Completed final sign-off Jun 2007 | 2113 Union St | renew pa#200604118697. for final inspection.Details
renew pa#200604118697. for final inspection. | |
| Dec 12, 2006 | Completed final sign-off Jul 2007 | 152 Lombard St | unit #404-master bath:replace cracked shower pan, retile shower and floors, new plumbing fixtures, counter tops, new surface lighting fixtures, switches, gfi's trim. guest bath: replace tub, plumbing fixtures, retile floor & walls, new counter top, new surface lighting fixtures, switches & gfi trim.Details
unit #404-master bath:replace cracked shower pan, retile shower and floors, new plumbing fixtures, counter tops, new surface lighting fixtures, switches, gfi's trim. guest bath: replace tub, plumbing fixtures, retile floor & walls, new counter top, new surface lighting fixtures, switches & gfi trim. | $21,000 |
| Oct 2, 2006 | Completed final sign-off Jan 2007 | 1 Daniel Burnham Ct | convert from shower over tub to shower only with prefab shower pan. replace 6 ' vanity, 2 sinks, 1 toilet. replace bathroom door with pocket door of same dimension. repair sheetrock at construction area. retile bath area. work on unit 1512 onlyDetails
convert from shower over tub to shower only with prefab shower pan. replace 6 ' vanity, 2 sinks, 1 toilet. replace bathroom door with pocket door of same dimension. repair sheetrock at construction area. retile bath area. work on unit 1512 only | $7,800 |
| Aug 21, 2006 | Completed final sign-off Aug 2006 | 534 Divisadero St | renew pa3200512230984 for final inspection.Details
renew pa3200512230984 for final inspection. | |
| Dec 23, 2005 | Never finaled issued Dec 2005, no final | 534 Divisadero St | remodel (e) kitchen: replace cabinets, appliances & finishes, inclusive of flooring repair interior doors, trim, plimbing & electrical done under seperate permits.Details
remodel (e) kitchen: replace cabinets, appliances & finishes, inclusive of flooring repair interior doors, trim, plimbing & electrical done under seperate permits. | $3,500 |
| Dec 23, 2005 | Completed final sign-off Apr 2006 | 77 Dow Pl | remodel (e) bathtub with shower over to be shower stall to allow h.c. accessibility for owner. all dimensions will meet code requirements. install tile over mortor new frameless shower stall. sepearate plumbing permits.Details
remodel (e) bathtub with shower over to be shower stall to allow h.c. accessibility for owner. all dimensions will meet code requirements. install tile over mortor new frameless shower stall. sepearate plumbing permits. | $10,000 |
| Oct 19, 2005 | Completed final sign-off Dec 2005 | 4000 19th St | renew permit exprired 200412272205 ca 00 renew expired permit 200412272205Details
renew permit exprired 200412272205 ca 00 renew expired permit 200412272205 | |
| Oct 19, 2005 | Completed final sign-off Dec 2005 | 192 Valley St | renew expierd permit 200407239719Details
renew expierd permit 200407239719 | |
| Oct 19, 2005 | Completed final sign-off Dec 2005 | 1801 Church St | renew exp permit 200407239709Details
renew exp permit 200407239709 | |
| Feb 1, 2005 | Expired or cancelled expired Feb 2007 | 1 Daniel Burnham Ct | provide positive latch of fire doors smoke detectors ea. side of doors and smoke guard screens aboveDetails
provide positive latch of fire doors smoke detectors ea. side of doors and smoke guard screens above | $5,000 |
| Dec 27, 2004 | Expired or cancelled expired Oct 2011 | 4000 19th St | remove and replace 39 aluminum single glaze sash with dual glazed sash doublehungDetails
remove and replace 39 aluminum single glaze sash with dual glazed sash doublehung | $12,850 |
| Nov 5, 2004 | Expired or cancelled expired Dec 2006 | 1 Daniel Burnham Ct | removal of towel room and storage room in health club on first floor residential floor plan.Details
removal of towel room and storage room in health club on first floor residential floor plan. | $3,500 |
| Nov 5, 2004 | Never finaled issued Nov 2004, no final | 1 Daniel Burnham Ct | combine suite 300c with 310c by creating a new 3'0" wide framed opening. no structural work.Details
combine suite 300c with 310c by creating a new 3'0" wide framed opening. no structural work. | $1,000 |
| Nov 5, 2004 | Expired or cancelled expired Sep 2008 | 1 Daniel Burnham Ct | expansion of groundfloor tenant into adjoining spaceDetails
expansion of groundfloor tenant into adjoining space | $12,000 |
| Oct 22, 2004 | Never finaled issued Oct 2004, no final | 1 Daniel Burnham Ct | demolition of 1/3 interior walls.construct new signing room,bathroom & filing room.mep.life safety,Details
demolition of 1/3 interior walls.construct new signing room,bathroom & filing room.mep.life safety, | $60,000 |
| Jul 23, 2004 | Never finaled issued Jul 2004, no final | 192 Valley St | remove an replace wxistisng aluminum single glazed w/ duel slash viny/sash 24 sash totalDetails
remove an replace wxistisng aluminum single glazed w/ duel slash viny/sash 24 sash total | $7,908 |
| Jul 23, 2004 | Never finaled issued Jul 2004, no final | 1801 Church St | remove an replace wxistisng aluminum single glazed w/ duel slash viny/sash 30 sash totalDetails
remove an replace wxistisng aluminum single glazed w/ duel slash viny/sash 30 sash total | $9,885 |
| May 27, 2004 | Never finaled issued Feb 2005, no final | 1190 Folsom St | occupant load calculation onlyDetails
occupant load calculation only | |
| Mar 24, 2004 | Completed final sign-off Jul 2004 | 1200 California St | renew:200310066563 for finla inpsection onlyDetails
renew:200310066563 for finla inpsection only | |
| Jul 25, 2003 | Completed final sign-off Nov 2003 | 41 Franklin St | replace (e)door access w/unequal pair storefront doors to meet access requirements. provide signageDetails
replace (e)door access w/unequal pair storefront doors to meet access requirements. provide signage | $2,100 |
| Mar 20, 2003 | Expired or cancelled expired Feb 2007 | 1 Daniel Burnham Ct | oti-2 3/f me lsDetails
oti-2 3/f me ls | |
| Aug 1, 2002 | Completed final sign-off Oct 2002 | 120 14th St | wall demo - partition walls - lid, remove roll up door/doors for reuse work on 1st/2nd floorsDetails
wall demo - partition walls - lid, remove roll up door/doors for reuse work on 1st/2nd floors | $8,000 |
| Dec 5, 2001 | Completed final sign-off Aug 2002 | 1 Daniel Burnham Ct | remodel: (n) wood fl., raise ceiling ht., (n) fixtures, separate permits for plumbins/ ele/sprinkleDetails
remodel: (n) wood fl., raise ceiling ht., (n) fixtures, separate permits for plumbins/ ele/sprinkle | $24,500 |
| Jul 16, 2001 | Expired or cancelled expired Aug 2002 | 1 Daniel Burnham Ct | demo partition walls, new cabs, new shower pan, new countertops, new lighting fixtures, replace inteDetails
demo partition walls, new cabs, new shower pan, new countertops, new lighting fixtures, replace inte | $44,000 |
| Jul 11, 2001 | Completed final sign-off Aug 2001 | 1 Daniel Burnham Ct | relocate ductwork-diffuser outlets in unit 245/250. ref. 2000/03/15/4312 for general contract.Details
relocate ductwork-diffuser outlets in unit 245/250. ref. 2000/03/15/4312 for general contract. | $2,500 |