Robert Cardoso
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Gensler
- Based in
- San Francisco
- On San Francisco permits
- Apr 2000 to Mar 2010
28 permits since 2000 (architect on 23 permits, engineer on 3 permits, authorized agent-others on 2 permits): 20 completed, 7 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 15, 2010 | Never finaled issued Mar 2010, no final | 650 California St | Bcci Construction Company | 28th floor-fire evacuation interior signage consisting of emergency evacuation information sign plaques to be located at elevator lobbyand stairs.Details
28th floor-fire evacuation interior signage consisting of emergency evacuation information sign plaques to be located at elevator lobbyand stairs. | $3,000 |
| Jan 4, 2010 | Never finaled issued Jan 2010, no final | 220 Montgomery St | San Francisco Commercial Builders Inc | 2nd floor-install of furniture partition (dirtt system) with diagonal bracingDetails
2nd floor-install of furniture partition (dirtt system) with diagonal bracing | $10,000 |
| Sep 9, 2009 | Completed final sign-off Jan 2010 | 560 Mission St | Turner Construction Co | 28th floor-small demo expanding into a vacant space. new partitions (non-structural), new ceiling. mechanical & electrical. life safety under seperate permit.Details
28th floor-small demo expanding into a vacant space. new partitions (non-structural), new ceiling. mechanical & electrical. life safety under seperate permit. | $100,000 |
| Aug 17, 2009 | Completed final sign-off Nov 2009 | 555 Mission St | Skyline Construction | 18th floor new build out for tenant improvement - new non-load bearing partitions, ceiling & finishes, mep as required. fire sprinkler & life safety udnerseparate permit.Details
18th floor new build out for tenant improvement - new non-load bearing partitions, ceiling & finishes, mep as required. fire sprinkler & life safety udnerseparate permit. | $800,000 |
| Aug 4, 2009 | Completed final sign-off Feb 2010 | 1040 Grant Av | Hathaway Dinwiddie Co. | interior demo to comply with ab 017 on 4th and 6th floors. demo of select partitions, ceilings, finishes and light fixtures.Details
interior demo to comply with ab 017 on 4th and 6th floors. demo of select partitions, ceilings, finishes and light fixtures. | $30,000 |
| Jun 3, 2009 | Completed final sign-off Dec 2009 | 760 Market St | Gci, Inc | 11th floor-mechanical & electrical for full floor t.i. to install new & relocated fixtures, outlets & hvac equipment, refer to pa# 2009-0505-7679 for all t.i. workDetails
11th floor-mechanical & electrical for full floor t.i. to install new & relocated fixtures, outlets & hvac equipment, refer to pa# 2009-0505-7679 for all t.i. work | $170,000 |
| Apr 22, 2009 | Completed final sign-off Oct 2009 | 425 Market St | Novo Construction Inc | 6th floor-demolititon of offices on the east side & re-spacing offices on the north & south sides. life safety & fire sprinkler under seperate permit if necessaryDetails
6th floor-demolititon of offices on the east side & re-spacing offices on the north & south sides. life safety & fire sprinkler under seperate permit if necessary | $130,000 |
| Apr 20, 2009 | Completed final sign-off Sep 2009 | 220 Montgomery St | Ayoob & Peery Plumbing Co Inc | 2nd floor-relocate fire sprinkler per tenant improvements-relocate 7Details
2nd floor-relocate fire sprinkler per tenant improvements-relocate 7 | $1,000 |
| Mar 13, 2009 | Completed final sign-off Apr 2009 | 4 Embarcadero Center | Principal Builders Inc. | 34th foor fire alarm improvement - add 1 new speaker, relocate 5 strobes and 2 speakers. ref arch appl #200902021232.Details
34th foor fire alarm improvement - add 1 new speaker, relocate 5 strobes and 2 speakers. ref arch appl #200902021232. | $5,000 |
| Mar 6, 2009 | Never finaled issued Mar 2009, no final | 350 Rhode Island St | Skyline Construction | 3rd floor-addition of 1 door/frame/hardware, fail safe security card reader. electrical permit under seperate permitDetails
3rd floor-addition of 1 door/frame/hardware, fail safe security card reader. electrical permit under seperate permit | $5,000 |
| Mar 4, 2009 | Completed final sign-off Aug 2009 | 1670 Owens St | Pribuss Engineering Inc | remove/replace fuel port to allow building access during refueling operations of generators, relocate primary/secondary fuel oil piping fr new fuel port location to existing piping in ceiling space, reroute vant stacks frm generators to shaft location above generator rm rooftop. rev. to 200801243180Details
remove/replace fuel port to allow building access during refueling operations of generators, relocate primary/secondary fuel oil piping fr new fuel port location to existing piping in ceiling space, reroute vant stacks frm generators to shaft location above generator rm rooftop. rev. to 200801243180 | $15,000 |
| Jan 22, 2009 | Completed final sign-off May 2009 | 5 Embarcadero Center | to clarify ada details for ada ramp approved under pa #200708240840. on the equinox regency club @ 19th. floor.Details
to clarify ada details for ada ramp approved under pa #200708240840. on the equinox regency club @ 19th. floor. | ||
| Dec 22, 2008 | Completed final sign-off Aug 2009 | 1670 Owens St | rev to pa# 2008/01/24/3180. paving & grading @ sidewalk & truck turn around area on b street. stainless steel column covers at round columns. architectural lighting at east elevation. revision to building drain at 1st fl (all work on private property & private street. no work in public right of way)Details
rev to pa# 2008/01/24/3180. paving & grading @ sidewalk & truck turn around area on b street. stainless steel column covers at round columns. architectural lighting at east elevation. revision to building drain at 1st fl (all work on private property & private street. no work in public right of way) | $21,000 | |
| Nov 13, 2008 | Completed final sign-off Dec 2008 | 499 Castro St | revision to pa #200809111288, to deleted bank teller machine from scope of work.Details
revision to pa #200809111288, to deleted bank teller machine from scope of work. | ||
| Oct 14, 2008 | Completed final sign-off Dec 2008 | 499 Castro St | Bcci Construction Company | demo of (e) carpet, (e) retial fixtures, (e) service sink, (e) acoustick ceiling, tile w/metal t-grid to remain; non-structural partitions & demo & removal of (e) light fixtures under ab-017.Details
demo of (e) carpet, (e) retial fixtures, (e) service sink, (e) acoustick ceiling, tile w/metal t-grid to remain; non-structural partitions & demo & removal of (e) light fixtures under ab-017. | $5,888 |
| Aug 11, 2008 | Completed final sign-off Aug 2008 | 3250 Mission St | Swinerton Builders | revision to pa# 200805232809 to add a door to proposed badit barrier.Details
revision to pa# 200805232809 to add a door to proposed badit barrier. | |
| Jun 27, 2008 | Completed final sign-off Jan 2010 | 1670 Owens St | revision to 200801243180: widen truck turn around area. structural revision to tranformer girger at 3rd floor and relocation of columns. relocate 2 accessible parking spacesDetails
revision to 200801243180: widen truck turn around area. structural revision to tranformer girger at 3rd floor and relocation of columns. relocate 2 accessible parking spaces | $50,000 | |
| May 13, 2008 | Never finaled issued May 2008, no final | 2 Embarcadero Center | Ayoob & Peery Plumbing Co Inc | relocate 204, add 36, remove 14 sprinkler heads per t.i.Details
relocate 204, add 36, remove 14 sprinkler heads per t.i. | $30,500 |
| May 13, 2008 | Never finaled issued May 2008, no final | 2 Embarcadero Center | Ayoob & Peery Plumbing Co Inc | add 28, relocate 207 remove 16 sprinkler heads per t.i. add, relocate & plug sprinkler heads per tenant improvements.Details
add 28, relocate 207 remove 16 sprinkler heads per t.i. add, relocate & plug sprinkler heads per tenant improvements. | $30,000 |
| May 13, 2008 | Never finaled issued Jun 2008, no final | 2 Embarcadero Center | Ayoob & Peery Plumbing Co Inc | add 43, relocate 196 & plug 14 sprinkler heads and add pre-action system per tenant improvement.Details
add 43, relocate 196 & plug 14 sprinkler heads and add pre-action system per tenant improvement. | $33,000 |
| Jan 24, 2008 | Completed final sign-off Jan 2010 | 1670 Owens St | erect 6 stories parking garage (823 spaces).Details
erect 6 stories parking garage (823 spaces). | $17,900,000 | |
| Jun 15, 2007 | Completed final sign-off Aug 2007 | 1 Embarcadero Center | Field Construction Inc. | oti-1, 22nd floor, lsDetails
oti-1, 22nd floor, ls | $7,000 |
| Apr 16, 2007 | Completed final sign-off Oct 2007 | 2155 Webster St | tenant improvement at level b of 2,950 sf to include relocation of extg mail room and chart room; new equipmentroom; new accessible toilet rooms and new hi low dringking fountain scope includes mechanical, electrical and plmbg alterations, demolition and construction of interior parttion.Details
tenant improvement at level b of 2,950 sf to include relocation of extg mail room and chart room; new equipmentroom; new accessible toilet rooms and new hi low dringking fountain scope includes mechanical, electrical and plmbg alterations, demolition and construction of interior parttion. | $500,000 | |
| Mar 30, 2007 | Completed final sign-off Dec 2008 | 600 Montgomery St | Skyline Construction | oti-2, 5th floor, el.Details
oti-2, 5th floor, el. | $2,500 |
| Mar 5, 2007 | Completed final sign-off Apr 2007 | 2 Folsom St | interior soft demolition of 1 wall and millwork on the 11th floorDetails
interior soft demolition of 1 wall and millwork on the 11th floor | $3,000 | |
| Oct 4, 2006 | Completed final sign-off Nov 2006 | 350 California St | Skyline Construction | oti-1, 5th floor, el, ls, spDetails
oti-1, 5th floor, el, ls, sp | $25,000 |
| Dec 7, 2004 | Never finaled issued Dec 2004, no final | 123 Collingwood St | repair damaged stair - remove (e) terrazzo treads, replace stair stringers, replace terrazzo treads,Details
repair damaged stair - remove (e) terrazzo treads, replace stair stringers, replace terrazzo treads, | $10,000 | |
| Apr 11, 2000 | Expired or cancelled cancelled Apr 2001 | 650 California St | oti-1 7/f el me ls sp 7/fDetails
oti-1 7/f el me ls sp 7/f | $50,000 |