Peter Bonneau
- Listed as
- engineer
- Firm
- Pe Structural Design
- Based in
- Richmond
- On San Francisco permits
- Nov 2019 to Jul 2025
12 permits since 2000 (engineer on 12 permits): 8 completed, 2 in progress, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 15, 2025 | In progress issued Nov 2025 | 1269 05th Av | Schrobsdorff Construction | remodel of 2 unit bldg with 450 squre foot additon at 1st and 2nd floor(unit 1269) and 94 square foot additon at 3rd floor(unit 1271)Details
remodel of 2 unit bldg with 450 squre foot additon at 1st and 2nd floor(unit 1269) and 94 square foot additon at 3rd floor(unit 1271) | $700,000 |
| Jun 24, 2025 | In progress issued Feb 2026 | 2762 21st St | Wilko Builders Llc. | remodel of entire house and a 2nd story addition with front and rear roof decks on 2nd level.Details
remodel of entire house and a 2nd story addition with front and rear roof decks on 2nd level. | $650,000 |
| Apr 22, 2025 | Completed final sign-off Nov 2025 | 2938 Pierce St | Hearth Corporation | rev 202409160848: changes to layout, deck & basement framing.Details
rev 202409160848: changes to layout, deck & basement framing. | |
| Nov 3, 2023 | Completed final sign-off Apr 2025 | 621 Baker St | Hearth Corporation | revision to permit# 202304195985: changes to layout and addition of 2nd dormer meeting 311 notification exception.new front elevction windows will be double hung wood windows with integrated and new door with transom and casement wood window.Details
revision to permit# 202304195985: changes to layout and addition of 2nd dormer meeting 311 notification exception.new front elevction windows will be double hung wood windows with integrated and new door with transom and casement wood window. | $20,000 |
| Nov 3, 2022 | Completed final sign-off Jan 2025 | 64 Divisadero St | T T General Construction | convert unfinished 1st floor to living space, incl, 2 new bedrooms + hall bath convert (e) bedroom in to new dining room and 2nd flr remodel (e) 2nd floor bathrm. new int stair @ existing light well. no work on 3rd and 4th flrsDetails
convert unfinished 1st floor to living space, incl, 2 new bedrooms + hall bath convert (e) bedroom in to new dining room and 2nd flr remodel (e) 2nd floor bathrm. new int stair @ existing light well. no work on 3rd and 4th flrs | $200,000 |
| Aug 25, 2022 | Never finaled issued Sep 2022, no final | 72 Harper St | Bradford Construction | rec to pa 202201115724 new 1st floor bedroom and family room, 2nd floor interior remodel, new hardscape, replace fau with heat pump.Details
rec to pa 202201115724 new 1st floor bedroom and family room, 2nd floor interior remodel, new hardscape, replace fau with heat pump. | $200,000 |
| Feb 25, 2022 | Completed final sign-off Apr 2023 | 1980 Scott St | Hearth Corporation | interior remodel: replacement of interior stair, kitchen remodel, master bath remodel, new half bath. replace exterior doors and siding at 1/f in back. no changes to front facade.Details
interior remodel: replacement of interior stair, kitchen remodel, master bath remodel, new half bath. replace exterior doors and siding at 1/f in back. no changes to front facade. | $175,000 |
| Jun 15, 2021 | Completed final sign-off Jul 2023 | 256 Mullen Av | Jose Martinez | new roof deck with internal stair at rear unit. new roof deck for front unit above garage.Details
new roof deck with internal stair at rear unit. new roof deck for front unit above garage. | $50,000 |
| Mar 30, 2021 | Completed final sign-off Mar 2022 | 720 03rd Av | T T General Construction | 3/f: hall bath and bedroom closets remodel, new master bath. 2/f: kitchen, vestibule and half bath remodel.Details
3/f: hall bath and bedroom closets remodel, new master bath. 2/f: kitchen, vestibule and half bath remodel. | $115,000 |
| Feb 13, 2021 | Completed final sign-off Jan 2023 | 366 Chenery St | T T General Construction | first floor:install garbage enclosure. new garage door. 2nd floor: convert floor to living space, including new master suite, office, family room, and storage. new uncond. mech closet and laundry room. new front entry porch. 3rd floor: gut remodel including kitchen, new bathroom & new deck at grade.Details
first floor:install garbage enclosure. new garage door. 2nd floor: convert floor to living space, including new master suite, office, family room, and storage. new uncond. mech closet and laundry room. new front entry porch. 3rd floor: gut remodel including kitchen, new bathroom & new deck at grade. | $350,000 |
| Jul 22, 2020 | Completed final sign-off Feb 2023 | 1287 05th Av | Eddie Design & Remodeling Inc | relocate laundry room with new wc, convert back porch laundry room into dining room. voluntary seismic strengthening on 1/f under (e) rear addition. replace one window. no change to front facade or bldg footprint.Details
relocate laundry room with new wc, convert back porch laundry room into dining room. voluntary seismic strengthening on 1/f under (e) rear addition. replace one window. no change to front facade or bldg footprint. | $65,000 |
| Nov 26, 2019 | Never finaled issued Jan 2021, no final | 833 Cayuga Av | Perez Construction Llc. | 1st fl remodel, family rm, bath, office, laundry, 4 bedroom. convert 70 sf of garage into living space. new windows at rear. new internal stair, 2nd fl kitchen remodel.Details
1st fl remodel, family rm, bath, office, laundry, 4 bedroom. convert 70 sf of garage into living space. new windows at rear. new internal stair, 2nd fl kitchen remodel. | $150,000 |