Jose Martinez
- Based in
- San Francisco
- On San Francisco permits
- Apr 2017 to Sep 2026
- Last 24 months
- 10 permits filed
56 permits since 2000: 43 completed, 4 in progress, 4 never finaled, 5 expired or cancelled.
Of the 4 never-finaled permits, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 15, 2026 | In progress filed Sep 2026, not yet issued | 44 Surrey St | new heated bathroom installed at basement level. install new gas tankless waterheater at basement level. install new laminate flr at guest room, basement level.Details
new heated bathroom installed at basement level. install new gas tankless waterheater at basement level. install new laminate flr at guest room, basement level. | $25,000 |
| May 26, 2026 | In progress issued May 2026 | 44 Surrey St | kitchen remodel, new cabinets, new sink, new dishwasher, new garbage disposal. all work in kind. no moving walls. approx 80 sq ft.Details
kitchen remodel, new cabinets, new sink, new dishwasher, new garbage disposal. all work in kind. no moving walls. approx 80 sq ft. | $37,000 |
| Apr 10, 2026 | Completed final sign-off Sep 2026 | 758 Great Hy | unit 1: revision to bpa 202601284734: 2nd floor: remodel (e) kitchen, remove kitchen walls, closet and fire place.Details
unit 1: revision to bpa 202601284734: 2nd floor: remodel (e) kitchen, remove kitchen walls, closet and fire place. | $16,000 |
| Jan 28, 2026 | Completed final sign-off Sep 2026 | 758 Great Hy | unit #1: kitchen and 2 bathroom remodel. inkindDetails
unit #1: kitchen and 2 bathroom remodel. inkind | $67,000 |
| Jan 20, 2026 | In progress issued Jan 2026 | 2627 21st St | reconstruct front woor stairs to be code compliant. reconstruct rear deck & stairs in kind. replace front 2nd fl wood windows and all rear windows. front wood windows to match existing style & size. install new hardie siding at rear facade. kitchen and bathroom remodelDetails
reconstruct front woor stairs to be code compliant. reconstruct rear deck & stairs in kind. replace front 2nd fl wood windows and all rear windows. front wood windows to match existing style & size. install new hardie siding at rear facade. kitchen and bathroom remodel | $100,000 |
| Jan 8, 2026 | In progress issued May 2026 | 1590 Union St | convert 2/f office space (1590a) to state adu (1 bed & 1 bath) 750sf. remodel (e) kitchen with new cabinets, appliances and finishes. remodel bathroom, new vent, new finishes and fixtures. new wiring and lighting throughout. new washer/dryer in-unit.Details
convert 2/f office space (1590a) to state adu (1 bed & 1 bath) 750sf. remodel (e) kitchen with new cabinets, appliances and finishes. remodel bathroom, new vent, new finishes and fixtures. new wiring and lighting throughout. new washer/dryer in-unit. | $68,500 |
| Dec 12, 2025 | Completed final sign-off Feb 2026 | 877 44th Av | install new electrical, upgrade new subpanel, outlets, switches. add garbage diposal at kitchen ( no removal of any cabinets in kitchen or barhroom.)Details
install new electrical, upgrade new subpanel, outlets, switches. add garbage diposal at kitchen ( no removal of any cabinets in kitchen or barhroom.) | $27,000 |
| Oct 9, 2025 | Completed final sign-off Oct 2025 | 20 Gloria Ct | to obtain final inspection for work approved under pa#202207077921. all work is complete.Details
to obtain final inspection for work approved under pa#202207077921. all work is complete. | |
| Jul 18, 2025 | Expired or cancelled withdrawn Jan 2026 | 758 Great Hy | kitchen remodel and 2 bathroom. remove existing walls between kitchen and living room.Details
kitchen remodel and 2 bathroom. remove existing walls between kitchen and living room. | $67,000 |
| Mar 13, 2025 | Completed final sign-off Mar 2025 | 402 Ellsworth St | exterior siding replacement (front area). total area of siding replacement shall not exceed 600 sqft. no sheathing or stud replacement under this permit application.Details
exterior siding replacement (front area). total area of siding replacement shall not exceed 600 sqft. no sheathing or stud replacement under this permit application. | $3,500 |
| Sep 17, 2024 | Completed final sign-off Sep 2025 | 66 Mirabel Av | revision to pa 202311060197 adjust location of 2 front entry doors due to existing conditions. no other work proposedDetails
revision to pa 202311060197 adjust location of 2 front entry doors due to existing conditions. no other work proposed | |
| Aug 9, 2024 | Completed final sign-off Apr 2025 | 44 Surrey St | install a new french drain and catch basin at the basement. replace (e) electrical outlet.Details
install a new french drain and catch basin at the basement. replace (e) electrical outlet. | $6,000 |
| Mar 20, 2024 | Completed final sign-off Jul 2024 | 2624 Bush St | unit #2: kitchen and bathroom remodel - new wiring and subpanel. no wall alterationDetails
unit #2: kitchen and bathroom remodel - new wiring and subpanel. no wall alteration | $48,000 |
| Feb 9, 2024 | Expired or cancelled cancelled Mar 2024 | 1590 Union St | legalization of existing unit# 1590 a at second floor level. no change to building exterior. remodel kitchen and bathroom. no structural work proposed.Details
legalization of existing unit# 1590 a at second floor level. no change to building exterior. remodel kitchen and bathroom. no structural work proposed. | $40,000 |
| Jan 30, 2024 | Completed final sign-off Apr 2024 | 1588 Union St | interior remodel of unit 1588 union street at 3rd floor. install the new skylights. selected non-bearing partitions to be removed. new wall construction per floor plan. remove extg bathroom & install nw related bathroom & 1 addtional bathroom. new washer & dryer closetDetails
interior remodel of unit 1588 union street at 3rd floor. install the new skylights. selected non-bearing partitions to be removed. new wall construction per floor plan. remove extg bathroom & install nw related bathroom & 1 addtional bathroom. new washer & dryer closet | $55,000 |
| Jan 10, 2024 | Completed final sign-off Apr 2024 | 1588 Union St | kitchen and bathroom remodel, new wiring and plumbing, new lights, new bathroom fan, new sheet rock and insullation. no moving walls.Details
kitchen and bathroom remodel, new wiring and plumbing, new lights, new bathroom fan, new sheet rock and insullation. no moving walls. | $75,000 |
| Jan 10, 2024 | Completed final sign-off Apr 2024 | 1588 Union St | window replacement, 6 windows total 2 at lightwell and 4 at front of building. front windows marvin elevateDetails
window replacement, 6 windows total 2 at lightwell and 4 at front of building. front windows marvin elevate | $3,500 |
| Nov 6, 2023 | Completed final sign-off Sep 2025 | 66 Mirabel Av | remodel 2 units including replacement of mechanical, plumbing & electrical system. replacement of all windows & installation of insulation throughout. ground floor addition of 404 ft of heated space within garage envelope. infill (e) lightwell. replace stucco facade with new painted wood siding.Details
remodel 2 units including replacement of mechanical, plumbing & electrical system. replacement of all windows & installation of insulation throughout. ground floor addition of 404 ft of heated space within garage envelope. infill (e) lightwell. replace stucco facade with new painted wood siding. | $460,000 |
| Nov 6, 2023 | Completed final sign-off Sep 2025 | 66 Mirabel Av | selective removal of interior finishes to investigate water damage. no architectural work proposed. no changes to walls. at both units.Details
selective removal of interior finishes to investigate water damage. no architectural work proposed. no changes to walls. at both units. | $3,000 |
| May 12, 2023 | Completed final sign-off Jul 2023 | 256 Mullen Av | rev to pa#202106152489, to remove new roof deck for front unit above garage from scope of work.Details
rev to pa#202106152489, to remove new roof deck for front unit above garage from scope of work. | |
| Apr 18, 2023 | Completed final sign-off Aug 2023 | 740 18th Av | install new electrical subpanel and new wire all interior of house install new kitchen sink and faucet, use the existing water line, and window leak repair (rear back of house area)Details
install new electrical subpanel and new wire all interior of house install new kitchen sink and faucet, use the existing water line, and window leak repair (rear back of house area) | $28,000 |
| Jul 7, 2022 | Expired or cancelled expired Oct 2025 | 20 Gloria Ct | interior scope: proposed family rm, (n) bathroom & laundry area, led light fixture @ garage level. re-build interior stair. (n) rear grade level deck.Details
interior scope: proposed family rm, (n) bathroom & laundry area, led light fixture @ garage level. re-build interior stair. (n) rear grade level deck. | $28,000 |
| Mar 25, 2022 | Completed final sign-off Jun 2022 | 206 Virginia Av | remodel: 1 kitchen ( cabinets, sink, d/w, stove, hood) & 1 bathroom: (tub, toilet, sink, tile). no change to layouts. new subpanel. new lights and receptacles. no new wall & no existing wall relocation. new lighting shall comply with cec 150.0 (k)3 & (k)5.Details
remodel: 1 kitchen ( cabinets, sink, d/w, stove, hood) & 1 bathroom: (tub, toilet, sink, tile). no change to layouts. new subpanel. new lights and receptacles. no new wall & no existing wall relocation. new lighting shall comply with cec 150.0 (k)3 & (k)5. | $43,000 |
| Feb 11, 2022 | Completed final sign-off Feb 2023 | 1588 Union St | unit b for 1588; replace 3 windows in-kind at lightwell, vinyl, not visible from streetDetails
unit b for 1588; replace 3 windows in-kind at lightwell, vinyl, not visible from street | $2,700 |
| Feb 11, 2022 | Completed final sign-off Feb 2023 | 1590 Union St | unit b for 1590 union st; replace 5 windows in-kind at lightwell, vinyl, not visible from streetDetails
unit b for 1590 union st; replace 5 windows in-kind at lightwell, vinyl, not visible from street | $3,500 |
| Jan 10, 2022 | Completed final sign-off May 2023 | 1590 Union St | kitchen remodeling and bathroom. replace refridgerator, dishwasher, stove hood, in-kind. new electrical outlets and lights.Details
kitchen remodeling and bathroom. replace refridgerator, dishwasher, stove hood, in-kind. new electrical outlets and lights. | $67,000 |
| Jan 10, 2022 | Completed final sign-off May 2023 | 1588 Union St | unit b. kitchen remodeling and bathroom. repalce refridgerator, dishwasher, hood, stove, and garbage disposal. new electrical outlets and lights.Details
unit b. kitchen remodeling and bathroom. repalce refridgerator, dishwasher, hood, stove, and garbage disposal. new electrical outlets and lights. | $67,000 |
| Aug 18, 2021 | Never finaled issued Aug 2021, no final | 639 18th Av | to obtain final inspction for work approved under pa# 201711073375 and 201712156594: all work is completed: demo of bathroom and kitchen both units: upgrade electrical panels: remove old ducting in garage: relocate one bathroom wall: replace rear 12 windows.Details
to obtain final inspction for work approved under pa# 201711073375 and 201712156594: all work is completed: demo of bathroom and kitchen both units: upgrade electrical panels: remove old ducting in garage: relocate one bathroom wall: replace rear 12 windows. | |
| Jun 15, 2021 | Completed final sign-off Jul 2023 | 256 Mullen Av | new roof deck with internal stair at rear unit. new roof deck for front unit above garage.Details
new roof deck with internal stair at rear unit. new roof deck for front unit above garage. | $50,000 |
| May 26, 2021 | Completed final sign-off Sep 2021 | 3633 22nd St | replacement windows: 8 in front and 6 at rear area. - windows at front to be woodDetails
replacement windows: 8 in front and 6 at rear area. - windows at front to be wood | $22,000 |
| Apr 15, 2021 | Completed final sign-off Jul 2021 | 140 Genebern Wy | windows leak repair and replace existing stucco on one side wall, ~450 sqft.Details
windows leak repair and replace existing stucco on one side wall, ~450 sqft. | $13,500 |
| Apr 13, 2021 | Completed final sign-off Jul 2021 | 3633 22nd St | 1. kitchen remodel/ cabinets change/ and dishwasher, refrigerator, stove, and hood. 2. bathroom remodeling new tiles, toilets, cabinets, sink. 25 outlets, 17 switches, no change to layout of walls and openings.Details
1. kitchen remodel/ cabinets change/ and dishwasher, refrigerator, stove, and hood. 2. bathroom remodeling new tiles, toilets, cabinets, sink. 25 outlets, 17 switches, no change to layout of walls and openings. | $87,000 |
| Mar 22, 2021 | Expired or cancelled cancelled Jan 2026 | 451 30th St | replace 14 lf of retaining wall. repair 20 sqft of garage ceiling.Details
replace 14 lf of retaining wall. repair 20 sqft of garage ceiling. | $13,500 |
| Feb 9, 2021 | Completed final sign-off Feb 2021 | 73 Mizpah St | renew bpa# 20160713266 for final inspection. all work complete.Details
renew bpa# 20160713266 for final inspection. all work complete. | $8,000 |
| Oct 28, 2020 | Completed final sign-off Oct 2021 | 140 Genebern Wy | repair front stairs and replace brick tiles all over. less than 50%Details
repair front stairs and replace brick tiles all over. less than 50% | $5,600 |
| Jul 14, 2020 | Completed final sign-off Jul 2020 | 639 18th Av | revision to pa# 201810153229. inspector has requested as built conditions to be permitted including 2 skylights, 1 window and stucco hall finish of rear wall. no work to front of bldg.Details
revision to pa# 201810153229. inspector has requested as built conditions to be permitted including 2 skylights, 1 window and stucco hall finish of rear wall. no work to front of bldg. | $9,000 |
| Jun 25, 2020 | Completed final sign-off Apr 2021 | 79 Farnsworth Ln | revision to pa# 201901079748. mech equip relocated per instructions of inspector. room layout altered due to mechanical change. no change to exterior. no structural change.Details
revision to pa# 201901079748. mech equip relocated per instructions of inspector. room layout altered due to mechanical change. no change to exterior. no structural change. | $4,000 |
| Feb 26, 2020 | Completed final sign-off Feb 2021 | 73 Mizpah St | to obtain final inspection for work approved under pa# 2016-1121-3229 & 2017-0502-5469. all work is complete.Details
to obtain final inspection for work approved under pa# 2016-1121-3229 & 2017-0502-5469. all work is complete. | |
| Dec 19, 2019 | Never finaled issued Jan 2020, no final | 639 18th Av | revision to permit #201810153229. remove interior wall per plan at 3rd fl level.Details
revision to permit #201810153229. remove interior wall per plan at 3rd fl level. | $8,000 |
| Sep 30, 2019 | Completed final sign-off Feb 2021 | 1287 Howard St | to comply w/ physical inspection report cc-8327Details
to comply w/ physical inspection report cc-8327 | $10,000 |
| Sep 27, 2019 | Completed final sign-off Aug 2020 | 273 Duncan St | remove closet and replace w/ new bathroom. no added sq footage. no structural work.Details
remove closet and replace w/ new bathroom. no added sq footage. no structural work. | $3,000 |
| Sep 3, 2019 | Completed final sign-off Oct 2019 | 211 Sutter St | change of use from retail to limited restaurant. install prep kitchen.Details
change of use from retail to limited restaurant. install prep kitchen. | $7,500 |
| Aug 22, 2019 | Completed final sign-off Mar 2020 | 576 Eureka St | replace kitchen cabinets, finishes, appliances - 1 kitchen. replace bath and master bath finishes and fixtures. - 2 bathroomsDetails
replace kitchen cabinets, finishes, appliances - 1 kitchen. replace bath and master bath finishes and fixtures. - 2 bathrooms | $5,000 |
| Jul 2, 2019 | Completed final sign-off Jul 2019 | 576 Eureka St | replace dry rot damage framing. replace mud sill. replace rinjoist, 12lf 1st level and 2nd level. install fire blocking. install metal strapping. install a35. loft side only. repair in kindDetails
replace dry rot damage framing. replace mud sill. replace rinjoist, 12lf 1st level and 2nd level. install fire blocking. install metal strapping. install a35. loft side only. repair in kind | $1,350 |
| Jun 24, 2019 | Completed final sign-off Jul 2019 | 576 Eureka St | replace wood siding at left side of building in-kind. no hardie board siding. no other work under this permit.Details
replace wood siding at left side of building in-kind. no hardie board siding. no other work under this permit. | $17,350 |
| Jan 25, 2019 | Completed final sign-off Jan 2020 | 860 Hayes St | remodel of bathroom onn 2/f opposite room #13; incl tile work, 2 new showrs and replacing of plumbing and elect. fiextures.Details
remodel of bathroom onn 2/f opposite room #13; incl tile work, 2 new showrs and replacing of plumbing and elect. fiextures. | $15,000 |
| Jan 7, 2019 | Completed final sign-off Apr 2021 | 79 Farnsworth Ln | construct (n) 765 sf adu with bathroom, kitchen & one bedroom. install (n) clad wood windows per plans. detail to match (e) house. install (n) concrete steps and retaining wall for adu access. adu per ordinance 95-17.Details
construct (n) 765 sf adu with bathroom, kitchen & one bedroom. install (n) clad wood windows per plans. detail to match (e) house. install (n) concrete steps and retaining wall for adu access. adu per ordinance 95-17. | $150,000 |
| Oct 15, 2018 | Completed final sign-off Jul 2020 | 639 18th Av | revision to pa # 2018-0222-2020. roof deck addition, relocate kitchen, on third floor, add int stair to roof deck. minor clarifications to original permit.Details
revision to pa # 2018-0222-2020. roof deck addition, relocate kitchen, on third floor, add int stair to roof deck. minor clarifications to original permit. | $50,000 |
| Jun 20, 2018 | Completed final sign-off Oct 2018 | 79 Mizpah St | bathroom remodel same location for fixtures. rewire whole house. local repair bathroom remodel, same location for fixtures. rewire house, wall repair, flooring in kitchen, new counters, sheetrock garage with 5/8 type gyp bd walls,ceiling no rooms in garageDetails
bathroom remodel same location for fixtures. rewire whole house. local repair bathroom remodel, same location for fixtures. rewire house, wall repair, flooring in kitchen, new counters, sheetrock garage with 5/8 type gyp bd walls,ceiling no rooms in garage | $29,000 |
| May 24, 2018 | Completed final sign-off Sep 2018 | 3350 Laguna St | 3rd fl. kitchen remodel, selected openings at kitchen wallDetails
3rd fl. kitchen remodel, selected openings at kitchen wall | $42,000 |
| Feb 22, 2018 | Completed final sign-off Jul 2020 | 639 18th Av | add condition space in garage with bathroom & laundry, infill lightwell @ 2nd floor, add bathroom @ 3rd floor, remove lath & plaster throughout & install new gypboard. pa#201711073375Details
add condition space in garage with bathroom & laundry, infill lightwell @ 2nd floor, add bathroom @ 3rd floor, remove lath & plaster throughout & install new gypboard. pa#201711073375 | $80,000 |
| Dec 15, 2017 | Never finaled issued Dec 2017, no final | 639 18th Av | rev to pa201711073375: relocate one bathroom wall. remove & replace rear siding with new as needed.Details
rev to pa201711073375: relocate one bathroom wall. remove & replace rear siding with new as needed. | $8,000 |
| Nov 7, 2017 | Never finaled issued Nov 2017, no final | 639 18th Av | demo and remodel (2) bathrooms and (2) kitchens @ both units. (new cabinets, counter tops) upgrade electrical, panels; remove old ducting in garage; no alteration of wall, window and doorDetails
demo and remodel (2) bathrooms and (2) kitchens @ both units. (new cabinets, counter tops) upgrade electrical, panels; remove old ducting in garage; no alteration of wall, window and door | $65,000 |
| Jul 20, 2017 | Completed final sign-off Oct 2017 | 758 Great Hy | replace two doors & for the garbage can room, 2 for access to the roof. door is visible to the street. fiberglass doors.Details
replace two doors & for the garbage can room, 2 for access to the roof. door is visible to the street. fiberglass doors. | $1,500 |
| May 2, 2017 | Completed final sign-off Feb 2021 | 73 Mizpah St | remove (e) roof (partial), siding, interior drywall, update & finish plumbing & electrical, reinforce (e) footing, foundation, framing. remodel (e) bathroom, relocate/remodel kitchen & dining room. floors of renovated area to be equal with existing structureDetails
remove (e) roof (partial), siding, interior drywall, update & finish plumbing & electrical, reinforce (e) footing, foundation, framing. remodel (e) bathroom, relocate/remodel kitchen & dining room. floors of renovated area to be equal with existing structure | $95,000 |
| Apr 18, 2017 | Expired or cancelled cancelled Jun 2017 | 15 Prospect Av | unit 15&15a: no walls moved/removed/added or infilled; all (e) layouts to remain unchanged; remodel 2 kitchens/2 bathrooms, new elctrical/plumbing, sheetrock replacement, new wood flooring, rear windows replaced in-kind, replace deteriorating front deck/stairs/railings/framing less than 50%Details
unit 15&15a: no walls moved/removed/added or infilled; all (e) layouts to remain unchanged; remodel 2 kitchens/2 bathrooms, new elctrical/plumbing, sheetrock replacement, new wood flooring, rear windows replaced in-kind, replace deteriorating front deck/stairs/railings/framing less than 50% | $90,000 |