T T General Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2010 to Sep 2026
- Last 24 months
- 7 permits filed
60 permits since 2000: 54 completed, 6 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 18, 2026 | In progress filed Sep 2026, not yet issued | 145 Jordan Av | full house remodel with rear addition at all levels, adding a total of 465 sf of floor area. no changes to front facade- slight expansion andd deckDetails
full house remodel with rear addition at all levels, adding a total of 465 sf of floor area. no changes to front facade- slight expansion andd deck | $1,100,000 |
| May 12, 2026 | In progress issued May 2026 | 1470 De Haro St | revise pa 202510097132 change structural framing at stair openingDetails
revise pa 202510097132 change structural framing at stair opening | |
| Feb 25, 2026 | Completed final sign-off May 2026 | 503 Hugo St | g/f -convert (e) closet to half bath, replace 1 rear facing window in e) openingDetails
g/f -convert (e) closet to half bath, replace 1 rear facing window in e) opening | $14,000 |
| Oct 9, 2025 | In progress issued Mar 2026 | 1470 De Haro St | expand level 1 to create new conditioned space at level 1, and enlarge level 2 bathroomDetails
expand level 1 to create new conditioned space at level 1, and enlarge level 2 bathroom | $55,000 |
| Nov 25, 2024 | In progress filed Nov 2024, not yet issued | 3948 Mission St | new garage door and curb cut on mission street. remove street tree.Details
new garage door and curb cut on mission street. remove street tree. | $20,000 |
| Nov 25, 2024 | Completed final sign-off Jun 2025 | 3948 Mission St | rev 202410092657- add utlitiy sink and remove structural scope of work at facade. reduce size of bathroom window. remove shearwall and holdown special inspections from pa#2024-1009-2657Details
rev 202410092657- add utlitiy sink and remove structural scope of work at facade. reduce size of bathroom window. remove shearwall and holdown special inspections from pa#2024-1009-2657 | |
| Oct 9, 2024 | Completed final sign-off Jun 2025 | 3948 Mission St | remodel lower unit. replace and expand existing deck under 30" in height facing rear yard.Details
remodel lower unit. replace and expand existing deck under 30" in height facing rear yard. | $75,000 |
| May 16, 2024 | In progress filed May 2024, not yet issued | 146 Elsie St | whole house remodel. backyard remodel w/ new deck 30" above grade. modifications to two bay windows exempt from 311 notification per municipal code section 136. addition at 2nd floor/ rear 2nd floor deckDetails
whole house remodel. backyard remodel w/ new deck 30" above grade. modifications to two bay windows exempt from 311 notification per municipal code section 136. addition at 2nd floor/ rear 2nd floor deck | $300,000 |
| Apr 7, 2023 | Completed final sign-off Jan 2024 | 218 Miguel St | revision to pa# 202205275172, partial foundation replacement instead of full.Details
revision to pa# 202205275172, partial foundation replacement instead of full. | |
| Feb 3, 2023 | In progress issued Apr 2024 | 218 Miguel St | int. remdl of (e) 2 stry sfr. no additiona unit. siding replacement at rear. no work at front facade. minor vert/horz addition at 2nd floor within (e) footprint, for primary brm. (n)roofdeckDetails
int. remdl of (e) 2 stry sfr. no additiona unit. siding replacement at rear. no work at front facade. minor vert/horz addition at 2nd floor within (e) footprint, for primary brm. (n)roofdeck | $100,000 |
| Jan 6, 2023 | Completed final sign-off Jan 2023 | 366 Chenery St | revision to pa#202102134653. change to backyard fence height and new 29" retaining wall. change to mudroom/wc/storage layout, & single faucet at master bath. no shower at 3rd floor bath. square off landin at back yard stairs. no new trash enclosureDetails
revision to pa#202102134653. change to backyard fence height and new 29" retaining wall. change to mudroom/wc/storage layout, & single faucet at master bath. no shower at 3rd floor bath. square off landin at back yard stairs. no new trash enclosure | |
| Nov 3, 2022 | Completed final sign-off Jan 2025 | 64 Divisadero St | convert unfinished 1st floor to living space, incl, 2 new bedrooms + hall bath convert (e) bedroom in to new dining room and 2nd flr remodel (e) 2nd floor bathrm. new int stair @ existing light well. no work on 3rd and 4th flrsDetails
convert unfinished 1st floor to living space, incl, 2 new bedrooms + hall bath convert (e) bedroom in to new dining room and 2nd flr remodel (e) 2nd floor bathrm. new int stair @ existing light well. no work on 3rd and 4th flrs | $200,000 |
| May 27, 2022 | Completed final sign-off Jan 2024 | 218 Miguel St | 1st fl - remodeling including new family room, bath and bedroom; replace (e) brick foundationDetails
1st fl - remodeling including new family room, bath and bedroom; replace (e) brick foundation | $175,000 |
| Mar 30, 2021 | Completed final sign-off Mar 2022 | 720 03rd Av | 3/f: hall bath and bedroom closets remodel, new master bath. 2/f: kitchen, vestibule and half bath remodel.Details
3/f: hall bath and bedroom closets remodel, new master bath. 2/f: kitchen, vestibule and half bath remodel. | $115,000 |
| Feb 13, 2021 | Completed final sign-off Jan 2023 | 366 Chenery St | first floor:install garbage enclosure. new garage door. 2nd floor: convert floor to living space, including new master suite, office, family room, and storage. new uncond. mech closet and laundry room. new front entry porch. 3rd floor: gut remodel including kitchen, new bathroom & new deck at grade.Details
first floor:install garbage enclosure. new garage door. 2nd floor: convert floor to living space, including new master suite, office, family room, and storage. new uncond. mech closet and laundry room. new front entry porch. 3rd floor: gut remodel including kitchen, new bathroom & new deck at grade. | $350,000 |
| Jan 3, 2020 | Completed final sign-off Jun 2020 | 3950 Mission St | remodeling 1 bath and 1 kitchen at 2nd fl. no structural work.Details
remodeling 1 bath and 1 kitchen at 2nd fl. no structural work. | $15,000 |
| Dec 12, 2019 | Completed final sign-off Jan 2021 | 351 27th St | interior remodel of kitchen, living, dining, bath, closetsDetails
interior remodel of kitchen, living, dining, bath, closets | $65,000 |
| May 14, 2019 | Completed final sign-off Oct 2020 | 339 Oxford St | replacing (e) rear 2nd flr deck and stairs to 1st flr & yard with new larger 2nd flr deck with fire wall. replace (e) exterior stairs from 1st to yard in kindDetails
replacing (e) rear 2nd flr deck and stairs to 1st flr & yard with new larger 2nd flr deck with fire wall. replace (e) exterior stairs from 1st to yard in kind | $25,000 |
| Apr 18, 2019 | Completed final sign-off Dec 2019 | 53 Stillings Av | 2nd flr - kitchen & bathroom remodel, including new skylights. 1st flr - conversion of 787 sf of garage/storage to conditioned space, including new master suite, den, storage, laundry room and interior stairsDetails
2nd flr - kitchen & bathroom remodel, including new skylights. 1st flr - conversion of 787 sf of garage/storage to conditioned space, including new master suite, den, storage, laundry room and interior stairs | $175,000 |
| Feb 12, 2019 | Completed final sign-off Dec 2019 | 200 Madrid St | revision to pa 2018-1213-8263 open kitchen to living room; replace concrete slab with 1st floor level; framing revisionsDetails
revision to pa 2018-1213-8263 open kitchen to living room; replace concrete slab with 1st floor level; framing revisions | $10,000 |
| Dec 13, 2018 | Completed final sign-off Dec 2019 | 200 Madrid St | convert 666sf of unconditioned 1st fl storage space into living space including remodeling an (e) 1/2 bath. reclaim 28sf of entry recess as (n) conditioned space. relocate (e) furnace & w/h to basement. rpelace most windows & doors. remodel (e) kitchen & bath on 2nd fl. replacing fixtures in kind.Details
convert 666sf of unconditioned 1st fl storage space into living space including remodeling an (e) 1/2 bath. reclaim 28sf of entry recess as (n) conditioned space. relocate (e) furnace & w/h to basement. rpelace most windows & doors. remodel (e) kitchen & bath on 2nd fl. replacing fixtures in kind. | $125,000 |
| Dec 6, 2018 | Completed final sign-off Dec 2019 | 200 Madrid St | (n) 2-story spiral stair to rear yard. (n) window @ rear facade.Details
(n) 2-story spiral stair to rear yard. (n) window @ rear facade. | $25,000 |
| May 9, 2018 | Completed final sign-off Jul 2018 | 245 Dolores St | remodel one kitchen, replace cabinets, counters & floor. at least 50% high efficiency lighting (by wattage). remodel one bathroom in same location. no walls moved, removed added or in-filled. all (e) layouts to remain unchanged.Details
remodel one kitchen, replace cabinets, counters & floor. at least 50% high efficiency lighting (by wattage). remodel one bathroom in same location. no walls moved, removed added or in-filled. all (e) layouts to remain unchanged. | $32,810 |
| Nov 9, 2017 | Completed final sign-off Mar 2018 | 218 Miguel St | remodel one bathroom in-kind, same location, new lights with occupancy sensorswitches use (e) fan.Details
remodel one bathroom in-kind, same location, new lights with occupancy sensorswitches use (e) fan. | $12,000 |
| Jun 19, 2017 | Completed final sign-off Mar 2018 | 566 Chenery St | 1st fl new bath, remove (e) 2nd bath, new exterior door at bedroom 2. 2nd fl new kitchen, living and dining rm. replace in kind exterior windows & doors, not visible from the street. work as indicated on condo conversion reportDetails
1st fl new bath, remove (e) 2nd bath, new exterior door at bedroom 2. 2nd fl new kitchen, living and dining rm. replace in kind exterior windows & doors, not visible from the street. work as indicated on condo conversion report | $130,000 |
| Apr 13, 2017 | Completed final sign-off May 2017 | 2155 Scott St | to comply w/complaint #201773742 - replace approx 38 sq ft of siding at adjacent bldg between 2155 & 2151 scott street. not visible from street.Details
to comply w/complaint #201773742 - replace approx 38 sq ft of siding at adjacent bldg between 2155 & 2151 scott street. not visible from street. | $1,800 |
| Mar 20, 2017 | Completed final sign-off Jun 2017 | 339 Oxford St | remodel one kitchen, replace cabinet, countertop, floor tile. at least 100% efficacy lighting. no change in wall layoutDetails
remodel one kitchen, replace cabinet, countertop, floor tile. at least 100% efficacy lighting. no change in wall layout | $9,000 |
| Jan 24, 2017 | Completed final sign-off Feb 2019 | 1279 Fitzgerald Av | to erect 2 stories, no basement, type v-b, single family dwelling.Details
to erect 2 stories, no basement, type v-b, single family dwelling. | $385,000 |
| Dec 1, 2016 | Completed final sign-off Jun 2017 | 1565 Dolores St | kitchen remodelDetails
kitchen remodel | $12,000 |
| Dec 1, 2016 | Completed final sign-off Jan 2017 | 152 Santa Marina St | replace garage door & foundation at front facadeDetails
replace garage door & foundation at front facade | $10,000 |
| Nov 15, 2016 | Completed final sign-off Dec 2018 | 152 Santa Marina St | (n) 153 sq ft 3rd fl master bath, landing & closet addition. (n) 142 sq ft roof deck off of master bath, including (n) guardrail. no change to street facade.Details
(n) 153 sq ft 3rd fl master bath, landing & closet addition. (n) 142 sq ft roof deck off of master bath, including (n) guardrail. no change to street facade. | $75,000 |
| Oct 15, 2015 | Completed final sign-off Jan 2019 | 2151 Scott St | partial demolition for expoloration purposes. desired outcome: view framing details, expilore foundation constructoni and other structural specific areas.Details
partial demolition for expoloration purposes. desired outcome: view framing details, expilore foundation constructoni and other structural specific areas. | $4,500 |
| Jul 22, 2015 | Completed final sign-off Jan 2019 | 2151 Scott St | interior renovation: 1st flr: convert unconditioned to fam room & bath. enlcose entry foyer. 2nd flr: remodel entire flr - kitchen, bath & add powder rm/ 3rd flr: convert 2 bedrms to master & new baths, new skylights, windows, reconfigure (e) stair.Details
interior renovation: 1st flr: convert unconditioned to fam room & bath. enlcose entry foyer. 2nd flr: remodel entire flr - kitchen, bath & add powder rm/ 3rd flr: convert 2 bedrms to master & new baths, new skylights, windows, reconfigure (e) stair. | $117,000 |
| May 18, 2015 | Completed final sign-off Sep 2015 | 45 Ora Wy | 1st floor/unit a101: kitchen remodel/bath remodel: new interior finishes @ bedroom & living room, minor partition changesDetails
1st floor/unit a101: kitchen remodel/bath remodel: new interior finishes @ bedroom & living room, minor partition changes | $30,000 |
| Mar 3, 2015 | Completed final sign-off Dec 2016 | 3303 Folsom St | remodel of upper unit at 4th fl; 3rd fl, 125 sq ft back addition w/ equal size reduction of deck, new spiral stair; 4th fl, 115 sq ft addition master suite, expend roof deck by 169 sq ft. the size of usable attic space is to increase by 63 sq ft.Details
remodel of upper unit at 4th fl; 3rd fl, 125 sq ft back addition w/ equal size reduction of deck, new spiral stair; 4th fl, 115 sq ft addition master suite, expend roof deck by 169 sq ft. the size of usable attic space is to increase by 63 sq ft. | $95,000 |
| Jul 31, 2014 | Completed final sign-off May 2016 | 3303 Folsom St | revision to appl #2014.0321.1414 - convert from 1 dwelling unit to 2 dwelling units (floors 1&2 one unit, floors 3 & 4 second unit). new bathroom on 1st floor, new kitchen, remove int stair on 2nd floor. change sprinklers to nfpa 13.Details
revision to appl #2014.0321.1414 - convert from 1 dwelling unit to 2 dwelling units (floors 1&2 one unit, floors 3 & 4 second unit). new bathroom on 1st floor, new kitchen, remove int stair on 2nd floor. change sprinklers to nfpa 13. | $20,000 |
| Jul 25, 2014 | Completed final sign-off Nov 2015 | 550 Mississippi St | a demolition of an (e) 2nd floor deck and construction of a new horizontal addition containing a stairway, family room and new deck. addition of a new bedroom and bathroom within (e) non conditioned space.Details
a demolition of an (e) 2nd floor deck and construction of a new horizontal addition containing a stairway, family room and new deck. addition of a new bedroom and bathroom within (e) non conditioned space. | $153,000 |
| May 19, 2014 | Completed final sign-off Jun 2014 | 1087 Francisco St | replace four windows @ south side. rear of the house & not visible from the street. all windows are the same with (e) windows.Details
replace four windows @ south side. rear of the house & not visible from the street. all windows are the same with (e) windows. | $2,800 |
| May 6, 2014 | Completed final sign-off Jul 2014 | 1440 Webster St | remodel one kitchen, replace cabinet, coutner top and wood floor, at least 50% high efficiency lighting (by wattage)Details
remodel one kitchen, replace cabinet, coutner top and wood floor, at least 50% high efficiency lighting (by wattage) | $9,500 |
| Mar 21, 2014 | Completed final sign-off May 2016 | 3303 Folsom St | convert 2 extg floors to habitable. lower floor at story 2. repair extg decks.Details
convert 2 extg floors to habitable. lower floor at story 2. repair extg decks. | $120,000 |
| Mar 5, 2014 | Completed final sign-off Apr 2015 | 75 Ora Wy | unit #d105 - remodel kitchen and bathroom, remove fire place, modify closetDetails
unit #d105 - remodel kitchen and bathroom, remove fire place, modify closet | $20,000 |
| Jan 8, 2014 | Completed final sign-off Apr 2014 | 80 Ora Wy | remodel 1 kitchen, replace cabinets, countertop, floor at least 50% high efficiency lighting ( by wattage)Details
remodel 1 kitchen, replace cabinets, countertop, floor at least 50% high efficiency lighting ( by wattage) | $9,500 |
| Jan 8, 2014 | Completed final sign-off Oct 2014 | 3702 Folsom St | convert basement to habitable, new foundation walls, lower slab @ basement, new doors & windows as shown. slightly enlarge garage door.Details
convert basement to habitable, new foundation walls, lower slab @ basement, new doors & windows as shown. slightly enlarge garage door. | $75,000 |
| Oct 18, 2013 | Completed final sign-off Nov 2013 | 140 Manor Dr | install type x 5/8 gypsum board on ceiling and wall in the garage area.Details
install type x 5/8 gypsum board on ceiling and wall in the garage area. | $1,800 |
| Oct 3, 2013 | Completed final sign-off Aug 2014 | 1108 Rhode Island St | fill in light well at north side, kitchen remodel 2nd fl, new window at lightwell, add 2 skylightsDetails
fill in light well at north side, kitchen remodel 2nd fl, new window at lightwell, add 2 skylights | $25,000 |
| Oct 1, 2013 | Completed final sign-off Oct 2013 | 140 Manor Dr | replace approximately 100 sq. ft. exterior dry rot wallboard at rear back of house/south side wall (remove stucco, replace woodboard and restucco).Details
replace approximately 100 sq. ft. exterior dry rot wallboard at rear back of house/south side wall (remove stucco, replace woodboard and restucco). | $2,000 |
| Aug 16, 2013 | Completed final sign-off Jul 2014 | 43 Powers Av | voluntary seismic upgrade to 1/f & 2/f and new foundation.Details
voluntary seismic upgrade to 1/f & 2/f and new foundation. | $60,000 |
| Jul 31, 2013 | Completed final sign-off Jan 2014 | 933 20th St | revision to pa #201306078960, add residetial style (non commercial)kitchen to messanine.Details
revision to pa #201306078960, add residetial style (non commercial)kitchen to messanine. | $12,000 |
| Jul 12, 2013 | Completed final sign-off Jan 2014 | 933 20th St | revision to 201306078960 - omit sparayed on fireproofing. substitute gyp bd. fireproofing. omit fireproofing to stairs as shown in 2013-0607-8960.Details
revision to 201306078960 - omit sparayed on fireproofing. substitute gyp bd. fireproofing. omit fireproofing to stairs as shown in 2013-0607-8960. | |
| Jun 7, 2013 | Completed final sign-off Jan 2014 | 933 20th St | build out (e) commercial space, reception area, bathrooms, offices, work area & lighting. legalize (e) mezzanine, relocate stairs, apply fireproofing to mezz decking. separate permits required for fire alarm, sprinklers, mep. no kitchen under this permit. approved otc. jjcDetails
build out (e) commercial space, reception area, bathrooms, offices, work area & lighting. legalize (e) mezzanine, relocate stairs, apply fireproofing to mezz decking. separate permits required for fire alarm, sprinklers, mep. no kitchen under this permit. approved otc. jjc | $160,000 |
| May 22, 2013 | Completed final sign-off Aug 2013 | 1099 23rd St | remodel & extnd master bathrm, replace all fixtures, new flooring, relocate subpanel. relocate gas hookup in laudnry room & new flooring at lower floor at lower floor entrance. remodel kitchen include nw 220v circuit for oven & nw flrg. remodel 1/2 bath. replace all fixtures new floor at half bath.Details
remodel & extnd master bathrm, replace all fixtures, new flooring, relocate subpanel. relocate gas hookup in laudnry room & new flooring at lower floor at lower floor entrance. remodel kitchen include nw 220v circuit for oven & nw flrg. remodel 1/2 bath. replace all fixtures new floor at half bath. | $80,000 |
| Mar 13, 2013 | Completed final sign-off Jul 2014 | 43 Powers Av | variance in process (tara sullivan): 2012.1075v. expand (e) 2nd story deck, (n) roof deck over 2nd story roof @ rear of bldgDetails
variance in process (tara sullivan): 2012.1075v. expand (e) 2nd story deck, (n) roof deck over 2nd story roof @ rear of bldg | $10,000 |
| Nov 19, 2012 | Completed final sign-off Dec 2012 | 49 Pond St | replace one side of backyard fence on south side approximately 20 ft long and 7 ft 6 in highDetails
replace one side of backyard fence on south side approximately 20 ft long and 7 ft 6 in high | $1,800 |
| Oct 19, 2012 | Completed final sign-off Nov 2012 | 80 Ora Wy | remodel one bathroom in kind same location, new light with occupancy sensor switch, use existing exhaust fanDetails
remodel one bathroom in kind same location, new light with occupancy sensor switch, use existing exhaust fan | $6,000 |
| Jul 19, 2012 | Completed final sign-off Sep 2012 | 17 Bennington St | revision to 201105176176. add 1 window at shower. omit window at stair.Details
revision to 201105176176. add 1 window at shower. omit window at stair. | |
| Dec 23, 2011 | Completed final sign-off Sep 2012 | 143 Fair Oaks St | remove (e) rear deck & stairs. new deck & stair at 2-stories.Details
remove (e) rear deck & stairs. new deck & stair at 2-stories. | $15,000 |
| Jun 28, 2011 | Completed final sign-off Sep 2011 | 75 Ora Wy | remodel condo unit in multi-family building. remodel one kitchen ; remove one gas fireplace (non-structural work only)Details
remodel condo unit in multi-family building. remodel one kitchen ; remove one gas fireplace (non-structural work only) | $11,000 |
| Feb 16, 2011 | Completed final sign-off Apr 2011 | 75 Ora Wy | remodel condo unit in a multi family bldg. unit d106 on the 1st floor. remodel full bathroom, minor non load bearing partition changes. elec and lighting in bedroom and hallDetails
remodel condo unit in a multi family bldg. unit d106 on the 1st floor. remodel full bathroom, minor non load bearing partition changes. elec and lighting in bedroom and hall | $15,000 |
| Nov 24, 2010 | Completed final sign-off Feb 2011 | 224 Oxford St | remodel one kitchen, replace cabinets, countertop, floor tiles, at least 50% high efficacy lighting (by wattage)Details
remodel one kitchen, replace cabinets, countertop, floor tiles, at least 50% high efficacy lighting (by wattage) | $6,000 |
| Jul 13, 2010 | Completed final sign-off Oct 2010 | 1628 Alemany Bl | remodel one kitchen,add 2 full bathrooms (1 in garage &1 in bsmnt) and one half bath on main/2nd floor,replace one furnace, build a wall btn garage and living space.new storage rm in bsmnt. legalize 2 bedrooms on ground fl.replace 2 windows at rear in main floor bedrms,new rear deck 6'x18',new drsDetails
remodel one kitchen,add 2 full bathrooms (1 in garage &1 in bsmnt) and one half bath on main/2nd floor,replace one furnace, build a wall btn garage and living space.new storage rm in bsmnt. legalize 2 bedrooms on ground fl.replace 2 windows at rear in main floor bedrms,new rear deck 6'x18',new drs | $32,000 |