Nancy Scheinholtz
- Listed as
- architect, authorized agent-others
- Firm
- Scheinholtz Assoc.
- Based in
- Burlingame
- On San Francisco permits
- Dec 2000 to Aug 2023
34 permits since 2000 (architect on 33 permits, authorized agent-others on 1 permit): 25 completed, 1 never finaled, 8 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 17, 2023 | Completed final sign-off May 2024 | 25 Presidio Tr | Fontana Construction, Inc. | revision to 201607011410 & 202203180362. add roof deck on 2nd fl on family room. replace front entry stairs and add pergola on 1sf fl deck previously approved.Details
revision to 201607011410 & 202203180362. add roof deck on 2nd fl on family room. replace front entry stairs and add pergola on 1sf fl deck previously approved. | $67,381 |
| Nov 28, 2022 | Completed final sign-off May 2024 | 25 Presidio Tr | Fontana Construction, Inc. | remove brick, add waterproofing, replace sides with stucco. front brick to be reinstalled. revision of pa# 2016-0701-1410Details
remove brick, add waterproofing, replace sides with stucco. front brick to be reinstalled. revision of pa# 2016-0701-1410 | $5,000 |
| Mar 18, 2022 | Completed final sign-off May 2024 | 25 Presidio Tr | Fontana Construction, Inc. | rev pa201607011410 change of deck from a wood deck to a roof deck. ext of hallway to exercise rm. french doors to deck changed to wndws. stair to be rebuilt to be open underneath. 2nd flr office will become mast bath. bath 3 will be remodeled. former master bath & closet will become master closet.Details
rev pa201607011410 change of deck from a wood deck to a roof deck. ext of hallway to exercise rm. french doors to deck changed to wndws. stair to be rebuilt to be open underneath. 2nd flr office will become mast bath. bath 3 will be remodeled. former master bath & closet will become master closet. | $40,000 |
| Oct 30, 2019 | Completed final sign-off Feb 2021 | 2855 Scott St | Jeff King And Company Inc | replace rear deck surface and railings, in kindDetails
replace rear deck surface and railings, in kind | $65,000 |
| May 3, 2018 | Expired or cancelled cancelled Dec 2019 | 1432 Willard St | Alioto Custom Building & Remodeling | horizontal addition below existing 1st fl space. remodel basement unit.existing stair from 1st fl to be repaired. new stair to connect basement level to rear yard. (small kitchen & bath)Details
horizontal addition below existing 1st fl space. remodel basement unit.existing stair from 1st fl to be repaired. new stair to connect basement level to rear yard. (small kitchen & bath) | $100,000 |
| Jul 1, 2016 | Completed final sign-off May 2024 | 25 Presidio Tr | Fontana Construction, Inc. | horizontal addition in rear yd 8'6". 2 story plus rebuild deck (less than 10' above grade) w/stair to grade, remodel kitchen, open up adj rooms, add bath on lower level in walk-in closet, change closet door on upper level.Details
horizontal addition in rear yd 8'6". 2 story plus rebuild deck (less than 10' above grade) w/stair to grade, remodel kitchen, open up adj rooms, add bath on lower level in walk-in closet, change closet door on upper level. | $125,000 |
| May 21, 2015 | Completed final sign-off Mar 2016 | 1976 California St | Hakewill Construction Co. Inc. | revision to app#201502259257. add laundry area. n/a maher ordinanceDetails
revision to app#201502259257. add laundry area. n/a maher ordinance | $3,000 |
| Jun 19, 2014 | Completed final sign-off May 2015 | 1 Hoffman Av | Connor Daly Corporation | 4th floor unit. remodel kitchen and 2 bathroom, move master bedroom to living room & living room to bedroom 2, install new lighting in master closet.Details
4th floor unit. remodel kitchen and 2 bathroom, move master bedroom to living room & living room to bedroom 2, install new lighting in master closet. | $93,000 |
| Feb 26, 2014 | Expired or cancelled cancelled Mar 2015 | 1976 California St | interior remodel of extg lower floor unit. mandatory wood frame seismic retrofit of lower level. n/a for the maher ordinance #155-13Details
interior remodel of extg lower floor unit. mandatory wood frame seismic retrofit of lower level. n/a for the maher ordinance #155-13 | $65,000 | |
| May 9, 2013 | Completed final sign-off Mar 2014 | 55 Santa Ana Av | Eric Wong | horizontal addition on 1st fl, vertical on 2nd fl. add 11 sq ft in rear of 1st flr, remodel kitchen. add 48 sq ft on second flr, remodel bathroom, move laundry to 2nd flr.Details
horizontal addition on 1st fl, vertical on 2nd fl. add 11 sq ft in rear of 1st flr, remodel kitchen. add 48 sq ft on second flr, remodel bathroom, move laundry to 2nd flr. | $80,000 |
| Aug 29, 2012 | Completed final sign-off May 2014 | 2465 Pacific Av | Sail Forth Builders Inc | remodel kitchen powder room, bath at 2nd floor. upgrade foundation. install plywood panel and footings under walls, install hold downs. this work is separate from future vertical addition permit.Details
remodel kitchen powder room, bath at 2nd floor. upgrade foundation. install plywood panel and footings under walls, install hold downs. this work is separate from future vertical addition permit. | $150,000 |
| May 4, 2012 | Expired or cancelled cancelled Jan 2026 | 2033 Fillmore St | construct wall , change lightingDetails
construct wall , change lighting | $15,000 | |
| Mar 6, 2012 | Completed final sign-off May 2014 | 2465 Pacific Av | add a vertical addition(3rd flr) w/family room, bedroom & bathroom. roof deck off of family room & roof deck on th roof of the addition accessed by new spiral stair.Details
add a vertical addition(3rd flr) w/family room, bedroom & bathroom. roof deck off of family room & roof deck on th roof of the addition accessed by new spiral stair. | $200,000 | |
| Feb 29, 2012 | Completed final sign-off Jun 2012 | 2550 Filbert St | Bjlgc Inc | widen garage door from 10 to 13'-9"(33% of lot width)Details
widen garage door from 10 to 13'-9"(33% of lot width) | $20,000 |
| Feb 29, 2012 | Expired or cancelled expired Jan 2022 | 645 Peralta Av | Kirk G Construction | new windows, new facade materials, add bay over side street at kitchen.Details
new windows, new facade materials, add bay over side street at kitchen. | $40,000 |
| Feb 24, 2012 | Completed final sign-off Mar 2012 | 2109 Broadway | Kirk G Construction | install a new metal railing at rear on 1st fl roof and reinstall existing fire ladder to comply with complaint 201290413. reopen existing framed skylight and add curb for new skylightDetails
install a new metal railing at rear on 1st fl roof and reinstall existing fire ladder to comply with complaint 201290413. reopen existing framed skylight and add curb for new skylight | $1,500 |
| Aug 15, 2011 | Never finaled issued Aug 2011, no final | 124 21st Av | C R Construction Co Inc | for final inspection only for bpa #9710750. to indicate wet bar & shower only, no kitchen per plan. remain to single family use only.Details
for final inspection only for bpa #9710750. to indicate wet bar & shower only, no kitchen per plan. remain to single family use only. | |
| Nov 17, 2008 | Completed final sign-off Sep 2009 | 140 San Pablo Av | Moroso Construction Inc | install non-structural walls to sub-divide (e) conditioned space. renovate (e) bathroom, relocate washer/dryer & seal off (e) window @ guest bedroom/office, replace bath window same size locationDetails
install non-structural walls to sub-divide (e) conditioned space. renovate (e) bathroom, relocate washer/dryer & seal off (e) window @ guest bedroom/office, replace bath window same size location | $25,000 |
| Oct 31, 2008 | Completed final sign-off Apr 2010 | 531 10th Av | Sail Forth Builders Inc | northwest corner is curently a back porch. project is to reconstruct this area is a 3 story horizontal addition. lower flr. on the 1st. flr. for legal headroom, create fam. rm., bath, stor. & bedrm., extend kitchen add deck & remodel kitchen on 2nd. flr., rebuild bedrm. & add bath on 3rd. flr. rev.Details
northwest corner is curently a back porch. project is to reconstruct this area is a 3 story horizontal addition. lower flr. on the 1st. flr. for legal headroom, create fam. rm., bath, stor. & bedrm., extend kitchen add deck & remodel kitchen on 2nd. flr., rebuild bedrm. & add bath on 3rd. flr. rev. | $350,000 |
| Jun 12, 2008 | Completed final sign-off Mar 2009 | 140 San Pablo Av | Moroso Construction Inc | renovate bathrooms on 2nd floor, add roof over lightwell, replace bathroom windowDetails
renovate bathrooms on 2nd floor, add roof over lightwell, replace bathroom window | $35,000 |
| Jun 2, 2008 | Completed final sign-off Oct 2008 | 2354 Larkin St | Christopher Wells Construction Inc. | remodel kitchen, bath, and powder room. add dumbwaiter between 1st floor and kitchen. replace kitchen windows in rear of house in same location with same type of windows (double hung). not visible from the streetDetails
remodel kitchen, bath, and powder room. add dumbwaiter between 1st floor and kitchen. replace kitchen windows in rear of house in same location with same type of windows (double hung). not visible from the street | $100,000 |
| Apr 23, 2008 | Completed final sign-off Dec 2008 | 1455 Lake St | laundry room in alternate location. and add full bath. revision to permit 2008 0404 8922.Details
laundry room in alternate location. and add full bath. revision to permit 2008 0404 8922. | ||
| Apr 16, 2008 | Completed final sign-off Apr 2009 | 620 El Camino Del Mar | Ben Rogne Construction | complete 1 story garage begin for pa #200603066073 w/ dcp variance #2005.0004v. extend kitchen 6ft onto existing deck and remodel kitchen, deck off kitchen extends into side yard under variance 2005.0004v. the 3rd fl master bath is expanded 215 sq ft and remodeled. 311 notification sent in 2005.Details
complete 1 story garage begin for pa #200603066073 w/ dcp variance #2005.0004v. extend kitchen 6ft onto existing deck and remodel kitchen, deck off kitchen extends into side yard under variance 2005.0004v. the 3rd fl master bath is expanded 215 sq ft and remodeled. 311 notification sent in 2005. | $225,000 |
| Feb 15, 2008 | Completed final sign-off Mar 2010 | 25 Scenic Wy | B G Flather Construction Inc | add 1 story 150 sf breakfast room @ rear of kitchen, remodel kitchen, rear portion of the tandem garage will be converted to family room. 1 parking space remain. remodel laundry room, mech room in basement. remodel 2nd floor bath.Details
add 1 story 150 sf breakfast room @ rear of kitchen, remodel kitchen, rear portion of the tandem garage will be converted to family room. 1 parking space remain. remodel laundry room, mech room in basement. remodel 2nd floor bath. | $175,000 |
| May 25, 2007 | Completed final sign-off Aug 2007 | 531 10th Av | Ben Rogne Construction | revision to app #200503308777:reduce scope of work. eliminate roof alterations, rear additon, kitchen remodel 2nd floor powder room, bathroom #3. ground floor slab will not be replaced with new dropped slab. no changes to sunrom or bedroom #3Details
revision to app #200503308777:reduce scope of work. eliminate roof alterations, rear additon, kitchen remodel 2nd floor powder room, bathroom #3. ground floor slab will not be replaced with new dropped slab. no changes to sunrom or bedroom #3 | |
| Jan 26, 2006 | Completed final sign-off Jun 2006 | 1376 De Haro St | Van Der Sterre Construction | add windscreen to extg roofDetails
add windscreen to extg roof | $10,000 |
| Dec 20, 2005 | Completed final sign-off Sep 2006 | 339 14th Av | remodel kitchen and bath per plan (at 2nd & 3rd floor)Details
remodel kitchen and bath per plan (at 2nd & 3rd floor) | $100,000 | |
| Dec 20, 2005 | Expired or cancelled expired Dec 2008 | 1455 Lake St | construct new stair and reconfigure floor plan to have a two unit building-owe unit on ground floor and one unit on the 2nd & 3rd fl. currently is only occupied by owner on 3 floors. infill on ground floor under building. (e) grd flr unit is not legal.Details
construct new stair and reconfigure floor plan to have a two unit building-owe unit on ground floor and one unit on the 2nd & 3rd fl. currently is only occupied by owner on 3 floors. infill on ground floor under building. (e) grd flr unit is not legal. | $100,000 | |
| May 2, 2005 | Expired or cancelled expired Jan 2006 | 257 29th Av | remodel is under contruction ext grade is lower than on plans. add'l exterior treads are needed.Details
remodel is under contruction ext grade is lower than on plans. add'l exterior treads are needed. | ||
| Mar 30, 2005 | Completed final sign-off Aug 2007 | 531 10th Av | Ben Rogne Construction | northwest corner of house is currently 3 story back porch.reconstruct area & integrate it into houseDetails
northwest corner of house is currently 3 story back porch.reconstruct area & integrate it into house | $175,000 |
| Dec 10, 2004 | Completed final sign-off Jan 2008 | 1589 17th Av | Baytex Corp. | add 3rd floor 3 bedrms 2 baths to existing 2 story home new stair connecting 3 floors will projectDetails
add 3rd floor 3 bedrms 2 baths to existing 2 story home new stair connecting 3 floors will project | $150,000 |
| Nov 2, 2004 | Expired or cancelled expired May 2008 | 140 San Pablo Av | Jeff Hicks Construction | remodel bathrooms on 1st & 2nd fl, add recessed lights in living room, replace windows in rear onDetails
remodel bathrooms on 1st & 2nd fl, add recessed lights in living room, replace windows in rear on | $35,000 |
| Aug 2, 2004 | Completed final sign-off Nov 2005 | 249 29th Av | add 3' addition on the ground floor in the rear of house for a larger family room. remodel kitchenDetails
add 3' addition on the ground floor in the rear of house for a larger family room. remodel kitchen | $100,000 | |
| Dec 8, 2000 | Expired or cancelled expired Jul 2002 | 3835 Scott St | kchn and bth remodelDetails
kchn and bth remodel | $31,000 |