B G Flather Construction Inc
- Based in
- Redwood City
- On San Francisco permits
- Aug 2006 to Mar 2013
- Last 24 months
- 0 permits filed
6 permits since 2000: 6 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 25, 2013 | Completed final sign-off Jan 2014 | 57 Benton Av | new electric service through ground floor and main floor. upgrade extg walls and cieling at ground floor to 1 hour rating and insulate. replace extg wall paneling at ground floor with 5/8 type x gyp brd. legalize bed, bath and den at ground floor.Details
new electric service through ground floor and main floor. upgrade extg walls and cieling at ground floor to 1 hour rating and insulate. replace extg wall paneling at ground floor with 5/8 type x gyp brd. legalize bed, bath and den at ground floor. | $20,000 |
| Mar 14, 2013 | Completed final sign-off Sep 2013 | 14 Presidio Tr | revision to pa#201209109313. paln revision to move nech & storage into (e) crawl space.Details
revision to pa#201209109313. paln revision to move nech & storage into (e) crawl space. | |
| Sep 10, 2012 | Completed final sign-off Sep 2013 | 14 Presidio Tr | interior renovation of ground floor & second floor including new kitchen, hvac & remodeled baths, revised floor plan & structural upgrades. legalize basement media room, bedroom & bathroom. window replacement on separate permit 2012-09-10-9318.Details
interior renovation of ground floor & second floor including new kitchen, hvac & remodeled baths, revised floor plan & structural upgrades. legalize basement media room, bedroom & bathroom. window replacement on separate permit 2012-09-10-9318. | $500,000 |
| Sep 10, 2012 | Completed final sign-off Sep 2013 | 14 Presidio Tr | replace existing exterior doors & windows with new, similar windows. interior work on separate permitDetails
replace existing exterior doors & windows with new, similar windows. interior work on separate permit | $100,000 |
| Feb 15, 2008 | Completed final sign-off Mar 2010 | 25 Scenic Wy | add 1 story 150 sf breakfast room @ rear of kitchen, remodel kitchen, rear portion of the tandem garage will be converted to family room. 1 parking space remain. remodel laundry room, mech room in basement. remodel 2nd floor bath.Details
add 1 story 150 sf breakfast room @ rear of kitchen, remodel kitchen, rear portion of the tandem garage will be converted to family room. 1 parking space remain. remodel laundry room, mech room in basement. remodel 2nd floor bath. | $175,000 |
| Aug 31, 2006 | Completed final sign-off Jan 2007 | 115 Cherry St | remodel 2 bathr & 1 power room (1/2 bath), repair sheetrock as required by electrical work.Details
remodel 2 bathr & 1 power room (1/2 bath), repair sheetrock as required by electrical work. | $100,000 |