Eric Wong
- Based in
- San Francisco
- On San Francisco permits
- Aug 2005 to Mar 2026
- Last 24 months
- 4 permits filed
64 permits since 2000: 56 completed, 4 never finaled, 4 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 30, 2026 | Completed final sign-off Jun 2026 | 2711 Union St | in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $6,000 |
| Jan 23, 2026 | Completed final sign-off Jul 2026 | 3017 Washington St | remodel ground level kitchen and bathroom; remove non-load bearing walls; add new venteless dryer/washer adj to bathroom.Details
remodel ground level kitchen and bathroom; remove non-load bearing walls; add new venteless dryer/washer adj to bathroom. | $47,000 |
| Jun 16, 2025 | Completed final sign-off Sep 2025 | 175 29th Av | remodel first floor bathroom. moving water closet, removing shower to create a 1/2 bathDetails
remodel first floor bathroom. moving water closet, removing shower to create a 1/2 bath | $9,000 |
| Jan 31, 2025 | Completed final sign-off Apr 2025 | 175 29th Av | remodel 2 full baths in kind on 3rd fl at rear. no structural work.Details
remodel 2 full baths in kind on 3rd fl at rear. no structural work. | $30,000 |
| Jul 2, 2024 | Completed final sign-off Feb 2025 | 175 29th Av | remove and cap off (e) plumbing at hall bath on 3/f, infill door openings to conect to primary closet. primary bath on 3/f, combine (e) primary closet to enlarge (e) primary bathroom, remove one non-load bearing wall.Details
remove and cap off (e) plumbing at hall bath on 3/f, infill door openings to conect to primary closet. primary bath on 3/f, combine (e) primary closet to enlarge (e) primary bathroom, remove one non-load bearing wall. | $26,000 |
| Aug 2, 2022 | Completed final sign-off Jun 2023 | 56 Sotelo Av | interior kitchen remodel with new configurations. no other changes, exterior changes, or occupancy.Details
interior kitchen remodel with new configurations. no other changes, exterior changes, or occupancy. | $30,000 |
| Nov 22, 2021 | Completed final sign-off Oct 2022 | 3017 Washington St | primary bathroom remodel: closet remodel, new washer/dryer, closet (existing closet), remodel of non structural walls to reconfigure space, skylight infill. all work is non structural only.Details
primary bathroom remodel: closet remodel, new washer/dryer, closet (existing closet), remodel of non structural walls to reconfigure space, skylight infill. all work is non structural only. | $28,000 |
| Nov 19, 2021 | Completed final sign-off Mar 2022 | 2655 Bush St | install new cabinets in kitchen and vanity and toilet in bathrooms: new countertop in kitchen, reinstall sinks and faucets and appliances. all of the above work due to fire sprinkler malfunction restore to original condition.Details
install new cabinets in kitchen and vanity and toilet in bathrooms: new countertop in kitchen, reinstall sinks and faucets and appliances. all of the above work due to fire sprinkler malfunction restore to original condition. | $60,000 |
| Jan 8, 2021 | Completed final sign-off Feb 2021 | 347 28th Av | 2 new windows on ground floor at rear(not visible from street) revision to app#201907267097Details
2 new windows on ground floor at rear(not visible from street) revision to app#201907267097 | $2,000 |
| Dec 1, 2020 | Completed final sign-off Apr 2021 | 3017 Washington St | main floor: kitchen remodel on main level, new lighting, replace cabinetry & countertops, no structural workDetails
main floor: kitchen remodel on main level, new lighting, replace cabinetry & countertops, no structural work | $29,000 |
| Oct 29, 2019 | Completed final sign-off Jun 2020 | 347 28th Av | remove load bearing wall on 2nd and 3rd floor kitchen. remove 2 post and move sliding door.Details
remove load bearing wall on 2nd and 3rd floor kitchen. remove 2 post and move sliding door. | $15,000 |
| Oct 16, 2019 | Completed final sign-off Dec 2019 | 2834 Jackson St | 4/f full bath remodel, replace toilet/vanity sink, remove tub for new shower stall, replace floor tiles, no structural work. (plans provided to verify 4/f is habitable, ref pa# 201612275925)Details
4/f full bath remodel, replace toilet/vanity sink, remove tub for new shower stall, replace floor tiles, no structural work. (plans provided to verify 4/f is habitable, ref pa# 201612275925) | $11,000 |
| Sep 18, 2019 | Completed final sign-off Dec 2019 | 565 15th Av | drywall repairs due to water damage/backup, install new flooring and baseboards, all work at ground floor only. approx 500 sq ft of flooring & approx 200 sq ft of drywall repair.Details
drywall repairs due to water damage/backup, install new flooring and baseboards, all work at ground floor only. approx 500 sq ft of flooring & approx 200 sq ft of drywall repair. | $4,000 |
| Aug 5, 2019 | Completed final sign-off Aug 2019 | 453 Union St | revision to pa 201707273050 & 201707273051 for final inspection (soft story)Details
revision to pa 201707273050 & 201707273051 for final inspection (soft story) | |
| Jul 18, 2019 | Completed final sign-off Jan 2021 | 347 28th Av | replace windows: a) reset 13 non-visible vinyls, b) replace 10 vinyls not visible from street, c) replace 6 windows visible from street (4 transoms to remain, 3rd level to be wood sliding, 2nd level middle to be wood fixed, 2nd level side windows to be wood single hung). new plumbing and electrical.Details
replace windows: a) reset 13 non-visible vinyls, b) replace 10 vinyls not visible from street, c) replace 6 windows visible from street (4 transoms to remain, 3rd level to be wood sliding, 2nd level middle to be wood fixed, 2nd level side windows to be wood single hung). new plumbing and electrical. | $85,000 |
| Jun 21, 2019 | Completed final sign-off Jul 2019 | 2 Talbert Ct | voluntary application of bituthene membrane to exterior rear side of (e) foundation, approx 25'wide x 5'hidh for moisture prevention. no other work. not visible from streetDetails
voluntary application of bituthene membrane to exterior rear side of (e) foundation, approx 25'wide x 5'hidh for moisture prevention. no other work. not visible from street | $9,700 |
| May 1, 2019 | Completed final sign-off Jul 2019 | 3001 Harrison St | to comply with nov 201932191 (4) (stair case), nov 201925762 (3) bathrm, nov 201933462 1 thru 4. repairs to 1st flr bathrm: replace (sheetrock), toilet and lav. ptraps to connect to (e) drain waste connections. repairs to exterior stairs (rear) - cosmetic, tighten boards/railings.Details
to comply with nov 201932191 (4) (stair case), nov 201925762 (3) bathrm, nov 201933462 1 thru 4. repairs to 1st flr bathrm: replace (sheetrock), toilet and lav. ptraps to connect to (e) drain waste connections. repairs to exterior stairs (rear) - cosmetic, tighten boards/railings. | $16,630 |
| Jan 11, 2018 | Completed final sign-off Feb 2018 | 3349 Buchanan St | repair/reinforce (e) lightwell staircase (dry rot) around 20% or lessDetails
repair/reinforce (e) lightwell staircase (dry rot) around 20% or less | $2,000 |
| Jul 27, 2017 | Completed final sign-off Aug 2019 | 453 Union St | ada compliance per soft story retrofit for commercial per sfebc chapter 4d, 2016 cebc appendix a-4. (residential pa#201707273050) no exterior work. no change to egress, occupancy, or increase. all work in the m occupancy, no work in r2 areas. no fa/ls work required.Details
ada compliance per soft story retrofit for commercial per sfebc chapter 4d, 2016 cebc appendix a-4. (residential pa#201707273050) no exterior work. no change to egress, occupancy, or increase. all work in the m occupancy, no work in r2 areas. no fa/ls work required. | $11,000 |
| Jul 27, 2017 | Completed final sign-off Aug 2019 | 453 Union St | soft story retrofit for residential per sfebc chapter 4d, 2016 cebc appendix a-4. (commercial pa #201707273051) no exterior work.Details
soft story retrofit for residential per sfebc chapter 4d, 2016 cebc appendix a-4. (commercial pa #201707273051) no exterior work. | $50,000 |
| Jul 18, 2017 | Completed final sign-off Jun 2018 | 70 Iris Av | replace cracked stucco and repair dryrot at front and side of house, new stucco in-kind. repair existing exterior entry stairs and waterproof, repair dryrot and install tiled stairs in kind. revisions to application no. 201611162889.Details
replace cracked stucco and repair dryrot at front and side of house, new stucco in-kind. repair existing exterior entry stairs and waterproof, repair dryrot and install tiled stairs in kind. revisions to application no. 201611162889. | $23,000 |
| Nov 16, 2016 | Completed final sign-off Jun 2018 | 70 Iris Av | interior alterations: g/f- convert (e) storage to 1 bedroom, 1 family room & 1 bathroom with new interior open stair connect to 2/f. 2/f & 3/f- relocate kitchen and create 1 new bedroom, remove (e) interior stair to convert to new bathroom and closet, add cantilevered deck.Details
interior alterations: g/f- convert (e) storage to 1 bedroom, 1 family room & 1 bathroom with new interior open stair connect to 2/f. 2/f & 3/f- relocate kitchen and create 1 new bedroom, remove (e) interior stair to convert to new bathroom and closet, add cantilevered deck. | $75,000 |
| Nov 8, 2016 | Completed final sign-off Feb 2017 | 2047 Green St | bathroom remodel, no structural workDetails
bathroom remodel, no structural work | $8,000 |
| Sep 26, 2016 | Expired or cancelled cancelled Aug 2017 | 70 Iris Av | kitchen & 2 bathroom remodel. non-structural work.Details
kitchen & 2 bathroom remodel. non-structural work. | $18,000 |
| Apr 12, 2016 | Never finaled issued Apr 2017, no final | 3015 Washington St | foundation wall fill in on rear deck, rear addition bedroom, electrical , plumbing for bathroom.Details
foundation wall fill in on rear deck, rear addition bedroom, electrical , plumbing for bathroom. | $18,000 |
| Feb 4, 2015 | Completed final sign-off Apr 2015 | 2047 Green St | permit is to supplement pa #2014.1230.4689. new door opening at kitchen at 2nd floor. infill 2 door openings at hallwayDetails
permit is to supplement pa #2014.1230.4689. new door opening at kitchen at 2nd floor. infill 2 door openings at hallway | $5,000 |
| Dec 30, 2014 | Completed final sign-off Apr 2015 | 2047 Green St | remodel kitchen & master bathroomDetails
remodel kitchen & master bathroom | $18,000 |
| Sep 8, 2014 | Completed final sign-off Nov 2014 | 383 Lombard St | unit 304: remodel kitchen and 2 bathrooms; to comply with cec150.0(k)3 & 5Details
unit 304: remodel kitchen and 2 bathrooms; to comply with cec150.0(k)3 & 5 | $20,000 |
| Jul 22, 2014 | Completed final sign-off Aug 2014 | 1962 45th Av | replace stucco in kind at front of house, replace (e) front windows in size in kind (aluminum), remove front ledges, repair dryrot if required, aluminum slider, slider cambo fixed to match existing.Details
replace stucco in kind at front of house, replace (e) front windows in size in kind (aluminum), remove front ledges, repair dryrot if required, aluminum slider, slider cambo fixed to match existing. | $4,800 |
| Apr 11, 2014 | Completed final sign-off Jun 2014 | 55 Santa Ana Av | 2/f: full bath remodel - no structural work, no walls to be removed.Details
2/f: full bath remodel - no structural work, no walls to be removed. | $6,800 |
| May 9, 2013 | Completed final sign-off Mar 2014 | 55 Santa Ana Av | horizontal addition on 1st fl, vertical on 2nd fl. add 11 sq ft in rear of 1st flr, remodel kitchen. add 48 sq ft on second flr, remodel bathroom, move laundry to 2nd flr.Details
horizontal addition on 1st fl, vertical on 2nd fl. add 11 sq ft in rear of 1st flr, remodel kitchen. add 48 sq ft on second flr, remodel bathroom, move laundry to 2nd flr. | $80,000 |
| Feb 27, 2013 | Completed final sign-off Aug 2013 | 77 Pixley St | 1)interior remodel, 2)new half bath at 2nd floor, 3) new stairway down to garage level from 2nd floor. 4)new master bedroom, bath and closet at 3rd floor. new laudry room at 3rd floor. remove 3rd floor deck.Details
1)interior remodel, 2)new half bath at 2nd floor, 3) new stairway down to garage level from 2nd floor. 4)new master bedroom, bath and closet at 3rd floor. new laudry room at 3rd floor. remove 3rd floor deck. | $50,000 |
| Jun 26, 2012 | Completed final sign-off Oct 2012 | 1955 22nd Av | remodel ground floor - add bedroom, family room, laundry, full bath & storage room. interior renovation only.Details
remodel ground floor - add bedroom, family room, laundry, full bath & storage room. interior renovation only. | $40,000 |
| Nov 14, 2011 | Never finaled issued Nov 2011, no final | 79 Pixley St | repair dryrot at lowest staircase in kind less than 30% per violation #201161867. left side stringer for four steps and treads.Details
repair dryrot at lowest staircase in kind less than 30% per violation #201161867. left side stringer for four steps and treads. | $300 |
| Oct 12, 2011 | Completed final sign-off May 2012 | 900 Lombard St | renew pa #201010143062 to complete work and obtain final inspection.Details
renew pa #201010143062 to complete work and obtain final inspection. | $10,000 |
| Aug 25, 2011 | Completed final sign-off May 2012 | 900 Lombard St | partial first floor structural upgrade(voluntary) any structural strenghtening as required in future alteration/addition shall be re-evaluated as a whole.Details
partial first floor structural upgrade(voluntary) any structural strenghtening as required in future alteration/addition shall be re-evaluated as a whole. | $10,000 |
| Jul 5, 2011 | Completed final sign-off Dec 2011 | 1912 Steiner St | remodel kitchen and relocate master bath. reconfigure partitions. legalize existing hall bath per 3r issuesDetails
remodel kitchen and relocate master bath. reconfigure partitions. legalize existing hall bath per 3r issues | $50,000 |
| Feb 17, 2011 | Completed final sign-off Feb 2012 | 286 Ramsell St | ground floor remodel. 1) rearrange extg play room to construct one new guest room with bathroom.2)rearrange extg exercise room to construction one new bathroom.Details
ground floor remodel. 1) rearrange extg play room to construct one new guest room with bathroom.2)rearrange extg exercise room to construction one new bathroom. | $30,000 |
| Feb 16, 2011 | Completed final sign-off Nov 2011 | 1060 Greenwich St | enclose portion of lightwell on third floor. new skylight in (e) third floor kitchen.Details
enclose portion of lightwell on third floor. new skylight in (e) third floor kitchen. | $10,000 |
| Oct 20, 2010 | Completed final sign-off Sep 2011 | 1085 Greenwich St | reduce roof deck size and replace redwood decking with trex decking or equivalent exterior decking. replace wind screen w/ new tempered glass panel.Details
reduce roof deck size and replace redwood decking with trex decking or equivalent exterior decking. replace wind screen w/ new tempered glass panel. | $10,000 |
| Oct 14, 2010 | Completed final sign-off Nov 2010 | 1062 Greenwich St | route new 3/4" gas line from proposed new meter to (e) range in kitchen; install new step light at staircase landing - high efficacy light v.i.f.; draywall repairs for above work.Details
route new 3/4" gas line from proposed new meter to (e) range in kitchen; install new step light at staircase landing - high efficacy light v.i.f.; draywall repairs for above work. | $1,200 |
| Oct 14, 2010 | Expired or cancelled expired Mar 2012 | 900 Lombard St | kitchen remodel, replace cabinets, countertop, flooring (complete); replace (2) french doors and (1) window @ rear in size in kind; relocate laundry layoutDetails
kitchen remodel, replace cabinets, countertop, flooring (complete); replace (2) french doors and (1) window @ rear in size in kind; relocate laundry layout | $10,000 |
| Mar 9, 2010 | Never finaled issued Mar 2010, no final | 1719 Broderick St | increase valuation per correction notice dated 12/1/09 by $45,000.00Details
increase valuation per correction notice dated 12/1/09 by $45,000.00 | $45,000 |
| Feb 5, 2010 | Completed final sign-off Jun 2010 | 1060 Greenwich St | to complete work and obtain final inspection for work approved under app #200807106345Details
to complete work and obtain final inspection for work approved under app #200807106345 | $24,000 |
| Oct 28, 2009 | Completed final sign-off Mar 2010 | 1719 Broderick St | revision to 200908144860, remove bath tub at 3rd fl bathroom, remove deck repair from scope, reduce opening to 6'6" from proposed 7', replace 2x5 windowDetails
revision to 200908144860, remove bath tub at 3rd fl bathroom, remove deck repair from scope, reduce opening to 6'6" from proposed 7', replace 2x5 window | |
| Sep 3, 2009 | Completed final sign-off Oct 2009 | 578 08th Av | repair (e) dry rot on exterior rear staircase in kind, less than 50%Details
repair (e) dry rot on exterior rear staircase in kind, less than 50% | $1,900 |
| Aug 18, 2009 | Completed final sign-off Sep 2009 | 1056 Greenwich St | comply with physical inspection report# cc-5628.Details
comply with physical inspection report# cc-5628. | $2,600 |
| Aug 14, 2009 | Completed final sign-off Sep 2009 | 143 Riverton Dr | remove partition wall in kitchen and relocate a door to closet.Details
remove partition wall in kitchen and relocate a door to closet. | $1,500 |
| Aug 14, 2009 | Completed final sign-off Mar 2010 | 1719 Broderick St | new half bathroom at second floor. relocate second floor bathroom to third floor enlarge opening and remove closet in dining room. remove stairs at rear yard. repair deck at rear as in-kind (less than 50%)Details
new half bathroom at second floor. relocate second floor bathroom to third floor enlarge opening and remove closet in dining room. remove stairs at rear yard. repair deck at rear as in-kind (less than 50%) | $30,000 |
| Aug 7, 2009 | Expired or cancelled expired Dec 2010 | 1719 Broderick St | replace ktichen cabinets & countertop at lower unit #1719 in kind. no wall removal, electrical & plumbing permit under separate.Details
replace ktichen cabinets & countertop at lower unit #1719 in kind. no wall removal, electrical & plumbing permit under separate. | $4,800 |
| Jul 31, 2009 | Completed final sign-off Sep 2009 | 143 Riverton Dr | replace kchn cabinets and countertop and sink 10x10 in kind layout to remain the same. no wall removal. electrical & plmg under seperate permitDetails
replace kchn cabinets and countertop and sink 10x10 in kind layout to remain the same. no wall removal. electrical & plmg under seperate permit | $4,800 |
| Jul 15, 2009 | Completed final sign-off Aug 2009 | 2020 Lombard St | comply n.o.v.#200449065/ces-revert (e) psycaic parlor to original use of garage. remove interior partition non-bearing wall, remove double glass door storefront & replace with the double wood door for the garage door. remove electrical sign at front of this subject space.Details
comply n.o.v.#200449065/ces-revert (e) psycaic parlor to original use of garage. remove interior partition non-bearing wall, remove double glass door storefront & replace with the double wood door for the garage door. remove electrical sign at front of this subject space. | $1,500 |
| Apr 10, 2009 | Completed final sign-off Jul 2009 | 2311 44th Av | convert extg bath and hallway to new bedroom, relocate extg bath, remodel extg kitchen, remove extg fire place, all on 2nd floor. remodel extg bedroom and entertainment room and toilet on ground floor.Details
convert extg bath and hallway to new bedroom, relocate extg bath, remodel extg kitchen, remove extg fire place, all on 2nd floor. remodel extg bedroom and entertainment room and toilet on ground floor. | $20,000 |
| Oct 10, 2008 | Completed final sign-off Nov 2008 | 1740 Bryant St | remodel kitchen & full bath, new cabinets, countertop & fixtures tanoughout kitchen floor area 12x12Details
remodel kitchen & full bath, new cabinets, countertop & fixtures tanoughout kitchen floor area 12x12 | $29,240 |
| Oct 3, 2008 | Completed final sign-off Jan 2009 | 1632 Pacheco St | remodel extg bath and kitchen and add one new bath. one new interior stair to ground floor on 2nd floor.add 3 new bedrooms, 2 new bath, one new storage and new laundry on ground floor. all work to be with in extg interior space of the bldgDetails
remodel extg bath and kitchen and add one new bath. one new interior stair to ground floor on 2nd floor.add 3 new bedrooms, 2 new bath, one new storage and new laundry on ground floor. all work to be with in extg interior space of the bldg | $45,000 |
| Jun 6, 2008 | Completed final sign-off Jun 2008 | 316 Pierce St | reinforce & repair or replace rotten steps @ side lightwell per violation#200859170 *7, approx 10-15% of staircase.Details
reinforce & repair or replace rotten steps @ side lightwell per violation#200859170 *7, approx 10-15% of staircase. | $1,000 |
| May 6, 2008 | Completed final sign-off Sep 2008 | 1731 28th Av | relocate kitchen, remodel (e) bathroom & add one toilet room. convert (e) kitchen to new storage. all work at 2nd floor. construct two bedroom, one full bathroom & laundry room, all work at ground floor.Details
relocate kitchen, remodel (e) bathroom & add one toilet room. convert (e) kitchen to new storage. all work at 2nd floor. construct two bedroom, one full bathroom & laundry room, all work at ground floor. | $48,000 |
| Mar 5, 2008 | Never finaled issued Mar 2008, no final | 180 Westwood Dr | replace exterior front staircase tiles with tiles in kindDetails
replace exterior front staircase tiles with tiles in kind | $2,000 |
| May 17, 2007 | Completed final sign-off Mar 2008 | 1015 Plymouth Av | add and remodel rooms at ground floor: study room, bedroom, 1/2 bath and family room.Details
add and remodel rooms at ground floor: study room, bedroom, 1/2 bath and family room. | $25,000 |
| Jul 7, 2006 | Expired or cancelled expired Jan 2011 | 815 Hyde St | add patition walls and doors for office rooms, add new counters and sinks for office rooms, electirical, mechinical, plumbing under separaate permit rev. to0200604259854Details
add patition walls and doors for office rooms, add new counters and sinks for office rooms, electirical, mechinical, plumbing under separaate permit rev. to0200604259854 | $20,000 |
| Jul 7, 2006 | Completed final sign-off Aug 2006 | 116 Corbett Av | complete bath remodel including new bath fixtures, tiling (5'9"x6'10") no other work. work in unit #116 only.Details
complete bath remodel including new bath fixtures, tiling (5'9"x6'10") no other work. work in unit #116 only. | $6,000 |
| Apr 27, 2006 | Completed final sign-off May 2006 | 265 Broad St | all work @ one room. insulate ground lever 1 rear room. (approx 15' x 22') including ceilings & exterior walls, install drywall on ceiling & exterior walls at opened areas ( including removal of existing drywall). rewire receptacles, & switches & lights in above room. replace ground bath (vanity &Details
all work @ one room. insulate ground lever 1 rear room. (approx 15' x 22') including ceilings & exterior walls, install drywall on ceiling & exterior walls at opened areas ( including removal of existing drywall). rewire receptacles, & switches & lights in above room. replace ground bath (vanity & | $4,000 |
| Nov 22, 2005 | Completed final sign-off Dec 2005 | 2 Santa Ysabel Av | repairs to exterior stud wall/stucco/dry wall (approx. 100 s..f.) caused by car accidentDetails
repairs to exterior stud wall/stucco/dry wall (approx. 100 s..f.) caused by car accident | $7,000 |
| Aug 8, 2005 | Completed final sign-off Oct 2005 | 2115 Baker St | remodel (e) second level split bath, flourescent lighting.Details
remodel (e) second level split bath, flourescent lighting. | $7,000 |