Ben Rogne Construction
- Based in
- San Anselmo
- On San Francisco permits
- May 2001 to Nov 2022
- Last 24 months
- 0 permits filed
41 permits since 2000: 39 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 8, 2022 | Completed final sign-off Mar 2023 | 2440 Broadway | revise issued permit with plans. app #202208231034. to change railing system with top rail to no top rail. reference esr report no. 3842Details
revise issued permit with plans. app #202208231034. to change railing system with top rail to no top rail. reference esr report no. 3842 | |
| Aug 23, 2022 | Completed final sign-off Mar 2023 | 2440 Broadway | remove existing metal and glass railings at rear balconys. replace in kind with glass lamina te, 42" high, 2 railings, 1 at 2440 broadway, 1 at 2442 broadwayDetails
remove existing metal and glass railings at rear balconys. replace in kind with glass lamina te, 42" high, 2 railings, 1 at 2440 broadway, 1 at 2442 broadway | $60,000 |
| Apr 21, 2022 | Completed final sign-off Jun 2022 | 156 08th Av | bathroom remodel- demo (e) fixtures, plaster, lath and tile. install new electrical, plumbing, fixtures, and tile. no change to floor plan. in kind.Details
bathroom remodel- demo (e) fixtures, plaster, lath and tile. install new electrical, plumbing, fixtures, and tile. no change to floor plan. in kind. | $35,000 |
| May 26, 2020 | Completed final sign-off Jun 2020 | 2165 Beach St | remove/replace (10) (e) wood windows, new marvin replacement insert windows (clad exteriors/wood interiors). no new framing or trim will be installed. windows are facing rear garden not visible to street.Details
remove/replace (10) (e) wood windows, new marvin replacement insert windows (clad exteriors/wood interiors). no new framing or trim will be installed. windows are facing rear garden not visible to street. | $38,000 |
| Jun 24, 2019 | Completed final sign-off Aug 2019 | 626 Haight St | kitchen remodel new cabines, new counter tile backsplash, tile floor, reuse (e) appliances same location no structural workDetails
kitchen remodel new cabines, new counter tile backsplash, tile floor, reuse (e) appliances same location no structural work | $50,000 |
| Sep 21, 2017 | Completed final sign-off Feb 2018 | 2825 Bryant St | repair dry rot at front entry stairs . less than 50%. no change to original design.Details
repair dry rot at front entry stairs . less than 50%. no change to original design. | $8,000 |
| Aug 28, 2017 | Completed final sign-off Apr 2018 | 628 Haight St | alterations to kitchen, family room, dining room, master bedroom & bath; alteration to building rear, door and (2) windows at exterior dining room.Details
alterations to kitchen, family room, dining room, master bedroom & bath; alteration to building rear, door and (2) windows at exterior dining room. | $45,000 |
| Feb 13, 2017 | Completed final sign-off Aug 2017 | 59 07th Av | kitchen remodel - no structural work, new cabinets and appliances.Details
kitchen remodel - no structural work, new cabinets and appliances. | $80,000 |
| Jan 22, 2016 | Completed final sign-off Mar 2016 | 143 Ashbury St | voluntary seismic upgrade (garage area only). install shearwall at perimeter, 5/8 anchor bolts 3ft on center 8" deep hold downs at front and rear.Details
voluntary seismic upgrade (garage area only). install shearwall at perimeter, 5/8 anchor bolts 3ft on center 8" deep hold downs at front and rear. | $10,000 |
| Jan 8, 2015 | Completed final sign-off Jul 2015 | 2460 Green St | revision appl. 2013.0807.3757. total 5 decks at the rear. remove one upper east deck and door. install window into existing opening. repair dry rot in four existing decks. maher n/a. no expansion of existing foot print.Details
revision appl. 2013.0807.3757. total 5 decks at the rear. remove one upper east deck and door. install window into existing opening. repair dry rot in four existing decks. maher n/a. no expansion of existing foot print. | $8,000 |
| Sep 23, 2014 | Completed final sign-off May 2015 | 101 Montcalm St | remodeling of ground floor bathroom, reduction of the height of a window for privacy reason. conversion of an extg storage area into a bedroom on the ground floor.Details
remodeling of ground floor bathroom, reduction of the height of a window for privacy reason. conversion of an extg storage area into a bedroom on the ground floor. | $4,800 |
| Aug 18, 2014 | Completed final sign-off Jan 2015 | 2295 Vallejo St | unit 501: replace bathroom fixtures & sheetrock patching & tilingDetails
unit 501: replace bathroom fixtures & sheetrock patching & tiling | $16,000 |
| Feb 24, 2014 | Completed final sign-off Aug 2014 | 630 Lake St | mandatory soft story retrofit. comply with chapter 34b. fema p807Details
mandatory soft story retrofit. comply with chapter 34b. fema p807 | $50,000 |
| Aug 7, 2013 | Completed final sign-off Jul 2015 | 2460 Green St | at 2nd flr, convert (e) deck to living space (+ 28 sf, add 22 sf )at (e) solarium. provide new roof @ (e) solarium @ 2nd flr. provide new windows, remove (e) stair entry court. create (n) terrace at 2nd flr in it's place.Details
at 2nd flr, convert (e) deck to living space (+ 28 sf, add 22 sf )at (e) solarium. provide new roof @ (e) solarium @ 2nd flr. provide new windows, remove (e) stair entry court. create (n) terrace at 2nd flr in it's place. | $120,000 |
| Jul 29, 2013 | Completed final sign-off Nov 2013 | 4248 Cesar Chavez St | replace 2 roof decks orginally approved in 1986. work includes new roofing, membrane, new decking, new railings & repair e stairs. all new work is replacing (e) constructionDetails
replace 2 roof decks orginally approved in 1986. work includes new roofing, membrane, new decking, new railings & repair e stairs. all new work is replacing (e) construction | $45,000 |
| Jun 14, 2013 | Completed final sign-off Jul 2015 | 1953 Webster St | const. a new deck above (e)roof at rear of house/replace window w/a door for access to deck/this project does not involve any changes to to the bldg depth height or width or the conditioned envelopeDetails
const. a new deck above (e)roof at rear of house/replace window w/a door for access to deck/this project does not involve any changes to to the bldg depth height or width or the conditioned envelope | $10,000 |
| Sep 7, 2012 | Completed final sign-off Nov 2012 | 755 14th Av | all work is on the back of the house (west side) and not visable from the street, replace 8 vinyl windows with wood double-hung windows, rreplace siding with ardie lap. siding.Details
all work is on the back of the house (west side) and not visable from the street, replace 8 vinyl windows with wood double-hung windows, rreplace siding with ardie lap. siding. | $45,000 |
| Aug 4, 2010 | Completed final sign-off Jul 2011 | 91 25th Av | structural strengthening at existing garage level consisting of new steel support beam,posts and footings and new plywood shearwall bracing and grade beam.Details
structural strengthening at existing garage level consisting of new steel support beam,posts and footings and new plywood shearwall bracing and grade beam. | $10,000 |
| May 18, 2010 | Completed final sign-off Jan 2012 | 3050 Lyon St | 2 floor rear addition. remodel kitchen, powder room at level 2. add guest bedroom/study, office & bathroom at level 1.Details
2 floor rear addition. remodel kitchen, powder room at level 2. add guest bedroom/study, office & bathroom at level 1. | $200,000 |
| Jun 2, 2008 | Completed final sign-off Sep 2008 | 73 Seacliff Av | renew pa# 2006/02/02/3706 & pa# 2007/07/05/5978 for final inspection only.Details
renew pa# 2006/02/02/3706 & pa# 2007/07/05/5978 for final inspection only. | |
| Apr 16, 2008 | Completed final sign-off Apr 2009 | 620 El Camino Del Mar | complete 1 story garage begin for pa #200603066073 w/ dcp variance #2005.0004v. extend kitchen 6ft onto existing deck and remodel kitchen, deck off kitchen extends into side yard under variance 2005.0004v. the 3rd fl master bath is expanded 215 sq ft and remodeled. 311 notification sent in 2005.Details
complete 1 story garage begin for pa #200603066073 w/ dcp variance #2005.0004v. extend kitchen 6ft onto existing deck and remodel kitchen, deck off kitchen extends into side yard under variance 2005.0004v. the 3rd fl master bath is expanded 215 sq ft and remodeled. 311 notification sent in 2005. | $225,000 |
| Dec 17, 2007 | Completed final sign-off Mar 2008 | 720 Lake St | work on apt#4.kitchen remodel: cabinets, insulation, sheetrock, small dryrot repair counter, sink, appliances, fan hood stove, kick space heater under cabinet. new lighting fluorescent, no structrual.Details
work on apt#4.kitchen remodel: cabinets, insulation, sheetrock, small dryrot repair counter, sink, appliances, fan hood stove, kick space heater under cabinet. new lighting fluorescent, no structrual. | $10,000 |
| Jun 29, 2007 | Completed final sign-off Sep 2008 | 73 Seacliff Av | remove stucco to repair dryrot-entire exterior. replace with new stucco after repair.Details
remove stucco to repair dryrot-entire exterior. replace with new stucco after repair. | $75,000 |
| May 25, 2007 | Completed final sign-off Aug 2007 | 531 10th Av | revision to app #200503308777:reduce scope of work. eliminate roof alterations, rear additon, kitchen remodel 2nd floor powder room, bathroom #3. ground floor slab will not be replaced with new dropped slab. no changes to sunrom or bedroom #3Details
revision to app #200503308777:reduce scope of work. eliminate roof alterations, rear additon, kitchen remodel 2nd floor powder room, bathroom #3. ground floor slab will not be replaced with new dropped slab. no changes to sunrom or bedroom #3 | |
| Apr 5, 2007 | Completed final sign-off Apr 2007 | 45 West Clay St | renew app #200602154645 for final inspectionDetails
renew app #200602154645 for final inspection | |
| Jan 24, 2007 | Completed final sign-off Jul 2007 | 2600 Union St | remove old wood windows, replace with new marvin insulated wood windows. same size & style, 13 apts. 109 windows, u-factor windows .37 max. 7 french doors in kind. french doors .32 max.Details
remove old wood windows, replace with new marvin insulated wood windows. same size & style, 13 apts. 109 windows, u-factor windows .37 max. 7 french doors in kind. french doors .32 max. | $100,000 |
| Jan 24, 2007 | Completed final sign-off Mar 2007 | 1177 California St | remove bath tub, install a shower with new plumbing fixtures and tile. master bath only.Details
remove bath tub, install a shower with new plumbing fixtures and tile. master bath only. | $9,000 |
| Jun 2, 2006 | Completed final sign-off Nov 2006 | 2485 Union St | remove + replace dryrot on wall. in bathroom. remodel bathroom, new tub, toiler, sink, fixtures and tile. all plumbing fixtures replaced into (e) locations. no structural work. no walls moved or added unite #3. for work.Details
remove + replace dryrot on wall. in bathroom. remodel bathroom, new tub, toiler, sink, fixtures and tile. all plumbing fixtures replaced into (e) locations. no structural work. no walls moved or added unite #3. for work. | $16,000 |
| Mar 6, 2006 | Expired or cancelled expired Apr 2008 | 620 El Camino Del Mar | construct new 1 car garage, 1 story, 12 ft w x 26 ft deep. construct new outdoor fireplace and 6'-8' solid fence. see attached variance decision #2005.0004v.Details
construct new 1 car garage, 1 story, 12 ft w x 26 ft deep. construct new outdoor fireplace and 6'-8' solid fence. see attached variance decision #2005.0004v. | $75,000 |
| Feb 23, 2006 | Completed final sign-off May 2006 | 720 Lake St | install kickspace heater under kitchen cabinetDetails
install kickspace heater under kitchen cabinet | $300 |
| Feb 23, 2006 | Completed final sign-off May 2006 | 720 Lake St | verify the work to be done will be on unit 2, 720 lake street. block 1350/003. app 200601242925Details
verify the work to be done will be on unit 2, 720 lake street. block 1350/003. app 200601242925 | |
| Feb 15, 2006 | Expired or cancelled expired Apr 2007 | 45 West Clay St | demolition of interior plaster and lath. no exteriorDetails
demolition of interior plaster and lath. no exterior | $10,000 |
| Jan 24, 2006 | Completed final sign-off May 2006 | 720 Lake St | kitchen remodel. cabinets, counter, sink, new appliances, fan, hood, stove. no new walls. new lightingDetails
kitchen remodel. cabinets, counter, sink, new appliances, fan, hood, stove. no new walls. new lighting | $10,000 |
| Sep 2, 2005 | Completed final sign-off Jun 2006 | 323 Montcalm St | voluntary latheral upgrade in garage,small rear retaining wall repair rear of yard&frt stairs(>50%).Details
voluntary latheral upgrade in garage,small rear retaining wall repair rear of yard&frt stairs(>50%). | $40,000 |
| Jul 22, 2005 | Completed final sign-off May 2006 | 330 Chestnut St | removal of studio & entry door & conversion of 3 units to 2 units building.Details
removal of studio & entry door & conversion of 3 units to 2 units building. | $2,000 |
| Mar 30, 2005 | Completed final sign-off Aug 2007 | 531 10th Av | northwest corner of house is currently 3 story back porch.reconstruct area & integrate it into houseDetails
northwest corner of house is currently 3 story back porch.reconstruct area & integrate it into house | $175,000 |
| Oct 1, 2004 | Completed final sign-off Oct 2004 | 3855 Jackson St | revision to pa#200403088080. remove & close up a door at west side of house in concrete wall.Details
revision to pa#200403088080. remove & close up a door at west side of house in concrete wall. | $500 |
| Aug 3, 2004 | Completed final sign-off Jul 2005 | 45 West Clay St | demo plaster walls (interior) create 2 bedrooms, new electrical updateDetails
demo plaster walls (interior) create 2 bedrooms, new electrical update | $20,000 |
| Dec 9, 2003 | Completed final sign-off Sep 2005 | 620 El Camino Del Mar | remove exist garage in basement. parking will be behind house, in buildable area, already paved. newDetails
remove exist garage in basement. parking will be behind house, in buildable area, already paved. new | $125,000 |
| Nov 4, 2003 | Completed final sign-off Oct 2004 | 620 El Camino Del Mar | remodel (e) bathroom, combine 2 bedrooms into master bedroomDetails
remodel (e) bathroom, combine 2 bedrooms into master bedroom | $40,000 |
| May 7, 2001 | Completed final sign-off Nov 2001 | 81 25th Av | engineering revision to 2001/03/13/4120. change rear stairs to platform and return 3' from propertyDetails
engineering revision to 2001/03/13/4120. change rear stairs to platform and return 3' from property |