Michael Comaroto
- Listed as
- engineer
- Firm
- Ma Engineering
- Based in
- San Ramon
- On San Francisco permits
- Aug 2019 to Sep 2025
23 permits since 2000 (engineer on 23 permits): 17 completed, 3 in progress, 2 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 18, 2025 | Completed final sign-off Sep 2026 | 235 Coleridge St | Mc Remodeling | ground floor: to add (1) bathroom, (1) family room, and an office. 2/f: to add an interior stair to the ground floor.Details
ground floor: to add (1) bathroom, (1) family room, and an office. 2/f: to add an interior stair to the ground floor. | $80,000 |
| Apr 4, 2025 | Completed final sign-off May 2026 | 1553 Masonic Av | Mc Remodeling | revision to pa#202410233555. expand kitchen in to garage. change rear sliding door size. replace bathroom flooring. change window in bedroom. add sheer walls. mechanical room added to drawingsDetails
revision to pa#202410233555. expand kitchen in to garage. change rear sliding door size. replace bathroom flooring. change window in bedroom. add sheer walls. mechanical room added to drawings | $35,000 |
| Dec 13, 2024 | In progress filed Dec 2024, not yet issued | 51 Ford St | add a deck off the 2nd floor. replace a window with door to access deck.Details
add a deck off the 2nd floor. replace a window with door to access deck. | $12,000 | |
| Sep 20, 2024 | Completed final sign-off Jun 2026 | 2475 23rd Av | John Woo Constructionllc | lightwell infill on 2nd flr. 26sf addition of habitable space. (n) 1 hr fire rated wall and parapet adjacent to neighboring buildilng. reconfigure interior stairs. replace (e) skylight located at hallway, install (n) 4 skylights located in bathrooms, hallway and stairs, (n) fixtures in (e) lowerDetails
lightwell infill on 2nd flr. 26sf addition of habitable space. (n) 1 hr fire rated wall and parapet adjacent to neighboring buildilng. reconfigure interior stairs. replace (e) skylight located at hallway, install (n) 4 skylights located in bathrooms, hallway and stairs, (n) fixtures in (e) lower | $100,000 |
| Jul 8, 2024 | In progress issued Jul 2024 | 366 15th Av | S And L Remodeling And Design Inc, Qse Construction | revise permit# 202404250779 which was a revision to 202303033042: to shore and ugprade entire ground floor to comply with nov# 202422382.Details
revise permit# 202404250779 which was a revision to 202303033042: to shore and ugprade entire ground floor to comply with nov# 202422382. | $150,000 |
| Jan 9, 2024 | Completed final sign-off May 2024 | 49 Barcelona Av | Robert Hauser Construction | voluntary seismic in accordance with cebc chapter a3 at rear of building crawl space.Details
voluntary seismic in accordance with cebc chapter a3 at rear of building crawl space. | $10,000 |
| Aug 29, 2023 | Completed final sign-off Oct 2023 | 1793 Sanchez St | Mc Remodeling | revision to permit 202307202641, new sqft of 400 sqft, previous 16sqftDetails
revision to permit 202307202641, new sqft of 400 sqft, previous 16sqft | $80,000 |
| Mar 3, 2023 | In progress issued Feb 2024 | 366 15th Av | Ot Bay Builders Inc. | excavate retaining wall @ ground floor to extend floor space to add a bathrom, laundry room; relocate (e) furnace & water heater;Details
excavate retaining wall @ ground floor to extend floor space to add a bathrom, laundry room; relocate (e) furnace & water heater; | $80,000 |
| Mar 1, 2023 | Completed final sign-off Dec 2024 | 118 Melrose Av | Green Group Remodeling Inc | 2nd fl - interior remodel of kitchen, family room and bathroom on the front of the building; remodeled area is 400 sf. no increase in bldg's sf. remove bearing wall & add new beam.Details
2nd fl - interior remodel of kitchen, family room and bathroom on the front of the building; remodeled area is 400 sf. no increase in bldg's sf. remove bearing wall & add new beam. | $100,000 |
| Dec 22, 2022 | Never finaled issued Jan 2023, no final | 654 11th Av | N M S Brosnan Construction | recommencement of pa# 201811085430 per inspection division: remove structural posts at ground floor and replace with steel beam and post.Details
recommencement of pa# 201811085430 per inspection division: remove structural posts at ground floor and replace with steel beam and post. | $80,000 |
| May 24, 2022 | Never finaled issued Jun 2022, no final | 10 Imperial Al | Beam Construction Enterprises Inc | update 1st flr kitchen,dining rm, water closet. adding elect fireplace to living rm. update 2nd flr guest bath, primary suite, + vault ceiling. add full (n) primary bath, skylight + solar tube. update all plumbing, elect, lighting, vent fans + fixtures. update hvac.Details
update 1st flr kitchen,dining rm, water closet. adding elect fireplace to living rm. update 2nd flr guest bath, primary suite, + vault ceiling. add full (n) primary bath, skylight + solar tube. update all plumbing, elect, lighting, vent fans + fixtures. update hvac. | $250,000 |
| Feb 23, 2022 | Completed final sign-off Sep 2023 | 266 Edinburgh St | Two Double U Inc | 2/f: remodel 1 bath and add 1 bath. relocate (e) kitchen. add 1 bedroom. add a stair to the g/f. g/f: add 1 bedroom & 1 office, 1 family room, 1 full bath and 1 storage room. relocate and replace (e) furnace and water heater.Details
2/f: remodel 1 bath and add 1 bath. relocate (e) kitchen. add 1 bedroom. add a stair to the g/f. g/f: add 1 bedroom & 1 office, 1 family room, 1 full bath and 1 storage room. relocate and replace (e) furnace and water heater. | $150,000 |
| Jan 20, 2022 | Completed final sign-off Sep 2023 | 378 Pennsylvania Av | Kevin Llorente Construction | repair/replace less than 50% of existing rear deck/staircase in kind.Details
repair/replace less than 50% of existing rear deck/staircase in kind. | $12,000 |
| Jul 2, 2021 | Completed final sign-off Dec 2022 | 351 Guerrero St | Kevin Llorente Construction | expansion of existing backyard decks from 4' x 5' to 12' x 17'. install two level spiral staircase.Details
expansion of existing backyard decks from 4' x 5' to 12' x 17'. install two level spiral staircase. | $25,000 |
| Apr 8, 2021 | Completed final sign-off Feb 2022 | 4205 22nd St | J Reilly Construction | remodel main floor kitchen and powder room.Details
remodel main floor kitchen and powder room. | $120,000 |
| Nov 9, 2020 | Completed final sign-off Dec 2020 | 2510 35th Av | Kevin Llorente Construction | ebb voluntary seismic reinforcement: bolt down foundatoin; strap down water ehater; install shear walls & hold downs.Details
ebb voluntary seismic reinforcement: bolt down foundatoin; strap down water ehater; install shear walls & hold downs. | $8,000 |
| Aug 28, 2020 | Completed final sign-off Nov 2021 | 2750 Harrison St | Kevin Llorente Construction | less than 50% repair of existing 3 story wood-framed rear exterior staircase. expand existing 3rd fl staircase landing/deck to 10'x15'.Details
less than 50% repair of existing 3 story wood-framed rear exterior staircase. expand existing 3rd fl staircase landing/deck to 10'x15'. | $15,000 |
| Aug 25, 2020 | Completed final sign-off Nov 2021 | 2748 Harrison St | Kevin Llorente Construction | less than 50% repair of existing 3 story wood-framed rear exterior staircase. expand existing 2nd fl staircase landing/deck to 10'x15'.Details
less than 50% repair of existing 3 story wood-framed rear exterior staircase. expand existing 2nd fl staircase landing/deck to 10'x15'. | $15,000 |
| Mar 16, 2020 | Completed final sign-off Oct 2024 | 1526 Masonic Av | construct one story type 5n, one story at 15' in height @ center of building at rear of 1526 masonic. new adu under bpa@ 2020-0316-7178.Details
construct one story type 5n, one story at 15' in height @ center of building at rear of 1526 masonic. new adu under bpa@ 2020-0316-7178. | $187,000 | |
| Mar 16, 2020 | Expired or cancelled withdrawn Jan 2022 | 1526 Masonic Av | adu at new rear building, type 5n, one story at 15'in height@ center line of newly constructed building bpa# 2020-0316-7173. per ordinance 162-16.Details
adu at new rear building, type 5n, one story at 15'in height@ center line of newly constructed building bpa# 2020-0316-7173. per ordinance 162-16. | $187,000 | |
| Feb 7, 2020 | Completed final sign-off Oct 2020 | 1140 Lawton St | Bailey General Contracting Co Inc | revisiont to pa 2020-0127-2849 structural improvement wall removalDetails
revisiont to pa 2020-0127-2849 structural improvement wall removal | $3,500 |
| Dec 19, 2019 | Completed final sign-off Mar 2021 | 62 Parnassus Av | Gngc Builders Inc | renovation of kitchen, new finishes to the dining & living rooms. new plumbing and electric in proposed area of construction. window replacement in kitchen in-kind, side facade. no change to egress or occupancy, or use.Details
renovation of kitchen, new finishes to the dining & living rooms. new plumbing and electric in proposed area of construction. window replacement in kitchen in-kind, side facade. no change to egress or occupancy, or use. | $150,000 |
| Aug 2, 2019 | Completed final sign-off Dec 2022 | 518 Funston Av | Mccormack Construction | horizontal rear (2) story addition; (n) first level deck; relocate kitchen & powder room & laundry; window replacemtn at rear as needed.Details
horizontal rear (2) story addition; (n) first level deck; relocate kitchen & powder room & laundry; window replacemtn at rear as needed. | $437,000 |