Kevin Llorente Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2010 to Apr 2022
- Last 24 months
- 0 permits filed
34 permits since 2000: 29 completed, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 14, 2022 | Completed final sign-off Apr 2022 | 755 Capp St | repair/replace less than 50% of rear decks and stairs in kind. unit 755Details
repair/replace less than 50% of rear decks and stairs in kind. unit 755 | $39,000 |
| Apr 14, 2022 | Completed final sign-off Apr 2022 | 757 Capp St | repair/replace less than 50% of rear decks and stairs in kind. unit 757Details
repair/replace less than 50% of rear decks and stairs in kind. unit 757 | $3,500 |
| Feb 1, 2022 | Completed final sign-off Mar 2022 | 695 05th St | to obtain final inspection for work approved under permit application #201712196917. all work is complete.Details
to obtain final inspection for work approved under permit application #201712196917. all work is complete. | |
| Jan 20, 2022 | Completed final sign-off Sep 2023 | 378 Pennsylvania Av | repair/replace less than 50% of existing rear deck/staircase in kind.Details
repair/replace less than 50% of existing rear deck/staircase in kind. | $12,000 |
| Jul 2, 2021 | Completed final sign-off Dec 2022 | 351 Guerrero St | expansion of existing backyard decks from 4' x 5' to 12' x 17'. install two level spiral staircase.Details
expansion of existing backyard decks from 4' x 5' to 12' x 17'. install two level spiral staircase. | $25,000 |
| Jun 10, 2021 | Completed final sign-off May 2022 | 351 Guerrero St | one kitchen remodel: replace cabinets, countertop. update electrical and plumbing. install electrical subpanel. non structural work.Details
one kitchen remodel: replace cabinets, countertop. update electrical and plumbing. install electrical subpanel. non structural work. | $25,000 |
| Nov 9, 2020 | Completed final sign-off Dec 2020 | 2510 35th Av | ebb voluntary seismic reinforcement: bolt down foundatoin; strap down water ehater; install shear walls & hold downs.Details
ebb voluntary seismic reinforcement: bolt down foundatoin; strap down water ehater; install shear walls & hold downs. | $8,000 |
| Oct 23, 2020 | Never finaled issued Oct 2020, no final | 1814 Castro St | installation of window in (e) euca attic. window framing already in place. previous owner opted to cover 24" o.c studs framing w/ single layer of exterior siding. panel window frame and install (n) to match.Details
installation of window in (e) euca attic. window framing already in place. previous owner opted to cover 24" o.c studs framing w/ single layer of exterior siding. panel window frame and install (n) to match. | $2,200 |
| Aug 28, 2020 | Completed final sign-off Nov 2021 | 2750 Harrison St | less than 50% repair of existing 3 story wood-framed rear exterior staircase. expand existing 3rd fl staircase landing/deck to 10'x15'.Details
less than 50% repair of existing 3 story wood-framed rear exterior staircase. expand existing 3rd fl staircase landing/deck to 10'x15'. | $15,000 |
| Aug 25, 2020 | Completed final sign-off Nov 2021 | 2748 Harrison St | less than 50% repair of existing 3 story wood-framed rear exterior staircase. expand existing 2nd fl staircase landing/deck to 10'x15'.Details
less than 50% repair of existing 3 story wood-framed rear exterior staircase. expand existing 2nd fl staircase landing/deck to 10'x15'. | $15,000 |
| Jul 22, 2020 | Completed final sign-off Sep 2020 | 161 Peralta Av | retile front stairs in kind. 50% or less replacementDetails
retile front stairs in kind. 50% or less replacement | $5,000 |
| Jan 24, 2020 | Expired or cancelled withdrawn May 2024 | 544 Garfield St | 325 sq ft second story addition 25'x13'. two bedrooms & a bathroom. add 400 sq ft roof deck.Details
325 sq ft second story addition 25'x13'. two bedrooms & a bathroom. add 400 sq ft roof deck. | $120,000 |
| Sep 11, 2019 | Completed final sign-off Oct 2019 | 315 Hoffman Av | repair (e) backyard deck, replcae less than 50%.Details
repair (e) backyard deck, replcae less than 50%. | $2,000 |
| Aug 1, 2019 | Completed final sign-off Jan 2020 | 85 Mountain Spring Av | remodel (2) bathrooms, replace main electrical panel in-kind, replace (2) subpanels in-kindDetails
remodel (2) bathrooms, replace main electrical panel in-kind, replace (2) subpanels in-kind | $40,000 |
| Mar 8, 2019 | Expired or cancelled withdrawn May 2024 | 544 Garfield St | add single story 630 sq ft. 1st story: adu w/ kitchen & bathroom per adu ordinance 95-17Details
add single story 630 sq ft. 1st story: adu w/ kitchen & bathroom per adu ordinance 95-17 | $180,000 |
| Dec 13, 2018 | Expired or cancelled expired Jun 2024 | 1678 43rd Av | kitchen rehabilitation window replacement rear work repairsDetails
kitchen rehabilitation window replacement rear work repairs | $93,000 |
| Oct 30, 2018 | Completed final sign-off Feb 2020 | 400 San Miguel St | 2nd fl: renovation of (e) bathroom & convert (e) utility rm to bedroom. 3rd fl: renovate (e) kitchen & add closet to (e) bedroom.Details
2nd fl: renovation of (e) bathroom & convert (e) utility rm to bedroom. 3rd fl: renovate (e) kitchen & add closet to (e) bedroom. | $25,000 |
| Jan 26, 2018 | Completed final sign-off May 2018 | 142 Langton St | rebuild deck in-kind at rear at ground fl. maher naDetails
rebuild deck in-kind at rear at ground fl. maher na | $8,000 |
| Aug 2, 2017 | Completed final sign-off Dec 2018 | 4924 California St | convert (e) 610sf workshop area & part of garage to 758sf bedroom, bath with wet bar. 944sf alteration at entry level to kitchen, bath & add bath & laundry. add 272sf deck at 1st level 3. 379sf alteration at 2nd fl level, remodel bath and add bathroom.Details
convert (e) 610sf workshop area & part of garage to 758sf bedroom, bath with wet bar. 944sf alteration at entry level to kitchen, bath & add bath & laundry. add 272sf deck at 1st level 3. 379sf alteration at 2nd fl level, remodel bath and add bathroom. | $180,000 |
| Mar 17, 2017 | Completed final sign-off Feb 2018 | 205 14th Av | correct nov #201636221. remodel of kitchen and two bathrooms. resume recessed lighting installed in dining and living rooms.Details
correct nov #201636221. remodel of kitchen and two bathrooms. resume recessed lighting installed in dining and living rooms. | $58,000 |
| Dec 12, 2016 | Completed final sign-off Apr 2017 | 787 Dartmouth St | adding a bathroom at basement/garage level of my house.Details
adding a bathroom at basement/garage level of my house. | $25,000 |
| Nov 14, 2016 | Never finaled issued Nov 2016, no final | 308 Upper Tr | unit #1: bathroom remodel. replace shower pan, install - gfci outlet, install vent fan.Details
unit #1: bathroom remodel. replace shower pan, install - gfci outlet, install vent fan. | $15,000 |
| Oct 5, 2016 | Completed final sign-off Oct 2016 | 355 Buena Vista East Av | remodel kitchen & bathroom: replace kitchen cabinets & countertop in-kind. approx 80sf. replace bathroom vanity & top in-kind. approx 50sf.Details
remodel kitchen & bathroom: replace kitchen cabinets & countertop in-kind. approx 80sf. replace bathroom vanity & top in-kind. approx 50sf. | $20,000 |
| May 3, 2016 | Completed final sign-off Jun 2016 | 123 Moultrie St | rebuild entry deck in kind. maher naDetails
rebuild entry deck in kind. maher na | $10,000 |
| Jun 26, 2015 | Completed final sign-off Jul 2015 | 32 Richland Av | repair backstairs; replace 4 treads & 1 stringer with same. less than 10% replacement - repair in-kindDetails
repair backstairs; replace 4 treads & 1 stringer with same. less than 10% replacement - repair in-kind | $2,300 |
| Feb 2, 2015 | Completed final sign-off Mar 2015 | 1435 Fulton St | apt #2: bathroom: replace toilet, replace bath tub w/shower stall (no elec). kitchen: replace cabinets, counter tops, sink, faucet, add 2 gfci outlets. built in microwave circuit. like for like.Details
apt #2: bathroom: replace toilet, replace bath tub w/shower stall (no elec). kitchen: replace cabinets, counter tops, sink, faucet, add 2 gfci outlets. built in microwave circuit. like for like. | $10,000 |
| May 28, 2014 | Completed final sign-off May 2017 | 1051 Duncan St | to comply with and abate nov #201342801 to legalize deck @rear of property by replqcing existing deck with new deck as shown on drawings to demolish two level deck, rear deck 33'x4' to 33' x 6' the deck will have fire wallDetails
to comply with and abate nov #201342801 to legalize deck @rear of property by replqcing existing deck with new deck as shown on drawings to demolish two level deck, rear deck 33'x4' to 33' x 6' the deck will have fire wall | $9,000 |
| May 28, 2014 | Completed final sign-off May 2017 | 1047 Duncan St | to comply with and abate n.o.v. #201343021 to legalize deck @ rear of property by replacing (e) deck with new deck as shown on drawings to demolish 2 level rear deck 33' x 4' to 33'x 6' the deck will include fire wallDetails
to comply with and abate n.o.v. #201343021 to legalize deck @ rear of property by replacing (e) deck with new deck as shown on drawings to demolish 2 level rear deck 33' x 4' to 33'x 6' the deck will include fire wall | $9,000 |
| Dec 18, 2013 | Completed final sign-off Mar 2014 | 201 14th Av | @201 - remodel bath & kitchen; update electrical; replace bath waterlines; replace plumbing fixture; replace kitchen cabinets. install gas wall heaters in units 201, 203 & 205. no change of wall window and doorDetails
@201 - remodel bath & kitchen; update electrical; replace bath waterlines; replace plumbing fixture; replace kitchen cabinets. install gas wall heaters in units 201, 203 & 205. no change of wall window and door | $35,000 |
| Jun 13, 2013 | Completed final sign-off Jul 2013 | 148 Ellert St | remove outer layer of alum siding on front of house, repair/repl damaged original siding as (channel board) needed, replace window/door casings as needed in kindDetails
remove outer layer of alum siding on front of house, repair/repl damaged original siding as (channel board) needed, replace window/door casings as needed in kind | $10,000 |
| Dec 15, 2011 | Completed final sign-off Jan 2012 | 1208 Newhall St | comply with nov 199928250. remove bath and kitchen plumbing fixtures (tub, sinks, toilet) capp off plumbing. remove unapproved electrical. convert space to storage at gr fl. to comply with his 199928250 dated 12/28/1999 @ ground floorDetails
comply with nov 199928250. remove bath and kitchen plumbing fixtures (tub, sinks, toilet) capp off plumbing. remove unapproved electrical. convert space to storage at gr fl. to comply with his 199928250 dated 12/28/1999 @ ground floor | $960 |
| May 13, 2011 | Completed final sign-off Aug 2011 | 121 Steiner St | all in kitchen: remove brick flue (unused) relocate elec. receptacle; replace sink/faucet; intall garbage disposal; install dishwasher; install 4-circuits from subpanel. install 1-under cabinet light.Details
all in kitchen: remove brick flue (unused) relocate elec. receptacle; replace sink/faucet; intall garbage disposal; install dishwasher; install 4-circuits from subpanel. install 1-under cabinet light. | $9,000 |
| Dec 20, 2010 | Completed final sign-off Mar 2011 | 123 Steiner St | install pocket door; hang sheetrock; replace sink w/similar; install elect subpanel; replace window w/like kind; replac eext door w/like kind (not facing street).Details
install pocket door; hang sheetrock; replace sink w/similar; install elect subpanel; replace window w/like kind; replac eext door w/like kind (not facing street). | $10,500 |
| Mar 16, 2010 | Completed final sign-off Jul 2010 | 2433 Larkin St | remodel kitchen:min half of kitchen lighting watts shall be of high efficency lights.Details
remodel kitchen:min half of kitchen lighting watts shall be of high efficency lights. | $8,000 |