Ot Bay Builders Inc.
- Based in
- San Jose
- On San Francisco permits
- Mar 2018 to Jul 2026
- Last 24 months
- 10 permits filed
39 permits since 2000: 26 completed, 10 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 31, 2026 | In progress issued Jul 2026 | 948 Chenery St | convert full bathroom to powder room at ground fl. remove tub/shower. vent added.Details
convert full bathroom to powder room at ground fl. remove tub/shower. vent added. | $40,000 |
| Jul 16, 2026 | In progress issued Jul 2026 | 948 Chenery St | guest bathroom remodel, replace tub to shower, sink, vanity, toilet, exhaust fan, mep up to code, 73 sq ft. 2nd flr.Details
guest bathroom remodel, replace tub to shower, sink, vanity, toilet, exhaust fan, mep up to code, 73 sq ft. 2nd flr. | $25,000 |
| Jun 3, 2026 | In progress issued Jun 2026 | 55 Forest View Dr | remodel bathroom, like for like. replace fixture: tub, sink, vanity, toklet, fan upgrade. mep to code. 64sf on 2/f.Details
remodel bathroom, like for like. replace fixture: tub, sink, vanity, toklet, fan upgrade. mep to code. 64sf on 2/f. | $25,000 |
| May 20, 2026 | In progress issued Sep 2026 | 1658 Chestnut St | interior remodel of the ground floor basement into bedroom with 2 bathrooms. addition of internal staircase. remodel kitchen and dining area located on 1st floor.Details
interior remodel of the ground floor basement into bedroom with 2 bathrooms. addition of internal staircase. remodel kitchen and dining area located on 1st floor. | $170,000 |
| Feb 10, 2026 | In progress issued Jul 2026 | 31 Brunswick St | rev 202310209116 to the structural plans only. excavation due to (e) house conditions.Details
rev 202310209116 to the structural plans only. excavation due to (e) house conditions. | $26,000 |
| Dec 16, 2025 | Completed final sign-off Apr 2026 | 1190 Sacramento St | 10th fl demolish 1 wall in bathroom, remove plumbing fixtures and closet. install new fixtures and closet.Details
10th fl demolish 1 wall in bathroom, remove plumbing fixtures and closet. install new fixtures and closet. | $45,000 |
| Oct 21, 2025 | Completed final sign-off Mar 2026 | 200 West Portal Av | repair for one damaged window on exterior. no change to locaiton of window, only repair framing due to exterior damage. (front window street facing) max u-factor = 0.58Details
repair for one damaged window on exterior. no change to locaiton of window, only repair framing due to exterior damage. (front window street facing) max u-factor = 0.58 | $18,000 |
| Jul 25, 2025 | Completed final sign-off Apr 2026 | 380 10th St | unit #25: existing half bathroom convert to full bathroom. relocate bathroom sink,run new waterline for a new shower. adding lights and relocating some existing. total 4 lightsDetails
unit #25: existing half bathroom convert to full bathroom. relocate bathroom sink,run new waterline for a new shower. adding lights and relocating some existing. total 4 lights | $33,000 |
| Jun 17, 2025 | In progress filed Jun 2025, not yet issued | 200 West Portal Av | window replacement in-kind. to comply with nov#202431862Details
window replacement in-kind. to comply with nov#202431862 | $12,000 |
| Oct 29, 2024 | Completed final sign-off Nov 2024 | 794 Moultrie St | 2nd floor - convert living room to bedroom. frame in (e) opening to convert living room to (n) bedroom.Details
2nd floor - convert living room to bedroom. frame in (e) opening to convert living room to (n) bedroom. | $2,900 |
| Sep 5, 2024 | In progress issued Nov 2025 | 80 Crown Tr | 1) remodel kitchen in kind. 2) remodel (2) existing baths. 3) replace (4) windows in-kindDetails
1) remodel kitchen in kind. 2) remodel (2) existing baths. 3) replace (4) windows in-kind | $60,000 |
| Jun 24, 2024 | Completed final sign-off Sep 2025 | 1306 Castro St | revision to permits 202403188075 and 202406184715. change location of exhaust replacement due to historical district facade limitation. exhaust of 500 cfm. added pictures of facade as requested removed 18'ramp ada and applyng for financial hardshipDetails
revision to permits 202403188075 and 202406184715. change location of exhaust replacement due to historical district facade limitation. exhaust of 500 cfm. added pictures of facade as requested removed 18'ramp ada and applyng for financial hardship | $20,857 |
| Jun 11, 2024 | Completed final sign-off Nov 2024 | 2185 Bush St | existing kitchen area remodel 116 sq ft remodel to include new cabinet appliances and layout, new pantry, laundry access. 2nd fl area remodel at 6' sq ft including new vanity toilet and shower. 1st fl bathroom remodelDetails
existing kitchen area remodel 116 sq ft remodel to include new cabinet appliances and layout, new pantry, laundry access. 2nd fl area remodel at 6' sq ft including new vanity toilet and shower. 1st fl bathroom remodel | $50,000 |
| Apr 30, 2024 | Completed final sign-off Jun 2024 | 5007 Diamond Heights Bl | deck repair 425 sqft, replace surface only with trex. repair dryrot if needed. less than 50%.Details
deck repair 425 sqft, replace surface only with trex. repair dryrot if needed. less than 50%. | $10,000 |
| Apr 25, 2024 | In progress issued May 2024 | 366 15th Av | to comply with nov 202422383 . soil groutingDetails
to comply with nov 202422383 . soil grouting | $15,000 |
| Apr 2, 2024 | Completed final sign-off Jan 2025 | 577 Vienna St | 1st fl provide (n) wetbar and (n) recessed lighting 2nd fl remodel (e) kitchen and new lighting. new skylightDetails
1st fl provide (n) wetbar and (n) recessed lighting 2nd fl remodel (e) kitchen and new lighting. new skylight | $68,000 |
| Mar 19, 2024 | Completed final sign-off Aug 2024 | 616 Teresita Bl | 49 sq ft addition by converting light well into conditioned spaceDetails
49 sq ft addition by converting light well into conditioned space | $30,000 |
| Mar 18, 2024 | Completed final sign-off Sep 2025 | 4101 24th St | (e) restroom/bathroom to comply with ada requirements. interior 4101 24th stDetails
(e) restroom/bathroom to comply with ada requirements. interior 4101 24th st | $15,000 |
| Feb 29, 2024 | Completed final sign-off Apr 2024 | 295 Mangels Av | drywall reapir in the kitchen area behind (e) cabinets + bath ceiling. counter top replacement + sink. replace and install recessed lights + switches througout the house, run new power for 2 lights in garage. install 120 sqft tile flooring, add new fan to existing bathroom.Details
drywall reapir in the kitchen area behind (e) cabinets + bath ceiling. counter top replacement + sink. replace and install recessed lights + switches througout the house, run new power for 2 lights in garage. install 120 sqft tile flooring, add new fan to existing bathroom. | $10,000 |
| Feb 28, 2024 | Completed final sign-off Jan 2025 | 101 Crescent Wy | bathroom remodel like for like no electrical work only shower pan only. replace toilet and vanity. 28 new recess light, and bathroom replace tile (no structural) only wet board.Details
bathroom remodel like for like no electrical work only shower pan only. replace toilet and vanity. 28 new recess light, and bathroom replace tile (no structural) only wet board. | $20,000 |
| Dec 11, 2023 | Completed final sign-off Mar 2024 | 1243 19th St | bathroom remodeling, converting tub to shower. upgrade the plumbing. replace tile, replacing 1 retrofit window (facing right side of bldg). no wall change.Details
bathroom remodeling, converting tub to shower. upgrade the plumbing. replace tile, replacing 1 retrofit window (facing right side of bldg). no wall change. | $20,000 |
| Nov 3, 2023 | Completed final sign-off Mar 2024 | 130 12th Av | remodel 3 total bathrooms: 2 bathrooms - remodel like for like. 1 bathroom remodel - replace (e) tub with shower.Details
remodel 3 total bathrooms: 2 bathrooms - remodel like for like. 1 bathroom remodel - replace (e) tub with shower. | $60,000 |
| Oct 20, 2023 | In progress issued Jul 2025 | 31 Brunswick St | adding adu per state adu program. the adu will be added "per planning code section 207.2" at lower levelDetails
adding adu per state adu program. the adu will be added "per planning code section 207.2" at lower level | $80,000 |
| Oct 5, 2023 | Expired or cancelled cancelled Nov 2023 | 2159 25th Av | 1 bathroom remodel like for like non structuralDetails
1 bathroom remodel like for like non structural | $20,000 |
| Sep 7, 2023 | Completed final sign-off Aug 2024 | 2603 Sacramento St | renovation kitchen and bath - relocating bath to other side of kitchen to open space. will be removing bath wall. will be adhering to all ca codes and upgrading elecrical and plumbing to meet energy efficent standards.Details
renovation kitchen and bath - relocating bath to other side of kitchen to open space. will be removing bath wall. will be adhering to all ca codes and upgrading elecrical and plumbing to meet energy efficent standards. | $37,000 |
| Aug 24, 2023 | Completed final sign-off Jan 2024 | 2555 Leavenworth St | bath & kitchen remodel no changes like for like. unit 105Details
bath & kitchen remodel no changes like for like. unit 105 | $23,000 |
| Aug 24, 2023 | Completed final sign-off Dec 2023 | 58 Casa Wy | bath remodel like in like upgrading plumbingg to copper. no structural work, no wall, framing modification.Details
bath remodel like in like upgrading plumbingg to copper. no structural work, no wall, framing modification. | $13,000 |
| Aug 18, 2023 | Completed final sign-off May 2024 | 1527 Van Dyke Av | bathroom remodel. remove non load bearing wall in the 2nd fl.Details
bathroom remodel. remove non load bearing wall in the 2nd fl. | $25,000 |
| Jul 13, 2023 | Never finaled filed Jul 2023, never issued | 1545 Broadway | unit# 304 - in-kind fireplace replacement, new gas insert unit, replace in-kind partition around fireplace and finishes.Details
unit# 304 - in-kind fireplace replacement, new gas insert unit, replace in-kind partition around fireplace and finishes. | $1,500 |
| Jun 8, 2023 | Completed final sign-off Aug 2023 | 56 Tomaso Ct | bathroom remodel like for like.Details
bathroom remodel like for like. | $25,000 |
| May 23, 2023 | Completed final sign-off Dec 2023 | 434 Arguello Bl | bathroom remodel like for like.Details
bathroom remodel like for like. | $25,000 |
| May 23, 2023 | Completed final sign-off Dec 2023 | 326 23rd Av | kitchen remodel like for like.Details
kitchen remodel like for like. | $30,000 |
| Apr 17, 2023 | Completed final sign-off May 2024 | 1545 Broadway | unit 304: interior renovation, remodel kitchen & (2) bathrooms, remove closet doors/create wardrobe closets, add recessed lighting throughoutDetails
unit 304: interior renovation, remodel kitchen & (2) bathrooms, remove closet doors/create wardrobe closets, add recessed lighting throughout | $40,000 |
| Mar 3, 2023 | In progress issued Feb 2024 | 366 15th Av | excavate retaining wall @ ground floor to extend floor space to add a bathrom, laundry room; relocate (e) furnace & water heater;Details
excavate retaining wall @ ground floor to extend floor space to add a bathrom, laundry room; relocate (e) furnace & water heater; | $80,000 |
| Jan 17, 2023 | Completed final sign-off Mar 2023 | 1020 Union St | unit #24: revision to permit # 202301109958 - omit guest bathroom remodel.Details
unit #24: revision to permit # 202301109958 - omit guest bathroom remodel. | |
| Jan 10, 2023 | Completed final sign-off Mar 2023 | 1020 Union St | master bathroom guest bathroom remodel like for like.Details
master bathroom guest bathroom remodel like for like. | $2,000 |
| Aug 26, 2022 | Completed final sign-off Sep 2025 | 720 Dartmouth St | demo/rebuild (e) 33 foot long/7 foot height retaining wall; (e) wall is 12x8 cmu, proposed new cmu 8x8 cmu wall, 33 feet long/6 feet high w/top mount rail fenceDetails
demo/rebuild (e) 33 foot long/7 foot height retaining wall; (e) wall is 12x8 cmu, proposed new cmu 8x8 cmu wall, 33 feet long/6 feet high w/top mount rail fence | $15,000 |
| Aug 23, 2022 | Completed final sign-off Jan 2025 | 220 Richardson Av | demolition of partitions, equipment, plumbing fixtures, windows & doors. new partitions, skylights, doors, plumbing fixtures, lighting fixtures & casework to be adde on 2n fl minor renovation in the garage. demolition of casework & equipment. new window & door to be added. lightwell infill.Details
demolition of partitions, equipment, plumbing fixtures, windows & doors. new partitions, skylights, doors, plumbing fixtures, lighting fixtures & casework to be adde on 2n fl minor renovation in the garage. demolition of casework & equipment. new window & door to be added. lightwell infill. | $50,000 |
| Mar 15, 2018 | Never finaled issued Aug 2023, no final | 2450 20th Av | comply w/ nov# 201755441 to remove north bedrm & bath @ 1st fl; remove temp partition wall & closet on 2nd fl; legalize partition wall in 2nd fl bathrm ; change doors orientation on 2nd fl; excavate foundation for legalizing 1st fl 468sf unit w/ 1 bedrm, 1 kitchen & 1 bath per ord# 43-14.Details
comply w/ nov# 201755441 to remove north bedrm & bath @ 1st fl; remove temp partition wall & closet on 2nd fl; legalize partition wall in 2nd fl bathrm ; change doors orientation on 2nd fl; excavate foundation for legalizing 1st fl 468sf unit w/ 1 bedrm, 1 kitchen & 1 bath per ord# 43-14. | $93,850 |