Lincoln Lighthill
- Listed as
- architect
- Firm
- Lincoln Lighthill Architect
- Based in
- San Francisco
- On San Francisco permits
- Apr 2016 to Jul 2026
35 permits since 2000 (architect on 35 permits): 28 completed, 3 in progress, 1 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 28, 2026 | In progress issued Sep 2026 | 555 Bryant St | Swinerton Builders | suite 100: tenant improvement, coffee shop, in existing warm shell space on gr fl with e accessible entrance from sidewalk and 2 e accessible restrooms. change of use from m to b occupancy. new fully accessible service support and customer areas. no exterior work.Details
suite 100: tenant improvement, coffee shop, in existing warm shell space on gr fl with e accessible entrance from sidewalk and 2 e accessible restrooms. change of use from m to b occupancy. new fully accessible service support and customer areas. no exterior work. | $350,000 |
| Feb 24, 2026 | In progress filed Feb 2026, not yet issued | 201 Spear St | install (n) 4 electrical channel letters facing front of building for " spro" for sign aDetails
install (n) 4 electrical channel letters facing front of building for " spro" for sign a | $5,000 | |
| Feb 20, 2026 | Completed final sign-off Jul 2026 | 201 Spear St | Bradshaw Group Inc | ground fl: tenant improvement for existing coffee shop. update service & customer areas, update (e) single occupant restroom to bring entire space to full access compliance. new mep systems. no change of use, occupancy or exterior work.Details
ground fl: tenant improvement for existing coffee shop. update service & customer areas, update (e) single occupant restroom to bring entire space to full access compliance. new mep systems. no change of use, occupancy or exterior work. | $250,000 |
| Jan 27, 2026 | In progress issued Jan 2026 | 201 Spear St | Bradshaw Group Inc | g/f -ste 1650: demolition of (e) interior. this demolition includes fixtures, floors, drywall and soffit. demolition includes all ductwork and and hvac registers, removal of ceiling tiles. per ab-017Details
g/f -ste 1650: demolition of (e) interior. this demolition includes fixtures, floors, drywall and soffit. demolition includes all ductwork and and hvac registers, removal of ceiling tiles. per ab-017 | $15,000 |
| Aug 28, 2025 | Completed final sign-off Dec 2025 | 31 Justin Dr | L Cabral Construction | (n) half bath with 2 (n) plumbing fixtures and associated electrical and finishes. (n) pocket doors and doorways in non shear walls.Details
(n) half bath with 2 (n) plumbing fixtures and associated electrical and finishes. (n) pocket doors and doorways in non shear walls. | $34,000 |
| Jul 24, 2025 | Completed final sign-off Mar 2026 | 412 Texas St | Doyle Developments | to comply with n.o.v. #202535741. scope includes new siding, windows & related structural work at existing rear wall & exising rear addition. an ab-009 attachedment b, included with this drawing set, has been filed with the accessor's office for the new property line windows,Details
to comply with n.o.v. #202535741. scope includes new siding, windows & related structural work at existing rear wall & exising rear addition. an ab-009 attachedment b, included with this drawing set, has been filed with the accessor's office for the new property line windows, | $75,000 |
| Dec 5, 2024 | Completed final sign-off Oct 2025 | 3327 22nd St | L Cabral Construction | interior remodel of (e) enclosed room at rear of 2nd floor condominum in a 3 unit , 3 story building scope includes (n) full bathroom and laundry room . exterior work and structrual upgrades are under separte permit.Details
interior remodel of (e) enclosed room at rear of 2nd floor condominum in a 3 unit , 3 story building scope includes (n) full bathroom and laundry room . exterior work and structrual upgrades are under separte permit. | $46,712 |
| Dec 5, 2024 | Completed final sign-off Oct 2025 | 3329 22nd St | L Cabral Construction | interior remodel of (e) enclosed room at rear of 2nd floor condominum in a 3 unit , 3 story building scope includes (n) full bathroom and laundry room . exterior work and structrual upgrades are under separte permit.Details
interior remodel of (e) enclosed room at rear of 2nd floor condominum in a 3 unit , 3 story building scope includes (n) full bathroom and laundry room . exterior work and structrual upgrades are under separte permit. | $46,712 |
| Nov 21, 2024 | Completed final sign-off Oct 2025 | 3327 22nd St | L Cabral Construction | work on common area only. exterior & structural upgrades to rear of (e), 3,unit story condo bldg. work includes structual upgrades, new siding to match existing. new windows & new doors. new skylight on existing roofDetails
work on common area only. exterior & structural upgrades to rear of (e), 3,unit story condo bldg. work includes structual upgrades, new siding to match existing. new windows & new doors. new skylight on existing roof | $92,588 |
| Feb 21, 2024 | Completed final sign-off Sep 2024 | 448 Gold Mine Dr | L Cabral Construction | new deck in rear yard at 1/f with stair to yard. remove non-structural wall between family room & interior stair. infill 1/f at stair to yard. new office within (e) 1/f family room. new exterior door in (e) window opening. minor elec work. no plumb work. no increase in flr area. no street space req.Details
new deck in rear yard at 1/f with stair to yard. remove non-structural wall between family room & interior stair. infill 1/f at stair to yard. new office within (e) 1/f family room. new exterior door in (e) window opening. minor elec work. no plumb work. no increase in flr area. no street space req. | $50,000 |
| May 18, 2023 | Completed final sign-off Aug 2024 | 228 Liberty St | Phase 2 Builders | kitchen and bath remodel in lower unit of (e) 2 unit building. includes removal of some (e) walls. addition of new shear walls and related structural work. window replacement and patching of existing exterior siding at side walls only. no exterior work at front or rear facade.Details
kitchen and bath remodel in lower unit of (e) 2 unit building. includes removal of some (e) walls. addition of new shear walls and related structural work. window replacement and patching of existing exterior siding at side walls only. no exterior work at front or rear facade. | $77,859 |
| May 2, 2023 | Completed final sign-off May 2023 | 219 Monterey Bl | Rua Woods Construction Inc | rev to pa# 2021-0520-0653; shifted internal wall of bathroom, bedroom, partiton walls only, changed location of bathr shower to shower over tub. update bedroom a and b's closet layout. all work on upper floor plan.Details
rev to pa# 2021-0520-0653; shifted internal wall of bathroom, bedroom, partiton walls only, changed location of bathr shower to shower over tub. update bedroom a and b's closet layout. all work on upper floor plan. | |
| Feb 24, 2023 | Completed final sign-off Jun 2025 | 141 Retiro Wy | replace windows and door at front of bldg.add garage door and pedestrian door to carport.replace wood siding with stucco.Details
replace windows and door at front of bldg.add garage door and pedestrian door to carport.replace wood siding with stucco. | $100,000 | |
| Feb 24, 2023 | Completed final sign-off Feb 2024 | 516 Belvedere St | L Cabral Construction | new 2nd flr deck at rear yard, deck complies with all planning setback requirements for otc approval, window replacement & new door to deck at rear yard 2nd flr facades, remodel 2 e bathrooms with no change in plumbing fixture count or location.Details
new 2nd flr deck at rear yard, deck complies with all planning setback requirements for otc approval, window replacement & new door to deck at rear yard 2nd flr facades, remodel 2 e bathrooms with no change in plumbing fixture count or location. | $71,924 |
| Nov 4, 2022 | Never finaled filed Nov 2022, never issued | 108 Villa Tr | new deck on(e)non-conforming garage roof.(n)parapets with more than 3'infill of sideyard for(n)outdoor area,(n)balcony on south facade overlapping rear yard setback.in kind window replacement.interior includes various(n)fixtures & finishes.Details
new deck on(e)non-conforming garage roof.(n)parapets with more than 3'infill of sideyard for(n)outdoor area,(n)balcony on south facade overlapping rear yard setback.in kind window replacement.interior includes various(n)fixtures & finishes. | $185,000 | |
| Sep 1, 2022 | Expired or cancelled withdrawn Nov 2022 | 108 Villa Tr | Arrow Builders Inc | new deck on (e) non-conforming garage roof. new parapets and 73' infill of side yard for new outdoor area. new balcony on south facade overlapping rear yard setback. in-kind of the type window replacement. interior includes new fixtures & finishes. no change to conditioned spaceDetails
new deck on (e) non-conforming garage roof. new parapets and 73' infill of side yard for new outdoor area. new balcony on south facade overlapping rear yard setback. in-kind of the type window replacement. interior includes new fixtures & finishes. no change to conditioned space | $600,000 |
| May 17, 2022 | Completed final sign-off May 2023 | 3577 Pacific Av | Arrow Builders Inc | resurfacing of (e) exterior roof deck, stair and walkway. replace (e) guardrails skylight. new and resurfaced built in planter boxes new low level sedum plantings on existing adjacent roof areas, matching (e) height roof curbs. no envelope changes.Details
resurfacing of (e) exterior roof deck, stair and walkway. replace (e) guardrails skylight. new and resurfaced built in planter boxes new low level sedum plantings on existing adjacent roof areas, matching (e) height roof curbs. no envelope changes. | $165,000 |
| May 20, 2021 | Completed final sign-off May 2023 | 219 Monterey Bl | Rua Woods Construction Inc | project addresses planning dept. complaint 2017-015789enf. (e) street level commercial space to be replace by new legal dwelling unit. (e) legal dwelling unit at middle floor wil be enlarged into lower level, where (e) unwarranted dwelling unit will be removed. no change to street facing facade.Details
project addresses planning dept. complaint 2017-015789enf. (e) street level commercial space to be replace by new legal dwelling unit. (e) legal dwelling unit at middle floor wil be enlarged into lower level, where (e) unwarranted dwelling unit will be removed. no change to street facing facade. | $100,000 |
| Jan 5, 2021 | Completed final sign-off Feb 2022 | 86 Elsie St | Art Of Construction Inc | interior remodel: (n) bathrooms - renovated, stair reconfiguration & new closets. exterior: limited siding maintenance/repair, window replacement in kind & increase door opening not visible from street. no facade work. no work in public right of way. no changes to fixture count.Details
interior remodel: (n) bathrooms - renovated, stair reconfiguration & new closets. exterior: limited siding maintenance/repair, window replacement in kind & increase door opening not visible from street. no facade work. no work in public right of way. no changes to fixture count. | $100,000 |
| Nov 25, 2020 | Completed final sign-off Mar 2022 | 100 Turquoise Wy | Kotas Construction Inc | rev to pa202008262711: 1 (n) skylight. no facade changes, no work in public right of way, no changes to fixture count.Details
rev to pa202008262711: 1 (n) skylight. no facade changes, no work in public right of way, no changes to fixture count. | $3,000 |
| Aug 26, 2020 | Completed final sign-off Mar 2022 | 100 Turquoise Wy | Kotas Construction Inc | kitchen and bath renovation. (n) windows in kind, doors-insulation of floor joists + exterior walls. patch + paint. no facade work. no changes to envelope. no mep changes to plumbing locations.Details
kitchen and bath renovation. (n) windows in kind, doors-insulation of floor joists + exterior walls. patch + paint. no facade work. no changes to envelope. no mep changes to plumbing locations. | $80,000 |
| Oct 10, 2019 | Completed final sign-off Apr 2020 | 513 Hickory St | Oak Leaf Construction | residential remodel of 3 story r-3 sfd. replace interior finishes, create new master bath, new stair, operable roof hatch to access a new roof deck, replace rear facade garage door with man doorDetails
residential remodel of 3 story r-3 sfd. replace interior finishes, create new master bath, new stair, operable roof hatch to access a new roof deck, replace rear facade garage door with man door | $500,000 |
| Aug 29, 2019 | Completed final sign-off Jul 2020 | 283 Richland Av | Kotas Construction Inc | revision to app#201905019403. revisions inlclude new skylight at roof, enlarged stair opening and new guardrail at extg stair, removal of extg posts on 3rd floor, and new framing for master bath shower.Details
revision to app#201905019403. revisions inlclude new skylight at roof, enlarged stair opening and new guardrail at extg stair, removal of extg posts on 3rd floor, and new framing for master bath shower. | $18,000 |
| May 1, 2019 | Completed final sign-off Jul 2020 | 283 Richland Av | Kotas Construction Inc | residential remodel of 3-story sfd/ scope includes remodel of 2 bathrooms (relocated), improvements to an (e) bedroom, new sliding door on the rear facade, replacement windows on the east facade and new cabinetry as shown. no other ext work.Details
residential remodel of 3-story sfd/ scope includes remodel of 2 bathrooms (relocated), improvements to an (e) bedroom, new sliding door on the rear facade, replacement windows on the east facade and new cabinetry as shown. no other ext work. | $75,000 |
| Nov 30, 2018 | Completed final sign-off Oct 2019 | 199 Sutter St | J R E Construction | install non electric projecting double faced sign "blue bottle coffee"Details
install non electric projecting double faced sign "blue bottle coffee" | $2,500 |
| Nov 30, 2018 | Expired or cancelled cancelled Jan 2026 | 199 Sutter St | exterior seating w/ pedestrian diverters (reference to pa 201811206430 in process)Details
exterior seating w/ pedestrian diverters (reference to pa 201811206430 in process) | $10,000 | |
| Sep 25, 2018 | Completed final sign-off Jan 2020 | 199 Sutter St | J R E Construction | t.i interior alteration of (e) coffee shop at ground level.n/a for maherDetails
t.i interior alteration of (e) coffee shop at ground level.n/a for maher | $185,000 |
| Aug 27, 2018 | Completed final sign-off Oct 2019 | 199 Sutter St | J R E Construction | new front door, replace existing in same location.door and sidelite to match existing. historic fabric of the building has been removedDetails
new front door, replace existing in same location.door and sidelite to match existing. historic fabric of the building has been removed | $8,000 |
| Aug 27, 2018 | Completed final sign-off Dec 2019 | 600 Eugenia Av | consists of the addition of a spiral stairs & landing to access the rear yard from the 2nd flr living area of (e) single home. a variance application was approved under a previous submittal & the nsr can be found on sheet g1.02. the (n) stair is not a reqd egress stair.Details
consists of the addition of a spiral stairs & landing to access the rear yard from the 2nd flr living area of (e) single home. a variance application was approved under a previous submittal & the nsr can be found on sheet g1.02. the (n) stair is not a reqd egress stair. | $7,500 | |
| Jun 13, 2017 | Completed final sign-off Dec 2017 | 750 Brannan St | Oliver & Company Inc. | revision to 2016111072146, scope includes new door to close off 1 area from another and addition of civil drawuings with site grading, drainage & sidewalkDetails
revision to 2016111072146, scope includes new door to close off 1 area from another and addition of civil drawuings with site grading, drainage & sidewalk | $1,500 |
| May 25, 2017 | Completed final sign-off Oct 2017 | 2064 Jackson St | Arrow Builders Inc | interior remodel of an existing bathroom, pantry & kitchen on the 3rd floor. there is no exterior work.Details
interior remodel of an existing bathroom, pantry & kitchen on the 3rd floor. there is no exterior work. | $130,000 |
| Mar 29, 2017 | Expired or cancelled cancelled Jan 2026 | 115 Mountain Spring Av | Johnstone - Mc Auliffe Const. Inc. | this is a revision to app#201607192752. work includes a new cantilovered deck at the 2nd floor front facade and associated access door and structural info.Details
this is a revision to app#201607192752. work includes a new cantilovered deck at the 2nd floor front facade and associated access door and structural info. | $25,000 |
| Dec 16, 2016 | Completed final sign-off Apr 2018 | 115 Mountain Spring Av | Johnstone - Mc Auliffe Const. Inc. | rev. to pa#201607192752 to remove (e) walls in 2/f, new roof structure and skylight over an (e) sunroom, new roofing and insulation over new structural roof sheathing, new exterior doors & window & assoc. minor exterior upgrades, new conditioned sq.ft. within (e) envelope for (n) laundry room.Details
rev. to pa#201607192752 to remove (e) walls in 2/f, new roof structure and skylight over an (e) sunroom, new roofing and insulation over new structural roof sheathing, new exterior doors & window & assoc. minor exterior upgrades, new conditioned sq.ft. within (e) envelope for (n) laundry room. | $350,000 |
| Nov 7, 2016 | Completed final sign-off Dec 2017 | 750 Brannan St | Oliver & Company Inc. | accessibility upgrades and additional minor work on existing warehouse building with existing storage and office uses. only the 1st fl is used, 2nd fl closed off with locking gates and not part of permit maher not reqDetails
accessibility upgrades and additional minor work on existing warehouse building with existing storage and office uses. only the 1st fl is used, 2nd fl closed off with locking gates and not part of permit maher not req | $130,000 |
| Apr 14, 2016 | Completed final sign-off Nov 2016 | 850 Battery St | Oliver & Company Inc. | #200: 1st flr: revision to ref pa 201312194588: scope is to the function of an open office to a training room. maher naDetails
#200: 1st flr: revision to ref pa 201312194588: scope is to the function of an open office to a training room. maher na | $3,500 |