Leo Panian
- Listed as
- engineer
- Firm
- Tipping Structural Engineers
- Based in
- Berkeley
- On San Francisco permits
- Feb 2012 to Jul 2026
13 permits since 2000 (engineer on 13 permits): 8 completed, 4 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 22, 2026 | In progress filed Jul 2026, not yet issued | 4 Embarcadero Center | 39th & 40th flrs: tenant improvement including: * selective demolition of offices and pantry * new non-load bearing partitions, ceiling, light fixtures & finishes * new operable partitionsDetails
39th & 40th flrs: tenant improvement including: * selective demolition of offices and pantry * new non-load bearing partitions, ceiling, light fixtures & finishes * new operable partitions | $3,037,500 | |
| Apr 1, 2026 | In progress filed Apr 2026, not yet issued | 766 San Francisco Golf Club Rd | construction of a new parking area and uncovered sand storage space. under separate pa# 202509245990, new maintenance building and administrative offices and associated site work.cDetails
construction of a new parking area and uncovered sand storage space. under separate pa# 202509245990, new maintenance building and administrative offices and associated site work.c | ||
| Nov 25, 2025 | In progress issued Apr 2026 | 754 San Francisco Golf Club Rd | Cody Vermette Group Inc | construction of a 1-story, type-v gold maintenance building and administrative offices including associated site work.Details
construction of a 1-story, type-v gold maintenance building and administrative offices including associated site work. | $6,500,000 |
| Apr 23, 2025 | In progress issued Sep 2025 | 554 Commercial St | Brennan Strong Hold Construction Inc | no exterior work planning approval under record # 2024001942 pta. full seismic retrofit, interior work includes ground floor bookstore, office, restrooms, new elevator, stairs at rear of interior.Details
no exterior work planning approval under record # 2024001942 pta. full seismic retrofit, interior work includes ground floor bookstore, office, restrooms, new elevator, stairs at rear of interior. | $1,500,000 |
| Apr 15, 2025 | Completed final sign-off Jan 2026 | 221 Main St | Gci, Inc | priority processing per ab-004.t.i of suites 104 & 250 on 1st fl & 2nd fl to create space for non-profit,private school for for grade 6-12,interior demolition of interior,including portion of 2nd fl structural slab for(n) stair opening,construction of(n)paritions doors,ceilings,finishes,fixtures.Details
priority processing per ab-004.t.i of suites 104 & 250 on 1st fl & 2nd fl to create space for non-profit,private school for for grade 6-12,interior demolition of interior,including portion of 2nd fl structural slab for(n) stair opening,construction of(n)paritions doors,ceilings,finishes,fixtures. | $10,000,000 |
| Mar 5, 2025 | Completed final sign-off Aug 2026 | 680 Folsom St | Gci, Inc | 15th floor. renovation of existing roof deck, including new convenience restroom and new elevator lobby finishes, select demo and new partitions, ceilings, doors, finishes. installation of new shade structure and planting beds. mep deferredDetails
15th floor. renovation of existing roof deck, including new convenience restroom and new elevator lobby finishes, select demo and new partitions, ceilings, doors, finishes. installation of new shade structure and planting beds. mep deferred | $790,000 |
| May 14, 2024 | Completed final sign-off Nov 2024 | 333 Dolores St | Guzman Construction Group Inc. | revision to addendum #2 (foundation and structure) of pa# 202209071941: to remove (2) windows from east elevation in accordance with changes made during plan check revisions of addendum #3 (amep).Details
revision to addendum #2 (foundation and structure) of pa# 202209071941: to remove (2) windows from east elevation in accordance with changes made during plan check revisions of addendum #3 (amep). | |
| Jun 30, 2023 | Completed final sign-off Dec 2023 | 1 Sansome St | Peacock Construction | 36/f: addition of (2) new phone booths in (e) office spaceDetails
36/f: addition of (2) new phone booths in (e) office space | $17,250 |
| Jun 7, 2022 | Completed final sign-off Oct 2022 | 143 Beaumont Av | voluntary partial seismic strengthening at ground floor. supplementing current installation of hold downs & shear plywood.Details
voluntary partial seismic strengthening at ground floor. supplementing current installation of hold downs & shear plywood. | $20,000 | |
| Dec 6, 2019 | Completed final sign-off Apr 2021 | 1455 03rd St | Truebeck Construction | installation of art on (e) privately owned, publicly accessed open space, lot 34.Details
installation of art on (e) privately owned, publicly accessed open space, lot 34. | $25,000 |
| Dec 6, 2019 | Completed final sign-off May 2021 | 1515 03rd St | Truebeck Construction | installation of art on (e) privately owned, publicly accessed pierpoint lane.Details
installation of art on (e) privately owned, publicly accessed pierpoint lane. | $30,000 |
| Jun 6, 2019 | Completed final sign-off Sep 2019 | 445 Geary St | Oliver & Company Inc. | lower level basement: replace carpet, paint, renovate fitting room, add 2 showers, excavation for pit for a temp stage lift. maher n/a.Details
lower level basement: replace carpet, paint, renovate fitting room, add 2 showers, excavation for pit for a temp stage lift. maher n/a. | $500,000 |
| Feb 29, 2012 | Never finaled issued May 2012, no final | 1275 Market St | Swinerton Builders | voluntary upgrade to the extg building egress. exterior to 2 extg egress stairs between floor 1-2 and 3-8.Details
voluntary upgrade to the extg building egress. exterior to 2 extg egress stairs between floor 1-2 and 3-8. | $1,100,000 |