Leighton Lee
- Listed as
- architect
- Firm
- Mavrik Studio
- Based in
- Treasure Island
- On San Francisco permits
- Jul 2016 to Sep 2024
32 permits since 2000 (architect on 32 permits): 26 completed, 5 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 30, 2024 | Completed final sign-off Jan 2025 | 580 California St | Skyline Construction | 22/flr- rev 202309207029 and ref 202312152614 for ti as built to remove call reference to two way comunication and card reader at elevator lobby. no card readers or two way comm being install in elevator lobbyDetails
22/flr- rev 202309207029 and ref 202312152614 for ti as built to remove call reference to two way comunication and card reader at elevator lobby. no card readers or two way comm being install in elevator lobby | |
| Dec 15, 2023 | Completed final sign-off Jun 2024 | 580 California St | Skyline Construction | 22/f: revision to permit 202309207029. change of offices room size by shifting partitions.Details
22/f: revision to permit 202309207029. change of offices room size by shifting partitions. | $50,000 |
| Sep 20, 2023 | Completed final sign-off Jun 2024 | 580 California St | Skyline Construction | modification of office space. new ceilings,light fixtures, finishes. mep deferred. restroom upgrades, breakroom.Details
modification of office space. new ceilings,light fixtures, finishes. mep deferred. restroom upgrades, breakroom. | $2,457,066 |
| Sep 7, 2023 | Completed final sign-off Jun 2024 | 580 California St | Skyline Construction | 22/f: interior demo of existing office partitions. no exterior work to be done.Details
22/f: interior demo of existing office partitions. no exterior work to be done. | $100,000 |
| Jun 9, 2021 | Completed final sign-off Nov 2021 | 580 California St | Peacock Construction | ste 2000: commercial t.i selective demo of non-loading bearing partitions. modi of (e) ceiling & tile, furniture & new finishes. new electrical, power, lighting.Details
ste 2000: commercial t.i selective demo of non-loading bearing partitions. modi of (e) ceiling & tile, furniture & new finishes. new electrical, power, lighting. | $96,690 |
| Jun 2, 2021 | Never finaled issued Jan 2022, no final | 1276 Market St | Kevin Dorgan Electrical | revision to bpa# 2015-1218-5457 s/r1, correction of(e) suite to as-built conditons, no new work to be performed for administration purpose onlyDetails
revision to bpa# 2015-1218-5457 s/r1, correction of(e) suite to as-built conditons, no new work to be performed for administration purpose only | $5,000 |
| Jun 1, 2021 | Never finaled filed Jun 2021, never issued | 444 De Haro St | Tashcon Corporation | install new emergency back up generator on unoccupied roofDetails
install new emergency back up generator on unoccupied roof | $15,000 |
| Nov 22, 2019 | Never finaled filed Nov 2019, never issued | 1276 Market St | change of use from existing medical cannabis dispensary to cannabis retail. no new work to be performed. for administrative purposes only.Details
change of use from existing medical cannabis dispensary to cannabis retail. no new work to be performed. for administrative purposes only. | ||
| Oct 4, 2019 | Completed final sign-off Feb 2021 | 1430 44th Av | Adolfo L Sanchez Jr | revision to renovation pa 2019-0709-5457. new lighting fixtures throughout residence. repace (e) knob and tube w/(n) compliant wiring. replace (e) roof insulation per title 24 report. replace (e) electrical panel and subpanel w/(n) afci panel. replace (e) fauDetails
revision to renovation pa 2019-0709-5457. new lighting fixtures throughout residence. repace (e) knob and tube w/(n) compliant wiring. replace (e) roof insulation per title 24 report. replace (e) electrical panel and subpanel w/(n) afci panel. replace (e) fau | $10,000 |
| Sep 26, 2019 | Completed final sign-off Dec 2019 | 1400 16th St | Tashcon Corporation | mep submittal for pa 201808278419. buildout of (e) garment factory space to b-occupancy lab space w/ supporting offices. install (n) interior and rooftop mechanical units. connect fixtures :& equipment via base building panels. provide plumb connections to (n) fixtures and drain lines to hvac unitsDetails
mep submittal for pa 201808278419. buildout of (e) garment factory space to b-occupancy lab space w/ supporting offices. install (n) interior and rooftop mechanical units. connect fixtures :& equipment via base building panels. provide plumb connections to (n) fixtures and drain lines to hvac units | $1,100,000 |
| Sep 11, 2019 | Expired or cancelled cancelled Nov 2022 | 2165 Irving St | install new overhead security gates over (e) storefront for sercurity of (e) dispensary. security gates will be recessed into (e) canopy and will not be visible when openDetails
install new overhead security gates over (e) storefront for sercurity of (e) dispensary. security gates will be recessed into (e) canopy and will not be visible when open | $14,000 | |
| Jul 9, 2019 | Completed final sign-off Feb 2021 | 1430 44th Av | Adolfo L Sanchez Jr | new finishes throughout residence, replace restroom fixtures in kind, replace kitchen appliances and casework, install somke and carbon monoxice alarm's, and install (n) doors with (e) openingsDetails
new finishes throughout residence, replace restroom fixtures in kind, replace kitchen appliances and casework, install somke and carbon monoxice alarm's, and install (n) doors with (e) openings | $20,000 |
| May 28, 2019 | Never finaled filed May 2019, never issued | 1331 Grant Av | change of use from laundromat to art gallery.exterior facade demising wall & entry door under separate permit.new finishes & ada accessible restroom. mep under deffered submital.Details
change of use from laundromat to art gallery.exterior facade demising wall & entry door under separate permit.new finishes & ada accessible restroom. mep under deffered submital. | $65,000 | |
| May 28, 2019 | Completed final sign-off Dec 2021 | 1335 Grant Av | Bevilacqua & Sons | change of use to cannabis dispensary. restore exterior facade & remove wood signage band for (n) clerestory. recess entry doors @ both commercial suites & install ramp and power assited door openers. revise demising wall location. new finishes & ada restroom.Details
change of use to cannabis dispensary. restore exterior facade & remove wood signage band for (n) clerestory. recess entry doors @ both commercial suites & install ramp and power assited door openers. revise demising wall location. new finishes & ada restroom. | $200,000 |
| Apr 15, 2019 | Completed final sign-off Oct 2024 | 2161 Irving St | Bevilacqua & Sons | replacement of existing lighting with new energy efficient fixtures as deferred submittal to pa 2019-0131-1686. revision: note to see a10.01 for lighting controls title 24 requirements.Details
replacement of existing lighting with new energy efficient fixtures as deferred submittal to pa 2019-0131-1686. revision: note to see a10.01 for lighting controls title 24 requirements. | $10,000 |
| Feb 25, 2019 | Never finaled filed Feb 2019, never issued | 1333 Grant Av | interior t.i. & change of use from laundromat to canabis dispensary. greation of (n) ada restrooms and accessible entry per da-04. mep deferred submittal. (n) finishes throughout & (n) millwork & sales counter.Details
interior t.i. & change of use from laundromat to canabis dispensary. greation of (n) ada restrooms and accessible entry per da-04. mep deferred submittal. (n) finishes throughout & (n) millwork & sales counter. | $90,000 | |
| Jan 9, 2019 | Completed final sign-off Oct 2019 | 996 Burnett Av | revision to permit application #2018/0220/1717.install brace between the ridge beam & kitchen wallDetails
revision to permit application #2018/0220/1717.install brace between the ridge beam & kitchen wall | ||
| Oct 4, 2018 | Completed final sign-off Nov 2018 | 680 Folsom St | Novo Construction Inc | 5th fl, ste 550 - interior ti to separate existing suite into two separate suites. current suite was originally 2 separate suites and new work will reinstate this condition. work will consist of new partitions and finishes in area of work. ref pa 2017-1227-7513Details
5th fl, ste 550 - interior ti to separate existing suite into two separate suites. current suite was originally 2 separate suites and new work will reinstate this condition. work will consist of new partitions and finishes in area of work. ref pa 2017-1227-7513 | $30,000 |
| Aug 27, 2018 | Completed final sign-off Dec 2019 | 1400 16th St | Tashcon Corporation | change of use. tenant improvement. expand previously approved lab, support spaces & accessory office on 1st fl into expansion space not covered under original permit. improvement work will be limited to interior only partitions, restrooms, mech, elect & plum. mep will be under separate permitDetails
change of use. tenant improvement. expand previously approved lab, support spaces & accessory office on 1st fl into expansion space not covered under original permit. improvement work will be limited to interior only partitions, restrooms, mech, elect & plum. mep will be under separate permit | $2,600,000 |
| Mar 23, 2018 | Completed final sign-off Oct 2024 | 2161 Irving St | change of use from medical cannibas dispensary to motion #m18-003. cannabis retail, no physical changes. ref pa #201512185450 & planning motionDetails
change of use from medical cannibas dispensary to motion #m18-003. cannabis retail, no physical changes. ref pa #201512185450 & planning motion | $40,000 | |
| Mar 22, 2018 | Completed final sign-off Dec 2025 | 3185 Mission St | Zack De Vito Inc | grandfathered mcd use conversion to cannabis retail. no work under this permit. approved but not issue, ref mcd change of use pa# 2016/02/11/9450.Details
grandfathered mcd use conversion to cannabis retail. no work under this permit. approved but not issue, ref mcd change of use pa# 2016/02/11/9450. | |
| Feb 20, 2018 | Completed final sign-off Oct 2019 | 998 Burnett Av | legalization of (e) adu per ordinance# 162-16, & correction of (e) violations. (n) finishes & (n) partitions. create (n) access stair from rear yard to portola drive for adu access. to comply w/ nov #201706772, 201708261, 201715941Details
legalization of (e) adu per ordinance# 162-16, & correction of (e) violations. (n) finishes & (n) partitions. create (n) access stair from rear yard to portola drive for adu access. to comply w/ nov #201706772, 201708261, 201715941 | $92,600 | |
| Jan 30, 2018 | Completed final sign-off Oct 2018 | 500 Church St | Mendez-Ortiz Contractors | ti for creation of new cafe/bona fide eating establishemnt. new finishes, mech, plm, ele and partitions. ref cp-zoc app 2017009207cua. fire alarm upgrade permit #201710252172.Details
ti for creation of new cafe/bona fide eating establishemnt. new finishes, mech, plm, ele and partitions. ref cp-zoc app 2017009207cua. fire alarm upgrade permit #201710252172. | $80,000 |
| Dec 27, 2017 | Completed final sign-off Feb 2018 | 680 Folsom St | Skyline Construction | on 5th floor - t.i. in extg office space. new doors with side lites for new conference rooms. demolition of non-bearing partitions. all lighting, mechanical, plumbing, and electrical system are extg to remain. n/a for maher.Details
on 5th floor - t.i. in extg office space. new doors with side lites for new conference rooms. demolition of non-bearing partitions. all lighting, mechanical, plumbing, and electrical system are extg to remain. n/a for maher. | $120,000 |
| Dec 21, 2017 | Completed final sign-off May 2018 | 1400 16th St | Skyline Construction | 1/f: rev to (e) pa 201710252229: revision to keep (e) door 138 in place and door 148a. revise hallway framing. maher naDetails
1/f: rev to (e) pa 201710252229: revision to keep (e) door 138 in place and door 148a. revise hallway framing. maher na | |
| Oct 25, 2017 | Completed final sign-off Apr 2018 | 1400 16th St | Skyline Construction | relocation of support accessory offices for lab space and new interior non-bearing partitions on 1st floor. all lighting, mechanical, and electrical is extg to remain unchanged. n/a for maher. alarm/sprinkler deferred if required.Details
relocation of support accessory offices for lab space and new interior non-bearing partitions on 1st floor. all lighting, mechanical, and electrical is extg to remain unchanged. n/a for maher. alarm/sprinkler deferred if required. | $115,000 |
| Aug 31, 2017 | Completed final sign-off May 2018 | 1290 Sutter St | Canning Electric Inc | to infill inside opening of window for fullfill accoustically rate for concert venue. maher n/aDetails
to infill inside opening of window for fullfill accoustically rate for concert venue. maher n/a | $5,000 |
| Aug 21, 2017 | Completed final sign-off May 2018 | 1400 16th St | installation of emergency generators on exposed 1st fl roof to be used in the event of power outage. not visible from public right of wayDetails
installation of emergency generators on exposed 1st fl roof to be used in the event of power outage. not visible from public right of way | $20,000 | |
| Aug 11, 2017 | Completed final sign-off Feb 2019 | 461 02nd St | Htn Construction | at #129: remodel of (e) live work unit. relocate walls and interior stairs , relocate bathroom, remodel lower level studio and meeting area. meher ordinance not apply.Details
at #129: remodel of (e) live work unit. relocate walls and interior stairs , relocate bathroom, remodel lower level studio and meeting area. meher ordinance not apply. | $150,000 |
| Jul 17, 2017 | Completed final sign-off Feb 2019 | 5750 Fulton St | Bhogal Builders And Electric Company | fill in under existing 2nd fl rear bay at back of house. convert unconditioned storage area on 1st fl to living area, to include (2) bedrms, (2) bathrms, (1) office, and den. 2nd fl: relocate kitchen, add (1) full bath and (1) half bath. new/replace fixtures at kitchen and bathrooms.Details
fill in under existing 2nd fl rear bay at back of house. convert unconditioned storage area on 1st fl to living area, to include (2) bedrms, (2) bathrms, (1) office, and den. 2nd fl: relocate kitchen, add (1) full bath and (1) half bath. new/replace fixtures at kitchen and bathrooms. | $125,000 |
| Jun 21, 2017 | Completed final sign-off Sep 2017 | 1 Avenue Of The Palms | Who Built Creative Builders | demo (e) play structure & construct (n) play structure in its place. (n) accessible path of travel to (n) play structure. location is at treasure island.Details
demo (e) play structure & construct (n) play structure in its place. (n) accessible path of travel to (n) play structure. location is at treasure island. | $40,000 |
| Jul 15, 2016 | Completed final sign-off Aug 2017 | 1400 16th St | Skyline Construction | new non structural partitions new mechanical, plumbing and electrical. new finishes and fixtures. change of use from garment factory to laboratory. ** maher: n/a **Details
new non structural partitions new mechanical, plumbing and electrical. new finishes and fixtures. change of use from garment factory to laboratory. ** maher: n/a ** | $4,800,000 |