Canning Electric Inc
- Based in
- San Francisco
- On San Francisco permits
- Aug 2000 to Nov 2025
- Last 24 months
- 7 permits filed
45 permits since 2000: 33 completed, 2 in progress, 7 never finaled, 3 expired or cancelled.
Of the 7 never-finaled permits, 1 is 3 to 5 years old, 6 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 6, 2025 | Expired or cancelled withdrawn Dec 2025 | 1228 Folsom St | removal of existing non-structural, non load-bearing interior room dividers. no new construction, framing or system modifications proposed.Details
removal of existing non-structural, non load-bearing interior room dividers. no new construction, framing or system modifications proposed. | $500 |
| Oct 29, 2025 | Completed final sign-off Apr 2026 | 60 Scenic Wy | replace in kind portion of deck due to dry rot. less than 50% repair. back of bldg. non street visible.Details
replace in kind portion of deck due to dry rot. less than 50% repair. back of bldg. non street visible. | $20,000 |
| Sep 26, 2025 | In progress issued Feb 2026 | 111 Cambon Dr | install 1 switchboard, 2 supercharger cabinets, 3 light poles, 16 chargepost level 3 in parking lotDetails
install 1 switchboard, 2 supercharger cabinets, 3 light poles, 16 chargepost level 3 in parking lot | $288,000 |
| Jun 20, 2025 | Completed final sign-off Sep 2025 | 3501 Clay St | demo of exting bathroom tile, new cabinets, vanity, mirror. removal of bathroom fixtures. remodel. replace in kind. no wall demo, no wall construction. no change in plumbing fixture count. no electrical workDetails
demo of exting bathroom tile, new cabinets, vanity, mirror. removal of bathroom fixtures. remodel. replace in kind. no wall demo, no wall construction. no change in plumbing fixture count. no electrical work | $20,000 |
| Apr 11, 2025 | Completed final sign-off Apr 2025 | 2989 Lake St | front stairway - limited dry rot where accessibleDetails
front stairway - limited dry rot where accessible | $250 |
| Feb 25, 2025 | Completed final sign-off Apr 2025 | 2989 Lake St | dry rot repair around garage door- replace in kindDetails
dry rot repair around garage door- replace in kind | $100 |
| Jan 22, 2025 | Completed final sign-off Feb 2026 | 1965 Lombard St | install ev charging, 16 posts, 4 cabinets, 6 lights, 1 switch board. 4 trash bins, 1 van access sign, 7 drilled bolts, 2 bolt down , 1 wifi repainter.Details
install ev charging, 16 posts, 4 cabinets, 6 lights, 1 switch board. 4 trash bins, 1 van access sign, 7 drilled bolts, 2 bolt down , 1 wifi repainter. | $451,000 |
| Mar 8, 2024 | Completed final sign-off May 2024 | 1133 Mission St | fallen fence due to bad weather repairing/replacing entire fence. in kind. visible to street. violation number 202419037. approx 8 ft tall chain linked fenceDetails
fallen fence due to bad weather repairing/replacing entire fence. in kind. visible to street. violation number 202419037. approx 8 ft tall chain linked fence | $3,000 |
| Nov 3, 2023 | In progress issued Nov 2023 | 45 Onondaga Av | to obtain final inspection for work approved under pa#202009093754. all work is completeDetails
to obtain final inspection for work approved under pa#202009093754. all work is complete | |
| Jul 27, 2023 | Completed final sign-off Mar 2025 | 690 Market St | revision to pa# 202110120227. update drawing index for sheet e3.0 drawing name change. updated to show meter stack, fused disconnect switch on 16th fl. revised meter bank mp-9a to 16th fl, name now mp-16a. added termination breaker. location changed for 600a unit mp-16a to 15th fl.Details
revision to pa# 202110120227. update drawing index for sheet e3.0 drawing name change. updated to show meter stack, fused disconnect switch on 16th fl. revised meter bank mp-9a to 16th fl, name now mp-16a. added termination breaker. location changed for 600a unit mp-16a to 15th fl. | |
| Jul 8, 2022 | Completed final sign-off Nov 2023 | 838 Kearny St | new electrical wiring for supply and install of new lighting and switches/outlets in e basement of school for new gymDetails
new electrical wiring for supply and install of new lighting and switches/outlets in e basement of school for new gym | $250,000 |
| Jan 24, 2022 | Never finaled issued Jan 2022, no final | 1228 Folsom St | dry rot repair on front facade of building. replace in kind and exploratory demo at front facade (approx 120sf).Details
dry rot repair on front facade of building. replace in kind and exploratory demo at front facade (approx 120sf). | $12,000 |
| Oct 12, 2021 | Completed final sign-off Mar 2025 | 690 Market St | electrical work associated with the conversion of 24 timeshare hotel units into individually metered units. builing will go from 44 hotel rooms and 57 dwelling units to 20 hotel rooms and 81 dwelling units.Details
electrical work associated with the conversion of 24 timeshare hotel units into individually metered units. builing will go from 44 hotel rooms and 57 dwelling units to 20 hotel rooms and 81 dwelling units. | $199,000 |
| Aug 24, 2021 | Completed final sign-off Nov 2021 | 1340 04th St | new title 24 lighting nad poer for tenant improvment on gr fl ref 202103307548Details
new title 24 lighting nad poer for tenant improvment on gr fl ref 202103307548 | $74,000 |
| Jul 26, 2021 | Completed final sign-off Oct 2021 | 150 Golden Gate Av | interior work only @ ground floor - adding lighting in 3 new unisex bathrooms and new hallway. ref pa 2021-0204-3984. ground work onlyDetails
interior work only @ ground floor - adding lighting in 3 new unisex bathrooms and new hallway. ref pa 2021-0204-3984. ground work only | $60,000 |
| Jul 19, 2021 | Completed final sign-off Oct 2021 | 150 04th Ti St | 900 avenue d, bldg #33a/ treasture island- kitchen remodel. no exterior work. (e) kitchen of treasure island school (closed). remodeled appliances replaced in-kind. epoxy repair to concrete floor. mep by others.Details
900 avenue d, bldg #33a/ treasture island- kitchen remodel. no exterior work. (e) kitchen of treasure island school (closed). remodeled appliances replaced in-kind. epoxy repair to concrete floor. mep by others. | $300,000 |
| Sep 9, 2020 | Never finaled issued Oct 2020, no final | 45 Onondaga St | provide basic core and shell, lighting and power to 45 onondaga. install new 600a service upgrade. ti reference #2020-0110-1639Details
provide basic core and shell, lighting and power to 45 onondaga. install new 600a service upgrade. ti reference #2020-0110-1639 | $50,000 |
| Sep 5, 2020 | Expired or cancelled withdrawn Oct 2020 | 35 Onondaga Av | provide basic core and shell, lighting and power to 45 onondaga. install new 600a service upgrade. ti reference #2020-0820-2199.Details
provide basic core and shell, lighting and power to 45 onondaga. install new 600a service upgrade. ti reference #2020-0820-2199. | $50,000 |
| Sep 1, 2020 | Completed final sign-off Jul 2023 | 2300 16th St | electric vehicle charging infastructure. install (6) tesla v2 supercharger cabinets on basement level. install (12) tesla v2 superchargers on ground floor parkingDetails
electric vehicle charging infastructure. install (6) tesla v2 supercharger cabinets on basement level. install (12) tesla v2 superchargers on ground floor parking | $383,800 |
| Jan 14, 2020 | Completed final sign-off Jul 2021 | 2675 Geary Bl | electric vehicle charging infrastructure **n/a maher**Details
electric vehicle charging infrastructure **n/a maher** | $795,000 |
| May 9, 2019 | Completed final sign-off Feb 2020 | 210 Post St | adding lighting and gfi outlets forrestroom remodel on 2nd & 11th fl.Details
adding lighting and gfi outlets forrestroom remodel on 2nd & 11th fl. | $30,000 |
| Feb 7, 2019 | Completed final sign-off Dec 2021 | 39 Taylor St | 2 new pg and e vaults to be installed in basement below sidewalk, new retaining walls for vaultsDetails
2 new pg and e vaults to be installed in basement below sidewalk, new retaining walls for vaults | $20,000 |
| Oct 3, 2018 | Completed final sign-off Jan 2021 | 601 Van Ness Av | 12 eletric vehicle charging stations & associated switchgear. **maher n/a**Details
12 eletric vehicle charging stations & associated switchgear. **maher n/a** | $185,000 |
| Jun 22, 2018 | Completed final sign-off Dec 2021 | 1424 Polk St | replacement of (e) sidewalk over basement. installation of (n) pg&e vault. shotcrete reinforcement of (e) brick basement walls below sidewalk with (n) foundationDetails
replacement of (e) sidewalk over basement. installation of (n) pg&e vault. shotcrete reinforcement of (e) brick basement walls below sidewalk with (n) foundation | $10,000 |
| May 25, 2018 | Never finaled issued Jun 2018, no final | 325 05th St | 2/f: ti build out of existing space on the 2nd floor only, add new lights/lighting title 24 controlsDetails
2/f: ti build out of existing space on the 2nd floor only, add new lights/lighting title 24 controls | $10,000 |
| May 25, 2018 | Never finaled issued Jun 2018, no final | 325 05th St | 3/f: t.i. build out of existing space on the 3rd fl. only add new lights/lighting title 24 controlsDetails
3/f: t.i. build out of existing space on the 3rd fl. only add new lights/lighting title 24 controls | $10,000 |
| May 25, 2018 | Never finaled issued Jun 2018, no final | 325 05th St | 1/f: ti build out of existing space on the 1st fl. only add new lights/lighting title 24 controlsDetails
1/f: ti build out of existing space on the 1st fl. only add new lights/lighting title 24 controls | $10,000 |
| May 7, 2018 | Completed final sign-off May 2018 | 25 Taylor St | to obtain final inspection for work approved under pa# 201403180970Details
to obtain final inspection for work approved under pa# 201403180970 | |
| Apr 3, 2018 | Completed final sign-off Jul 2018 | 724 Pine St | to comply with t-24 requirements. ref elec permit #ew201802050845 electrical drawings only. maher naDetails
to comply with t-24 requirements. ref elec permit #ew201802050845 electrical drawings only. maher na | $70,000 |
| Aug 31, 2017 | Completed final sign-off May 2018 | 1290 Sutter St | to infill inside opening of window for fullfill accoustically rate for concert venue. maher n/aDetails
to infill inside opening of window for fullfill accoustically rate for concert venue. maher n/a | $5,000 |
| Aug 31, 2017 | Never finaled issued Aug 2017, no final | 735 Taylor St | reconfiguration of laundry room. (e) units egress maintained as is. mep under seperate permit. build new wall per plan.Details
reconfiguration of laundry room. (e) units egress maintained as is. mep under seperate permit. build new wall per plan. | $15,000 |
| Jul 11, 2017 | Completed final sign-off Oct 2017 | 1126 Bush St | excavating a 1'- 2" deep utility pit at ground floor in preparation for new switchgear. n/a ordinance #155-13Details
excavating a 1'- 2" deep utility pit at ground floor in preparation for new switchgear. n/a ordinance #155-13 | $30,000 |
| Jul 3, 2017 | Completed final sign-off Oct 2017 | 698 Bush St | excavating 2'-6" deep utility put inhte basement. install rebar & concrete per drawings in basement storage for new recessed floor. work to be done in preparation for new switchgear.Details
excavating 2'-6" deep utility put inhte basement. install rebar & concrete per drawings in basement storage for new recessed floor. work to be done in preparation for new switchgear. | $10,000 |
| Jun 20, 2017 | Completed final sign-off Oct 2018 | 795 Pine St | relocating laundry room - moving wall & partial wood floor (approx 100sf) in kind. mep under seperate permit.Details
relocating laundry room - moving wall & partial wood floor (approx 100sf) in kind. mep under seperate permit. | $15,000 |
| Jun 1, 2017 | Completed final sign-off Dec 2017 | 1405 Franklin St | replace concrete in rear yard, in kind, due to cracking; roughly 10' x 5'Details
replace concrete in rear yard, in kind, due to cracking; roughly 10' x 5' | $5,000 |
| Feb 1, 2017 | Never finaled issued Feb 2017, no final | 153 Kearny St | ref pa#201608155034: title 24 only. n/a maherDetails
ref pa#201608155034: title 24 only. n/a maher | |
| Nov 9, 2016 | Expired or cancelled cancelled Jan 2026 | 1405 Franklin St | the project scope is to demolition of an existing commercial unit and install a new electrical room.Details
the project scope is to demolition of an existing commercial unit and install a new electrical room. | $10,000 |
| Apr 28, 2015 | Completed final sign-off Mar 2016 | 1263 Mission St | basement, 1 2 3: interior mep system upgrade ref pa 2015 0323 1540, maher naDetails
basement, 1 2 3: interior mep system upgrade ref pa 2015 0323 1540, maher na | $120,000 |
| Feb 5, 2015 | Completed final sign-off Jul 2016 | 1000 Sansome St | electrial upgrade off common hallways and bathroom. relocation of existing dc elevator service. title 24 lighting controls. fire alarm on separate permit. appl. 2014.0617.8678.Details
electrial upgrade off common hallways and bathroom. relocation of existing dc elevator service. title 24 lighting controls. fire alarm on separate permit. appl. 2014.0617.8678. | $90,000 |
| Feb 5, 2015 | Completed final sign-off Mar 2015 | 200 Kansas St | suite #200: existing 24 lighting controls. t.i. of suite 200. new lighting and power per open space. fire alarm under separat permit. ref. #2014.0728.2328. maher n/a.Details
suite #200: existing 24 lighting controls. t.i. of suite 200. new lighting and power per open space. fire alarm under separat permit. ref. #2014.0728.2328. maher n/a. | $80,000 |
| Feb 5, 2015 | Completed final sign-off Aug 2015 | 1699 Van Ness Av | relocation of lighting and power outlets in slelective areas. addition of lighting and power connectiions in selective areas. fire alarm under separate permit. ref. t.i. appl. 2014.1103.0549.Details
relocation of lighting and power outlets in slelective areas. addition of lighting and power connectiions in selective areas. fire alarm under separate permit. ref. t.i. appl. 2014.1103.0549. | $65,000 |
| Mar 18, 2014 | Completed final sign-off May 2018 | 25 Taylor St | title 24 for lighting on m, 2+3 floorsDetails
title 24 for lighting on m, 2+3 floors | $20,000 |
| Mar 4, 2014 | Completed final sign-off Nov 2016 | 25 Taylor St | revision to appl #2013.10.29.0550: new electrical service including supply to existing fire pump. mts will be removed upon completion of new service upgrade.Details
revision to appl #2013.10.29.0550: new electrical service including supply to existing fire pump. mts will be removed upon completion of new service upgrade. | $125,000 |
| Feb 6, 2013 | Completed final sign-off Feb 2013 | 2021 Jefferson St | to comply with physical inspection report cc-7222Details
to comply with physical inspection report cc-7222 | |
| Aug 3, 2000 | Completed final sign-off Feb 2001 | 3379 22nd St | install fire alarm in new buildingDetails
install fire alarm in new building | $2,000 |