Keith Trotman Kirley
- Listed as
- architect
- Firm
- Kirley+Architecture & Deve
- Based in
- San Francisco
- On San Francisco permits
- Nov 2016 to Aug 2026
16 permits since 2000 (architect on 16 permits): 13 completed, 2 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 21, 2026 | In progress filed Aug 2026, not yet issued | 39 Brewster St | change (e) office on 1/f into legal bedroom. add unconditioned egress corridor to the exterior balboa st. side. no work on 2/f, roof, or exterior elevation.Details
change (e) office on 1/f into legal bedroom. add unconditioned egress corridor to the exterior balboa st. side. no work on 2/f, roof, or exterior elevation. | $15,000 | |
| Sep 17, 2025 | Completed final sign-off Aug 2026 | 2631 Balboa St | Cody Design Build Inc | revision to pa # 2025-0522-7130. add new deck on the entry level (2nd fl) top of flat roofDetails
revision to pa # 2025-0522-7130. add new deck on the entry level (2nd fl) top of flat roof | |
| May 22, 2025 | Completed final sign-off Aug 2026 | 2631 Balboa St | Cody Design Build Inc | 1st/f: addition to rear. n) conditioned space bedroom, bath, mud rm & laundry w/ new stair to 2nd/f, updated foundation to bedroom. 2nd/f: remodel kitchen, bath, living, entry, den & powder rm. 3rd/f: remodel master suite, 2nd bath, n) laundry closet, linen closet. n) windows & doors thruDetails
1st/f: addition to rear. n) conditioned space bedroom, bath, mud rm & laundry w/ new stair to 2nd/f, updated foundation to bedroom. 2nd/f: remodel kitchen, bath, living, entry, den & powder rm. 3rd/f: remodel master suite, 2nd bath, n) laundry closet, linen closet. n) windows & doors thru | $195,000 |
| Feb 27, 2025 | Expired or cancelled withdrawn Sep 2025 | 766 Hayes St | Darc Ventures Inc Dba Spl Construction S | foundation upgrade and 174 sq ft infill of unconditioned space beneth cantilevered rooms and associated revision rear facade at ground floor.Details
foundation upgrade and 174 sq ft infill of unconditioned space beneth cantilevered rooms and associated revision rear facade at ground floor. | $95,000 |
| Aug 1, 2024 | In progress issued Sep 2024 | 1235 05th Av | Kingfish Construction Llc. | interior remodel on 3rd fl. (n) deck on existing flat roof on 2nd fl. (n) windows on rear facade on 3rd fl onlyDetails
interior remodel on 3rd fl. (n) deck on existing flat roof on 2nd fl. (n) windows on rear facade on 3rd fl only | $150,000 |
| Jan 24, 2024 | Completed final sign-off Jan 2025 | 2559 43rd Av | M M I A Inc Dba Keith Fontana Constructi | remodel storage area into living space for same unit. new doors to exterior at lower level. addition of rear deck & new exterior door at 2/f.Details
remodel storage area into living space for same unit. new doors to exterior at lower level. addition of rear deck & new exterior door at 2/f. | $400,000 |
| Jul 6, 2023 | Completed final sign-off Jul 2024 | 2614 Jackson St | Arrow Construction & Remodeling | replace paving at entry breezeway and provide new security gateDetails
replace paving at entry breezeway and provide new security gate | $15,000 |
| Jun 2, 2022 | Completed final sign-off Apr 2023 | 60 Cedro Av | Brady Construction Inc | remodel of existing single family kitchen & upstairs bathroom and structural upgrade to existing foundation.Details
remodel of existing single family kitchen & upstairs bathroom and structural upgrade to existing foundation. | $125,000 |
| Dec 10, 2020 | Completed final sign-off Aug 2023 | 2416 15th St | Phase 2 Builders | horizontal addition of adu per state law to existing r3 3-story single family residence first floor: expand existing conditioned area at rear yard with 12'-foot permitted obstruction per planning code section 136 with new sleeping, eating, living areas and bathroom at grade.Details
horizontal addition of adu per state law to existing r3 3-story single family residence first floor: expand existing conditioned area at rear yard with 12'-foot permitted obstruction per planning code section 136 with new sleeping, eating, living areas and bathroom at grade. | $203,750 |
| Nov 30, 2020 | Completed final sign-off Nov 2022 | 443 Lake St | Jetton Construction | 1/f: new gym,bedroom, bathroom, mudroom and laundry area with new stair to level 2. interior renovations to 2/f & 3/f including kitchen & power & bathroom & den,entry,living room,den,master. exterior work includes (n) garage door in (e) opening at front and new fenestration at rear & sides of house.Details
1/f: new gym,bedroom, bathroom, mudroom and laundry area with new stair to level 2. interior renovations to 2/f & 3/f including kitchen & power & bathroom & den,entry,living room,den,master. exterior work includes (n) garage door in (e) opening at front and new fenestration at rear & sides of house. | $105,000 |
| Oct 29, 2020 | Completed final sign-off Jun 2021 | 1424 Ulloa St | Brady Construction Inc | enclose (e) unconditioned space adj to garage, new bedroom & bathrom partial demo (e) slapb, new french doors at back wall.Details
enclose (e) unconditioned space adj to garage, new bedroom & bathrom partial demo (e) slapb, new french doors at back wall. | $45,000 |
| Jul 22, 2019 | Completed final sign-off Jan 2020 | 1896 Hyde St | Boswell Builders | grnd flr ti - non structural partition walls, new accessible bar counter and extended back bar area, relocated ele panel, ele conduit & hvac duct relocation work, new kitchen modification including new equipment as noted in the planDetails
grnd flr ti - non structural partition walls, new accessible bar counter and extended back bar area, relocated ele panel, ele conduit & hvac duct relocation work, new kitchen modification including new equipment as noted in the plan | $260,000 |
| Mar 18, 2019 | Completed final sign-off Jul 2019 | 680 Mission St | Taylor Resaurant System | ground flr ti - non structural partitions walls and ceiling panel, wood wall paneling installation of freestanding pos, millwork w/accessible product display shelving storage shelving minor ele and hvac. relocation of one 3-comp sink and handwashing stationDetails
ground flr ti - non structural partitions walls and ceiling panel, wood wall paneling installation of freestanding pos, millwork w/accessible product display shelving storage shelving minor ele and hvac. relocation of one 3-comp sink and handwashing station | $90,000 |
| Aug 7, 2018 | Completed final sign-off Mar 2019 | 2001 Fillmore St | Boswell Builders | g/f-restaurant remodel and comply w/ complaint 201879512 and interior remodel to (e) restaurant, bathroom, bar area and new interior millwork. replacement of (e) front windows and skylights. maher n/a.Details
g/f-restaurant remodel and comply w/ complaint 201879512 and interior remodel to (e) restaurant, bathroom, bar area and new interior millwork. replacement of (e) front windows and skylights. maher n/a. | $150,000 |
| Feb 2, 2018 | Completed final sign-off Feb 2018 | 825 Cole St | building documentation to convert media room at lower level to legal bedroom.Details
building documentation to convert media room at lower level to legal bedroom. | ||
| Nov 23, 2016 | Completed final sign-off Apr 2018 | 166 Ewing Tr | Phase 2 Builders | insulate and condition e 1st fl to create new living space, full bath, new door, window. infill existing light well at 2nd level add new windowDetails
insulate and condition e 1st fl to create new living space, full bath, new door, window. infill existing light well at 2nd level add new window | $100,000 |