Cody Design Build Inc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2023 to Aug 2026
- Last 24 months
- 13 permits filed
17 permits since 2000: 13 completed, 4 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 18, 2026 | In progress issued Aug 2026 | 2243 Steiner St | remodel kitchen and (3) (e) bathrooms. relocate laundry to 2/f. add wall to close off (e) den.Details
remodel kitchen and (3) (e) bathrooms. relocate laundry to 2/f. add wall to close off (e) den. | $208,177 |
| May 26, 2026 | Completed final sign-off Sep 2026 | 682 28th St | remodel in kind one bathroom including tub/shower, toilet, vanity, tile. no moving walls. approx. 85 sq ft.Details
remodel in kind one bathroom including tub/shower, toilet, vanity, tile. no moving walls. approx. 85 sq ft. | $12,000 |
| Mar 3, 2026 | Completed final sign-off Aug 2026 | 2631 Balboa St | revision to #202505227130 & 202509175467: hvac equipment moved but not changed, pg&e panel moved. minor plumbing changes & interior door locations.Details
revision to #202505227130 & 202509175467: hvac equipment moved but not changed, pg&e panel moved. minor plumbing changes & interior door locations. | |
| Jan 20, 2026 | Completed final sign-off Apr 2026 | 3992 25th St | remodel 1 bathroom including toilet, vanity, shower & shower pan. replace five street facing windows with new milgard v400 tuscany vinyl double-hung windows. replace one street facing sliding glass door with new milgard vinyl unit. new drywall in on room, less than 100 sq ft.Details
remodel 1 bathroom including toilet, vanity, shower & shower pan. replace five street facing windows with new milgard v400 tuscany vinyl double-hung windows. replace one street facing sliding glass door with new milgard vinyl unit. new drywall in on room, less than 100 sq ft. | $35,000 |
| Jan 5, 2026 | Completed final sign-off Jul 2026 | 978 Teresita Bl | revision to pa# 202506209076. demo floating wood floor and slab beneath it in garage. pour new slab in place of old slab. stair remodel and floor remodel on ground floor.Details
revision to pa# 202506209076. demo floating wood floor and slab beneath it in garage. pour new slab in place of old slab. stair remodel and floor remodel on ground floor. | $20,000 |
| Dec 17, 2025 | In progress issued Dec 2025 | 2639 Balboa St | replace siding in kind east sde of bldg. street visible. wood to hardy artisan.Details
replace siding in kind east sde of bldg. street visible. wood to hardy artisan. | $15,000 |
| Nov 18, 2025 | Completed final sign-off Jul 2026 | 978 Teresita Bl | replace (7) windows, same rough opening, same location, non street facing. dry rot repair as needed on front and back of house. replace street facing stucco, in kind. replace rear siding, in kind. add new insulation and drywall throughout.Details
replace (7) windows, same rough opening, same location, non street facing. dry rot repair as needed on front and back of house. replace street facing stucco, in kind. replace rear siding, in kind. add new insulation and drywall throughout. | $20,000 |
| Sep 17, 2025 | Completed final sign-off Aug 2026 | 2631 Balboa St | revision to pa # 2025-0522-7130. add new deck on the entry level (2nd fl) top of flat roofDetails
revision to pa # 2025-0522-7130. add new deck on the entry level (2nd fl) top of flat roof | |
| Jul 8, 2025 | Completed final sign-off Jan 2026 | 3992 25th St | upper unit kitchen 3992: remodel one kitchen. replace in kind cabinets, appliances, flooring, plumbing fixtures.Details
upper unit kitchen 3992: remodel one kitchen. replace in kind cabinets, appliances, flooring, plumbing fixtures. | $40,000 |
| Jun 20, 2025 | Completed final sign-off Jul 2026 | 978 Teresita Bl | remodel (e) kitchen and bathroom on 2/f. relocate (e) half bath to full bath on 1/f. 3 windows replacement; remove (e) fireplace; relocate door in bedrooms and modify closet doors; voluntary add plywood sheathing to north ane east exterior wall from insideDetails
remodel (e) kitchen and bathroom on 2/f. relocate (e) half bath to full bath on 1/f. 3 windows replacement; remove (e) fireplace; relocate door in bedrooms and modify closet doors; voluntary add plywood sheathing to north ane east exterior wall from inside | $70,000 |
| May 22, 2025 | Completed final sign-off Aug 2026 | 2631 Balboa St | 1st/f: addition to rear. n) conditioned space bedroom, bath, mud rm & laundry w/ new stair to 2nd/f, updated foundation to bedroom. 2nd/f: remodel kitchen, bath, living, entry, den & powder rm. 3rd/f: remodel master suite, 2nd bath, n) laundry closet, linen closet. n) windows & doors thruDetails
1st/f: addition to rear. n) conditioned space bedroom, bath, mud rm & laundry w/ new stair to 2nd/f, updated foundation to bedroom. 2nd/f: remodel kitchen, bath, living, entry, den & powder rm. 3rd/f: remodel master suite, 2nd bath, n) laundry closet, linen closet. n) windows & doors thru | $195,000 |
| May 12, 2025 | Completed final sign-off Aug 2026 | 2631 Balboa St | demolition of backyard landscape (all flat work) and drywall interior (provide 5/8 gyp-x at exterior pl walls, 1/2" at all others)Details
demolition of backyard landscape (all flat work) and drywall interior (provide 5/8 gyp-x at exterior pl walls, 1/2" at all others) | $6,000 |
| Jan 10, 2025 | Completed final sign-off Mar 2025 | 54 Elizabeth St | like for like kitchen remodel replace cabinets, counter tops, appliances and flooring. approx 85sqftDetails
like for like kitchen remodel replace cabinets, counter tops, appliances and flooring. approx 85sqft | $24,000 |
| Jun 11, 2024 | In progress filed Jun 2024, not yet issued | 863 Vermont St | reroofingDetails
reroofing | $13,000 |
| Jun 5, 2024 | Completed final sign-off Aug 2024 | 863 Vermont St | repair roof deck above garage. remove (e) deck boards & sleepers. replace sleeprs and deck boards w/ trex material. deck is on a garage roof, roofer will replace roofing. we will remove and replace siding and door as needed so roofer can install membrane properly.Details
repair roof deck above garage. remove (e) deck boards & sleepers. replace sleeprs and deck boards w/ trex material. deck is on a garage roof, roofer will replace roofing. we will remove and replace siding and door as needed so roofer can install membrane properly. | $14,000 |
| Apr 5, 2024 | In progress issued Apr 2024 | 25 Forest Side Av | 1x kitchen remodel. new cabinets and countertops , sink and faucet. and hood vent- no wall removal.Details
1x kitchen remodel. new cabinets and countertops , sink and faucet. and hood vent- no wall removal. | $12,000 |
| Dec 21, 2023 | Completed final sign-off Dec 2024 | 3915 Cesar Chavez St | one 2nd flr bathroom remodel in (e) single family dwelling and associated plumbing and electrical work.Details
one 2nd flr bathroom remodel in (e) single family dwelling and associated plumbing and electrical work. | $20,552 |