Arrow Construction & Remodeling
- Based in
- Novato
- On San Francisco permits
- Feb 2010 to May 2026
- Last 24 months
- 3 permits filed
22 permits since 2000: 16 completed, 2 in progress, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 13, 2026 | In progress issued May 2026 | 2750 Vallejo St | repair 4 shower pans that are damaged and leaking. total of 4 bathrooms. all work like for like.Details
repair 4 shower pans that are damaged and leaking. total of 4 bathrooms. all work like for like. | $125,250 |
| Jul 22, 2025 | Completed final sign-off Mar 2026 | 2614 Jackson St | cosmetic renovation of three bathrooms. no walls will be moved or altered.Details
cosmetic renovation of three bathrooms. no walls will be moved or altered. | $175,000 |
| Jun 6, 2025 | In progress issued Jun 2025 | 2750 Vallejo St | interior cosmetic remodel: kitchen, primary bathroom, powder room and relocating wet bar at the top flDetails
interior cosmetic remodel: kitchen, primary bathroom, powder room and relocating wet bar at the top fl | $450,000 |
| Jul 6, 2023 | Completed final sign-off Jul 2024 | 2614 Jackson St | replace paving at entry breezeway and provide new security gateDetails
replace paving at entry breezeway and provide new security gate | $15,000 |
| Jul 26, 2022 | Completed final sign-off Jul 2024 | 663 Marina Bl | repair in kind less than 50% of existing entry stairs. facing front. in-kindDetails
repair in kind less than 50% of existing entry stairs. facing front. in-kind | $39,000 |
| Jul 18, 2022 | Completed final sign-off Jul 2024 | 663 Marina Bl | revision to 2021 0222 5093. replace (e) stucco & waterproofing with new in kind at front of bldg.Details
revision to 2021 0222 5093. replace (e) stucco & waterproofing with new in kind at front of bldg. | |
| Feb 9, 2022 | Completed final sign-off Jul 2024 | 1973 Filbert St | alterations at front facade only. replace stucco, window casing, new garage door, new entry door, new stairs at front of house. no interior workDetails
alterations at front facade only. replace stucco, window casing, new garage door, new entry door, new stairs at front of house. no interior work | $25,000 |
| Jan 10, 2022 | Completed final sign-off Jul 2022 | 2614 Jackson St | replace kitchen cabinets, counter top & appliances. no wall to be altered or moved, no structural to be touched. same layout on new kitchen cabinets. remodel in kind.Details
replace kitchen cabinets, counter top & appliances. no wall to be altered or moved, no structural to be touched. same layout on new kitchen cabinets. remodel in kind. | $50,000 |
| Nov 30, 2021 | Completed final sign-off Jul 2024 | 663 Marina Bl | replacement of extg metal fireplace box with new metal fireplace box.Details
replacement of extg metal fireplace box with new metal fireplace box. | $9,500 |
| Jun 11, 2021 | Completed final sign-off Jul 2024 | 663 Marina Bl | remodel of (e) kitchen.Details
remodel of (e) kitchen. | $240,000 |
| Feb 22, 2021 | Completed final sign-off Jul 2024 | 663 Marina Bl | remodel of (e) north & west facades including (n) moldings & railings. revise front door & sidelite. change 2 2nd level north facing windows into doors. add (n) skylight over (e) master bathrm. no front landscaping work. no foundn work. no soil disturbance greater than 2' below grade. no work onDetails
remodel of (e) north & west facades including (n) moldings & railings. revise front door & sidelite. change 2 2nd level north facing windows into doors. add (n) skylight over (e) master bathrm. no front landscaping work. no foundn work. no soil disturbance greater than 2' below grade. no work on | $240,000 |
| Dec 15, 2020 | Completed final sign-off Jul 2024 | 663 Marina Bl | remodel of existing master bathroom and wardrobe. relocate existing non-structural interior wall in that area.Details
remodel of existing master bathroom and wardrobe. relocate existing non-structural interior wall in that area. | $180,000 |
| Jul 13, 2020 | Never finaled issued Jul 2020, no final | 1973 Filbert St | interior remodel of existing kitchen, family room, pantry, master bathroom, master closets, and bar with new lighting at areas of work. no exterior or structural work.Details
interior remodel of existing kitchen, family room, pantry, master bathroom, master closets, and bar with new lighting at areas of work. no exterior or structural work. | $185,000 |
| Jan 12, 2017 | Completed final sign-off Feb 2017 | 1501 Filbert St | to obtain final inspection for work approved under pa#201411131432. all work is complete.Details
to obtain final inspection for work approved under pa#201411131432. all work is complete. | |
| Feb 11, 2015 | Completed final sign-off Feb 2017 | 1501 Filbert St | unit #21 - revision to #201411131432: convert empty space under staircase @ lower level into vsable space for audio & video closet equipment.no bearing walls to be altered. staircase cosntructed of metal & free standing. no structural work , add one receptable & sprinkler heads as neededDetails
unit #21 - revision to #201411131432: convert empty space under staircase @ lower level into vsable space for audio & video closet equipment.no bearing walls to be altered. staircase cosntructed of metal & free standing. no structural work , add one receptable & sprinkler heads as needed | $8,000 |
| Nov 13, 2014 | Expired or cancelled expired Feb 2017 | 1501 Filbert St | interior remodel: master bath remodel, no structural work to be done, new plumbing fixtures & cabinetry, also new tile work as per plans, exh fan @ bathrm to remain, (e) led lights to remainDetails
interior remodel: master bath remodel, no structural work to be done, new plumbing fixtures & cabinetry, also new tile work as per plans, exh fan @ bathrm to remain, (e) led lights to remain | $50,000 |
| Sep 30, 2014 | Completed final sign-off Oct 2014 | 2000 Washington St | to obtain final inspection for work approved under pa#2010-02-24-7073.Details
to obtain final inspection for work approved under pa#2010-02-24-7073. | |
| Jun 11, 2014 | Completed final sign-off Jun 2015 | 765 Market St | interior remodel: non structural, kitchen and bathroom remodel with new fixtures & finishes, no bearing walls removal.Details
interior remodel: non structural, kitchen and bathroom remodel with new fixtures & finishes, no bearing walls removal. | $165,000 |
| Feb 20, 2014 | Completed final sign-off Jul 2014 | 415 Edna St | kitchen renovation in rectory. replace cabinetry, appliances. upgrade electrical to current building codeDetails
kitchen renovation in rectory. replace cabinetry, appliances. upgrade electrical to current building code | $10,000 |
| Oct 9, 2012 | Never finaled issued Oct 2012, no final | 2190 Broadway | 7w, breakfast room - remove cabinets, non bearing wall, ornamental header and refigerator. new soffit to match existing. new low voltage recessed light fixture to match existing halo h1499t 50watt 12 volt mr16 max with 1493w trim. relocate light fixture. patch hardwood flooring as needed.Details
7w, breakfast room - remove cabinets, non bearing wall, ornamental header and refigerator. new soffit to match existing. new low voltage recessed light fixture to match existing halo h1499t 50watt 12 volt mr16 max with 1493w trim. relocate light fixture. patch hardwood flooring as needed. | $8,000 |
| Mar 29, 2010 | Completed final sign-off Mar 2011 | 170 Pacific Av | replace appliances in kitchen. new stove needs gas vs. electricity. run new gas line & rewire from 220 to 110 for new stoveDetails
replace appliances in kitchen. new stove needs gas vs. electricity. run new gas line & rewire from 220 to 110 for new stove | $20,000 |
| Feb 24, 2010 | Never finaled issued Feb 2010, no final | 2000 Washington St | removal of partition walls in 2 rooms to increase closet space incl. conversion of (e) bedroom #2 to new pantry. rovide & install cabinets. replace carpet with hardwood floor.paint two rooms. all work on 3rd floor.convert (e) bedroom no.2 to new pantry. sprinkler & fire alarm on separate permit ifDetails
removal of partition walls in 2 rooms to increase closet space incl. conversion of (e) bedroom #2 to new pantry. rovide & install cabinets. replace carpet with hardwood floor.paint two rooms. all work on 3rd floor.convert (e) bedroom no.2 to new pantry. sprinkler & fire alarm on separate permit if | $56,000 |