Kathleen Bost
- Listed as
- architect
- Firm
- Kathleen Bost Architecture
- Based in
- San Francisco
- On San Francisco permits
- Jul 2007 to Apr 2026
15 permits since 2000 (architect on 15 permits): 9 completed, 2 in progress, 3 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 27, 2026 | In progress issued Apr 2026 | 2934 Broderick St | Toolbox, K L Construction | 2nd floor kitchen and powderroom renovation, 2nd floor rear deck replacement and expansion, 2nd floor reardeck stairs to rear yard. select rear yard facing door and window replacement.Details
2nd floor kitchen and powderroom renovation, 2nd floor rear deck replacement and expansion, 2nd floor reardeck stairs to rear yard. select rear yard facing door and window replacement. | $79,000 |
| Sep 26, 2024 | Completed final sign-off Mar 2026 | 55 San Buenaventura Wy | Andrew Gallagher Construction | in kind window & door replacements (all sides) (n) doors at rear of home. bathroom remodels. alterd space at basement level. new interior stairs replacing existing from 1st to basement. new wet bar at first fl, select (n) lighting & electrical throughout. (e) chimney at rear to be removed.Details
in kind window & door replacements (all sides) (n) doors at rear of home. bathroom remodels. alterd space at basement level. new interior stairs replacing existing from 1st to basement. new wet bar at first fl, select (n) lighting & electrical throughout. (e) chimney at rear to be removed. | $371,458 |
| Jun 12, 2024 | In progress issued Jun 2024 | 2832 Union St | Fontana Construction, Inc. | rev 201511021455- (n) fence to replace (e) w/soil retainng where requiredDetails
rev 201511021455- (n) fence to replace (e) w/soil retainng where required | $7,000 |
| Oct 14, 2022 | Never finaled issued Mar 2023, no final | 11 Yerba Buena Av | O'neill Construction | remodel master bedroom rear doors and closets. replace lower rear french doors. front porch remodel and replace french door at rearDetails
remodel master bedroom rear doors and closets. replace lower rear french doors. front porch remodel and replace french door at rear | $90,000 |
| Sep 3, 2021 | Never finaled issued Sep 2021, no final | 88 Entrada Ct | Duffin Construction | demo of interior wall b/w kitchen and family room. add new stairs b/w kitchen and family room. create trash enclosure at extg garage doors. new concrete footings for opening b/w kitchen and family and trash enclosure.Details
demo of interior wall b/w kitchen and family room. add new stairs b/w kitchen and family room. create trash enclosure at extg garage doors. new concrete footings for opening b/w kitchen and family and trash enclosure. | $50,000 |
| Dec 29, 2020 | Expired or cancelled cancelled Jan 2026 | 2708 Pine St | addition of small bathroom within (e) family room of (e) building envelope. cosmetic renovations of (e) bathroom.Details
addition of small bathroom within (e) family room of (e) building envelope. cosmetic renovations of (e) bathroom. | $35,000 | |
| May 2, 2018 | Completed final sign-off Aug 2019 | 1927 44th Av | House To Home Remodeling | horizontal addition. 192 sf wood deck addition on the backyard of an (e) single family. master window to be removed and replaced with a pair of franch door. one new casement window to be added.Details
horizontal addition. 192 sf wood deck addition on the backyard of an (e) single family. master window to be removed and replaced with a pair of franch door. one new casement window to be added. | $50,000 |
| Apr 21, 2017 | Never finaled issued Apr 2017, no final | 1939 Divisadero St | Toolbox | change of use from retail to retail with office use at 1st fl. paint and patch walls. repair and install new wood flooring. install power door operator at entry door. n/a maherDetails
change of use from retail to retail with office use at 1st fl. paint and patch walls. repair and install new wood flooring. install power door operator at entry door. n/a maher | |
| Dec 22, 2015 | Completed final sign-off Jul 2016 | 3586 Pierce St | Flores General Building | interior renovation to kitchen, new cabinets, replace 1 window in place & enlarge 2 others, relocate & replace door to secondary exit, interior renovation of (e) bathroom. add new bath to second bedroom, new skylights in kitchen & new bath. n/a ordinance #155-13Details
interior renovation to kitchen, new cabinets, replace 1 window in place & enlarge 2 others, relocate & replace door to secondary exit, interior renovation of (e) bathroom. add new bath to second bedroom, new skylights in kitchen & new bath. n/a ordinance #155-13 | $100,000 |
| Aug 6, 2015 | Completed final sign-off Jun 2016 | 1034 Filbert St | Paul Ryan Associates | #250 - kitchen remodel - replace cabinets & appliances, replace (e) can lights. bath & master bath remodel - replace (e) finishes, new vanities, replace (e) lighting.Details
#250 - kitchen remodel - replace cabinets & appliances, replace (e) can lights. bath & master bath remodel - replace (e) finishes, new vanities, replace (e) lighting. | $300,000 |
| Jul 27, 2015 | Completed final sign-off Oct 2015 | 216 Magellan Av | Becket Construction | renovation of existing closet into powder room.Details
renovation of existing closet into powder room. | $7,000 |
| Dec 19, 2013 | Completed final sign-off May 2015 | 2635 Scott St | Fontana Construction, Inc. | new stucco at front facade, new windows and guardrails at front facade, bathroom renovation, some new lighting, new glass panel at top of existing lightwell.Details
new stucco at front facade, new windows and guardrails at front facade, bathroom renovation, some new lighting, new glass panel at top of existing lightwell. | $400,000 |
| Mar 13, 2012 | Completed final sign-off Apr 2014 | 772 Wisconsin St | Lung Fung Const & Elec Co | revision to pa #200707136790 - remdoel including installnew velux mtl framed skylight with built up curb, & 60 min mlt-framed fire rated skylite for class "a" roof. expanding basement & adding (n) guardrail,(n) planters, (n) stairs, (n) stucco & (n) sliding door. interior remdoel of kitchen & baths.Details
revision to pa #200707136790 - remdoel including installnew velux mtl framed skylight with built up curb, & 60 min mlt-framed fire rated skylite for class "a" roof. expanding basement & adding (n) guardrail,(n) planters, (n) stairs, (n) stucco & (n) sliding door. interior remdoel of kitchen & baths. | $50,000 |
| Jul 13, 2007 | Completed final sign-off Apr 2014 | 772 Wisconsin St | remodel of extg 1 story and basement residence, addition of 1 storyDetails
remodel of extg 1 story and basement residence, addition of 1 story | $225,000 | |
| Jul 10, 2007 | Completed final sign-off Apr 2014 | 772 Wisconsin St | reduce non conforming structure to comply with section 136.23 to be a garden structureDetails
reduce non conforming structure to comply with section 136.23 to be a garden structure | $500 |