Toolbox
- Based in
- San Francisco
- On San Francisco permits
- Jun 2002 to Apr 2026
- Last 24 months
- 2 permits filed
45 permits since 2000: 40 completed, 1 in progress, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 27, 2026 | In progress issued Apr 2026 | 2934 Broderick St | 2nd floor kitchen and powderroom renovation, 2nd floor rear deck replacement and expansion, 2nd floor reardeck stairs to rear yard. select rear yard facing door and window replacement.Details
2nd floor kitchen and powderroom renovation, 2nd floor rear deck replacement and expansion, 2nd floor reardeck stairs to rear yard. select rear yard facing door and window replacement. | $79,000 |
| Mar 2, 2026 | Completed final sign-off Mar 2026 | 419 Broderick St | revision to pa #2022-0628-7301: switch mini split heat pump to air to water hydronic systemDetails
revision to pa #2022-0628-7301: switch mini split heat pump to air to water hydronic system | |
| Jun 10, 2024 | Completed final sign-off Mar 2026 | 888 Haight St | structural: voluntary strengthen (e) post to beam connections at garage. architectural: at rear room behind garage - add (1) full bath, replace windows, insulate walls and add 5/8 type x gyp bd. w/ fire door to garage. this ground level rear room to be "unconditioned storage" not habitable space.Details
structural: voluntary strengthen (e) post to beam connections at garage. architectural: at rear room behind garage - add (1) full bath, replace windows, insulate walls and add 5/8 type x gyp bd. w/ fire door to garage. this ground level rear room to be "unconditioned storage" not habitable space. | $35,000 |
| Dec 15, 2023 | Completed final sign-off Aug 2024 | 2727 Pine St | kitchen remodel (demolish non structural partition between kitchen and family room. new cabinets and appliances, new led lighting. new drop ceilingDetails
kitchen remodel (demolish non structural partition between kitchen and family room. new cabinets and appliances, new led lighting. new drop ceiling | $7,200 |
| Nov 3, 2022 | Completed final sign-off Apr 2023 | 3029 California St | kitchen remodel: replace in kind cabinets, countertops, appliances, minor lighting changes to high efficiency led fixtures.Details
kitchen remodel: replace in kind cabinets, countertops, appliances, minor lighting changes to high efficiency led fixtures. | $45,000 |
| Jun 28, 2022 | Completed final sign-off Mar 2026 | 419 Broderick St | addition of one dwelling unit at the ground floor. the project also proposes alterations to the side stairs and structural foundation upgrades.Details
addition of one dwelling unit at the ground floor. the project also proposes alterations to the side stairs and structural foundation upgrades. | $200,000 |
| Jun 18, 2021 | Completed final sign-off Mar 2022 | 130 Winfield St | rev to 2021 0419 8804 -demo of (e) non-structural walls - lower level. new walls, doors, ceiling, finishes and lighting for lower level. replace heating system with hyronic system.Details
rev to 2021 0419 8804 -demo of (e) non-structural walls - lower level. new walls, doors, ceiling, finishes and lighting for lower level. replace heating system with hyronic system. | $68,000 |
| Jun 1, 2021 | Completed final sign-off Aug 2022 | 65 Santa Rita Av | kitchen remodel. remove 2 walls, structural upgrades per engineering, flooring, electrical and plumbing updates.Details
kitchen remodel. remove 2 walls, structural upgrades per engineering, flooring, electrical and plumbing updates. | $65,000 |
| Apr 19, 2021 | Never finaled issued Apr 2021, no final | 130 Winfield St | 1st fl (only) remove and replace wood paneling with 5/8 type x drywall, insulatem replace kitchen and bath fixtures and tile in-kind in (e) locations. upgrade wiring and lightng to code replace forced air heat and water heater with high effciency boiler and radiant heat. new flooring. no structuralDetails
1st fl (only) remove and replace wood paneling with 5/8 type x drywall, insulatem replace kitchen and bath fixtures and tile in-kind in (e) locations. upgrade wiring and lightng to code replace forced air heat and water heater with high effciency boiler and radiant heat. new flooring. no structural | $68,000 |
| Jul 23, 2019 | Completed final sign-off Jul 2020 | 782 11th Av | remodel lower unit (kitchen, new bath, 3 rear facing windows, 1 rear facing french door at deck, replace (e) windows at south prop line in (e) openings). remove (e) l level rotted porch & stairs at rear & construct new deck & stairs to grade. meps includedDetails
remodel lower unit (kitchen, new bath, 3 rear facing windows, 1 rear facing french door at deck, replace (e) windows at south prop line in (e) openings). remove (e) l level rotted porch & stairs at rear & construct new deck & stairs to grade. meps included | $120,000 |
| May 15, 2019 | Expired or cancelled cancelled Aug 2020 | 782 11th Av | one bathroom remodel upper unit. replace in kind tub, toilet, vanity, tile surfaces. non structuralDetails
one bathroom remodel upper unit. replace in kind tub, toilet, vanity, tile surfaces. non structural | $11,000 |
| Apr 29, 2019 | Completed final sign-off Aug 2019 | 56 Lower Tr | new beam to replace existing beam at second floor. revision to p.a. # 2019-0124-1097.Details
new beam to replace existing beam at second floor. revision to p.a. # 2019-0124-1097. | $1,000 |
| Jan 24, 2019 | Completed final sign-off Aug 2019 | 56 Lower Tr | remodel kitchen and two bathrooms. new fixtures and finishes. new cabinetry and doors. replace in kind.Details
remodel kitchen and two bathrooms. new fixtures and finishes. new cabinetry and doors. replace in kind. | $48,000 |
| Sep 17, 2018 | Completed final sign-off Sep 2019 | 195 Jersey St | kitchen and bathroom remodel.Details
kitchen and bathroom remodel. | $38,000 |
| Apr 17, 2018 | Completed final sign-off Dec 2018 | 4339 26th St | replace finishes in (2) bathrooms, 1 shower pan replacement at 2nd floorDetails
replace finishes in (2) bathrooms, 1 shower pan replacement at 2nd floor | $42,000 |
| Apr 21, 2017 | Never finaled issued Apr 2017, no final | 1939 Divisadero St | change of use from retail to retail with office use at 1st fl. paint and patch walls. repair and install new wood flooring. install power door operator at entry door. n/a maherDetails
change of use from retail to retail with office use at 1st fl. paint and patch walls. repair and install new wood flooring. install power door operator at entry door. n/a maher | |
| Nov 23, 2016 | Completed final sign-off Oct 2017 | 333 Oak Park Dr | renovation of existing kitchen and living room. renovation of e entry stair. interior electrical, plumb, finishes in affected areas only. minor structural to accommodate interior layout and raised ceiling in liv rm. 2 new windows, 1 skylightDetails
renovation of existing kitchen and living room. renovation of e entry stair. interior electrical, plumb, finishes in affected areas only. minor structural to accommodate interior layout and raised ceiling in liv rm. 2 new windows, 1 skylight | $110,000 |
| Jul 20, 2016 | Completed final sign-off Dec 2016 | 746 Hayes St | existing kitchen replacement. to comply with complaint #201626741Details
existing kitchen replacement. to comply with complaint #201626741 | $18,000 |
| Apr 22, 2016 | Completed final sign-off Aug 2016 | 2401 Vallejo St | bathroom remodel (2/f) toilet & vanity (e) locations & plumbing, shower valve moves to new location, new shower pan, tile & shower enclosure (e) recessed lighting changed to led, bath fan replaced, new tile work.Details
bathroom remodel (2/f) toilet & vanity (e) locations & plumbing, shower valve moves to new location, new shower pan, tile & shower enclosure (e) recessed lighting changed to led, bath fan replaced, new tile work. | $20,000 |
| Jan 15, 2015 | Completed final sign-off Mar 2015 | 421 Broderick St | to obtain final inspection for work approved under pa#201212196540. all work is complete.Details
to obtain final inspection for work approved under pa#201212196540. all work is complete. | |
| Jan 15, 2015 | Completed final sign-off Mar 2015 | 419 Broderick St | to obtain final inspection for work approved under pa#201212196533. all work is complete.Details
to obtain final inspection for work approved under pa#201212196533. all work is complete. | |
| Nov 4, 2014 | Completed final sign-off Jan 2015 | 927 Grove St | remodel (e) bathroom- all ightings to be controlled via t-24 compliant occupancy senosr. all publumbing to be calgreen complaint; no work visible from street. no plans; to be comply with cec2150.0(k)5Details
remodel (e) bathroom- all ightings to be controlled via t-24 compliant occupancy senosr. all publumbing to be calgreen complaint; no work visible from street. no plans; to be comply with cec2150.0(k)5 | $9,037 |
| May 27, 2014 | Completed final sign-off Mar 2017 | 443 Broderick St | work required to comply with physical inspection application cc-7281; corrections to rearstair landings @l2 & l3 and legalization of existing rear deck vriance concurrently applied for cut back deck by 5'-0" from south property line. retain (e) stair & add sprinklers to stair.Details
work required to comply with physical inspection application cc-7281; corrections to rearstair landings @l2 & l3 and legalization of existing rear deck vriance concurrently applied for cut back deck by 5'-0" from south property line. retain (e) stair & add sprinklers to stair. | $6,000 |
| Sep 20, 2013 | Never finaled issued Sep 2013, no final | 1116 Fell St | convert pantry to a bathroom with a full shower. move door from kitchen to bedroom. one shower, 1 vanity , 2 sink, 1 toilet, 2 outlets, 2 ligh fixtures, 1 exhaust fan.Details
convert pantry to a bathroom with a full shower. move door from kitchen to bedroom. one shower, 1 vanity , 2 sink, 1 toilet, 2 outlets, 2 ligh fixtures, 1 exhaust fan. | $11,392 |
| Apr 16, 2013 | Completed final sign-off Mar 2015 | 419 Broderick St | stair connection from existing roof deck to existing stair @ 2nd floor. all work exterior.Details
stair connection from existing roof deck to existing stair @ 2nd floor. all work exterior. | $6,000 |
| Dec 19, 2012 | Completed final sign-off Mar 2015 | 421 Broderick St | demo of rear porch, new rear addition of bathroom & laundry in same footprint, bathroom renovation, front entry resequencing, wall removal at dining room, wall add for studyroom.Details
demo of rear porch, new rear addition of bathroom & laundry in same footprint, bathroom renovation, front entry resequencing, wall removal at dining room, wall add for studyroom. | $65,000 |
| Dec 19, 2012 | Completed final sign-off Mar 2015 | 419 Broderick St | demo of rear porch, new rear addition of bathroom & laundry in same footprint, new rear starir, new roof deck.Details
demo of rear porch, new rear addition of bathroom & laundry in same footprint, new rear starir, new roof deck. | $40,000 |
| Jan 4, 2012 | Completed final sign-off May 2012 | 3669 19th St | 1 kitchen and 1 bathroom remodel. replace existing fixtures and cabinetry.Details
1 kitchen and 1 bathroom remodel. replace existing fixtures and cabinetry. | $42,000 |
| Jul 13, 2011 | Completed final sign-off Oct 2011 | 5206 California St | interior removel of existing 3 story, 2 unit condo. 2 new baths, 1 at each of the 2 living stories, rear yard landscapingDetails
interior removel of existing 3 story, 2 unit condo. 2 new baths, 1 at each of the 2 living stories, rear yard landscaping | $25,000 |
| Jun 17, 2011 | Completed final sign-off Jun 2011 | 3669 19th St | replace 6 double hung wood windows in kind with double glazing, max u factor 0.40. bew windows to be painted and have ogee lugs on upper sash, 2nd floor on street.Details
replace 6 double hung wood windows in kind with double glazing, max u factor 0.40. bew windows to be painted and have ogee lugs on upper sash, 2nd floor on street. | $10,000 |
| Nov 22, 2010 | Completed final sign-off Jul 2011 | 3044 Franklin St | unit # 302 on 3rd floor. reconfigure kitchen. revise existing cabinetry. emove 4 ft section of int.wall. sink is on mew location.Details
unit # 302 on 3rd floor. reconfigure kitchen. revise existing cabinetry. emove 4 ft section of int.wall. sink is on mew location. | $10,000 |
| Mar 8, 2010 | Completed final sign-off Jun 2010 | 3044 Franklin St | remodel of bathroom new tile vanity, new shower pan, new shower enclosure. non-structural work, in-kind.Details
remodel of bathroom new tile vanity, new shower pan, new shower enclosure. non-structural work, in-kind. | $12,000 |
| Aug 28, 2009 | Completed final sign-off May 2010 | 419 Broderick St | remodel of interior for condo at 419 broderick: relocate kitchen, remodel bathroom, open structural wall between kitchen and dining, upgrade electrical in remodeled area, replace 6 existing windows with like kind wood, add 2 windows at(e) lightwell.Details
remodel of interior for condo at 419 broderick: relocate kitchen, remodel bathroom, open structural wall between kitchen and dining, upgrade electrical in remodeled area, replace 6 existing windows with like kind wood, add 2 windows at(e) lightwell. | $75,000 |
| Jun 18, 2009 | Completed final sign-off Jun 2010 | 39 Dashiell Hammett St | unit 401. demo existing master bath, replace vanity, tub and shower fixtures, new shower fan, new ventilation fan, replace door with pocket door in partition wall.Details
unit 401. demo existing master bath, replace vanity, tub and shower fixtures, new shower fan, new ventilation fan, replace door with pocket door in partition wall. | $20,000 |
| May 21, 2009 | Completed final sign-off Jun 2009 | 2945 Pacific Av | replacement shower pan revision to pa#200904236942. per plumbing inspector wayne wong.Details
replacement shower pan revision to pa#200904236942. per plumbing inspector wayne wong. | $800 |
| Apr 23, 2009 | Completed final sign-off Jun 2009 | 2945 Pacific Av | remove tile floor and shower wall tile to access plumbing for replacement. repair with new tile cast iron tub and vanaity to remain. no electrical alterations or structural changes.Details
remove tile floor and shower wall tile to access plumbing for replacement. repair with new tile cast iron tub and vanaity to remain. no electrical alterations or structural changes. | $10,000 |
| Jun 15, 2007 | Completed final sign-off Dec 2007 | 533 Steiner St | comply with report 3r-4782 except items #4 and #18.Details
comply with report 3r-4782 except items #4 and #18. | $5,000 |
| Jun 7, 2006 | Completed final sign-off Nov 2006 | 65 Santa Rita Av | remodel of existing bathrooms, relocation of non-loadbearing walls. addition & replacement of windows, modification of ceiling/roof structure. no change in exterior slope.Details
remodel of existing bathrooms, relocation of non-loadbearing walls. addition & replacement of windows, modification of ceiling/roof structure. no change in exterior slope. | $75,000 |
| Dec 14, 2005 | Completed final sign-off Apr 2006 | 746 Hayes St | bathroom remode - new sink, toilet, tub, tile, etc. windowDetails
bathroom remode - new sink, toilet, tub, tile, etc. window | $10,000 |
| Jul 1, 2005 | Completed final sign-off Mar 2006 | 927 Ortega St | convert portion of exist garage space to office & halfbath. no structural changes.Details
convert portion of exist garage space to office & halfbath. no structural changes. | $10,000 |
| Jan 3, 2005 | Completed final sign-off Apr 2005 | 235 Rutledge St | construct new rear deck. replacement of (e)windows,install doors,(n)ext lights.Details
construct new rear deck. replacement of (e)windows,install doors,(n)ext lights. | $18,500 |
| Apr 14, 2004 | Completed final sign-off May 2004 | 1031 Fell St | replace kitchen floor covering w/tile. replace kitchen cabinets, stove, sink & refregerator remain iDetails
replace kitchen floor covering w/tile. replace kitchen cabinets, stove, sink & refregerator remain i | $3,000 |
| Jan 20, 2004 | Completed final sign-off Apr 2004 | 5160 Diamond Heights Bl | remodel of existing bathroom new tub & fixtures. new tile & exhaust fan. unit c107 onlyDetails
remodel of existing bathroom new tub & fixtures. new tile & exhaust fan. unit c107 only | $8,000 |
| Jan 20, 2004 | Completed final sign-off May 2004 | 1031 Fell St | repairs to building to correct all violations found in physical inspection 3r-3946- fix stairs, railDetails
repairs to building to correct all violations found in physical inspection 3r-3946- fix stairs, rail | $3,000 |
| Jun 25, 2002 | Completed final sign-off Jun 2003 | 2855 Washington St | new electrical service to subpanels in each unit, replace cabs fixtures & surfaces in both kitchensDetails
new electrical service to subpanels in each unit, replace cabs fixtures & surfaces in both kitchens | $80,000 |