Becket Construction
- Based in
- La Honda
- On San Francisco permits
- Mar 2009 to Sep 2015
- Last 24 months
- 0 permits filed
8 permits since 2000: 8 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 4, 2015 | Completed final sign-off Jul 2016 | 36 Parker Av | remodel two baths:bath 1 remove tub,install (n)shower, move toilet. bath 2 move sink & toilet. new lighting & electrical for both baths. living room: add 7 recessed lights & repair ceiling. mo new wall & no (e)wall relocation. lighting in bathroom remodel shall comply w/cec 150.0(k)5.Details
remodel two baths:bath 1 remove tub,install (n)shower, move toilet. bath 2 move sink & toilet. new lighting & electrical for both baths. living room: add 7 recessed lights & repair ceiling. mo new wall & no (e)wall relocation. lighting in bathroom remodel shall comply w/cec 150.0(k)5. | $32,000 |
| Jul 27, 2015 | Completed final sign-off Oct 2015 | 216 Magellan Av | renovation of existing closet into powder room.Details
renovation of existing closet into powder room. | $7,000 |
| May 13, 2015 | Completed final sign-off Jun 2015 | 964 Clayton St | structural improvement and bracing at ground floor only.Details
structural improvement and bracing at ground floor only. | $10,000 |
| Mar 21, 2014 | Completed final sign-off Apr 2014 | 3625 Santiago St | replace 2 damaged columns supporting sunroom with new foundations per plan.Details
replace 2 damaged columns supporting sunroom with new foundations per plan. | $5,000 |
| Dec 30, 2013 | Completed final sign-off Feb 2014 | 140 Granville Wy | seismic retrofit of crawl space walls.Details
seismic retrofit of crawl space walls. | $10,000 |
| Oct 21, 2013 | Completed final sign-off Jan 2014 | 650 Steiner St | repair extg wood staircase in common area at side of bldg.Details
repair extg wood staircase in common area at side of bldg. | $12,000 |
| Mar 11, 2009 | Completed final sign-off Mar 2009 | 2782 Bush St | minor dryrot at bay window . repair approx 16 sq ft in kind.Details
minor dryrot at bay window . repair approx 16 sq ft in kind. | $250 |
| Mar 3, 2009 | Completed final sign-off Mar 2009 | 2782 Bush St | convirm fire dampers at garage, separate common area electrical, plumbing corrections. correct violation per condo conversion report cc5502Details
convirm fire dampers at garage, separate common area electrical, plumbing corrections. correct violation per condo conversion report cc5502 | $5,000 |