Andrew Gallagher Construction
- Based in
- Novato
- On San Francisco permits
- Sep 2019 to Jul 2026
- Last 24 months
- 9 permits filed
41 permits since 2000: 30 completed, 4 in progress, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 3 are 3 to 5 years old, 2 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 31, 2026 | Completed final sign-off Aug 2026 | 2410 Steiner St | dry rot repair on breezeway siding 2x6 studs on south elevation. apprx 40sf of siding to be replace in kind like for like not visible from street.Details
dry rot repair on breezeway siding 2x6 studs on south elevation. apprx 40sf of siding to be replace in kind like for like not visible from street. | $3,500 |
| Jun 17, 2026 | In progress issued Jul 2026 | 1027 Hayes St | revision to 202308295507 to inlcude renovation to primary suite and interior renovation to unit 3.Details
revision to 202308295507 to inlcude renovation to primary suite and interior renovation to unit 3. | $55,000 |
| Feb 25, 2026 | Completed final sign-off Jun 2026 | 2611 California St | replace in kind remodel of 2 bathrooms.Details
replace in kind remodel of 2 bathrooms. | $54,789 |
| Dec 8, 2025 | Completed final sign-off Dec 2025 | 1 Presidio Tr | to obtain final inspection for work approved under pa# 202406285462 & 202410102720. all work is complete.Details
to obtain final inspection for work approved under pa# 202406285462 & 202410102720. all work is complete. | |
| Aug 13, 2025 | In progress issued May 2026 | 1516 Shrader St | renovation to (e) ground floor & increase in habitable space which includes an art studio, bedroom & bathroom. demo (e) 95 sf wood deck. rebuild new 68 sf deck. remodel of primary bathroom & addition of bay window at primary bedroom.Details
renovation to (e) ground floor & increase in habitable space which includes an art studio, bedroom & bathroom. demo (e) 95 sf wood deck. rebuild new 68 sf deck. remodel of primary bathroom & addition of bay window at primary bedroom. | $135,000 |
| Jun 5, 2025 | Completed final sign-off Sep 2026 | 20 Alton Av | horizontal addition for new stairs at 3rd fl. interior remodel. lower floor at media room at ground level to create more ceiling height. 9 (n) windows and 1 (n) sliding door. removal of (e) rear deckDetails
horizontal addition for new stairs at 3rd fl. interior remodel. lower floor at media room at ground level to create more ceiling height. 9 (n) windows and 1 (n) sliding door. removal of (e) rear deck | $300,000 |
| Jan 27, 2025 | Completed final sign-off May 2025 | 457 Diamond St | revision 202109208778- remodel bathroom at 1st floor to change layout. no structural workDetails
revision 202109208778- remodel bathroom at 1st floor to change layout. no structural work | $15,252 |
| Dec 17, 2024 | Completed final sign-off Feb 2026 | 152 Collins St | 3/f: renovate 3/f and rebuild rear roof. replace 3/f powder room with full bathroom. new egress window for 3/f bedrooms. add 3 bedrooms by reallocating (e) rooms on 3/f.Details
3/f: renovate 3/f and rebuild rear roof. replace 3/f powder room with full bathroom. new egress window for 3/f bedrooms. add 3 bedrooms by reallocating (e) rooms on 3/f. | $67,300 |
| Oct 10, 2024 | Expired or cancelled expired Dec 2025 | 1 Presidio Tr | revision to pa #202406285462. full replace in kind kitchen remodel, powder room replace in kind remodel, and replace in kind master closet remodel.Details
revision to pa #202406285462. full replace in kind kitchen remodel, powder room replace in kind remodel, and replace in kind master closet remodel. | $27,541 |
| Sep 26, 2024 | Completed final sign-off Mar 2026 | 55 San Buenaventura Wy | in kind window & door replacements (all sides) (n) doors at rear of home. bathroom remodels. alterd space at basement level. new interior stairs replacing existing from 1st to basement. new wet bar at first fl, select (n) lighting & electrical throughout. (e) chimney at rear to be removed.Details
in kind window & door replacements (all sides) (n) doors at rear of home. bathroom remodels. alterd space at basement level. new interior stairs replacing existing from 1st to basement. new wet bar at first fl, select (n) lighting & electrical throughout. (e) chimney at rear to be removed. | $371,458 |
| Jun 28, 2024 | Expired or cancelled expired Dec 2025 | 1 Presidio Tr | master bathroom remodel in kind, guest bathroom remodel in kind, partial kitchen remodeled cabinet faces and countersDetails
master bathroom remodel in kind, guest bathroom remodel in kind, partial kitchen remodeled cabinet faces and counters | $90,250 |
| Jan 17, 2024 | Completed final sign-off Mar 2024 | 3020 Clay St | replace in kind wood kitchen sashes for 4 windows at the front facade of the building hung and integrated ogsDetails
replace in kind wood kitchen sashes for 4 windows at the front facade of the building hung and integrated ogs | $8,250 |
| Nov 3, 2023 | In progress issued Feb 2025 | 763 Kansas St | 3 story horizontal rear addition to n.east and s.east corners of front bldg, incl interior remodel at all floors for (n) media rm & office at 1st fl, (n) kitchen & pwdr rm @ 2nd fl, 2(n) baths, 1(n) bdrm, & (n) lndry rm @ 3rd fl. (n) roof deck at lvl 4. no work at (e) r-3 cottage @ rear of lot.Details
3 story horizontal rear addition to n.east and s.east corners of front bldg, incl interior remodel at all floors for (n) media rm & office at 1st fl, (n) kitchen & pwdr rm @ 2nd fl, 2(n) baths, 1(n) bdrm, & (n) lndry rm @ 3rd fl. (n) roof deck at lvl 4. no work at (e) r-3 cottage @ rear of lot. | $540,000 |
| Oct 10, 2023 | Completed final sign-off Mar 2025 | 1263 Stanyan St | revision to pa# 202108176540, relocation of 1st flr bathroom, change 1 partition wall, change location of 1 exterior side door. not visible from street.Details
revision to pa# 202108176540, relocation of 1st flr bathroom, change 1 partition wall, change location of 1 exterior side door. not visible from street. | $27,500 |
| Oct 3, 2023 | Completed final sign-off Mar 2024 | 2410 Steiner St | replace in kind primary bathroom remodel. change counter tops in kitchen.Details
replace in kind primary bathroom remodel. change counter tops in kitchen. | $37,542 |
| Aug 29, 2023 | In progress issued Nov 2025 | 1027 Hayes St | partial renovation of 2 story, 3 unit building. add storage space at sidwalk level below entry stairs.Details
partial renovation of 2 story, 3 unit building. add storage space at sidwalk level below entry stairs. | $487,433 |
| Aug 24, 2023 | Completed final sign-off Jan 2024 | 67 Pond St | interior remodel of bathroom and bedroom, upper unit only (1 story)Details
interior remodel of bathroom and bedroom, upper unit only (1 story) | $39,500 |
| Jul 31, 2023 | Completed final sign-off Oct 2024 | 4043 19th St | revision to pa202112285077. revise framing above garage to accommodate garage overhead door, vaulted ceiling @ 3/f master bedroom, revised window @ 3/f master bath, & revised skylights on roof.Details
revision to pa202112285077. revise framing above garage to accommodate garage overhead door, vaulted ceiling @ 3/f master bedroom, revised window @ 3/f master bath, & revised skylights on roof. | |
| Oct 11, 2022 | Completed final sign-off Jul 2023 | 764 Faxon Av | revision to 202203150021 & 202206136167: reconstruct (e) front stairs & landing in-kind.Details
revision to 202203150021 & 202206136167: reconstruct (e) front stairs & landing in-kind. | $10,000 |
| Jul 25, 2022 | Completed final sign-off Jun 2024 | 581 Capp St | replace existing foundation and slab on grade for structural drwawings.Details
replace existing foundation and slab on grade for structural drwawings. | $95,450 |
| Jul 1, 2022 | Never finaled filed Jul 2022, never issued | 577 Capp St | certified pre-existing shared fire escape system will be removed &reinstalled using (e) thru-bolt connections. temp. scaffolding will be utilized to satisfy egress for both properties during neighbors construction project. no (n) structural penetration supports required, utilizing (e) thru bolt...Details
certified pre-existing shared fire escape system will be removed &reinstalled using (e) thru-bolt connections. temp. scaffolding will be utilized to satisfy egress for both properties during neighbors construction project. no (n) structural penetration supports required, utilizing (e) thru bolt... | $1,000 |
| Mar 22, 2022 | Never finaled issued Mar 2022, no final | 2656 Mcallister St | recommencement and completion of approved work approved under pa# 201401307458. 10% of work remaining.Details
recommencement and completion of approved work approved under pa# 201401307458. 10% of work remaining. | $30,000 |
| Mar 15, 2022 | Completed final sign-off Jul 2023 | 764 Faxon Av | renovation of 2 story house to include: kitchen, aster bath, master baedroom, library, bath #1, (n) powder room and replace (e) windows. reconstruct interior and exterior stairs.Details
renovation of 2 story house to include: kitchen, aster bath, master baedroom, library, bath #1, (n) powder room and replace (e) windows. reconstruct interior and exterior stairs. | $200,000 |
| Feb 10, 2022 | Completed final sign-off Jan 2024 | 844 Clayton St | revision to pa 202104208922 1/f interior remodel: remove wall b/t hall and media room, remove laundry closet, show elec and lighting layout in hall, media rm and office. revision to pa 202111222912 in-kind kitchen remodel: reconfigure kitchen layout, remove wall b/t dining and kitchen, new half bathDetails
revision to pa 202104208922 1/f interior remodel: remove wall b/t hall and media room, remove laundry closet, show elec and lighting layout in hall, media rm and office. revision to pa 202111222912 in-kind kitchen remodel: reconfigure kitchen layout, remove wall b/t dining and kitchen, new half bath | $35,231 |
| Dec 28, 2021 | Completed final sign-off Oct 2024 | 4043 19th St | excavate under bldg for new basement & garage. add 10'-0" curb cut at new garage entry. reconstruct front stair. renovate interior. add residential elevator.Details
excavate under bldg for new basement & garage. add 10'-0" curb cut at new garage entry. reconstruct front stair. renovate interior. add residential elevator. | $650,000 |
| Nov 22, 2021 | Completed final sign-off Aug 2023 | 844 Clayton St | replace in kind kitchen. new cabinets, counters and electrical. replace in kind 2 doors and 1 window at rear of building.Details
replace in kind kitchen. new cabinets, counters and electrical. replace in kind 2 doors and 1 window at rear of building. | $55,000 |
| Nov 10, 2021 | Completed final sign-off Jun 2024 | 581 Capp St | addition, restoration & interior renovation. capp st (west) historic facade restoration, replace single-pane wd wndws w/ (n) wd wndws to match historic. exterior restoration to match wd siding-details-doors-stoop-iron work. demo (e) 2-stry rear addition. construct (n) 3-stry addition at rear.Details
addition, restoration & interior renovation. capp st (west) historic facade restoration, replace single-pane wd wndws w/ (n) wd wndws to match historic. exterior restoration to match wd siding-details-doors-stoop-iron work. demo (e) 2-stry rear addition. construct (n) 3-stry addition at rear. | $800,000 |
| Sep 28, 2021 | Completed final sign-off Apr 2022 | 132 Marview Wy | revision to pa# 202010206939. extend rear yard landscaping walls.Details
revision to pa# 202010206939. extend rear yard landscaping walls. | $18,000 |
| Sep 20, 2021 | Completed final sign-off May 2025 | 457 Diamond St | one story horizontal addition. (n) bedrooms (2) ground floor level 1. addition of interior stair from level to level 2.(n) bathroom @ level 1.Details
one story horizontal addition. (n) bedrooms (2) ground floor level 1. addition of interior stair from level to level 2.(n) bathroom @ level 1. | $500,000 |
| Aug 17, 2021 | Completed final sign-off Mar 2025 | 1263 Stanyan St | new additional of a garge below (e) single family home.Details
new additional of a garge below (e) single family home. | $80,000 |
| Jul 14, 2021 | Never finaled issued Jan 2022, no final | 2537 Chestnut St | rev to 202102013732: remove (e) skylight above ktichen & install (n) skylight.Details
rev to 202102013732: remove (e) skylight above ktichen & install (n) skylight. | $500 |
| Apr 20, 2021 | Completed final sign-off Jan 2024 | 844 Clayton St | add new media room, office, laundry closet & bath at 1st fl. new concrete slab @ 1st fl except garage; excavate approx. 24 cu. yard of soil.Details
add new media room, office, laundry closet & bath at 1st fl. new concrete slab @ 1st fl except garage; excavate approx. 24 cu. yard of soil. | $65,000 |
| Apr 16, 2021 | Completed final sign-off May 2023 | 3090 Clay St | new perimeter foundation and new interior slab in extg garage. new storage space.Details
new perimeter foundation and new interior slab in extg garage. new storage space. | $25,000 |
| Mar 24, 2021 | Never finaled issued Mar 2021, no final | 771 Elizabeth St | kitchen remodel. replace cabinets, countertop, backspash, lights and paint.Details
kitchen remodel. replace cabinets, countertop, backspash, lights and paint. | $45,000 |
| Feb 6, 2021 | Completed final sign-off Jul 2023 | 375 San Leandro Wy | interior remodel with horizontal addition at rear <10 ft'. 140 sq ft new ground floor area of addition.Details
interior remodel with horizontal addition at rear <10 ft'. 140 sq ft new ground floor area of addition. | $435,226 |
| Feb 1, 2021 | Completed final sign-off Apr 2022 | 2537 Chestnut St | interior renovation of (e) 1/f & 2/f: partial conversion of 1/f floor area from non-habitable to habitable including new rec room, laundry, storage and bathroom. 2/f: new bathrooms, kitchen remodel, remove walls. no increase in gross sf.Details
interior renovation of (e) 1/f & 2/f: partial conversion of 1/f floor area from non-habitable to habitable including new rec room, laundry, storage and bathroom. 2/f: new bathrooms, kitchen remodel, remove walls. no increase in gross sf. | $150,000 |
| Nov 20, 2020 | Completed final sign-off Jan 2022 | 137 03rd Av | remove (e) wall between kitchen and dining room, new kitchen island, lighting and gfci receptacles, relocate hvac air register, new sliding patio doors to rear deck, replce bath vanity & sinks.Details
remove (e) wall between kitchen and dining room, new kitchen island, lighting and gfci receptacles, relocate hvac air register, new sliding patio doors to rear deck, replce bath vanity & sinks. | $45,000 |
| Oct 20, 2020 | Completed final sign-off Apr 2022 | 132 Marview Wy | interior remodel not visible from street: 1/f reconfig (e) interior open stair connecting two floors. enlarge and reconfigure (e) bedroom, relocate bathroom and laundry room. 2/f: remodel kitchen , bathroom & bedroom.Details
interior remodel not visible from street: 1/f reconfig (e) interior open stair connecting two floors. enlarge and reconfigure (e) bedroom, relocate bathroom and laundry room. 2/f: remodel kitchen , bathroom & bedroom. | $140,000 |
| Oct 10, 2020 | Never finaled issued Jan 2021, no final | 2537 Chestnut St | interior renovation of (e) upper level master closet and master bathroom. no increase in sq ft.Details
interior renovation of (e) upper level master closet and master bathroom. no increase in sq ft. | $43,000 |
| Aug 10, 2020 | Completed final sign-off Jul 2023 | 311 Jersey St | vertical addition to include a roof deck above and a stair penthouse structure for access. no alteration of front facade.project to include new interior stair, 3 bedrooms + 2 bathrooms @ new 2nd floor, & remodeled laundry area @ 1st floor.new windows, doors, electrical / enwork as req'd.Details
vertical addition to include a roof deck above and a stair penthouse structure for access. no alteration of front facade.project to include new interior stair, 3 bedrooms + 2 bathrooms @ new 2nd floor, & remodeled laundry area @ 1st floor.new windows, doors, electrical / enwork as req'd. | $288,000 |
| Sep 20, 2019 | Completed final sign-off Dec 2022 | 580 Hill St | new garage and relocation of entry stairs at property front.Details
new garage and relocation of entry stairs at property front. | $50,000 |