Juancho Isidoro
- Listed as
- architect, authorized agent-others, designer, pmt consultant/expediter
- Firm
- I-Design Arch.
- Based in
- Corte Madera
- On San Francisco permits
- Apr 2000 to Sep 2026
57 permits since 2000 (architect on 39 permits, designer on 9 permits, authorized agent-others on 8 permits, pmt consultant/expediter on 1 permit): 41 completed, 13 in progress, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 9, 2026 | In progress filed Sep 2026, not yet issued | 230 Castro St | convert the rear of the (e) into state adu with new bedroom, bathroom, kitchen and study. replace 2 (e) rear windows, relocate the utility room; relocate & reuse (e) furnaces & boilers. new retainingw wall at rear.Details
convert the rear of the (e) into state adu with new bedroom, bathroom, kitchen and study. replace 2 (e) rear windows, relocate the utility room; relocate & reuse (e) furnaces & boilers. new retainingw wall at rear. | $85,000 | |
| Aug 28, 2026 | In progress issued Aug 2026 | 573 Arkansas St | Man Hao Chen | 2nd floor: convert bedroom 3 (located at front of building) into a junior ensuite with bathroom and closet; remodel (e) bathroom, build a new powder room and coat closet, build a laundry closet with a stackable washer/ dryer.Details
2nd floor: convert bedroom 3 (located at front of building) into a junior ensuite with bathroom and closet; remodel (e) bathroom, build a new powder room and coat closet, build a laundry closet with a stackable washer/ dryer. | $38,000 |
| Aug 26, 2026 | In progress issued Sep 2026 | 121 Yukon St | Mission Home Remodeling Inc | remodel 3 kitchens like for like with cabinets and appliances, remodel 3 bathrooms like for like with plumbing throught, replace floor finishes, replace knob and tube electrical wiring and upgrade main panel. replace wall insulation and gyp board sheating throught, replace furnace with heat pump forDetails
remodel 3 kitchens like for like with cabinets and appliances, remodel 3 bathrooms like for like with plumbing throught, replace floor finishes, replace knob and tube electrical wiring and upgrade main panel. replace wall insulation and gyp board sheating throught, replace furnace with heat pump for | $180,000 |
| Aug 17, 2026 | In progress filed Aug 2026, not yet issued | 2454 24th Av | convert undeveloped ground floor garage & storage areas into habitable space. remodel spaces into facility room, junior suite,bedroom,bathroom,den & laundry. remodel & replace int. stairs. enclose small lightwell. reduce size of lightwell. replace kitchen and replace all cabinets & appliances. ab112Details
convert undeveloped ground floor garage & storage areas into habitable space. remodel spaces into facility room, junior suite,bedroom,bathroom,den & laundry. remodel & replace int. stairs. enclose small lightwell. reduce size of lightwell. replace kitchen and replace all cabinets & appliances. ab112 | $180,000 | |
| Jul 31, 2026 | Completed final sign-off Sep 2026 | 2684 Green St | Man Hao Chen | install new clothes washer and ventless, electric dryer in existing closet of third floor.Details
install new clothes washer and ventless, electric dryer in existing closet of third floor. | $5,000 |
| Jun 30, 2026 | Completed final sign-off Sep 2026 | 2684 Green St | Man Hao Chen | remove (e) door between dining room and kitchen and enlarge the opening. create a second opening between dining room and kitchen, rmeove and relocate (e) cabinets, relocate (e) electrical subpanel.Details
remove (e) door between dining room and kitchen and enlarge the opening. create a second opening between dining room and kitchen, rmeove and relocate (e) cabinets, relocate (e) electrical subpanel. | $28,000 |
| Dec 30, 2025 | In progress issued Jan 2026 | 230 Castro St | Nemarti Modern World Construction | corrective actions to nov#202546868. interior units#2,3 & 6. relocate the kitchen to creat a new bedroom, build new kitchen, remodel the bathroom and add a laundry closet; remove lath & plaster finish of existing interior partions and replace w/gyp. board; relocate vent flues for kitchen range hoodsDetails
corrective actions to nov#202546868. interior units#2,3 & 6. relocate the kitchen to creat a new bedroom, build new kitchen, remodel the bathroom and add a laundry closet; remove lath & plaster finish of existing interior partions and replace w/gyp. board; relocate vent flues for kitchen range hoods | $68,000 |
| Dec 18, 2025 | Completed final sign-off Aug 2026 | 320 Wawona St | Man Hao Chen | remodel existing ground floor habitable space. convert rear bedroom into master bedroom ensuite. remove existing bathroom & build new master bath 2. replace patio door & side blocks w/ new 8 foot wide sliding glass door.add new header. replace(e) hvac unit w/ new hvac unitDetails
remodel existing ground floor habitable space. convert rear bedroom into master bedroom ensuite. remove existing bathroom & build new master bath 2. replace patio door & side blocks w/ new 8 foot wide sliding glass door.add new header. replace(e) hvac unit w/ new hvac unit | $50,000 |
| Nov 29, 2025 | In progress filed Nov 2025, not yet issued | 148 Oxford St | horizontal addition. 1st/2nd fl, 2 (n) bedrms,bathrm,laundry rm & storage. replace (e) interior stairs with (n) stair to 2nd flr & roof.install (n) furnace, tankless water heater in (n) utility rm.(n) foundation & conc.slab & wall framing.excavate 38 cu.yds.n roof deckDetails
horizontal addition. 1st/2nd fl, 2 (n) bedrms,bathrm,laundry rm & storage. replace (e) interior stairs with (n) stair to 2nd flr & roof.install (n) furnace, tankless water heater in (n) utility rm.(n) foundation & conc.slab & wall framing.excavate 38 cu.yds.n roof deck | $350,000 | |
| Nov 5, 2025 | Completed final sign-off Nov 2025 | 42 Otis St | S C K Builders Inc. | to clarify on sheet a1.3 the location of the electrical subpanel that was installed under pa# 2017-0330-2802 per field inspectors notes on job card 2025-0819-3419, 3420, 3421, 3422.Details
to clarify on sheet a1.3 the location of the electrical subpanel that was installed under pa# 2017-0330-2802 per field inspectors notes on job card 2025-0819-3419, 3420, 3421, 3422. | |
| Nov 5, 2025 | Completed final sign-off Nov 2025 | 42 Otis St | S C K Builders Inc. | to clarify on sheet a1.3 the location of the electrical subpanel that was installed under pa# 2017-0330-2802 per field inspectors notes on job card 2025-0819-3419, 3420, 3421, 3422.Details
to clarify on sheet a1.3 the location of the electrical subpanel that was installed under pa# 2017-0330-2802 per field inspectors notes on job card 2025-0819-3419, 3420, 3421, 3422. | |
| Nov 5, 2025 | Completed final sign-off Nov 2025 | 42 Otis St | S C K Builders Inc. | to clarify on sheet a1.3 the location of the electrical subpanel that was installed under pa# 2017-0330-2802 per field inspectors notes on job card 2025-0819-3419, 3420, 3421, 3422.Details
to clarify on sheet a1.3 the location of the electrical subpanel that was installed under pa# 2017-0330-2802 per field inspectors notes on job card 2025-0819-3419, 3420, 3421, 3422. | |
| Nov 5, 2025 | Completed final sign-off Nov 2025 | 42 Otis St | S C K Builders Inc. | to clarify on sheet a1.3 the location of the electrical subpanel that was installed under pa# 2017-0330-2802 per field inspectors notes on job card 2025-0819-3419, 3420, 3421, 3422.Details
to clarify on sheet a1.3 the location of the electrical subpanel that was installed under pa# 2017-0330-2802 per field inspectors notes on job card 2025-0819-3419, 3420, 3421, 3422. | |
| Aug 19, 2025 | Completed final sign-off Nov 2025 | 42 Otis St | S C K Builders Inc. | interior remodel of unit #506. convert unit #506 from chap 11a to chap 11b accessible. remodel entry, bathroom & kitchen areas.Details
interior remodel of unit #506. convert unit #506 from chap 11a to chap 11b accessible. remodel entry, bathroom & kitchen areas. | $75,000 |
| Aug 19, 2025 | Completed final sign-off Oct 2025 | 42 Otis St | S C K Builders Inc. | interior remodel of unit #402. convert unit #402 from chap 11a to chap 11b accessible. remodel entry, bathroom & kitchen areas.Details
interior remodel of unit #402. convert unit #402 from chap 11a to chap 11b accessible. remodel entry, bathroom & kitchen areas. | $75,000 |
| Aug 19, 2025 | Completed final sign-off Oct 2025 | 42 Otis St | S C K Builders Inc. | interior remodel of unit #502. convert unit #502 from chap 11a to chap 11b accessible. remodel entry, bathroom & kitchen areas.Details
interior remodel of unit #502. convert unit #502 from chap 11a to chap 11b accessible. remodel entry, bathroom & kitchen areas. | $75,000 |
| Aug 19, 2025 | Completed final sign-off Nov 2025 | 42 Otis St | S C K Builders Inc. | interior remodel of common area. install communications system at ground floor entry area to meet chap 11b accessibility requirements.Details
interior remodel of common area. install communications system at ground floor entry area to meet chap 11b accessibility requirements. | $5,000 |
| Aug 19, 2025 | Completed final sign-off Nov 2025 | 42 Otis St | S C K Builders Inc. | interior remodel of unit #406. convert unit #406 from chap 11a to chap 11b accessible. remodel entry, bathroom & kitchen areas.Details
interior remodel of unit #406. convert unit #406 from chap 11a to chap 11b accessible. remodel entry, bathroom & kitchen areas. | $75,000 |
| Jul 24, 2025 | In progress issued Feb 2026 | 166 Landers St | build horizontal extension to the rear of the (e) ground floor and second floors. build a vertical extension (3rd floor addition) avove the seond floor. preserve the (e) front facade and front exterior stairs. remodel and renovate interior spaces to both (e) floors. build an on grade patio at theDetails
build horizontal extension to the rear of the (e) ground floor and second floors. build a vertical extension (3rd floor addition) avove the seond floor. preserve the (e) front facade and front exterior stairs. remodel and renovate interior spaces to both (e) floors. build an on grade patio at the | $850,000 | |
| Jun 25, 2025 | Completed final sign-off Jul 2025 | 1358 28th Av | Paul O'driscoll Inc | revision to 202205174412 to remove fire sprinkler from addendumDetails
revision to 202205174412 to remove fire sprinkler from addendum | |
| Apr 28, 2025 | In progress issued Aug 2025 | 146 Missouri St | demolish type 5b 2 story single family dwelling buildingDetails
demolish type 5b 2 story single family dwelling building | $15,000 | |
| Apr 24, 2025 | In progress issued Aug 2025 | 146 Missouri St | erect type vb 4 story 2-unit residential buildingDetails
erect type vb 4 story 2-unit residential building | $850,000 | |
| Apr 7, 2025 | Completed final sign-off Nov 2025 | 90 Entrada Ct | Paul O'driscoll Inc | convert undeveloped ground floor garage and storage areas into habitable space. remodel spaces into a new family room, bathroom, playroom, and den. rebuild lower half of (e) interior stairs to meet current code. build new footing and conc. slab and wall framing as req'd. excavate 18 cu. yds.Details
convert undeveloped ground floor garage and storage areas into habitable space. remodel spaces into a new family room, bathroom, playroom, and den. rebuild lower half of (e) interior stairs to meet current code. build new footing and conc. slab and wall framing as req'd. excavate 18 cu. yds. | $155,000 |
| Mar 31, 2025 | Completed final sign-off Nov 2025 | 2570 Chestnut St | Paul O'driscoll Inc | remodel existing hallway bathroom; replace tub w/shower;replace bathroom window at lightwell. remodel existing kitchen; remove existing non-structural wall between laundry & kitchen; replace all kitchen cabinets & appliances; relocate washer & dryer.Details
remodel existing hallway bathroom; replace tub w/shower;replace bathroom window at lightwell. remodel existing kitchen; remove existing non-structural wall between laundry & kitchen; replace all kitchen cabinets & appliances; relocate washer & dryer. | $35,000 |
| Jul 1, 2024 | Completed final sign-off May 2025 | 126 Dorchester Wy | Patrick Coakley Construction, Paul O'driscoll Inc | convert undeveloped ground floor storage into habitable space. build new bedroom, bathroom, gym, laundry, powder rm, & storage. remodel rear open area into family room. replace extg int. stairs with nw stairs. install nw furnace & tankless w.h. build nw foundation slab & wall framing as required.Details
convert undeveloped ground floor storage into habitable space. build new bedroom, bathroom, gym, laundry, powder rm, & storage. remodel rear open area into family room. replace extg int. stairs with nw stairs. install nw furnace & tankless w.h. build nw foundation slab & wall framing as required. | $248,000 |
| May 7, 2024 | Completed final sign-off Jul 2024 | 75 Alviso St | Aviv Construction Inc | revision to 202307101798 , did not build new rear deck, e deck and stairs remain. did no build 2nd fl walk in closet. changes to rear door and windowsDetails
revision to 202307101798 , did not build new rear deck, e deck and stairs remain. did no build 2nd fl walk in closet. changes to rear door and windows | |
| Feb 2, 2024 | In progress filed Feb 2024, not yet issued | 2275 40th Av | revision to issued pa202104138429. change fire sprinkler type from nfpa 13 to nfpa13r. the project is a 2 story, single family residence (r3).Details
revision to issued pa202104138429. change fire sprinkler type from nfpa 13 to nfpa13r. the project is a 2 story, single family residence (r3). | ||
| Nov 3, 2023 | In progress issued Aug 2024 | 1782 39th Av | Man Hao Chen | convert ground floor garage / storage into acessory dwelling unit (a.d.u.)build a two-bedroom, two-bathroom.build an exit passageway from the rear yard to the front yard.install new tankless water heater & mini package units.no new work on the second and third floors. (2 units + adu)Details
convert ground floor garage / storage into acessory dwelling unit (a.d.u.)build a two-bedroom, two-bathroom.build an exit passageway from the rear yard to the front yard.install new tankless water heater & mini package units.no new work on the second and third floors. (2 units + adu) | $285,000 |
| Oct 20, 2023 | Completed final sign-off Jun 2024 | 2039 Greenwich St | Fog Horn Builders Inc | remodel (e) kitchen area into the entry room & replace cabinets, build new bathroom, enlarge closets in bedrooms 1&2Details
remodel (e) kitchen area into the entry room & replace cabinets, build new bathroom, enlarge closets in bedrooms 1&2 | $35,000 |
| Jul 17, 2023 | Expired or cancelled withdrawn May 2025 | 166 Landers St | horizontal ext to the rear of (e) ground fl and 2nd fl. build a vertical ext (3rd fl) above the 2nd fl. preserve the (e) front facade and front exterior stairs. remodel and renovate int spaces to both (e) fl. build an on-grade patio at rear yard. build roof deck above the new 3rd fl excavate 25yds.Details
horizontal ext to the rear of (e) ground fl and 2nd fl. build a vertical ext (3rd fl) above the 2nd fl. preserve the (e) front facade and front exterior stairs. remodel and renovate int spaces to both (e) fl. build an on-grade patio at rear yard. build roof deck above the new 3rd fl excavate 25yds. | $350,000 | |
| Jul 10, 2023 | Completed final sign-off Jul 2024 | 75 Alviso St | Aviv Construction Inc | remodel kitchen. replace all cabinets & appliances. convert rear study room into breakfast nook. remove existing wall between study & kitchen. extend/ enlarge rear deck and replace exterior stairs. convert front area of master bedroom into walk-in-closet.Details
remodel kitchen. replace all cabinets & appliances. convert rear study room into breakfast nook. remove existing wall between study & kitchen. extend/ enlarge rear deck and replace exterior stairs. convert front area of master bedroom into walk-in-closet. | $58,000 |
| May 25, 2023 | In progress issued Mar 2026 | 276 Grand View Av | Mission Home Remodeling Inc | demolition of a type 5b, 2 single familyDetails
demolition of a type 5b, 2 single family | $22,500 |
| May 25, 2023 | In progress issued Mar 2026 | 276 Grand View Av | Mission Home Remodeling Inc | to erect a 3-story + 1 basement, 2-dwelling units, type 5-b residential buildingDetails
to erect a 3-story + 1 basement, 2-dwelling units, type 5-b residential building | $650,000 |
| May 17, 2022 | Completed final sign-off Jul 2025 | 1358 28th Av | g/f: convert rear area into habitable space, create family rm & entertainment rm, (n) bedrm w/bath & closet, n bathrm & laundry rm, n int. stairs to 2/f. 2/f: create open living rm, dining rm, kitchen area, n study & den at rear, n bedrm, n bathrm, int stairs to 3/f. 3/f: addition includes n masterDetails
g/f: convert rear area into habitable space, create family rm & entertainment rm, (n) bedrm w/bath & closet, n bathrm & laundry rm, n int. stairs to 2/f. 2/f: create open living rm, dining rm, kitchen area, n study & den at rear, n bedrm, n bathrm, int stairs to 3/f. 3/f: addition includes n master | $450,000 | |
| May 3, 2022 | Completed final sign-off May 2023 | 1336 38th Av | S And L Tec Construction Co Inc | g/f reduce (e) garage into 1 car; enclose bottom rear area (e) 2nf fl into hab. space. bld 2 (n) bed/bath; (n) media rm w/ wet bar, fam rm, & ldry; replace (e) & bld (n) int strs. 2nd fl remove (e) bearing wall, create open lvng/dining/kit. bld 2 bed/bath, enlrg rear deck & replace str to r yrdDetails
g/f reduce (e) garage into 1 car; enclose bottom rear area (e) 2nf fl into hab. space. bld 2 (n) bed/bath; (n) media rm w/ wet bar, fam rm, & ldry; replace (e) & bld (n) int strs. 2nd fl remove (e) bearing wall, create open lvng/dining/kit. bld 2 bed/bath, enlrg rear deck & replace str to r yrd | $285,000 |
| Mar 4, 2022 | Completed final sign-off May 2022 | 2519 Pacheco St | Lynch Construction Inc | remodel and englarge the (e) master bathroom. replace all fixtures and floor & wall finishes. add new door to 2nd bedroom; add new light switch. no work on g/f.Details
remodel and englarge the (e) master bathroom. replace all fixtures and floor & wall finishes. add new door to 2nd bedroom; add new light switch. no work on g/f. | $18,000 |
| Feb 14, 2022 | Completed final sign-off Jun 2023 | 3134 Lyon St | Il Nido Designs Llc | convert rear area of existing ground flr into new habitable space. build a new study bathroom & great family room. rebuild the smaller utillity rm. no work on 2nd & 3rd floors. construct (n) 1 hr wall separation between garage & (n) habitable space.Details
convert rear area of existing ground flr into new habitable space. build a new study bathroom & great family room. rebuild the smaller utillity rm. no work on 2nd & 3rd floors. construct (n) 1 hr wall separation between garage & (n) habitable space. | $48,000 |
| Feb 11, 2022 | Completed final sign-off Apr 2023 | 2037 Greenwich St | D C S Construction Services Inc | unit 2037 only:remodel (e) kitchen area into the laundry room and replace cabinets. convert the (e) bedroom 2 and closet into master bedroom and master closet. relocate the washer and dryer in the hallway laundry closet.no new work on the ground and 2nd floor. no structural work under this permit.Details
unit 2037 only:remodel (e) kitchen area into the laundry room and replace cabinets. convert the (e) bedroom 2 and closet into master bedroom and master closet. relocate the washer and dryer in the hallway laundry closet.no new work on the ground and 2nd floor. no structural work under this permit. | $48,000 |
| Feb 11, 2022 | Completed final sign-off Jan 2025 | 39 Westwood Dr | 1st fl: remove and replace the stairsto the second floor. build new 1 hour rated wall sepration between the garage and new stairs. 2nd fl: remodel existing common bathroom and closet. convert the existing study into a new bathroom. add insulation. remove and replace the stairs to the ground floor.Details
1st fl: remove and replace the stairsto the second floor. build new 1 hour rated wall sepration between the garage and new stairs. 2nd fl: remodel existing common bathroom and closet. convert the existing study into a new bathroom. add insulation. remove and replace the stairs to the ground floor. | $35,000 | |
| Nov 1, 2021 | Completed final sign-off Nov 2023 | 1966 36th Av | Patrick Coakley Construction | add a new adu on g/f. build a horizontal addition to the rear of the g/f for the adu. - eliminate the existing interior stairs and remodel the existing bathroom and add a new laundry room at 2/f. eg-02 applied.Details
add a new adu on g/f. build a horizontal addition to the rear of the g/f for the adu. - eliminate the existing interior stairs and remodel the existing bathroom and add a new laundry room at 2/f. eg-02 applied. | $85,000 |
| Jun 2, 2021 | Completed final sign-off Mar 2022 | 641 Chenery St | Patrick Coakley Construction | 2nd fl remodel e kitchhen area and replace cabinets, reduce e living rm and create new bedroom. remodel e bath. build new bath. 1st fl no new work.Details
2nd fl remodel e kitchhen area and replace cabinets, reduce e living rm and create new bedroom. remodel e bath. build new bath. 1st fl no new work. | $45,000 |
| Apr 15, 2021 | Completed final sign-off Jul 2024 | 1339 Noe St | A L Martin Construction | extend front porch to the property line. remove non-bearing wall (not part of original building). replace & build (n) steps, extend beyond property line into sidewalk. repair & repave sidewalk adjacent to new steps. no sub-sidewalk space exists. add (n) safety guardrail between new steps & driveway.Details
extend front porch to the property line. remove non-bearing wall (not part of original building). replace & build (n) steps, extend beyond property line into sidewalk. repair & repave sidewalk adjacent to new steps. no sub-sidewalk space exists. add (n) safety guardrail between new steps & driveway. | $18,000 |
| Apr 13, 2021 | Completed final sign-off Jul 2024 | 2275 40th Av | Patrick Coakley Construction | horizontal extension to rear of (e) ground floor and 2nd floor. includs interior remodeling to both (e) floors. build a (n) deck at rear of 2nd floor. excavate 14 cu.yds.Details
horizontal extension to rear of (e) ground floor and 2nd floor. includs interior remodeling to both (e) floors. build a (n) deck at rear of 2nd floor. excavate 14 cu.yds. | $365,000 |
| Apr 9, 2021 | Completed final sign-off Jan 2022 | 1363 Hudson Av | Patrick Coakley Construction | basement: convert e bsmnt area into an ent. rm; add a new full bathrm, move laundry rm & move util rm to bsmnt; connect bsmnt w/new stairs to 1/f. 1/f: remove e bearing wall to open the liv rm/din rm/kitc areas; remodel the kitchen; convert e bathrm into a powder rm; extend e deck over e garage roofDetails
basement: convert e bsmnt area into an ent. rm; add a new full bathrm, move laundry rm & move util rm to bsmnt; connect bsmnt w/new stairs to 1/f. 1/f: remove e bearing wall to open the liv rm/din rm/kitc areas; remodel the kitchen; convert e bathrm into a powder rm; extend e deck over e garage roof | $165,000 |
| Mar 31, 2021 | Completed final sign-off May 2024 | 151 Stillings Av | Waters And Waters | g/f: reduce (e) garage into 1 car space, create new family and media rms. create new master bedrm suite w/ master bath and w.i.c. build new laundry and utility rms. replace (e) and build new interior stairs to 2nd flr. 2/f: remove (e) bearing wall to open living/dining/kitchen areas.Details
g/f: reduce (e) garage into 1 car space, create new family and media rms. create new master bedrm suite w/ master bath and w.i.c. build new laundry and utility rms. replace (e) and build new interior stairs to 2nd flr. 2/f: remove (e) bearing wall to open living/dining/kitchen areas. | $180,000 |
| Nov 30, 2020 | Completed final sign-off May 2021 | 154 Park St | Patrick Coakley Construction | convert (e) one bedroom one bathroom ground floor unit into a two bedroom two bath dwelling unit. convert (e) living room into a master bedroom. convert (e) dining room into master bathroom. convert (e) bathroom into a bedroom. convert (e) bedroom into open living/dining/kitchen areaDetails
convert (e) one bedroom one bathroom ground floor unit into a two bedroom two bath dwelling unit. convert (e) living room into a master bedroom. convert (e) dining room into master bathroom. convert (e) bathroom into a bedroom. convert (e) bedroom into open living/dining/kitchen area | $85,000 |
| Nov 30, 2020 | Completed final sign-off Jul 2021 | 528 Noriega St | Patrick Coakley Construction | remodel (e) master bedroom suite; englard and remodel master bathroom; build new master walk-in closet.Details
remodel (e) master bedroom suite; englard and remodel master bathroom; build new master walk-in closet. | $35,000 |
| Nov 30, 2020 | Completed final sign-off Feb 2022 | 846 42nd Av | Benkee Construction Co | add 1 new dwelling unit to (e) sfd. convert (e) g/f rear space into a 2 bedroom, 1 bathroom second unit. relocate laundry and utility room. build new exterior stairs for upper unit access to rear yard.Details
add 1 new dwelling unit to (e) sfd. convert (e) g/f rear space into a 2 bedroom, 1 bathroom second unit. relocate laundry and utility room. build new exterior stairs for upper unit access to rear yard. | $140,000 |
| Aug 31, 2017 | Completed final sign-off May 2018 | 723 Taraval St | Bc United Construction Inc | ti to extend the (e) front massage lease space into rear portion of the ground flr per conditional use auth #2016-016335cua. work includes removal of (e) non-structural demising wall, (n) sauna & steam rooms, shower & install (n) washer & dryer.Details
ti to extend the (e) front massage lease space into rear portion of the ground flr per conditional use auth #2016-016335cua. work includes removal of (e) non-structural demising wall, (n) sauna & steam rooms, shower & install (n) washer & dryer. | $15,000 |
| Oct 2, 2015 | Completed final sign-off Jul 2016 | 1318 Taylor St | Bc United Construction Inc | interior remodeling only. remodel extg kitchen and bathroom. remove extg power room and build new full bathroom.Details
interior remodeling only. remodel extg kitchen and bathroom. remove extg power room and build new full bathroom. | $25,000 |
| Jul 2, 2015 | Completed final sign-off Oct 2016 | 135 Cerritos Av | S C K Builders Inc. | residential renovation and new addition of (e) 3-story house. extend the lower level garage by 14'-3" towards the rear; extend the east half of the mid-level by 14'-3" above the new garage; remodel and renovate the mid-level and garage level of (e) house. 1 bath & 1 powder room added.Details
residential renovation and new addition of (e) 3-story house. extend the lower level garage by 14'-3" towards the rear; extend the east half of the mid-level by 14'-3" above the new garage; remodel and renovate the mid-level and garage level of (e) house. 1 bath & 1 powder room added. | $180,000 |
| May 21, 2015 | Completed final sign-off Jul 2016 | 1314 Taylor St | Bc United Construction Inc | construct new full bathroom. enlarge and remodel extg kitchen. reduce extg bathroom into powder room. upgrade extg electrical, switches, outlets, etc. throughout.Details
construct new full bathroom. enlarge and remodel extg kitchen. reduce extg bathroom into powder room. upgrade extg electrical, switches, outlets, etc. throughout. | $48,000 |
| Feb 27, 2012 | Completed final sign-off Jun 2012 | 475 Sansome St | Source Planning And Construction Inc | 8th floor-construction of demising wall between suite #800 & 840, remove some (e) non bearing walls & construct new interior partitions, relocate doors & interior sidelights. extend & continue (e) suspended ceiling & add new light fixturesDetails
8th floor-construction of demising wall between suite #800 & 840, remove some (e) non bearing walls & construct new interior partitions, relocate doors & interior sidelights. extend & continue (e) suspended ceiling & add new light fixtures | $400,000 |
| May 11, 2007 | Completed final sign-off Sep 2008 | 1400 Van Ness Av | Sjk Development | renovation & alteration to existing retail bldg. seismic & structural upgrade; provide new elevator to all stories. 2 new exit stairs; ada toiletson all stories, upgrade mech/heating systems. upgrade elec panel system.Details
renovation & alteration to existing retail bldg. seismic & structural upgrade; provide new elevator to all stories. 2 new exit stairs; ada toiletson all stories, upgrade mech/heating systems. upgrade elec panel system. | $750,000 |
| Dec 13, 2006 | Expired or cancelled expired Feb 2009 | 950 Corbett Av | install fire sprinkler and standpipe addition to building pa# 200201106632 throughtout per nfpa13-14.Details
install fire sprinkler and standpipe addition to building pa# 200201106632 throughtout per nfpa13-14. | $30,000 | |
| Nov 21, 2006 | Completed final sign-off Apr 2008 | 2655 Van Ness Av | alteration to pa# 200312232916/s-work under construction, provide mechanical parking for 10 spaces with lifts. these spaces will not be independenty accessible. sprinkler protection upgrades.Details
alteration to pa# 200312232916/s-work under construction, provide mechanical parking for 10 spaces with lifts. these spaces will not be independenty accessible. sprinkler protection upgrades. | $100,000 | |
| Apr 18, 2000 | Expired or cancelled expired May 2002 | 300 Brannan St | revision to app #9910039 patio trellis sign canopy addtn to garage duct system struc revsn stor wallDetails
revision to app #9910039 patio trellis sign canopy addtn to garage duct system struc revsn stor wall | $10,000 |