S C K Builders Inc.
- Based in
- San Mateo
- On San Francisco permits
- Mar 2010 to Nov 2025
- Last 24 months
- 9 permits filed
23 permits since 2000: 20 completed, 3 never finaled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 5, 2025 | Completed final sign-off Nov 2025 | 42 Otis St | to clarify on sheet a1.3 the location of the electrical subpanel that was installed under pa# 2017-0330-2802 per field inspectors notes on job card 2025-0819-3419, 3420, 3421, 3422.Details
to clarify on sheet a1.3 the location of the electrical subpanel that was installed under pa# 2017-0330-2802 per field inspectors notes on job card 2025-0819-3419, 3420, 3421, 3422. | |
| Nov 5, 2025 | Completed final sign-off Nov 2025 | 42 Otis St | to clarify on sheet a1.3 the location of the electrical subpanel that was installed under pa# 2017-0330-2802 per field inspectors notes on job card 2025-0819-3419, 3420, 3421, 3422.Details
to clarify on sheet a1.3 the location of the electrical subpanel that was installed under pa# 2017-0330-2802 per field inspectors notes on job card 2025-0819-3419, 3420, 3421, 3422. | |
| Nov 5, 2025 | Completed final sign-off Nov 2025 | 42 Otis St | to clarify on sheet a1.3 the location of the electrical subpanel that was installed under pa# 2017-0330-2802 per field inspectors notes on job card 2025-0819-3419, 3420, 3421, 3422.Details
to clarify on sheet a1.3 the location of the electrical subpanel that was installed under pa# 2017-0330-2802 per field inspectors notes on job card 2025-0819-3419, 3420, 3421, 3422. | |
| Nov 5, 2025 | Completed final sign-off Nov 2025 | 42 Otis St | to clarify on sheet a1.3 the location of the electrical subpanel that was installed under pa# 2017-0330-2802 per field inspectors notes on job card 2025-0819-3419, 3420, 3421, 3422.Details
to clarify on sheet a1.3 the location of the electrical subpanel that was installed under pa# 2017-0330-2802 per field inspectors notes on job card 2025-0819-3419, 3420, 3421, 3422. | |
| Aug 19, 2025 | Completed final sign-off Nov 2025 | 42 Otis St | interior remodel of unit #406. convert unit #406 from chap 11a to chap 11b accessible. remodel entry, bathroom & kitchen areas.Details
interior remodel of unit #406. convert unit #406 from chap 11a to chap 11b accessible. remodel entry, bathroom & kitchen areas. | $75,000 |
| Aug 19, 2025 | Completed final sign-off Oct 2025 | 42 Otis St | interior remodel of unit #502. convert unit #502 from chap 11a to chap 11b accessible. remodel entry, bathroom & kitchen areas.Details
interior remodel of unit #502. convert unit #502 from chap 11a to chap 11b accessible. remodel entry, bathroom & kitchen areas. | $75,000 |
| Aug 19, 2025 | Completed final sign-off Oct 2025 | 42 Otis St | interior remodel of unit #402. convert unit #402 from chap 11a to chap 11b accessible. remodel entry, bathroom & kitchen areas.Details
interior remodel of unit #402. convert unit #402 from chap 11a to chap 11b accessible. remodel entry, bathroom & kitchen areas. | $75,000 |
| Aug 19, 2025 | Completed final sign-off Nov 2025 | 42 Otis St | interior remodel of unit #506. convert unit #506 from chap 11a to chap 11b accessible. remodel entry, bathroom & kitchen areas.Details
interior remodel of unit #506. convert unit #506 from chap 11a to chap 11b accessible. remodel entry, bathroom & kitchen areas. | $75,000 |
| Aug 19, 2025 | Completed final sign-off Nov 2025 | 42 Otis St | interior remodel of common area. install communications system at ground floor entry area to meet chap 11b accessibility requirements.Details
interior remodel of common area. install communications system at ground floor entry area to meet chap 11b accessibility requirements. | $5,000 |
| Jun 30, 2022 | Completed final sign-off Jan 2023 | 835 Turk St | demo e tile on the walls and floor. patch repair drywall and sub-floor as necessary, install new tile flooring and walls. new toilet new pedestal sink. new shower valves ceiling fixtures as necessary. gfi outlet as necessary 12 bath remodels.Details
demo e tile on the walls and floor. patch repair drywall and sub-floor as necessary, install new tile flooring and walls. new toilet new pedestal sink. new shower valves ceiling fixtures as necessary. gfi outlet as necessary 12 bath remodels. | $160,000 |
| Aug 10, 2020 | Never finaled issued Nov 2020, no final | 1700 Market St | revision to the approved architectural addendum #2 - pa #201604074244-s2. the revision includes the response to the fire department fa pre-application meeting on 04/05/2020.Details
revision to the approved architectural addendum #2 - pa #201604074244-s2. the revision includes the response to the fire department fa pre-application meeting on 04/05/2020. | |
| Aug 7, 2020 | Never finaled issued Nov 2020, no final | 1700 Market St | revision to approved bpa#201604074244-s5, addendum #5 - errcs. updated alarm points to add antenna monitoring; revised equipment location; revised architectural floor plans.Details
revision to approved bpa#201604074244-s5, addendum #5 - errcs. updated alarm points to add antenna monitoring; revised equipment location; revised architectural floor plans. | |
| Dec 19, 2016 | Completed final sign-off Dec 2016 | 135 Cerritos Av | as-built plans for pa#201507020609: g/f: added fireplace, added closet in hall of bdrm 1, remove closets from study from pa201507020609.Details
as-built plans for pa#201507020609: g/f: added fireplace, added closet in hall of bdrm 1, remove closets from study from pa201507020609. | |
| Apr 7, 2016 | Completed final sign-off Dec 2020 | 1700 Market St | construct (n) mixed-used building (apartment & commercial)Details
construct (n) mixed-used building (apartment & commercial) | $6,500,000 |
| Sep 23, 2015 | Completed final sign-off Oct 2016 | 135 Cerritos Av | foundation stabilizationDetails
foundation stabilization | $5,000 |
| Jul 2, 2015 | Completed final sign-off Oct 2016 | 135 Cerritos Av | residential renovation and new addition of (e) 3-story house. extend the lower level garage by 14'-3" towards the rear; extend the east half of the mid-level by 14'-3" above the new garage; remodel and renovate the mid-level and garage level of (e) house. 1 bath & 1 powder room added.Details
residential renovation and new addition of (e) 3-story house. extend the lower level garage by 14'-3" towards the rear; extend the east half of the mid-level by 14'-3" above the new garage; remodel and renovate the mid-level and garage level of (e) house. 1 bath & 1 powder room added. | $180,000 |
| Apr 30, 2015 | Completed final sign-off Oct 2016 | 135 Cerritos Av | drywall repair on side of house, 100 sq. ft. of dry wall.Details
drywall repair on side of house, 100 sq. ft. of dry wall. | $200 |
| Oct 9, 2014 | Completed final sign-off Dec 2014 | 1593 North Point St | revised lighting and relfected ceiling plan. revision to previously approved permit 201404223832. n/a maher ordinance # 155-13Details
revised lighting and relfected ceiling plan. revision to previously approved permit 201404223832. n/a maher ordinance # 155-13 | |
| Aug 6, 2014 | Completed final sign-off Dec 2014 | 1593 North Point St | to comply with correction notice from bldg inspector.Details
to comply with correction notice from bldg inspector. | $3,000 |
| Apr 22, 2014 | Completed final sign-off Dec 2014 | 1593 North Point St | ti: interior tenant improvement to renovate approx 2391 sf on gr floor for a commercial realty office in an existing vacant ground fl tenant spaceDetails
ti: interior tenant improvement to renovate approx 2391 sf on gr floor for a commercial realty office in an existing vacant ground fl tenant space | $60,000 |
| Dec 16, 2013 | Completed final sign-off Jun 2014 | 2167 18th Av | kitchen and bathroom remodel. add media, bedroom, bathrooms, and office at basement level. sink not propsed on ground floor, new roof deck.Details
kitchen and bathroom remodel. add media, bedroom, bathrooms, and office at basement level. sink not propsed on ground floor, new roof deck. | $60,000 |
| Apr 19, 2013 | Never finaled issued May 2013, no final | 1700 California St | suite #310-tenant improvement-new interior partitions, lighting layout & finishes.Details
suite #310-tenant improvement-new interior partitions, lighting layout & finishes. | $80,000 |
| Mar 9, 2010 | Completed final sign-off Mar 2011 | 250 Clara St | repair stucco over doorDetails
repair stucco over door | $200 |