Permit GraphShortlistSan Francisco building permits since 2000

Joshua Marrow

License
C63015
Look the license up with the state
Listed as
engineer
On San Francisco permits
Sep 2013 to Oct 2018

19 permits since 2000 (engineer on 19 permits): 19 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Oct 3, 2018Completed
final sign-off Feb 2019
422 Arguello BlGil Construction & Assoc Inc.soft story seismic retrofit in accordance with sf ordinance 66-13, sfbc chapter 4d utilizing iebc a-4 methodology.
Details
Permit
201810032155
Status
complete
Filed
Oct 3, 2018
Permit issued
Oct 10, 2018
Final sign-off
Feb 26, 2019
Declared cost
$42,000
Address
422 Arguello Bl

soft story seismic retrofit in accordance with sf ordinance 66-13, sfbc chapter 4d utilizing iebc a-4 methodology.

Open the permit page

$42,000
Aug 31, 2018Completed
final sign-off Oct 2018
680 Clay StAligned Technologies Llc Dba Aligned Devrevision to 201808026227 shorten first floor. maher n/a.
Details
Permit
201808318920
Status
complete
Filed
Aug 31, 2018
Permit issued
Sep 10, 2018
Final sign-off
Oct 18, 2018
Address
680 Clay St

revision to 201808026227 shorten first floor. maher n/a.

Open the permit page

Oct 4, 2017Completed
final sign-off Jan 2023
667 33rd Avsoft story retrofit according to sfebc chapter 4d, ordinance no. 66-13. new playwood shearwalls over (e) studs and install of simpsom strong walls w/ new concrete grade beams in the transeverse direction.
Details
Permit
201710040336
Status
complete
Filed
Oct 4, 2017
Permit issued
Sep 21, 2022
Final sign-off
Jan 6, 2023
Declared cost
$100,000
Address
667 33rd Av

soft story retrofit according to sfebc chapter 4d, ordinance no. 66-13. new playwood shearwalls over (e) studs and install of simpsom strong walls w/ new concrete grade beams in the transeverse direction.

Open the permit page

$100,000
Sep 15, 2017Completed
final sign-off Nov 2018
340 Spruce StMulhall Construction Inc.soft story seismic retrofit per sfebc chapt4d - iebc appx a-4.
Details
Permit
201709158475
Status
complete
Filed
Sep 15, 2017
Permit issued
May 24, 2018
Final sign-off
Nov 30, 2018
Declared cost
$85,000
Address
340 Spruce St

soft story seismic retrofit per sfebc chapt4d - iebc appx a-4.

Open the permit page

$85,000
Sep 6, 2017Completed
final sign-off Sep 2018
1100 Masonic AvMulhall Construction Inc.soft story seismic retrofit consisting of plywood sheathing at existing walls & new plywood shear walls with new grade beams. all at the basement level (target story). 2016 cebc appendix a-4.
Details
Permit
201709067096
Status
complete
Filed
Sep 6, 2017
Permit issued
Jan 26, 2018
Final sign-off
Sep 25, 2018
Declared cost
$40,000
Address
1100 Masonic Av

soft story seismic retrofit consisting of plywood sheathing at existing walls & new plywood shear walls with new grade beams. all at the basement level (target story). 2016 cebc appendix a-4.

Open the permit page

$40,000
Sep 6, 2017Completed
final sign-off Aug 2018
367 Church StHough Constructionsoft story seismic retrofit consisting of plywood sheathing at existing walls & new plywood & simpson strong walls w/new foundations. all at the ground floor level (target story). soft storey rerofit per sfebc chapter 4d, 2016 cebc appendix a-4.
Details
Permit
201709067090
Status
complete
Filed
Sep 6, 2017
Permit issued
Jun 8, 2018
Final sign-off
Aug 8, 2018
Declared cost
$45,000
Address
367 Church St

soft story seismic retrofit consisting of plywood sheathing at existing walls & new plywood & simpson strong walls w/new foundations. all at the ground floor level (target story). soft storey rerofit per sfebc chapter 4d, 2016 cebc appendix a-4.

Open the permit page

$45,000
Apr 27, 2017Completed
final sign-off Dec 2017
616 Divisadero StHuff Construction Company Increvision to pa# 201612084523 for construction field changes. existing field conditions have more space to alter joist and beam framing. instead of using hangers joist will frame over beams.
Details
Permit
201704275099
Status
complete
Filed
Apr 27, 2017
Permit issued
Jul 12, 2017
Final sign-off
Dec 4, 2017
Address
616 Divisadero St

revision to pa# 201612084523 for construction field changes. existing field conditions have more space to alter joist and beam framing. instead of using hangers joist will frame over beams.

Open the permit page

Apr 27, 2017Completed
final sign-off Jan 2018
60 Crestline DrMulhall Construction Inc.soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4 include 1-5 parking garage and crawl space area.
Details
Permit
201704275096
Status
complete
Filed
Apr 27, 2017
Permit issued
May 30, 2017
Final sign-off
Jan 22, 2018
Declared cost
$140,000
Address
60 Crestline Dr

soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4 include 1-5 parking garage and crawl space area.

Open the permit page

$140,000
Apr 21, 2017Completed
final sign-off Jul 2017
1230 Pacific AvA Plus Buildersrevision to pa 2016-0129-8316, revise structural for stairs
Details
Permit
201704214583
Status
complete
Filed
Apr 21, 2017
Permit issued
Jun 2, 2017
Final sign-off
Jul 24, 2017
Address
1230 Pacific Av

revision to pa 2016-0129-8316, revise structural for stairs

Open the permit page

Mar 28, 2017Completed
final sign-off Oct 2017
2875 Jackson StMulhall Construction Inc.soft story retrofit per sfbc chapter 4d engineering criteria 2012 iebc appendix a-4
Details
Permit
201703282592
Status
complete
Filed
Mar 28, 2017
Permit issued
Apr 11, 2017
Final sign-off
Oct 23, 2017
Declared cost
$150,000
Address
2875 Jackson St

soft story retrofit per sfbc chapter 4d engineering criteria 2012 iebc appendix a-4

Open the permit page

$150,000
May 3, 2016Completed
final sign-off Jun 2016
123 Moultrie StKevin Llorente Constructionrebuild entry deck in kind. maher na
Details
Permit
201605036363
Status
complete
Filed
May 3, 2016
Permit issued
May 3, 2016
Final sign-off
Jun 7, 2016
Declared cost
$10,000
Address
123 Moultrie St

rebuild entry deck in kind. maher na

Open the permit page

$10,000
Dec 18, 2015Completed
final sign-off Feb 2016
35 Rosemont PlMulhall Construction Inc.minor kitchen remodel(cabinets only per plan) w/removal of (e) non load bearing wall.
Details
Permit
201512185485
Status
complete
Filed
Dec 18, 2015
Permit issued
Dec 18, 2015
Final sign-off
Feb 1, 2016
Declared cost
$4,000
Address
35 Rosemont Pl

minor kitchen remodel(cabinets only per plan) w/removal of (e) non load bearing wall.

Open the permit page

$4,000
Sep 30, 2015Completed
final sign-off Apr 2016
455 Cole StMulhall Construction Inc.mandatory seismic strengthening per san francisco soft story ordinance done in conformance with iebc-a4
Details
Permit
201509308479
Status
complete
Filed
Sep 30, 2015
Permit issued
Oct 21, 2015
Final sign-off
Apr 20, 2016
Declared cost
$100,000
Address
455 Cole St

mandatory seismic strengthening per san francisco soft story ordinance done in conformance with iebc-a4

Open the permit page

$100,000
May 26, 2015Completed
final sign-off Nov 2015
657 Cayuga AvSeabee Constructioninstall roof in atrium with skylight. install skylight in breakfast nook
Details
Permit
201505267169
Status
complete
Filed
May 26, 2015
Permit issued
Jun 11, 2015
Final sign-off
Nov 24, 2015
Declared cost
$60,000
Address
657 Cayuga Av

install roof in atrium with skylight. install skylight in breakfast nook

Open the permit page

$60,000
Feb 6, 2015Completed
final sign-off May 2015
1825 Mission StSienna Homes Construction Corporation1st floor common area - remove 1 office, add 2 offices,replace light fixtrues, plumbing fixtrues @ both bathrooms (like for like), replace front door, flooring & paint, replace kitchen appliances at common area only next to offices. n/a maher ordinance
Details
Permit
201502067723
Status
complete
Filed
Feb 6, 2015
Permit issued
Feb 10, 2015
Final sign-off
May 6, 2015
Declared cost
$15,485
Address
1825 Mission St

1st floor common area - remove 1 office, add 2 offices,replace light fixtrues, plumbing fixtrues @ both bathrooms (like for like), replace front door, flooring & paint, replace kitchen appliances at common area only next to offices. n/a maher ordinance

Open the permit page

$15,485
Jan 20, 2015Completed
final sign-off Apr 2015
2727 Polk StMulhall Construction Inc.soft story seismic retrofit. new plywood shearwalls at 1st fl and crawl space. new simpson strong walls at garage. 1 new concrete grade beam. no moment frames. 2012 iebc, appendix a-4
Details
Permit
201501206070
Status
complete
Filed
Jan 20, 2015
Permit issued
Jan 27, 2015
Final sign-off
Apr 29, 2015
Declared cost
$30,000
Address
2727 Polk St

soft story seismic retrofit. new plywood shearwalls at 1st fl and crawl space. new simpson strong walls at garage. 1 new concrete grade beam. no moment frames. 2012 iebc, appendix a-4

Open the permit page

$30,000
Apr 23, 2014Completed
final sign-off Aug 2014
1395 16th AvMulhall Construction Inc.soft story retrofit includes concrete grade beam, moment frame & plywood shear walls per sfbc 34b, 2012 iebc a4.
Details
Permit
201404233939
Status
complete
Filed
Apr 23, 2014
Permit issued
Apr 28, 2014
Final sign-off
Aug 12, 2014
Declared cost
$25,000
Address
1395 16th Av

soft story retrofit includes concrete grade beam, moment frame & plywood shear walls per sfbc 34b, 2012 iebc a4.

Open the permit page

$25,000
Apr 23, 2014Completed
final sign-off Aug 2014
1385 16th AvMulhall Construction Inc.soft story retrofit includes concrete grade beam, moment frame & plywood shear walls per sfbc 34b, 2012 iebc a4.
Details
Permit
201404233941
Status
complete
Filed
Apr 23, 2014
Permit issued
Apr 28, 2014
Final sign-off
Aug 12, 2014
Declared cost
$25,000
Address
1385 16th Av

soft story retrofit includes concrete grade beam, moment frame & plywood shear walls per sfbc 34b, 2012 iebc a4.

Open the permit page

$25,000
Sep 4, 2013Completed
final sign-off Oct 2014
1045 Bryant StBcci Construction Companystructural work including wood framing for 2 new staircases and limited stud frame load bearing walls, elevator pit and floor. infill at existing at existing openings under ab-17
Details
Permit
201309045883
Status
complete
Filed
Sep 4, 2013
Permit issued
Sep 6, 2013
Final sign-off
Oct 31, 2014
Declared cost
$125,000
Address
1045 Bryant St

structural work including wood framing for 2 new staircases and limited stud frame load bearing walls, elevator pit and floor. infill at existing at existing openings under ab-17

Open the permit page

$125,000