Seabee Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2013 to Oct 2015
- Last 24 months
- 0 permits filed
41 permits since 2000: 29 completed, 9 never finaled, 3 expired or cancelled.
Of the 9 never-finaled permits, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 6, 2015 | Never finaled issued Oct 2015, no final | 622 Green St | comply with nov #201545811. remodel extg bar and replace kitchen hood. mep under seperate permit. n/a for maherDetails
comply with nov #201545811. remodel extg bar and replace kitchen hood. mep under seperate permit. n/a for maher | $25,000 |
| Aug 28, 2015 | Never finaled issued Aug 2015, no final | 801 Kearny St | soft demo of an extg full restaurant to demolish non-bearing wall, counters, workout tables, and hood system per ab- 017. extg fire sprinkler system ceiling light fixtures plmg fixtures and hvac system to remain. n/a for maherDetails
soft demo of an extg full restaurant to demolish non-bearing wall, counters, workout tables, and hood system per ab- 017. extg fire sprinkler system ceiling light fixtures plmg fixtures and hvac system to remain. n/a for maher | $15,000 |
| Aug 26, 2015 | Completed final sign-off Sep 2015 | 2937 16th St | unit 2: just minor repair of dry rot wood at the rear deck. dry rot is less than 50% to comply with nov#201537931.Details
unit 2: just minor repair of dry rot wood at the rear deck. dry rot is less than 50% to comply with nov#201537931. | $2,500 |
| Aug 19, 2015 | Never finaled issued Aug 2015, no final | 716 18th Av | revision bpa #201507222165, revision on foundation details 10 on s3.1 and no foundation work on northerly side.Details
revision bpa #201507222165, revision on foundation details 10 on s3.1 and no foundation work on northerly side. | |
| Aug 10, 2015 | Completed final sign-off Apr 2016 | 2558 16th Av | construct one new bathroom at 2nd flr, construct two bedrm, two bathrms and laundry room at ground floor.Details
construct one new bathroom at 2nd flr, construct two bedrm, two bathrms and laundry room at ground floor. | $52,000 |
| Aug 5, 2015 | Never finaled issued Aug 2015, no final | 716 18th Av | revision to appl #2015.0722.2165: revision on foundation detail 2,5,9 on s3.1Details
revision to appl #2015.0722.2165: revision on foundation detail 2,5,9 on s3.1 | |
| Jul 29, 2015 | Completed final sign-off Apr 2016 | 230 Liberty St | renovation of upper unit kitchen, bath, master bedroom, closet and hallway office.Details
renovation of upper unit kitchen, bath, master bedroom, closet and hallway office. | $81,276 |
| Jul 22, 2015 | Never finaled issued Jul 2015, no final | 716 18th Av | replace foundation per plan. new studio on separate permitDetails
replace foundation per plan. new studio on separate permit | $5,000 |
| Jul 13, 2015 | Completed final sign-off Jun 2016 | 716 18th Av | relocate kitchen for the approved permit # 201506108624Details
relocate kitchen for the approved permit # 201506108624 | |
| Jun 10, 2015 | Never finaled issued Jul 2015, no final | 716 18th Av | to add a new studio unit with kitchen and a full bath in 1/f.Details
to add a new studio unit with kitchen and a full bath in 1/f. | $40,000 |
| May 27, 2015 | Completed final sign-off Jan 2016 | 1918 Vicente St | 1/f: convert (e) spaces to have a bedroom, a family room, relocate (e) full bathroom. in 2/f: relocate kitchen, bathroom, stair, add a bedroom.Details
1/f: convert (e) spaces to have a bedroom, a family room, relocate (e) full bathroom. in 2/f: relocate kitchen, bathroom, stair, add a bedroom. | $45,000 |
| May 26, 2015 | Completed final sign-off Nov 2015 | 657 Cayuga Av | install roof in atrium with skylight. install skylight in breakfast nookDetails
install roof in atrium with skylight. install skylight in breakfast nook | $60,000 |
| May 5, 2015 | Completed final sign-off Mar 2016 | 3917 California St | comply with complaint #201534771 and 201542741. remove illegal kitchen, convert to laundry. legalize extg bed room. all work at ground floor.Details
comply with complaint #201534771 and 201542741. remove illegal kitchen, convert to laundry. legalize extg bed room. all work at ground floor. | $20,000 |
| Apr 16, 2015 | Completed final sign-off Jul 2016 | 306 Louisburg St | 1st floor: add a new full bath and a storage room. 2nd floor: convert living room to a bedroom with a bath, convert dining room to a living room, breakfast to a dining area. comply with complaint no 201532871.Details
1st floor: add a new full bath and a storage room. 2nd floor: convert living room to a bedroom with a bath, convert dining room to a living room, breakfast to a dining area. comply with complaint no 201532871. | $20,000 |
| Apr 14, 2015 | Completed final sign-off Mar 2016 | 3917 California St | remodel (e) kitchen & two full bathroom in kind. all work at second floor, comply with complaint #201534771.Details
remodel (e) kitchen & two full bathroom in kind. all work at second floor, comply with complaint #201534771. | $20,000 |
| Apr 10, 2015 | Never finaled issued Apr 2015, no final | 5525 Diamond Heights Bl | 1st floor: add a shower stall to (e) toilet, add laundry hookup in family room, divide existing room to a bedroom and study room per plan, add a entry security gate at front. 2nd floor: remodel kitchen per plan. comply with nov #201535611.Details
1st floor: add a shower stall to (e) toilet, add laundry hookup in family room, divide existing room to a bedroom and study room per plan, add a entry security gate at front. 2nd floor: remodel kitchen per plan. comply with nov #201535611. | $25,000 |
| Mar 25, 2015 | Completed final sign-off May 2015 | 5867 Mission St | unit #7: relocate (e) kitchen, convert kitchen space into a study, replace (e) windows. maher - not req'd ; to comply with cec150.0(k)3Details
unit #7: relocate (e) kitchen, convert kitchen space into a study, replace (e) windows. maher - not req'd ; to comply with cec150.0(k)3 | $12,000 |
| Mar 23, 2015 | Completed final sign-off Dec 2015 | 337 Moraga St | 1st floor interior remodel. add one full bathroom and one gym room on garage. no structural workDetails
1st floor interior remodel. add one full bathroom and one gym room on garage. no structural work | $15,000 |
| Mar 16, 2015 | Completed final sign-off Oct 2015 | 919 Teresita Bl | to add one family room, one full bathroom on existing ground floor per plan. note: family room not to be used for sleeping purposesDetails
to add one family room, one full bathroom on existing ground floor per plan. note: family room not to be used for sleeping purposes | $50,000 |
| Mar 12, 2015 | Completed final sign-off Mar 2015 | 790 Pacheco St | to comply with complaint # 200731397 & 201469261, replace kitchen cabinets doors and bathroom tile.Details
to comply with complaint # 200731397 & 201469261, replace kitchen cabinets doors and bathroom tile. | $6,000 |
| Mar 9, 2015 | Completed final sign-off Sep 2015 | 491 Harkness Av | pour concrete slab approx 3" thick x 25' x 55' at rear yard, replace in-kind, nonstructrual, nov #201530467Details
pour concrete slab approx 3" thick x 25' x 55' at rear yard, replace in-kind, nonstructrual, nov #201530467 | $2,000 |
| Mar 6, 2015 | Never finaled issued Mar 2015, no final | 515 Columbus Av | remodel two bathroom to accommodate a ada bathroom.Details
remodel two bathroom to accommodate a ada bathroom. | $10,000 |
| Feb 27, 2015 | Completed final sign-off Jan 2016 | 622 Green St | remodeling two bathrooms - one ada maher - not req'dDetails
remodeling two bathrooms - one ada maher - not req'd | $10,000 |
| Feb 13, 2015 | Completed final sign-off Feb 2015 | 661 Castro St | replace bathroom 4 tiles & fix 1 door.Details
replace bathroom 4 tiles & fix 1 door. | $1,000 |
| Feb 13, 2015 | Completed final sign-off Mar 2015 | 647 21st Av | to comply with complaint#201522171. replace kitchen cabinets doors. and replace bathroom tiles.Details
to comply with complaint#201522171. replace kitchen cabinets doors. and replace bathroom tiles. | $6,000 |
| Feb 13, 2015 | Completed final sign-off Feb 2015 | 1238 42nd Av | change one window & replace one door in rear side. not visible from street.Details
change one window & replace one door in rear side. not visible from street. | $2,500 |
| Jan 29, 2015 | Completed final sign-off Feb 2015 | 1669 Sacramento St | change new (52) vinyl windows in backyard.Details
change new (52) vinyl windows in backyard. | $8,000 |
| Jan 29, 2015 | Completed final sign-off Aug 2015 | 1459 20th Av | remove illegal kitchen, convert to laundry, legalize (e) 2 bedrm, multipurpose rm & convert full bathrm into half bathrm, all work at ground floor.Details
remove illegal kitchen, convert to laundry, legalize (e) 2 bedrm, multipurpose rm & convert full bathrm into half bathrm, all work at ground floor. | $48,000 |
| Jan 28, 2015 | Completed final sign-off Aug 2015 | 171 Vernon St | revision to pa#201409237071, add 2 bathrooms on ground floor. repair stucco 300sf at front in-kindDetails
revision to pa#201409237071, add 2 bathrooms on ground floor. repair stucco 300sf at front in-kind | $10,000 |
| Jan 27, 2015 | Completed final sign-off Feb 2015 | 1673 Sacramento St | fill in front left side window total of 2 window with 5/8" type x g.b. remodel one existing bathroom. not visble from streetDetails
fill in front left side window total of 2 window with 5/8" type x g.b. remodel one existing bathroom. not visble from street | $7,000 |
| Jan 26, 2015 | Never finaled issued Feb 2015, no final | 2600 39th Av | legalize (e) bedrm, family rm, laundry/study rm, one full bathroom and one half bath rm, all work at ground floor. (remove dwelling unit at ground floor).Details
legalize (e) bedrm, family rm, laundry/study rm, one full bathroom and one half bath rm, all work at ground floor. (remove dwelling unit at ground floor). | $36,000 |
| Jan 20, 2015 | Expired or cancelled revoked Apr 2015 | 2425 Folsom St | remove illegal kitchen, convert to laundry, legalize (e) bedrm, study rm, storage rm & convert (e) full bathroom into half bathroom; all work at ground floor.Details
remove illegal kitchen, convert to laundry, legalize (e) bedrm, study rm, storage rm & convert (e) full bathroom into half bathroom; all work at ground floor. | $36,000 |
| Jan 8, 2015 | Completed final sign-off Aug 2015 | 156 Upland Dr | add a family room and a full bath at ground floorDetails
add a family room and a full bath at ground floor | $15,000 |
| Dec 1, 2014 | Completed final sign-off Feb 2015 | 1358 Clement St | 1st fl: convert e space to have a bedroom, family room, study, and 1/2 bath as parto of unit 1 above living space. comply with 201407791Details
1st fl: convert e space to have a bedroom, family room, study, and 1/2 bath as parto of unit 1 above living space. comply with 201407791 | $40,000 |
| Nov 19, 2014 | Completed final sign-off Feb 2015 | 1358 Clement St | lowest floor unit - remodel bathroom & upgrade service panel; to comply with cec150.0(k)5Details
lowest floor unit - remodel bathroom & upgrade service panel; to comply with cec150.0(k)5 | $5,000 |
| Nov 17, 2014 | Completed final sign-off May 2015 | 1254 Mission St | comply with bldg complaint #201242341; comply with plumbing complaint #201242321; comply with electrical complaint #201242302, new two h/c restroom.Details
comply with bldg complaint #201242341; comply with plumbing complaint #201242321; comply with electrical complaint #201242302, new two h/c restroom. | $18,000 |
| Nov 17, 2014 | Expired or cancelled cancelled Dec 2019 | 746 45th Av | legalize (e) unpermitted remodeling work on lower floor, including new bathroom,and computer room. add clothes washer and dryer in garage. new fire sepatation wall at garage. remodel existing kitchen,add afci in all rooms on both floors, gfcis in bathrooms and kitchen. new high efficiancy lighting.Details
legalize (e) unpermitted remodeling work on lower floor, including new bathroom,and computer room. add clothes washer and dryer in garage. new fire sepatation wall at garage. remodel existing kitchen,add afci in all rooms on both floors, gfcis in bathrooms and kitchen. new high efficiancy lighting. | $50,000 |
| Sep 19, 2014 | Completed final sign-off Jan 2015 | 228 Liberty St | new internal stair from lower unit to garage level & new bedroom & bathroom at garage level.Details
new internal stair from lower unit to garage level & new bedroom & bathroom at garage level. | $70,000 |
| Jul 9, 2014 | Expired or cancelled cancelled Jan 2015 | 1526 Revere Av | b/f - replace 2 nos. of windows which are not visible from street; replacement of hardwood floor finishes.Details
b/f - replace 2 nos. of windows which are not visible from street; replacement of hardwood floor finishes. | $5,000 |
| Jul 2, 2014 | Completed final sign-off Feb 2015 | 518 Haight St | interior remodeling in an extg restaurant. a bar and service station shall be added in the extg dining room. extg kitchen and toilet rooms shall remain with out changes. n/a for the maher ordinance #155-13Details
interior remodeling in an extg restaurant. a bar and service station shall be added in the extg dining room. extg kitchen and toilet rooms shall remain with out changes. n/a for the maher ordinance #155-13 | $48,000 |
| Dec 20, 2013 | Completed final sign-off Apr 2017 | 813 Washington St | change of use convert (e) restaurant to retail/office, new interior stair, ada restroom, retail space and office space, storage per plan, comply to nov #201220221 & 201338681; repair(e) egress balcony with new folding stairDetails
change of use convert (e) restaurant to retail/office, new interior stair, ada restroom, retail space and office space, storage per plan, comply to nov #201220221 & 201338681; repair(e) egress balcony with new folding stair | $70,000 |