John Dorr
- Listed as
- architect, authorized agent-others
- Firm
- Doma Architects
- Based in
- San Rafael
- On San Francisco permits
- Apr 2008 to Dec 2025
30 permits since 2000 (architect on 30 permits, authorized agent-others on 1 permit): 18 completed, 5 in progress, 1 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 10, 2025 | In progress filed Dec 2025, not yet issued | 160 Seacliff Av | O'neill Construction Inc | revision to pa 202410213318 add new yoga/gym and spa with hot tub at garage level. redesign subterranean basement level roomsDetails
revision to pa 202410213318 add new yoga/gym and spa with hot tub at garage level. redesign subterranean basement level rooms | $114,364 |
| Jun 9, 2025 | In progress issued Jul 2025 | 160 Seacliff Av | O'neill Construction Inc | rev 202410213318: appeal agreenment between 140 seacliff ave and 160 seacliff ave based on "east elevation agreement w/ neighbor at 140 seacliff ave. see 2/a3.3. 1) osbcure film to glass; planter; solid balcony rail.Details
rev 202410213318: appeal agreenment between 140 seacliff ave and 160 seacliff ave based on "east elevation agreement w/ neighbor at 140 seacliff ave. see 2/a3.3. 1) osbcure film to glass; planter; solid balcony rail. | $1,564 |
| May 27, 2025 | In progress issued May 2025 | 224 Seacliff Av | Project Roofing | re roofing (no torch), remove all clay barrel tiles & store in a safe location, overlay roof with 5/8 plywood and new membrane reinstall clay barrel tiles, tear off and replace the waterproof membrane on all 3 existing roof terraces.Details
re roofing (no torch), remove all clay barrel tiles & store in a safe location, overlay roof with 5/8 plywood and new membrane reinstall clay barrel tiles, tear off and replace the waterproof membrane on all 3 existing roof terraces. | $43,400 |
| Dec 11, 2024 | In progress issued May 2026 | 224 Seacliff Av | O'neill Construction Inc | work to include foundation upgrade & upgrade structural framing. add new basement. remodel of 1st, 2nd & 3rd floors per drawings and to comply with bid_insp notice of violation 202547909 (12-12-2025) additional scope for removal of stucco on north,east and west side facades.Details
work to include foundation upgrade & upgrade structural framing. add new basement. remodel of 1st, 2nd & 3rd floors per drawings and to comply with bid_insp notice of violation 202547909 (12-12-2025) additional scope for removal of stucco on north,east and west side facades. | $264,419 |
| Dec 10, 2024 | In progress issued Mar 2025 | 160 Seacliff Av | O'neill Construction Inc | revision to pa 202303214117. new horizontal addition within the building area to existing single family home at the first, second, and thrid flr. (2) new 2'8" deep roof eave overhang (e) rear yard parapet wall to match (e) and (3) new proposed skylight.Details
revision to pa 202303214117. new horizontal addition within the building area to existing single family home at the first, second, and thrid flr. (2) new 2'8" deep roof eave overhang (e) rear yard parapet wall to match (e) and (3) new proposed skylight. | $286,415 |
| Jul 9, 2024 | Completed final sign-off Aug 2025 | 224 Seacliff Av | O'neill Construction Inc | to comply with nov 202183822 rear stairs. remove partial exterior walls and steps to beach per drawingsDetails
to comply with nov 202183822 rear stairs. remove partial exterior walls and steps to beach per drawings | $185,464 |
| Feb 27, 2024 | Expired or cancelled suspend Dec 2025 | 224 Seacliff Av | O'neill Construction Inc | comply w/ nov# 202293488, for fire damage. repair and replace in kind fire damaged windows and doors, framing, hole in roof, stucco as needed and exploritory demo to assess structural stregth (up to 10%)Details
comply w/ nov# 202293488, for fire damage. repair and replace in kind fire damaged windows and doors, framing, hole in roof, stucco as needed and exploritory demo to assess structural stregth (up to 10%) | $147,000 |
| Mar 21, 2023 | Expired or cancelled suspend Dec 2025 | 160 Seacliff Av | O'neill Construction Inc | add non-visible below grade underground garage with mechanical and storage rooms. no exterior work to (e) building.Details
add non-visible below grade underground garage with mechanical and storage rooms. no exterior work to (e) building. | $550,750 |
| Apr 16, 2021 | Expired or cancelled cancelled Jun 2025 | 1001 Ulloa St | Elliott Build Remodel Llc | (n) deck @ rear yard. replacement includs:windows throughout w/ wood windows; sun rm walls & roof w/ (n) stucco walls/ skylight sys & windows;(e) garage door. remove 2 chimneys. remodle:(n) garage w/ (n) storage, wine rm & (n) stairs; kitchen,fmy rom & bath @ 1st fl;mstr bedrm, rm,bath,Details
(n) deck @ rear yard. replacement includs:windows throughout w/ wood windows; sun rm walls & roof w/ (n) stucco walls/ skylight sys & windows;(e) garage door. remove 2 chimneys. remodle:(n) garage w/ (n) storage, wine rm & (n) stairs; kitchen,fmy rom & bath @ 1st fl;mstr bedrm, rm,bath, | $100,000 |
| Jan 25, 2021 | Completed final sign-off Oct 2021 | 254 Central Av | C G Adams Construction | apt a - install a new incline platform liftDetails
apt a - install a new incline platform lift | $5,000 |
| Dec 13, 2019 | Completed final sign-off Jan 2025 | 351 San Carlos St | Stroub Construction | raise home 18", replace(e) carriage door with new garage door, add 185 sq ft bed addition @ the 2nd level in the rear of the property. replacement foundation to be, under separate permit.Details
raise home 18", replace(e) carriage door with new garage door, add 185 sq ft bed addition @ the 2nd level in the rear of the property. replacement foundation to be, under separate permit. | $500,000 |
| Dec 10, 2019 | Completed final sign-off Sep 2022 | 3696 Clay St | Ggd Inc. | exterior: new asphalt shingle roof, skylights and ext front entry lighting. interior: remove extg elevator, install nw elevator in alternate location, new powder rooms, extg kitchen remodel, extg bedroom remodel, extg attic lounge remodel.Details
exterior: new asphalt shingle roof, skylights and ext front entry lighting. interior: remove extg elevator, install nw elevator in alternate location, new powder rooms, extg kitchen remodel, extg bedroom remodel, extg attic lounge remodel. | $500,000 |
| Jun 13, 2017 | Expired or cancelled cancelled Jan 2026 | 2600 Broadway | Plath & Company Inc | 890 sq.ft. below grade, horizontal addition to create family/media room and bar.Details
890 sq.ft. below grade, horizontal addition to create family/media room and bar. | $100,000 |
| Apr 29, 2015 | Completed final sign-off Jul 2015 | 2186 Sutter St | Chbc Investement Inc | revision to pa#201306189838 change decking material to 329 sq.ft. bison 1 pe tile and 260 sq.ft. non-combustible stone tile.Details
revision to pa#201306189838 change decking material to 329 sq.ft. bison 1 pe tile and 260 sq.ft. non-combustible stone tile. | $200 |
| Apr 23, 2015 | Completed final sign-off Jun 2017 | 2730 Vallejo St | Thompson Suskind L P | 109 sq. ft. addition & remodel work @ (e) 4th floor. new 107 sq.ft. deck in rear & side yard @ (e) 2nd level. new relesseo trash enclosure @ driveway. new windows & interior door @ master bedroom. ** maher: compliance with ordinance no# 155-13 not required **Details
109 sq. ft. addition & remodel work @ (e) 4th floor. new 107 sq.ft. deck in rear & side yard @ (e) 2nd level. new relesseo trash enclosure @ driveway. new windows & interior door @ master bedroom. ** maher: compliance with ordinance no# 155-13 not required ** | $100,000 |
| Feb 18, 2015 | Completed final sign-off Jun 2017 | 2730 Vallejo St | Thompson Suskind L P | replace windows, ceader, replace wood fireplace with gas fire place & remove chimneys throughout. new wood deck in rear yard. remodel (e) stair with new circular stair. reconfigure interior spaces & new paint & stain finishes. new plumbing fixture & lighting & appliance. new insulation throughout.Details
replace windows, ceader, replace wood fireplace with gas fire place & remove chimneys throughout. new wood deck in rear yard. remodel (e) stair with new circular stair. reconfigure interior spaces & new paint & stain finishes. new plumbing fixture & lighting & appliance. new insulation throughout. | $300,000 |
| Apr 24, 2014 | Completed final sign-off Mar 2017 | 238 Presidio Av | Ggd Inc. | remodel existing single family residence. reconfigure interior walls at all levels. add 4th floor, 1 & 2 story rear yard addition. no work to front facade. ** maher: compliance with ordinance no# 155-13 not required **Details
remodel existing single family residence. reconfigure interior walls at all levels. add 4th floor, 1 & 2 story rear yard addition. no work to front facade. ** maher: compliance with ordinance no# 155-13 not required ** | $800,000 |
| Nov 13, 2013 | Completed final sign-off Oct 2015 | 326 Spruce St | Upscale Construction Inc. | remodel e attic at 3/f include(n)stair to attic @bed level, remodel hall bath, new linen closet @ hall remove(e) fire box @bedrm @ entry, living rm widening of openings@ living rm & dining rms remove (e) fireplace chimney@kitchen add island, new dormersDetails
remodel e attic at 3/f include(n)stair to attic @bed level, remodel hall bath, new linen closet @ hall remove(e) fire box @bedrm @ entry, living rm widening of openings@ living rm & dining rms remove (e) fireplace chimney@kitchen add island, new dormers | $325,000 |
| Nov 7, 2013 | Completed final sign-off Oct 2014 | 440 El Camino Del Mar | Upscale Construction Inc. | window replacement ot match existing wood windows & stucco repair as needed for new windows. windows cannot be seen from street rear & side of building. to comply with u factor not > .4; and emergency rescue window.Details
window replacement ot match existing wood windows & stucco repair as needed for new windows. windows cannot be seen from street rear & side of building. to comply with u factor not > .4; and emergency rescue window. | $25,000 |
| Aug 27, 2013 | Completed final sign-off Oct 2014 | 440 El Camino Del Mar | Upscale Construction Inc. | interior remodel of sfd. new work includes upgrading a portion of extg concrete foundation. floor slab excavate extg crawl space at grade. upgrade portions of extg floor frmg & structural beams, reconfigure some int. walls, reconfigure int. stair.Details
interior remodel of sfd. new work includes upgrading a portion of extg concrete foundation. floor slab excavate extg crawl space at grade. upgrade portions of extg floor frmg & structural beams, reconfigure some int. walls, reconfigure int. stair. | $719,000 |
| Jun 18, 2013 | Never finaled issued Sep 2014, no final | 2186 Sutter St | Chbc Investement Inc | commercial office addition at street level in rear yard for units 2186 & 2188 sutter st. w/new deck above commercial office addition for residential units 2186 & 2188 sutter st. replace (e) door & window on north wall of unit 2186 w/new pair french door & side lites. replace (e) wood deck @ 2nd leveDetails
commercial office addition at street level in rear yard for units 2186 & 2188 sutter st. w/new deck above commercial office addition for residential units 2186 & 2188 sutter st. replace (e) door & window on north wall of unit 2186 w/new pair french door & side lites. replace (e) wood deck @ 2nd leve | $40,000 |
| May 1, 2013 | Completed final sign-off Jan 2017 | 726 El Camino Del Mar | O'neill Construction Inc | remodel (e)wood framed,stucco finished sfd.add 2nd story over(e)living rm wing.add single story&multi story addition into rear yd.raise(e)roof&cornice.add arch details,reconfigure int. walls&provide(n)finishes,fixtures&cabinetry.add piers&fencing@frt,retaining walls@rear yd.Details
remodel (e)wood framed,stucco finished sfd.add 2nd story over(e)living rm wing.add single story&multi story addition into rear yd.raise(e)roof&cornice.add arch details,reconfigure int. walls&provide(n)finishes,fixtures&cabinetry.add piers&fencing@frt,retaining walls@rear yd. | $1,000,000 |
| Feb 26, 2013 | Completed final sign-off Apr 2018 | 60 Allston Wy | Wei Ming Construction | remodel existing wood framed stucco finished single family residt. provide new concrete foundation, raise existing wood framed bldg approx 3' excavate crawl space to provide conditioned habital space, add exterior windows and doors, rear exterior stair, reconfigure front entry stair &Details
remodel existing wood framed stucco finished single family residt. provide new concrete foundation, raise existing wood framed bldg approx 3' excavate crawl space to provide conditioned habital space, add exterior windows and doors, rear exterior stair, reconfigure front entry stair & | $300,000 |
| Aug 28, 2012 | Completed final sign-off Apr 2013 | 1906 Green St | Plath & Company Inc | unit #3 - remodel an (e) kitchen: raise a false beam ceilign in (e) living room to (e) higher flat ceiling & add crown moulding. remodel of an (e) master bathroom, replace plumbing fixtures & finishes within an (e) guest bathroom.Details
unit #3 - remodel an (e) kitchen: raise a false beam ceilign in (e) living room to (e) higher flat ceiling & add crown moulding. remodel of an (e) master bathroom, replace plumbing fixtures & finishes within an (e) guest bathroom. | $45,000 |
| Mar 4, 2011 | Completed final sign-off May 2012 | 3525 Pacific Av | Plath & Company Inc | renovation of (e) garden - courtyard.Details
renovation of (e) garden - courtyard. | $225,000 |
| Mar 4, 2011 | Completed final sign-off May 2012 | 3525 Pacific Av | Plath & Company Inc | framing revision to the roof & in-law level.Details
framing revision to the roof & in-law level. | $5,000 |
| Mar 4, 2011 | Expired or cancelled withdrawn Jun 2011 | 3525 Pacific Av | Plath & Company Inc | remove (e) lightwell & (e) windows. add new laundry window & extend exterior stair landing at bottom. provide 1 house wall assembly at all exterior wall construction with in 5'-0" of property lines.Details
remove (e) lightwell & (e) windows. add new laundry window & extend exterior stair landing at bottom. provide 1 house wall assembly at all exterior wall construction with in 5'-0" of property lines. | $20,000 |
| Apr 21, 2010 | Completed final sign-off May 2012 | 3525 Pacific Av | Plath & Company Inc | remodel & reconfigure rooms throughout an (e) single family dwelling with 3 story addition added to the west side of the (e) building & an expansion of an (e) 4th floor room. sprinkler per nfpa 13 entire building under separate permit.Details
remodel & reconfigure rooms throughout an (e) single family dwelling with 3 story addition added to the west side of the (e) building & an expansion of an (e) 4th floor room. sprinkler per nfpa 13 entire building under separate permit. | $1,500,000 |
| Jun 17, 2008 | Completed final sign-off Feb 2009 | 21 Presidio Tr | Bbc Construction Inc. | remove stucco repair with roof membrane. replace windows in kind, add rail at roof deck, remove skylight & replace windows with patio doors. new roof deck at rear.Details
remove stucco repair with roof membrane. replace windows in kind, add rail at roof deck, remove skylight & replace windows with patio doors. new roof deck at rear. | $50,000 |
| Apr 25, 2008 | Expired or cancelled cancelled Oct 2009 | 2660 Broadway | add 2nd fl over (e) detached garage, new floor to accomodate art studio & storage.-Details
add 2nd fl over (e) detached garage, new floor to accomodate art studio & storage.- | $200,000 |