Wei Ming Construction
- Based in
- Daly City
- On San Francisco permits
- May 2006 to Oct 2022
- Last 24 months
- 0 permits filed
37 permits since 2000: 35 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 14, 2022 | Completed final sign-off Oct 2023 | 1639 Ulloa St | kitchen and bathroom remodel on 2/f. replace plaster sheet rock at 2nd flr.Details
kitchen and bathroom remodel on 2/f. replace plaster sheet rock at 2nd flr. | $18,000 |
| Sep 23, 2022 | Completed final sign-off Jun 2023 | 2018 18th Av | legalize the family room, one study room and a full bathroom on g/f. relocation of furance and water heater at garage.Details
legalize the family room, one study room and a full bathroom on g/f. relocation of furance and water heater at garage. | $40,000 |
| Jul 21, 2022 | Completed final sign-off May 2023 | 2031 41st Av | replace (2) existing windows at front of house. u factor = 0.30 maxDetails
replace (2) existing windows at front of house. u factor = 0.30 max | $6,000 |
| Jul 2, 2019 | Completed final sign-off Oct 2019 | 167 Graystone Tr | dryrot repair on deck and 2nd fl wall at back yard. less than 50%Details
dryrot repair on deck and 2nd fl wall at back yard. less than 50% | $7,000 |
| Jul 2, 2019 | Completed final sign-off Oct 2019 | 799 La Playa | apt 1: remodel kitchen & 2-1/2 bathrooms in-kind. replace all (e) fixtures.Details
apt 1: remodel kitchen & 2-1/2 bathrooms in-kind. replace all (e) fixtures. | $30,000 |
| Dec 21, 2017 | Completed final sign-off Jun 2019 | 1645 Ulloa St | revision to site permit #201606150054, omit 3rd story addition,changes to 1st & 2nd fl plan. new master bedroom with walk-in closet & bathroom, new storage, media room, windows, lightwell & foundation at 1st fl, kitchen renovation & new windows at 2nd flDetails
revision to site permit #201606150054, omit 3rd story addition,changes to 1st & 2nd fl plan. new master bedroom with walk-in closet & bathroom, new storage, media room, windows, lightwell & foundation at 1st fl, kitchen renovation & new windows at 2nd fl | |
| Aug 28, 2017 | Never finaled issued Sep 2017, no final | 60 Allston Wy | revision to 2013-0226-0957 structural revisions to plansDetails
revision to 2013-0226-0957 structural revisions to plans | |
| Jun 15, 2016 | Completed final sign-off Jun 2019 | 1645 Ulloa St | 3rd story addition w/ roof decks. (n) laundry room & foundaiton @ 1st fl. kitchen renovation @ 2nd fl. replace (e) rear windows. seismic upgrade.Details
3rd story addition w/ roof decks. (n) laundry room & foundaiton @ 1st fl. kitchen renovation @ 2nd fl. replace (e) rear windows. seismic upgrade. | $211,613 |
| Dec 1, 2015 | Completed final sign-off Jun 2016 | 275 Concord St | to comply with complaint 201544131 - add one bedroom on 1st floor; (n) full bath on 1st floor; turn (e) storage into entertainment room on 1st floor; remove illegal deck & staircase on 2nd floor per planDetails
to comply with complaint 201544131 - add one bedroom on 1st floor; (n) full bath on 1st floor; turn (e) storage into entertainment room on 1st floor; remove illegal deck & staircase on 2nd floor per plan | $40,000 |
| Dec 23, 2014 | Completed final sign-off Sep 2015 | 135 Miramar Av | legalize new unit at final plan. 2 bedrooms, 1 bath, 1 storage and kitchen. add 1 furnace.Details
legalize new unit at final plan. 2 bedrooms, 1 bath, 1 storage and kitchen. add 1 furnace. | $6,000 |
| Dec 5, 2014 | Completed final sign-off Feb 2015 | 1452 Waller St | unit #2: remodel bathroom 7x5Details
unit #2: remodel bathroom 7x5 | $12,222 |
| Oct 15, 2013 | Completed final sign-off Nov 2014 | 753 35th Av | kitchen remodel and new opening between kitchen and dining room. legalize gr fl bathDetails
kitchen remodel and new opening between kitchen and dining room. legalize gr fl bath | $9,000 |
| Apr 17, 2013 | Completed final sign-off Jul 2013 | 25 Mizpah St | add an interior stair to connect 1st and 2nd floor per plan. add one bath tub on 1st fl per plan. add raised floor on 1st floor.Details
add an interior stair to connect 1st and 2nd floor per plan. add one bath tub on 1st fl per plan. add raised floor on 1st floor. | $6,000 |
| Apr 11, 2013 | Completed final sign-off Jul 2013 | 340 Quintara St | replace plywood siding to hardship plank siding at front of the house repair dry rot.Details
replace plywood siding to hardship plank siding at front of the house repair dry rot. | $15,000 |
| Feb 26, 2013 | Completed final sign-off Apr 2018 | 60 Allston Wy | remodel existing wood framed stucco finished single family residt. provide new concrete foundation, raise existing wood framed bldg approx 3' excavate crawl space to provide conditioned habital space, add exterior windows and doors, rear exterior stair, reconfigure front entry stair &Details
remodel existing wood framed stucco finished single family residt. provide new concrete foundation, raise existing wood framed bldg approx 3' excavate crawl space to provide conditioned habital space, add exterior windows and doors, rear exterior stair, reconfigure front entry stair & | $300,000 |
| Feb 1, 2012 | Completed final sign-off Mar 2012 | 282 Guerrero St | rebuilt rear damage stairway in kind. same location and same configuration. to comply with his. nov. 201280136.Details
rebuilt rear damage stairway in kind. same location and same configuration. to comply with his. nov. 201280136. | $6,000 |
| Jan 18, 2012 | Completed final sign-off Mar 2012 | 723 41st Av | remodel kitchen. lighting comply with cec150(k)8Details
remodel kitchen. lighting comply with cec150(k)8 | $9,000 |
| Jan 17, 2012 | Completed final sign-off Jan 2013 | 437 Liberty St | remove dirt at unexcavated area at rear of garage to create a new home office with a wet bar & powder room (half bath). replace existing concrete slab, level garage floor & add conc. footing at one existing post. replace existing conc. driveway ramp with new.Details
remove dirt at unexcavated area at rear of garage to create a new home office with a wet bar & powder room (half bath). replace existing concrete slab, level garage floor & add conc. footing at one existing post. replace existing conc. driveway ramp with new. | $40,000 |
| Oct 13, 2011 | Completed final sign-off Dec 2011 | 1322 42nd Av | repair dry rot at front stairway about 150 sq.ft. less than 40%Details
repair dry rot at front stairway about 150 sq.ft. less than 40% | $4,000 |
| Sep 21, 2011 | Completed final sign-off Dec 2011 | 2583 32nd Av | kitchen remodel, counter top, flooring. no change on walls and openings.Details
kitchen remodel, counter top, flooring. no change on walls and openings. | $7,200 |
| Sep 8, 2011 | Completed final sign-off Jun 2012 | 2463 15th Av | rebuild the rear deck on second floor. adding a new rear deck on first froor.Details
rebuild the rear deck on second floor. adding a new rear deck on first froor. | $7,500 |
| Jun 1, 2011 | Completed final sign-off Sep 2011 | 824 Teresita Bl | revision to pa# 2011-0321-2455-replace a beam & 2 new postsDetails
revision to pa# 2011-0321-2455-replace a beam & 2 new posts | $3,000 |
| Mar 21, 2011 | Completed final sign-off Sep 2011 | 824 Teresita Bl | 1)add 2 bedrooms, one full bath, one utility room and storage/hall area on 1st floor. 2)relocate of interior stairway.Details
1)add 2 bedrooms, one full bath, one utility room and storage/hall area on 1st floor. 2)relocate of interior stairway. | $50,000 |
| Feb 1, 2011 | Completed final sign-off Jun 2011 | 7 Wawona St | remodel kitchen at main floorDetails
remodel kitchen at main floor | $9,000 |
| Jul 9, 2010 | Completed final sign-off Sep 2010 | 1954 18th Av | repair dry rot and restucco about 400 sqft at front of houseDetails
repair dry rot and restucco about 400 sqft at front of house | $9,000 |
| Apr 19, 2010 | Completed final sign-off Mar 2011 | 2242 Cabrillo St | 1st fl: add 1 bedrm, full bath rm, fam. rm and a storage rm. rewmove rear stairway. 3rd fl: add a full bath and remodel (e) bathrm. add 2 skylights and replace all (e) windows. replace rear room foundationDetails
1st fl: add 1 bedrm, full bath rm, fam. rm and a storage rm. rewmove rear stairway. 3rd fl: add a full bath and remodel (e) bathrm. add 2 skylights and replace all (e) windows. replace rear room foundation | $60,000 |
| Mar 9, 2010 | Completed final sign-off May 2010 | 1569 Clay St | main bathroom remodel on second floor. provide h.e. light or "manual on" o.s.Details
main bathroom remodel on second floor. provide h.e. light or "manual on" o.s. | $8,000 |
| Apr 27, 2009 | Completed final sign-off Jul 2009 | 2471 45th Av | at ground fl: add two bedrooms, rrelocated bathroom and living room, relocated wash/dryer.Details
at ground fl: add two bedrooms, rrelocated bathroom and living room, relocated wash/dryer. | $25,000 |
| Apr 13, 2009 | Completed final sign-off Jun 2009 | 315 Brazil Av | work on unit#315 brazil ave only. to comply w/nov#200997360. item #5. remove (e) wall heat unit in living room and replace /(n) furnace in water heater room on 1st fl. maintain 1 hr fire separation between units.Details
work on unit#315 brazil ave only. to comply w/nov#200997360. item #5. remove (e) wall heat unit in living room and replace /(n) furnace in water heater room on 1st fl. maintain 1 hr fire separation between units. | $5,000 |
| Jan 21, 2009 | Completed final sign-off Jan 2009 | 121 22nd Av | renew pa# 2008/04/02/8592 to obtain final inspection.Details
renew pa# 2008/04/02/8592 to obtain final inspection. | |
| Jan 2, 2009 | Completed final sign-off Dec 2009 | 774 18th Av | build an office & family room in basement w/ half bath, laundry area, extend the deck at the rear of house on ground floor.Details
build an office & family room in basement w/ half bath, laundry area, extend the deck at the rear of house on ground floor. | $20,000 |
| Apr 2, 2008 | Expired or cancelled expired Jan 2009 | 121 22nd Av | construct new full bathroom at basement level. install 3 plywood shear wallsDetails
construct new full bathroom at basement level. install 3 plywood shear walls | $8,700 |
| Dec 20, 2007 | Completed final sign-off Jul 2008 | 631 Congo St | comply nov #200720102. re-sheet rock @ all interior ceilings & walls. also, convert (e) laundry space into stydy & full bath. new deck at rear, remodel second floor kitchen & bath. convert (e) living to bedroom, bedroom to living room. add 2 (2'x5') windows at front elevation.Details
comply nov #200720102. re-sheet rock @ all interior ceilings & walls. also, convert (e) laundry space into stydy & full bath. new deck at rear, remodel second floor kitchen & bath. convert (e) living to bedroom, bedroom to living room. add 2 (2'x5') windows at front elevation. | $80,000 |
| Nov 6, 2007 | Completed final sign-off Jun 2008 | 733 35th Av | revision to appl #200605192053: remolition clarification at the ground & at the second floor, miscellaneous modifications & clarifications of plan sheets a-2.1, a-2.2,a-2.3,a-2.4. new skylight at roof on third floor, foundation modification at grid lines.Details
revision to appl #200605192053: remolition clarification at the ground & at the second floor, miscellaneous modifications & clarifications of plan sheets a-2.1, a-2.2,a-2.3,a-2.4. new skylight at roof on third floor, foundation modification at grid lines. | $500 |
| Aug 22, 2007 | Completed final sign-off Dec 2007 | 2662 22nd Av | repair front stair and replace all stucco at front of house (about 300 sq. ft). no structural work under this permit. stucco replacement in kind.Details
repair front stair and replace all stucco at front of house (about 300 sq. ft). no structural work under this permit. stucco replacement in kind. | $15,000 |
| Jun 28, 2007 | Completed final sign-off Aug 2007 | 1507 31st Av | repair some dryrot at the side of front stair about 40 sqft. no termite report submitted approximatly 40 sqft.Details
repair some dryrot at the side of front stair about 40 sqft. no termite report submitted approximatly 40 sqft. | $4,000 |
| May 19, 2006 | Completed final sign-off Jun 2008 | 733 35th Av | horizontal addition and interior remodelingDetails
horizontal addition and interior remodeling | $80,000 |