- Mar 2006 to Apr 2022
47 permits since 2000 (architect on 45 permits, attorney on 1 permit, designer on 1 permit): 35 completed, 7 never finaled, 5 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 18, 2022 | Never finaled issued Jun 2022, no final | 1192 Market St | Build Group Inc. | renovation of bar #1: demo of non-bearing partitions, doors, ceiling, lighting, millwork & finishes. upgrade (e) utilities. new partitions, doors, finishes, ceilings, lighting. new bar, & shelving. mep deferred.Details
renovation of bar #1: demo of non-bearing partitions, doors, ceiling, lighting, millwork & finishes. upgrade (e) utilities. new partitions, doors, finishes, ceilings, lighting. new bar, & shelving. mep deferred. | $273,420 |
| Apr 18, 2022 | Never finaled issued Jun 2022, no final | 1192 Market St | Build Group Inc. | renovation of (n) bar #2: demo of non-bearing partitions, doors, ceiling, lighting, millwork & finish materials. upgrade utilities. install (n) walls & doors, finished ceilings and lighting. (n) bar.Details
renovation of (n) bar #2: demo of non-bearing partitions, doors, ceiling, lighting, millwork & finish materials. upgrade utilities. install (n) walls & doors, finished ceilings and lighting. (n) bar. | $214,578 |
| Nov 2, 2021 | Completed final sign-off Mar 2022 | 2500 16th St | Hathaway Dinwiddie Construct Co | interior t.i. convert two healthy cat wards to a (n) surgical suite, convert two isolation cat wards to a dentistry and scrub in areaDetails
interior t.i. convert two healthy cat wards to a (n) surgical suite, convert two isolation cat wards to a dentistry and scrub in area | $950,000 |
| Aug 11, 2020 | Completed final sign-off Mar 2021 | 160 South Van Ness Av | Build Group Inc. | demolition of interior partitions and finishes, ceiling and lighting, restroom fixtures, mechanical equipment, and floor finishes. t.i. includes addition of new walls, new restrooms, and new finishes. mep & lifesafty under a seperate permit.Details
demolition of interior partitions and finishes, ceiling and lighting, restroom fixtures, mechanical equipment, and floor finishes. t.i. includes addition of new walls, new restrooms, and new finishes. mep & lifesafty under a seperate permit. | $145,000 |
| Jun 20, 2018 | Expired or cancelled cancelled Jan 2026 | 1 Union St | barrier removal to upgrade existing level 2 restroom to be ada compliantDetails
barrier removal to upgrade existing level 2 restroom to be ada compliant | $18,000 | |
| Oct 11, 2017 | Never finaled issued Jun 2018, no final | 1 Union St | D Squared Construction | modifications to existing non historic "barn door" window alcoves which were added in 1992.Details
modifications to existing non historic "barn door" window alcoves which were added in 1992. | $97,000 |
| Feb 24, 2017 | Completed final sign-off Jun 2017 | 2500 16th St | Plant Construction Co, Lp | 1/f restroom- revision to 201408184035 and permit revision 201612205422 tenant improvement. revised scope includes modifications to 1st fl restroomDetails
1/f restroom- revision to 201408184035 and permit revision 201612205422 tenant improvement. revised scope includes modifications to 1st fl restroom | $50,000 |
| Dec 20, 2016 | Completed final sign-off Oct 2017 | 2500 16th St | Plant Construction Co, Lp | rev to #201408184035, t.i. of 1/f & 2/f (6,453 sf). revision scope includes modification of spray on acoustic tile at ceiling & added window scope; structural work for shaft floor opening, canopy; window widening. maher n/aDetails
rev to #201408184035, t.i. of 1/f & 2/f (6,453 sf). revision scope includes modification of spray on acoustic tile at ceiling & added window scope; structural work for shaft floor opening, canopy; window widening. maher n/a | $30,000 |
| Jul 29, 2016 | Completed final sign-off Jun 2017 | 450 Sansome St | Peacock Construction | 9th floor: remodel (e) suite for ti - includes the demo of (e) walls, construction of new walls, lighting upgrades and upgrades to finishes maher naDetails
9th floor: remodel (e) suite for ti - includes the demo of (e) walls, construction of new walls, lighting upgrades and upgrades to finishes maher na | $375,000 |
| Jan 20, 2015 | Completed final sign-off Mar 2015 | 450 Sansome St | Peacock Construction | 16th floor: t.i. 700 s.f. of remodel in existing space included t-24. sprinkler, life safety, mechanical under separate permit. maher n/a.Details
16th floor: t.i. 700 s.f. of remodel in existing space included t-24. sprinkler, life safety, mechanical under separate permit. maher n/a. | $45,000 |
| Dec 17, 2014 | Completed final sign-off Jun 2015 | 1000 California St | Bcci Construction Company | revision to pa#201407141179 relocation of accessible sink in restroom. n/a ordinance #155-13Details
revision to pa#201407141179 relocation of accessible sink in restroom. n/a ordinance #155-13 | |
| Aug 18, 2014 | Completed final sign-off Oct 2017 | 2500 16th St | Plant Construction Co, Lp | t.i.- of 1st and 2nd story of portion of building, 6,453 s.f. scope includes new partitions, exterior scope of work includes new windows/doors where missing; separate permit for structural; maher n/aDetails
t.i.- of 1st and 2nd story of portion of building, 6,453 s.f. scope includes new partitions, exterior scope of work includes new windows/doors where missing; separate permit for structural; maher n/a | $500,000 |
| Jul 15, 2014 | Completed final sign-off Jan 2015 | 2500 16th St | Plant Construction Company Lp | scope of work limited to demo of non-structural interior wall partitions, windows, doors. n/a ordinance #155-13Details
scope of work limited to demo of non-structural interior wall partitions, windows, doors. n/a ordinance #155-13 | $20,000 |
| Jul 14, 2014 | Completed final sign-off Jun 2015 | 1000 California St | Bcci Construction Company | revision to approved permit #2013-1213-4187. to reduce the scope in order to leave some existing structural walls in place. n/a maher ordinanceDetails
revision to approved permit #2013-1213-4187. to reduce the scope in order to leave some existing structural walls in place. n/a maher ordinance | |
| Jun 25, 2014 | Completed final sign-off Sep 2014 | 450 Sansome St | Peacock Construction Inc | demo selected non structural partitions, construct new non structural partitions, new millwork. sprinkler, lifesafety, mep under separate permit maher n/aDetails
demo selected non structural partitions, construct new non structural partitions, new millwork. sprinkler, lifesafety, mep under separate permit maher n/a | $168,000 |
| Jun 16, 2014 | Completed final sign-off Sep 2014 | 450 Sansome St | Peacock Construction Inc | demo of selected non-structural partitions, millwork, ceiling tile. new compliant millwork, ceiling tile, lights and carpet. mep, fire sprinkler and life safety - under separate permit. n/a ordinance #155-13.Details
demo of selected non-structural partitions, millwork, ceiling tile. new compliant millwork, ceiling tile, lights and carpet. mep, fire sprinkler and life safety - under separate permit. n/a ordinance #155-13. | $173,000 |
| May 30, 2014 | Completed final sign-off Feb 2016 | 244 California St | Peacock Construction Inc | office tenant improvement: demo non-structural partitions, construct new non-structural partitons. relocate door and frame. replace sink and counter top. install new ceiling grid and tile. new lighting. mechanical & electrical, fire/life safety: under separate permit. n/a ordinance #155-13Details
office tenant improvement: demo non-structural partitions, construct new non-structural partitons. relocate door and frame. replace sink and counter top. install new ceiling grid and tile. new lighting. mechanical & electrical, fire/life safety: under separate permit. n/a ordinance #155-13 | $63,000 |
| Feb 11, 2014 | Completed final sign-off Jun 2017 | 450 Sansome St | Peacock Construction Inc | remodel of selected area of (e) ground floor lobby to perform cosmetic upgrades. complinace with ordinance no.155-13 not required. excavation <50 cu yd. fire/mec/elect/under separate permitDetails
remodel of selected area of (e) ground floor lobby to perform cosmetic upgrades. complinace with ordinance no.155-13 not required. excavation <50 cu yd. fire/mec/elect/under separate permit | $185,000 |
| Jan 27, 2014 | Completed final sign-off Feb 2015 | 201 Alabama St | Plant Construction Company Lp | work at unit# a only. m.e.p. associated with t.i. under pa# 2013/11/20/2436. all other work under separate permit. ** maher: compliance with ordinance no# 155-13 not required **Details
work at unit# a only. m.e.p. associated with t.i. under pa# 2013/11/20/2436. all other work under separate permit. ** maher: compliance with ordinance no# 155-13 not required ** | $75,000 |
| Dec 18, 2013 | Completed final sign-off Feb 2015 | 201 Alabama St | Plant Construction Company Lp | work @ unit# a only. front lobby to be updated with new cement plaster & a new storefront system to provide a transparent entry. new skylights to be added for optimal daylight. interior lobby new finishes. all other work under separate pa. compliance with ord 15-133 not required.Details
work @ unit# a only. front lobby to be updated with new cement plaster & a new storefront system to provide a transparent entry. new skylights to be added for optimal daylight. interior lobby new finishes. all other work under separate pa. compliance with ord 15-133 not required. | $92,250 |
| Nov 21, 2013 | Completed final sign-off Feb 2015 | 2500 16th St | Plant Construction Company Lp | t.i. for (e) spca middle bldg, work includes (n) partitoins, millwork, equipment, & (n) connection to adjacent bldg (pa#2013.1120.2436). no exterior work, mep & fire protection under separate permits. (demo permit #2013.0607.8983 under separate bldg)Details
t.i. for (e) spca middle bldg, work includes (n) partitoins, millwork, equipment, & (n) connection to adjacent bldg (pa#2013.1120.2436). no exterior work, mep & fire protection under separate permits. (demo permit #2013.0607.8983 under separate bldg) | $440,000 |
| Nov 20, 2013 | Completed final sign-off Feb 2015 | 201 Alabama St | t.i for (e) animal shelter "maddies" adiption center. work includes (n) wall + window partitions furniture + equipment. front lobby toget (n) cement plaster. no exterior work. compliance w/ ordinance no 155-13 no required.Details
t.i for (e) animal shelter "maddies" adiption center. work includes (n) wall + window partitions furniture + equipment. front lobby toget (n) cement plaster. no exterior work. compliance w/ ordinance no 155-13 no required. | $2,800,000 | |
| Nov 12, 2013 | Completed final sign-off Jun 2015 | 1000 California St | Bcci Construction Company | demo and structuraql work ab017. build out separate permitDetails
demo and structuraql work ab017. build out separate permit | $150,000 |
| Nov 5, 2013 | Completed final sign-off Feb 2014 | 450 Sansome St | Peacock Construction Inc | 13th floor tenant improvement for umqua bank offices including new partitions, new doors & finish upgrades. sprinkler and f/a under seperate permit.Details
13th floor tenant improvement for umqua bank offices including new partitions, new doors & finish upgrades. sprinkler and f/a under seperate permit. | $400,000 |
| Jun 7, 2013 | Completed final sign-off Jan 2015 | 2500 16th St | Plant Construction Company Lp | demolish 2-story, type 5, spca hospital & kennels building.Details
demolish 2-story, type 5, spca hospital & kennels building. | $30,000 |
| Apr 12, 2013 | Completed final sign-off Jun 2013 | 795 Folsom St | West Builders Inc. | revision to appl #2012.11.09.3979 - scope is to eliminate proposed truncated domes on sidewalk on original permit. domes are not allowed by dpw & should have been crossed off in orig permit. all work was outside bldg, no actual constructoin work.Details
revision to appl #2012.11.09.3979 - scope is to eliminate proposed truncated domes on sidewalk on original permit. domes are not allowed by dpw & should have been crossed off in orig permit. all work was outside bldg, no actual constructoin work. | |
| Jul 19, 2012 | Completed final sign-off Aug 2012 | 201 Alabama St | Plant Construction Company Lp | revision to appl #2011.1220.1064 - additional storage racks in existing warehouse.Details
revision to appl #2011.1220.1064 - additional storage racks in existing warehouse. | $5,000 |
| May 22, 2012 | Completed final sign-off Jul 2015 | 1000 California St | Plant Construction Company Lp | guest room #10 & #26- revisions to pa# 2012-0206-3584-revise configuration of guest rooms to be fully accessible, no changed to mep.Details
guest room #10 & #26- revisions to pa# 2012-0206-3584-revise configuration of guest rooms to be fully accessible, no changed to mep. | |
| Mar 9, 2012 | Completed final sign-off Jun 2012 | 99 Green St | West Builders Inc. | 2nd floor only: new partitions for office & new conference rooms, new breakroom & appliances, new flooring & wall finishes.Details
2nd floor only: new partitions for office & new conference rooms, new breakroom & appliances, new flooring & wall finishes. | $110,000 |
| Dec 20, 2011 | Completed final sign-off Aug 2012 | 201 Alabama St | Plant Construction Company Lp | installation of new storage racks in existing storage area.Details
installation of new storage racks in existing storage area. | $11,050 |
| Dec 5, 2011 | Expired or cancelled withdrawn Sep 2012 | 201 Alabama St | Plant Construction Company Lp | to document the seismic work previously completed under pa 200705010109, conforms w/ seismic requirt in the 2001 cbc w. sf amendments subject to review in current pa 201108182700. for record keeping purpose.Details
to document the seismic work previously completed under pa 200705010109, conforms w/ seismic requirt in the 2001 cbc w. sf amendments subject to review in current pa 201108182700. for record keeping purpose. | |
| Oct 21, 2011 | Completed final sign-off Jun 2012 | 1455 Irving St | Bluewater Environmentl Svc Inc | demolish one story storage bldg.Details
demolish one story storage bldg. | $7,120 |
| Oct 13, 2011 | Expired or cancelled cancelled Jul 2012 | 2324 Vallejo St | Paul Ryan Associates | remodel 2 kitchens (1 at each unit) & 4 bathrooms between both units, including misc. removal/replacement of interior floor finishes.Details
remodel 2 kitchens (1 at each unit) & 4 bathrooms between both units, including misc. removal/replacement of interior floor finishes. | $5,000 |
| Aug 18, 2011 | Completed final sign-off Aug 2012 | 201 Alabama St | phase 2 - tenant improvement of approx 18,964 sf of adminstrative space for animal service facility. this includes a new 7,889 sf 3rd floor.adding a communicating door on grid line 1. seismic upgrade is triggered due to increase in occupant load.Details
phase 2 - tenant improvement of approx 18,964 sf of adminstrative space for animal service facility. this includes a new 7,889 sf 3rd floor.adding a communicating door on grid line 1. seismic upgrade is triggered due to increase in occupant load. | $1,695,000 | |
| Aug 18, 2011 | Completed final sign-off Sep 2012 | 201 Alabama St | Plant Construction Company Lp | phase 1 - tenant improvement of approx 15,045 sf of 1st floor storage, office and laundry space, including a new structural mechanical platform on the roof.Details
phase 1 - tenant improvement of approx 15,045 sf of 1st floor storage, office and laundry space, including a new structural mechanical platform on the roof. | $32,500 |
| Aug 18, 2011 | Completed final sign-off Aug 2012 | 201 Alabama St | Plant Construction Company Lp | phase 3 - tenant improvement of approx 693 sf of animal shelter space which including a lift, stair, and a connection to (existing) sf/spca space next door.Details
phase 3 - tenant improvement of approx 693 sf of animal shelter space which including a lift, stair, and a connection to (existing) sf/spca space next door. | $28,000 |
| Jul 26, 2011 | Completed final sign-off Sep 2011 | 99 Green St | West Builders Inc. | ground floor lobby new partition & entry door, new ada barrier, upgrade bathroom to full accessibility.Details
ground floor lobby new partition & entry door, new ada barrier, upgrade bathroom to full accessibility. | $10,000 |
| Jul 25, 2011 | Expired or cancelled cancelled Jul 2018 | 99 Green St | replace extg damaged front entry storefront doors.Details
replace extg damaged front entry storefront doors. | $5,000 | |
| Jun 6, 2011 | Completed final sign-off Feb 2013 | 1322 16th Av | Meylan Construction | owner is performing a lot line adjustment, scope of this permit is to perform the agreed upon adjustments per item #4 of the pre=application meeting notes dated 11-6-09. install sprinkler system, replace and infill property line openingsDetails
owner is performing a lot line adjustment, scope of this permit is to perform the agreed upon adjustments per item #4 of the pre=application meeting notes dated 11-6-09. install sprinkler system, replace and infill property line openings | $5,500 |
| Jun 6, 2011 | Completed final sign-off Feb 2013 | 1314 16th Av | Meylan Construction | owner is performing a lot line adjustment, scope of this permit is to perform the agreed upon adjustments per item #4 of the pre=application meeting notes dated 11-6-09. install sprinkler system, replace and infill property line openingsDetails
owner is performing a lot line adjustment, scope of this permit is to perform the agreed upon adjustments per item #4 of the pre=application meeting notes dated 11-6-09. install sprinkler system, replace and infill property line openings | $5,500 |
| May 16, 2011 | Never finaled issued May 2011, no final | 244 California St | Meylan Construction | 6th floor suite 600 - one new interior wall to subdivide existing room into 2 private offices. replace existing interior office doors. lighting under seperate permit.Details
6th floor suite 600 - one new interior wall to subdivide existing room into 2 private offices. replace existing interior office doors. lighting under seperate permit. | $9,800 |
| Feb 16, 2011 | Never finaled issued Apr 2011, no final | 244 California St | Meylan Construction | revision to pa# 2011.02.09.9877 to rotate conference room iin suite 204Details
revision to pa# 2011.02.09.9877 to rotate conference room iin suite 204 | |
| Feb 9, 2011 | Never finaled issued Feb 2011, no final | 244 California St | Meylan Construction | scope of work includes 1 new conference room in suite 204. room is approx 150 sf. also includes new light fixture and repainting exiting ceilingDetails
scope of work includes 1 new conference room in suite 204. room is approx 150 sf. also includes new light fixture and repainting exiting ceiling | $9,500 |
| Sep 8, 2010 | Completed final sign-off May 2014 | 2324 Vallejo St | remodel existing single family residence & basement rental unit including rear addition. change in number of stories is per current building & planning codes & guidelines. the height of the building is not increasing.Details
remodel existing single family residence & basement rental unit including rear addition. change in number of stories is per current building & planning codes & guidelines. the height of the building is not increasing. | $500,000 | |
| Dec 3, 2008 | Expired or cancelled expired Jun 2010 | 624 Taylor St | mechanical work only, raise existing flue & reinstall fan. new flue location will be a min. of 10' above the rooflineDetails
mechanical work only, raise existing flue & reinstall fan. new flue location will be a min. of 10' above the roofline | $7,500 | |
| Sep 2, 2008 | Completed final sign-off Sep 2008 | 2001 37th Av | revision to pa# 2008-0319-7499-for kitchen equipment replacement: relocate exit signs to clarify exit path.Details
revision to pa# 2008-0319-7499-for kitchen equipment replacement: relocate exit signs to clarify exit path. | $100 | |
| Mar 8, 2006 | Never finaled issued Jun 2006, no final | 624 Taylor St | remodel existing 2nd floor kitchen aneew finishers, equipment, select plumbing & mechinacal. relocate chefs office & employee dining area remodel (e) toilet oroms. replace (e) cartoon room ceiling with acoustle poaster & pattened border.Details
remodel existing 2nd floor kitchen aneew finishers, equipment, select plumbing & mechinacal. relocate chefs office & employee dining area remodel (e) toilet oroms. replace (e) cartoon room ceiling with acoustle poaster & pattened border. | $1,543,650 |