James Goring
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Goring & Straia Arch
- Based in
- Berkeley
- On San Francisco permits
- Oct 2000 to Oct 2022
17 permits since 2000 (architect on 13 permits, engineer on 3 permits, authorized agent-others on 1 permit): 16 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 4, 2022 | Completed final sign-off May 2023 | 1 Sansome St | Peacock Construction | electrical work for tenant improvement on 17th fl. new lighting, branch circuiting to e panel. new power and signal. ref 202207128237.Details
electrical work for tenant improvement on 17th fl. new lighting, branch circuiting to e panel. new power and signal. ref 202207128237. | $60,000 |
| Aug 8, 2022 | Completed final sign-off Nov 2022 | 101 California St | Source Planning And Construction Inc | suite 3240: title 24 electrical compliance. ref t.i. pa202111031723.Details
suite 3240: title 24 electrical compliance. ref t.i. pa202111031723. | $35,000 |
| Aug 8, 2022 | Completed final sign-off Dec 2022 | 101 California St | Source Planning And Construction Inc | suite 2710: title 24 electrical compliance. ref t.i. pa202109218877.Details
suite 2710: title 24 electrical compliance. ref t.i. pa202109218877. | $35,000 |
| Jan 12, 2021 | Completed final sign-off Jul 2022 | 30 Hotaling Pl | Paradigm General Contractors | t.i. 1st floor lobby, 2nd and 3rd flr tenant improvement. walls, finishes. no mech/ plumbing. electrical dederred.Details
t.i. 1st floor lobby, 2nd and 3rd flr tenant improvement. walls, finishes. no mech/ plumbing. electrical dederred. | $120,000 |
| Dec 8, 2020 | Completed final sign-off May 2021 | 30 Hotaling Pl | Paradigm General Contractors | soft demo of existing finishes, non-structural partitions. 2nd, 3rd floor. ab-017 - soft demo only.Details
soft demo of existing finishes, non-structural partitions. 2nd, 3rd floor. ab-017 - soft demo only. | $2,000 |
| Feb 11, 2020 | Completed final sign-off Apr 2021 | 55 Stockton St | Michilli Inc | "nespresso" interior ti for retail on g/f space of (e) bldg, install new cladding over (e) storefront framing, reconfigure interior partitions, new hvac systems, lighting, plumbing & interior finishes, new (1) restroom & break area in storage area in basement.Details
"nespresso" interior ti for retail on g/f space of (e) bldg, install new cladding over (e) storefront framing, reconfigure interior partitions, new hvac systems, lighting, plumbing & interior finishes, new (1) restroom & break area in storage area in basement. | $800,000 |
| Feb 11, 2020 | Completed final sign-off Nov 2021 | 55 Stockton St | Sign Of Light | install 1 non-illuminated decal/window signage "nesspresso"Details
install 1 non-illuminated decal/window signage "nesspresso" | $2,000 |
| Feb 11, 2020 | Completed final sign-off Nov 2021 | 55 Stockton St | Sign Of Light | install 1 illuminated double-faced projecting blade sign "nesspresso"Details
install 1 illuminated double-faced projecting blade sign "nesspresso" | $2,000 |
| Dec 30, 2014 | Completed final sign-off Apr 2015 | 401 Taraval St | Mc Nely Construction Company | revision to appl #201109225285 & 201303061654: delete sink & cabinetry from scope of work.Details
revision to appl #201109225285 & 201303061654: delete sink & cabinetry from scope of work. | |
| Nov 22, 2013 | Completed final sign-off Apr 2015 | 401 Taraval St | Mc Nely Construction Company | revision to appl #2011.0922.5285 & 2013.03.06.1654 - relocating gas meter from exit enclosure to the front of building within a 1-hour enclosureDetails
revision to appl #2011.0922.5285 & 2013.03.06.1654 - relocating gas meter from exit enclosure to the front of building within a 1-hour enclosure | $5,000 |
| Jun 5, 2013 | Completed final sign-off Jul 2014 | 401 Taraval St | Aegis Enterprises Inc | add and relocated ssu in (e0 sprinklered basement and install new fire sprinkler systems at (e) 2nd & 3rd fl. to accomodate t.i changes. 155 ssu, 123 ssp, 7 hsw. ti pa #201109225285Details
add and relocated ssu in (e0 sprinklered basement and install new fire sprinkler systems at (e) 2nd & 3rd fl. to accomodate t.i changes. 155 ssu, 123 ssp, 7 hsw. ti pa #201109225285 | $50,000 |
| Mar 6, 2013 | Completed final sign-off Apr 2015 | 401 Taraval St | Mc Nely Construction Company | revision to 201109225285: construct cupola with clerestory windows at roof indicated on conditional use permit.Details
revision to 201109225285: construct cupola with clerestory windows at roof indicated on conditional use permit. | $200,000 |
| Sep 13, 2012 | Completed final sign-off Jun 2013 | 90 Grant Av | Build Group Inc. | erect an electric single faced projecting sign.Details
erect an electric single faced projecting sign. | $50,000 |
| Apr 24, 2012 | Completed final sign-off Jun 2013 | 90 Grant Av | Build Group Inc. | new exterior storefront. demolition of (e) stairs connecting the basement, ground floor & 2nd floor. replace windows. new new windows.Details
new exterior storefront. demolition of (e) stairs connecting the basement, ground floor & 2nd floor. replace windows. new new windows. | $450,000 |
| Apr 16, 2012 | Completed final sign-off Sep 2012 | 90 Grant Av | Truebeck Construction | interior non structural ti to existing space on the 2nd fl. includes lighting., fire alarm , fire sprinklers, mechanical under sep permitDetails
interior non structural ti to existing space on the 2nd fl. includes lighting., fire alarm , fire sprinklers, mechanical under sep permit | $180,000 |
| Sep 22, 2011 | Completed final sign-off Apr 2015 | 401 Taraval St | Mc Nely Construction Company | convert b occ. bldg to a-3 occ. seismic retrofit, structural reinforcement of occupied fl, modify main entrance to create accessible lobby & elevator, replace hvac system review title 24, replace elevator to comply w/ada standards, reconfigure interior partition layout to adopt to proposed use.Details
convert b occ. bldg to a-3 occ. seismic retrofit, structural reinforcement of occupied fl, modify main entrance to create accessible lobby & elevator, replace hvac system review title 24, replace elevator to comply w/ada standards, reconfigure interior partition layout to adopt to proposed use. | $1,700,000 |
| Oct 26, 2000 | Expired or cancelled cancelled Jan 2002 | 100 Girard St | demolish a two story single family dwellingDetails
demolish a two story single family dwelling |