James Fagler
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Gelfand Partners Architects
- Based in
- San Francisco
- On San Francisco permits
- May 2001 to Jul 2020
145 permits since 2000 (architect on 115 permits, authorized agent-others on 26 permits, engineer on 3 permits, designer on 1 permit): 114 completed, 17 never finaled, 14 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 145.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 22, 2020 | Expired or cancelled withdrawn Oct 2020 | 187 Tioga Av | revision to app#200412131315 and 201911046300. add one bathroom on basement, ground floor and 2nd floor. no structural alteration.Details
revision to app#200412131315 and 201911046300. add one bathroom on basement, ground floor and 2nd floor. no structural alteration. | $6,000 | |
| Jul 22, 2020 | Expired or cancelled withdrawn Oct 2020 | 189 Tioga Av | revision to app#200412131313 and 201911046303. add one bathroom on basement, ground floor and 2nd floor. no structural alteration.Details
revision to app#200412131313 and 201911046303. add one bathroom on basement, ground floor and 2nd floor. no structural alteration. | $6,000 | |
| Nov 4, 2019 | Completed final sign-off Jan 2021 | 189 Tioga Av | revision to pa #200412131313 & 201907085353. reconfigure the stairway. relocate the bathroom & add bedroom on basement level. convert storage to study on ground level.Details
revision to pa #200412131313 & 201907085353. reconfigure the stairway. relocate the bathroom & add bedroom on basement level. convert storage to study on ground level. | ||
| Nov 4, 2019 | Completed final sign-off Jan 2021 | 187 Tioga Av | revision to pa #200412131315 & 201907085352. reconfigure the stairway. relocate the bathroom & add bedroom on basement level. convert storage to study on ground level.Details
revision to pa #200412131315 & 201907085352. reconfigure the stairway. relocate the bathroom & add bedroom on basement level. convert storage to study on ground level. | ||
| Sep 3, 2019 | Completed final sign-off Mar 2020 | 1340 Golden Gate Av | Amone Corp | revision to pa# 201804176578: staff accessible bathroom moved to 2nd floor because it will require lee work than chnaging thr prevousluy approved permit bathroom location; which at the lovation of the elevator eqpt room. the door newar entry stairs moved to comply with ada handrail ext. reqt.Details
revision to pa# 201804176578: staff accessible bathroom moved to 2nd floor because it will require lee work than chnaging thr prevousluy approved permit bathroom location; which at the lovation of the elevator eqpt room. the door newar entry stairs moved to comply with ada handrail ext. reqt. | |
| Jul 22, 2019 | Completed final sign-off Aug 2019 | 838 Pacific Av | Cahill Contractors Inc | revised extg parking to provide complying ada paving space. add loading zone, delete 2 parking space. revision to app#201510190132. n/a for maherDetails
revised extg parking to provide complying ada paving space. add loading zone, delete 2 parking space. revision to app#201510190132. n/a for maher | |
| Dec 12, 2018 | Completed final sign-off Mar 2019 | 711 Pacific Av | Cahill Contractors Inc | change of use from temporary occupancy approved permit pa 2018-0402-5282 education to original approved assembly occupancy per 2015-1020-0191 install kitchen and bathroom doors, toilet partitions and apliances at community centerDetails
change of use from temporary occupancy approved permit pa 2018-0402-5282 education to original approved assembly occupancy per 2015-1020-0191 install kitchen and bathroom doors, toilet partitions and apliances at community center | |
| Sep 24, 2018 | Completed final sign-off Aug 2019 | 524 Alemany Bl | D.F.P.F Corp Dba Fine Line Construction | revision to pa 201602189892 mohrad. building 17, clarify full cope of accessibility by mayor's office of disability enforcement of 2010 ada standards and cal build codeDetails
revision to pa 201602189892 mohrad. building 17, clarify full cope of accessibility by mayor's office of disability enforcement of 2010 ada standards and cal build code | |
| Sep 24, 2018 | Completed final sign-off Jul 2019 | 945 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | bldg 12 moh rad priority mod permit per 2016-0218-9878 revision to approver permit 2016-0218-9878 to clarify full scope of accessibility by the mayor's office of disability in the enforcement of the 2010 ada standards and the ca bldg codeDetails
bldg 12 moh rad priority mod permit per 2016-0218-9878 revision to approver permit 2016-0218-9878 to clarify full scope of accessibility by the mayor's office of disability in the enforcement of the 2010 ada standards and the ca bldg code | |
| Sep 24, 2018 | Completed final sign-off Aug 2019 | 548 Alemany Bl | D.F.P.F Corp Dba Fine Line Construction | bldg 14 - moh rad priority mod permit per 2016-0218-9879 revision to approver permit 2016-0218-9879 to clarify full scope of accessibility by the mayor's office of disability in the enforcement of the 2010 ada standards and the ca bldg codeDetails
bldg 14 - moh rad priority mod permit per 2016-0218-9879 revision to approver permit 2016-0218-9879 to clarify full scope of accessibility by the mayor's office of disability in the enforcement of the 2010 ada standards and the ca bldg code | |
| Sep 24, 2018 | Never finaled issued Oct 2018, no final | 512 Alemany Bl | D.F.P.F Corp Dba Fine Line Construction | revision to pa 201602189894 mohrad. building 20, clarify full cope of accessibility by mayor's office of disability enforcement of 2010 ada standards and cal build codeDetails
revision to pa 201602189894 mohrad. building 20, clarify full cope of accessibility by mayor's office of disability enforcement of 2010 ada standards and cal build code | |
| Sep 24, 2018 | Completed final sign-off Aug 2019 | 901 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | revision to pa 201602189893 mohrad. building 19, clarify full cope of accessibility by mayor's office of disability enforcement of 2010 ada standards and cal build codeDetails
revision to pa 201602189893 mohrad. building 19, clarify full cope of accessibility by mayor's office of disability enforcement of 2010 ada standards and cal build code | |
| Sep 24, 2018 | Completed final sign-off Jul 2019 | 957 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | revision to pa 201602189871 mohrad. building 11, clarify full cope of accessibility by mayor's office of disability enforcement of 2010 ada standards and cal build codeDetails
revision to pa 201602189871 mohrad. building 11, clarify full cope of accessibility by mayor's office of disability enforcement of 2010 ada standards and cal build code | |
| Sep 24, 2018 | Completed final sign-off Jul 2019 | 925 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | bldg 15 - moh rad priority mod permit per 2016-0218-9890 revision to approver permit 2016-0218-9890 to clarify full scope of accessibility by the mayor's office of disability in the enforcement of the 2010 ada standards and the ca bldg codeDetails
bldg 15 - moh rad priority mod permit per 2016-0218-9890 revision to approver permit 2016-0218-9890 to clarify full scope of accessibility by the mayor's office of disability in the enforcement of the 2010 ada standards and the ca bldg code | |
| Sep 24, 2018 | Completed final sign-off Aug 2019 | 817 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | moh rad priority-mod permit per permit 201602189880 rev to approved permit 2011602189880 to clarify full scope of accessibility by the mayors office of disability in the enforcement to the 2010 ada standards and the cbcDetails
moh rad priority-mod permit per permit 201602189880 rev to approved permit 2011602189880 to clarify full scope of accessibility by the mayors office of disability in the enforcement to the 2010 ada standards and the cbc | |
| Sep 24, 2018 | Completed final sign-off Aug 2019 | 536 Alemany Bl | D.F.P.F Corp Dba Fine Line Construction | bldg 16 - moh rad priority mod permit per 2016-0218-9891 revision to approver permit 2016-0218-9891 to clarify full scope of accessibility by the mayor's office of disability in the enforcement of the 2010 ada standards and the ca bldg codeDetails
bldg 16 - moh rad priority mod permit per 2016-0218-9891 revision to approver permit 2016-0218-9891 to clarify full scope of accessibility by the mayor's office of disability in the enforcement of the 2010 ada standards and the ca bldg code | |
| Aug 22, 2018 | Completed final sign-off Mar 2019 | 711 Pacific Av | Cahill Contractors Llc. | revision to app#201510200191 to revise previously approved plan layout at type c.2, 2 bedroom unit and type b.5, 2 bedroom unit, replacement units only.Details
revision to app#201510200191 to revise previously approved plan layout at type c.2, 2 bedroom unit and type b.5, 2 bedroom unit, replacement units only. | $5,000 |
| Aug 22, 2018 | Completed final sign-off Jul 2019 | 838 Pacific Av | Cahill Contractors Llc. | revision to app#201510190132 to provide pipe wrap at shower per inspectionsDetails
revision to app#201510190132 to provide pipe wrap at shower per inspections | $1,000 |
| Aug 22, 2018 | Completed final sign-off Mar 2019 | 795 Pacific Av | Cahill Contractors Llc. | revision to app#201510200191 to provide wrap at shower pipe per field inspectionDetails
revision to app#201510200191 to provide wrap at shower pipe per field inspection | $1,000 |
| Aug 22, 2018 | Completed final sign-off Mar 2019 | 655 Pacific Av | Cahill Contractors Llc. | revision to app#201510270832 to revise previously approved plan lauyout type c.1, 2 bedroom unit, replacement unit only.Details
revision to app#201510270832 to revise previously approved plan lauyout type c.1, 2 bedroom unit, replacement unit only. | $5,000 |
| Jul 24, 2018 | Never finaled issued Aug 2018, no final | 895 Pacific Av | Cahill Contractors Llc. | revision to approved permit #201510270842. permit only for revision to main entry accessible control location. n/a for maher.Details
revision to approved permit #201510270842. permit only for revision to main entry accessible control location. n/a for maher. | $3,000 |
| Apr 17, 2018 | Completed final sign-off Mar 2020 | 1340 Golden Gate Av | Amone Corp | window replacement. re-roofing. accessible upgrade. finish upgrades, repair ext siding, pt exterior.Details
window replacement. re-roofing. accessible upgrade. finish upgrades, repair ext siding, pt exterior. | $487,000 |
| Apr 4, 2018 | Completed final sign-off Mar 2019 | 711 Pacific Av | Cahill Contractors Llc. | upgrade to extg exterior emergency generator. revision to app#201510200191. n/a for maherDetails
upgrade to extg exterior emergency generator. revision to app#201510200191. n/a for maher | $5,000 |
| Mar 14, 2018 | Completed final sign-off Sep 2018 | 1760 Bush St | Nibbi Bros Inc. | revision to 201810270955 revise main entry rampDetails
revision to 201810270955 revise main entry ramp | |
| Feb 26, 2018 | Completed final sign-off Mar 2019 | 711 Pacific Av | Cahill Contractors Llc. | revision to pa#201510201091, clarification of sloping at unit entrances. n/a for maher.Details
revision to pa#201510201091, clarification of sloping at unit entrances. n/a for maher. | |
| Jan 2, 2018 | Completed final sign-off Jun 2018 | 990 Pacific Av | Bbi - Con Inc | electrical, venting, and enclosure upgrdes to existing emergency generator, add fuel port and pipingDetails
electrical, venting, and enclosure upgrdes to existing emergency generator, add fuel port and piping | $30,000 |
| May 23, 2017 | Completed final sign-off Feb 2018 | 990 Pacific Av | Bbi - Con Inc | confirmation of occupant load at existing community room per sffd field inspector request. ref pa #201504012567/r1.Details
confirmation of occupant load at existing community room per sffd field inspector request. ref pa #201504012567/r1. | |
| Nov 14, 2016 | Never finaled issued Nov 2016, no final | 895 Pacific Av | Rcm Fire Protection Inc. | addition or modification of existing sprinkler system at altered area. total 38 heads. ref 201510270842-sDetails
addition or modification of existing sprinkler system at altered area. total 38 heads. ref 201510270842-s | $24,500 |
| Jul 11, 2016 | Never finaled issued Mar 2017, no final | 1125 Scott St | Fire Detection Unlimited | fire alarm:upgrade 5(e)units into new ada hearing&visual impaired.all remote pwr supplies in bldgs w/new ada-hvi units replc w/new remote pwr supply.upgrade 3(e)units into new ada access units.fire alrm coverage for extension to (e)comm bldg.201504305058,5167,5046,8056,5038,5059.Details
fire alarm:upgrade 5(e)units into new ada hearing&visual impaired.all remote pwr supplies in bldgs w/new ada-hvi units replc w/new remote pwr supply.upgrade 3(e)units into new ada access units.fire alrm coverage for extension to (e)comm bldg.201504305058,5167,5046,8056,5038,5059. | $62,589 |
| Jul 11, 2016 | Never finaled issued Apr 2017, no final | 1150 Scott St | Fire Detection Unlimited | fire alarm: upgrading 7 units into new ada hearing and visual impaired. all remote power supplies in the buildings with new ada hvi units will be replaced with new. remove power supply. upgrade 2 existing units into new ada accessible units n/a for maher ordinance no. 155-13.Details
fire alarm: upgrading 7 units into new ada hearing and visual impaired. all remote power supplies in the buildings with new ada hvi units will be replaced with new. remove power supply. upgrade 2 existing units into new ada accessible units n/a for maher ordinance no. 155-13. | $69,756 |
| Mar 14, 2016 | Completed final sign-off Jun 2018 | 1565 Turk St | Amone Corp | 1565, 1575, 1585 turk. renovate e residential bldgs - replace windows and balcony railings in kind, new interior finishes, roofing, system upgrade. life safety under separate permit.Details
1565, 1575, 1585 turk. renovate e residential bldgs - replace windows and balcony railings in kind, new interior finishes, roofing, system upgrade. life safety under separate permit. | $110,000 |
| Mar 14, 2016 | Never finaled issued Jul 2016, no final | 1555 Turk Bl | Amone Corp | renovate e community bldg, finish, system, roof upgrade. 18" hor addition at bathroom only. max u factor at any new window to =0.36. building 3. life safety under separate permit.Details
renovate e community bldg, finish, system, roof upgrade. 18" hor addition at bathroom only. max u factor at any new window to =0.36. building 3. life safety under separate permit. | $75,000 |
| Mar 14, 2016 | Completed final sign-off May 2017 | 1135 Steiner St | Amone Corp | renovate e residential bldgs - replace windows(n windows; max u factor=0.32) and balcony railings in kind, new interior finishes, roofing, system upgrades. building 2. life safety under separate permit.Details
renovate e residential bldgs - replace windows(n windows; max u factor=0.32) and balcony railings in kind, new interior finishes, roofing, system upgrades. building 2. life safety under separate permit. | $110,000 |
| Oct 30, 2015 | Completed final sign-off May 2019 | 320 Clementina St | Tony Ng Plumbing Co, D.F.P.F Corp Dba Fine Line Construction | moh rad priority project. clementina tower are identical concrete buildings with 13 floors of seior and disable housing, scope of work includes structural, life safety and accessibility upgrades and general renovations.Details
moh rad priority project. clementina tower are identical concrete buildings with 13 floors of seior and disable housing, scope of work includes structural, life safety and accessibility upgrades and general renovations. | $36,000,000 |
| Oct 20, 2015 | Completed final sign-off Mar 2019 | 711 Pacific Av | Cahill Contractors Inc, Sabah International Incorporated | rad program. new horizontal addition for community room, new accessible units, new garbage enclosures, new plumbing + electrical systems, new exhaust systems. n/a for maher ordinance no. 155-13.Details
rad program. new horizontal addition for community room, new accessible units, new garbage enclosures, new plumbing + electrical systems, new exhaust systems. n/a for maher ordinance no. 155-13. | $5,000,000 |
| Oct 19, 2015 | Completed final sign-off Oct 2019 | 838 Pacific Av | Cahill Contractors Llc. | horizontal addition. co gen enclosure. renov unit-kitchen/baths-new appl&plumbing fixtures.g/fl-offices,community rm,laundry.new interior main entrances on pacific ave.replac all windows in kind,new entry drs.landscaping along pacific ave.Details
horizontal addition. co gen enclosure. renov unit-kitchen/baths-new appl&plumbing fixtures.g/fl-offices,community rm,laundry.new interior main entrances on pacific ave.replac all windows in kind,new entry drs.landscaping along pacific ave. | $18,000,000 |
| Sep 16, 2015 | Completed final sign-off Aug 2017 | 1885 Mission St | D.F.P.F Corp Dba Fine Line Construction, Devlin/Mcnally Construction | comply w/nov 201302222, core and shell upgrade of unoccupied bldg. 1) new accessible kitchen/bathrm construction at three floors; 2) new voluntary structural strengthening at three floors; 3) holes cut in 2nd & 3rd floors for future stairs - design build by owner/tenant improvementDetails
comply w/nov 201302222, core and shell upgrade of unoccupied bldg. 1) new accessible kitchen/bathrm construction at three floors; 2) new voluntary structural strengthening at three floors; 3) holes cut in 2nd & 3rd floors for future stairs - design build by owner/tenant improvement | $350,000 |
| Apr 1, 2015 | Completed final sign-off Feb 2018 | 990 Pacific Av | mohcd rad program. seismic upgrade, replace windows, systems and finish upgrades 5% accessible upgrades, 1% hvi units. general scope of work. defered submittals: automatic fire sprinkler system, standpipe, fire alarm system, ext. building maintenance.Details
mohcd rad program. seismic upgrade, replace windows, systems and finish upgrades 5% accessible upgrades, 1% hvi units. general scope of work. defered submittals: automatic fire sprinkler system, standpipe, fire alarm system, ext. building maintenance. | $27,676,322 | |
| Mar 6, 2015 | Completed final sign-off Sep 2017 | 227 Bay St | Amone Corp | moh rad priority permit. per sheet a0.01. exterior revised from cement plaster to composite siding. interior upgrades, accessibility upgrades, roofing replacement. windows, exterior paint, lobby remodel. legalize room count as 50 units total. ** maher: n/a ***Details
moh rad priority permit. per sheet a0.01. exterior revised from cement plaster to composite siding. interior upgrades, accessibility upgrades, roofing replacement. windows, exterior paint, lobby remodel. legalize room count as 50 units total. ** maher: n/a *** | $6,191,281 |
| Mar 6, 2015 | Completed final sign-off Jul 2017 | 491 31st Av | moh rad priority permit. per sheet a0.01. new windows, interior upgrades, accessibility upgrades, roofing replacement. ext trim replacement, ext paint, minor structural, repair, unit kitchen replacement in kind.Details
moh rad priority permit. per sheet a0.01. new windows, interior upgrades, accessibility upgrades, roofing replacement. ext trim replacement, ext paint, minor structural, repair, unit kitchen replacement in kind. | $6,133,912 | |
| Feb 23, 2015 | Completed final sign-off Mar 2015 | 956 Ellsworth St | change of occupancy. no work proposed to extg bldg per section 3408.4. no seismic improvements required. n/a for the maherDetails
change of occupancy. no work proposed to extg bldg per section 3408.4. no seismic improvements required. n/a for the maher | ||
| Aug 14, 2014 | Completed final sign-off Feb 2016 | 1200 Turk St | buidling 4: voluntary seismic repair. interior finish upgrade. new sliding doors to replace (e), new cabintry. ** work to be per site pa# 2013/12/20/4778 **Details
buidling 4: voluntary seismic repair. interior finish upgrade. new sliding doors to replace (e), new cabintry. ** work to be per site pa# 2013/12/20/4778 ** | $300,000 | |
| Aug 14, 2014 | Completed final sign-off May 2016 | 1160 Webster St | buidling 2: voluntary seismic repair. interior finish upgrade. new sliding doors to replace (e), new balcony rails to replace (e). new entry wall. ** work to be per site pa# 2013/12/20/4778 **Details
buidling 2: voluntary seismic repair. interior finish upgrade. new sliding doors to replace (e), new balcony rails to replace (e). new entry wall. ** work to be per site pa# 2013/12/20/4778 ** | $300,000 | |
| Aug 14, 2014 | Completed final sign-off Feb 2016 | 1224 Turk St | D.F.P.F Corp Dba Fine Line Construction | buidling 3: voluntary seismic repair. interior finish upgrade. new sliding doors to replace (e), new cabintry. ** work to be per site pa# 2013/12/20/4778 **Details
buidling 3: voluntary seismic repair. interior finish upgrade. new sliding doors to replace (e), new cabintry. ** work to be per site pa# 2013/12/20/4778 ** | $300,000 |
| Aug 14, 2014 | Completed final sign-off May 2016 | 1335 Eddy St | buidling 1: voluntary seismic repair. interior finish upgrade. new sliding doors to replace (e), new balcony rails to replace (e). new entry wall, relocate (e) fence to within property line. ** work to be per site pa# 2013/12/20/4778 **Details
buidling 1: voluntary seismic repair. interior finish upgrade. new sliding doors to replace (e), new balcony rails to replace (e). new entry wall, relocate (e) fence to within property line. ** work to be per site pa# 2013/12/20/4778 ** | $300,000 | |
| Dec 20, 2013 | Completed final sign-off Apr 2016 | 1150 Webster St | D.F.P.F Corp Dba Fine Line Construction | modify (e) sidewalk @ front entry ramp.Details
modify (e) sidewalk @ front entry ramp. | $900,000 |
| Jun 17, 2013 | Completed final sign-off Dec 2013 | 480 Ellis St | Swinerton Builders | revision to app#200811076130.demolish non complying toilet facilities in 488 and 486 ellis st spaces.demolish extg damaged wood joists and replace with concrete slab on grade. demolish mezzanine and mezzanine stairs at 486 ellis st. revise hardships 4 and 5 and remove hardships 6 & 7Details
revision to app#200811076130.demolish non complying toilet facilities in 488 and 486 ellis st spaces.demolish extg damaged wood joists and replace with concrete slab on grade. demolish mezzanine and mezzanine stairs at 486 ellis st. revise hardships 4 and 5 and remove hardships 6 & 7 | |
| Apr 4, 2013 | Completed final sign-off Aug 2013 | 112 Columbus Av | Delta Builders Inc. | revision to appl #2012.0907.9139 & 2006.10.13.5025 - confirm layout of existing main stair enclosure.Details
revision to appl #2012.0907.9139 & 2006.10.13.5025 - confirm layout of existing main stair enclosure. | |
| Sep 7, 2012 | Completed final sign-off Aug 2013 | 112 Columbus Av | Delta Builders Inc. | revision to pa#2009.0825.5517: relocate laundry from ground floor to basement, provide additional showers & toilets at 2nd/3rd floors, renovate penthouse, number of residential units remains the same. repair (e) stairs from ground to basement.Details
revision to pa#2009.0825.5517: relocate laundry from ground floor to basement, provide additional showers & toilets at 2nd/3rd floors, renovate penthouse, number of residential units remains the same. repair (e) stairs from ground to basement. | $174,000 |
| Jun 29, 2012 | Completed final sign-off Nov 2012 | 335 Jones St | Leon Construction Inc | new produce market. electrical and plumbing, relocate storefront to add outdoor seating on site, new partition wallDetails
new produce market. electrical and plumbing, relocate storefront to add outdoor seating on site, new partition wall | $18,000 |
| Jun 19, 2012 | Completed final sign-off Aug 2013 | 112 Columbus Av | Delta Builders Inc. | rev. pa#200908255517: attic level-attic to remain non-habitable space, no storage. provide draft stops in the (e) attic. provide header at removed walls at the 2nd & 3rd floor per enclosed details & locations on pa#200908255517. provide venting per cbc 1203.2.Details
rev. pa#200908255517: attic level-attic to remain non-habitable space, no storage. provide draft stops in the (e) attic. provide header at removed walls at the 2nd & 3rd floor per enclosed details & locations on pa#200908255517. provide venting per cbc 1203.2. | $4,000 |
| Oct 11, 2011 | Completed final sign-off Jun 2013 | 480 Ellis St | Swinerton Builders | rev. to pa# 2008.11.07.6130. reconfiguring ground fl ooffice arae , 3 restrooms. adding bike storage for residents. moving the unisex bathrm from lobby to tenent at 484 ellis,making the gas meter roo largerDetails
rev. to pa# 2008.11.07.6130. reconfiguring ground fl ooffice arae , 3 restrooms. adding bike storage for residents. moving the unisex bathrm from lobby to tenent at 484 ellis,making the gas meter roo larger | |
| Aug 17, 2011 | Completed final sign-off Sep 2011 | 1690 Eddy St | Portrait Homes Inc | revision to pa# 2010.09.03.0223. revise accessible path of travel to show 48" walkway. replace existing 2 steps at sidewalk with 2 new steps and handrailDetails
revision to pa# 2010.09.03.0223. revise accessible path of travel to show 48" walkway. replace existing 2 steps at sidewalk with 2 new steps and handrail | $3,000 |
| Aug 15, 2011 | Completed final sign-off Sep 2011 | 1680 Eddy St | Portrait Homes Inc | revision to appl #201010082636 - add accessible ramp & railing at (e) play area, re-construct (e) fence. not visible from the streetDetails
revision to appl #201010082636 - add accessible ramp & railing at (e) play area, re-construct (e) fence. not visible from the street | $4,000 |
| Jun 24, 2011 | Never finaled issued Jul 2011, no final | 1680 Eddy St | Portrait Homes Inc | replacement of (e) non complying concrete ramp with new complying accessible ramp & railing in (e) location. (e) fencing to relocated, add entry controls to fenceDetails
replacement of (e) non complying concrete ramp with new complying accessible ramp & railing in (e) location. (e) fencing to relocated, add entry controls to fence | $8,000 |
| Apr 18, 2011 | Never finaled issued Sep 2012, no final | 170 Otis St | Cahill Contractors Inc | demo extg concrete ramp and provide new ramp in new location. provide new striped pathway, truncated domes and acc. parking space.Details
demo extg concrete ramp and provide new ramp in new location. provide new striped pathway, truncated domes and acc. parking space. | $15,000 |
| Apr 1, 2011 | Completed final sign-off May 2011 | 1150 Pierce St | Portrait Homes Inc | relocate extg site fence at pierce st between turk and eddy to completely inside property line. re-install extg fence at new location. extg landscape area at sidewalk to remain.Details
relocate extg site fence at pierce st between turk and eddy to completely inside property line. re-install extg fence at new location. extg landscape area at sidewalk to remain. | $2,000 |
| Mar 15, 2011 | Completed final sign-off Mar 2011 | 44 Mcallister St | D.F.P.F Corp Dba Fine Line Construction | revision to pa# 2007.01.24.2425 s4, delta #10 dated 23/15/11. revisw title 24 adapatable units fromunit#s g10,220,320,520,620,720,820. to units 212,312,412,512,612,712,812. revisions to plan lay out urh 2,3,4/ no exterior work under this permit. total# of adaptable units to remain the sameDetails
revision to pa# 2007.01.24.2425 s4, delta #10 dated 23/15/11. revisw title 24 adapatable units fromunit#s g10,220,320,520,620,720,820. to units 212,312,412,512,612,712,812. revisions to plan lay out urh 2,3,4/ no exterior work under this permit. total# of adaptable units to remain the same | $5,000 |
| Jan 20, 2011 | Never finaled issued Jan 2011, no final | 1690 Eddy St | Portrait Homes Inc | approval of sffd fire access in lieu of required sprinklers (refer to p/a no. 201009030223. demo/relocate existing parking space and curb. all parking on site.Details
approval of sffd fire access in lieu of required sprinklers (refer to p/a no. 201009030223. demo/relocate existing parking space and curb. all parking on site. | $1,000 |
| Nov 30, 2010 | Never finaled issued Nov 2010, no final | 44 Mcallister St | D.F.P.F Corp Dba Fine Line Construction | to obtain final inspection for work approved under pa #200607196961, all work is complet.Details
to obtain final inspection for work approved under pa #200607196961, all work is complet. | |
| Nov 30, 2010 | Completed final sign-off Jul 2011 | 2301 Mission St | Leon Construction Inc | removal of (e) brick infill on south facade for one new property line window at ground floor. work to be per admin bulletin ab-009.Details
removal of (e) brick infill on south facade for one new property line window at ground floor. work to be per admin bulletin ab-009. | $7,500 |
| Nov 23, 2010 | Completed final sign-off Dec 2010 | 44 Mcallister St | D.F.P.F Corp Dba Fine Line Construction | install 2 security gates at existing exterior exit paths, within existing property line.Details
install 2 security gates at existing exterior exit paths, within existing property line. | $10,000 |
| Oct 8, 2010 | Completed final sign-off Sep 2011 | 1680 Eddy St | Portrait Homes Inc | renovation of (e) community bldg bathrooms, offices, kitchen at 2nd floor, new windows to replace (e) at 2nd floor. new hvac, plumbing, electrical, new exterior stair to repair (e) stair. no work at ground fl, no work in public way. (n)accessible ramp to replace existing non-complying ramp.Details
renovation of (e) community bldg bathrooms, offices, kitchen at 2nd floor, new windows to replace (e) at 2nd floor. new hvac, plumbing, electrical, new exterior stair to repair (e) stair. no work at ground fl, no work in public way. (n)accessible ramp to replace existing non-complying ramp. | $600,000 |
| Oct 8, 2010 | Never finaled issued Feb 2011, no final | 1150 Pierce St | Portrait Homes Inc | (e) accessory structure to 1150 pierce st. scope of permit: install new curb cut at (e) sidewalk.Details
(e) accessory structure to 1150 pierce st. scope of permit: install new curb cut at (e) sidewalk. | $5,000 |
| Sep 9, 2010 | Completed final sign-off Dec 2013 | 1303 Steiner St | Portrait Homes Inc | rebuild free standing trash enclosures, pathe of accessible travel to accessible units (units accessiblity via sep permit) new accessible parking at ex parking lots (3 locations) rebuild e steps to n accessible ramp at same locaation, no work at public wayDetails
rebuild free standing trash enclosures, pathe of accessible travel to accessible units (units accessiblity via sep permit) new accessible parking at ex parking lots (3 locations) rebuild e steps to n accessible ramp at same locaation, no work at public way | $110,000 |
| Sep 3, 2010 | Completed final sign-off Sep 2011 | 1665 Eddy St | Portrait Homes Inc | to erect 1 story laundry building. fire dept access review and fire protection analysis. no sprinklers required. access lane and lock box program sffd ab-5.09 required.Details
to erect 1 story laundry building. fire dept access review and fire protection analysis. no sprinklers required. access lane and lock box program sffd ab-5.09 required. | $400,000 |
| Sep 3, 2010 | Completed final sign-off Dec 2013 | 1690 Eddy St | Portrait Homes Inc | to erect 1 story laundry building.Details
to erect 1 story laundry building. | $200,000 |
| Sep 3, 2010 | Completed final sign-off Dec 2010 | 44 Mcallister St | D.F.P.F Corp Dba Fine Line Construction | revision to pa #2007-0124-2425 to replace 56 single glazed windows with double glazed, all are same size as original. nov#201044498-bid, 200993147-pid, 201063971-pid, 201063976-pid.Details
revision to pa #2007-0124-2425 to replace 56 single glazed windows with double glazed, all are same size as original. nov#201044498-bid, 200993147-pid, 201063971-pid, 201063976-pid. | $125,000 |
| Jul 26, 2010 | Completed final sign-off Feb 2011 | 1329 Steiner St | Portrait Homes Inc | unit 02 and 82: convert 2 existing units to accessible. new kitchen, bath cabinets, raise elec, new bath layout, upgrade finishesDetails
unit 02 and 82: convert 2 existing units to accessible. new kitchen, bath cabinets, raise elec, new bath layout, upgrade finishes | $44,000 |
| Jul 26, 2010 | Completed final sign-off Mar 2011 | 1797 Ellis St | Portrait Homes Inc | unit 31: convert 1 existing unit to accessible. new kitchen, bath cabinets, raise elec, new bath layout, upgrade finishesDetails
unit 31: convert 1 existing unit to accessible. new kitchen, bath cabinets, raise elec, new bath layout, upgrade finishes | $22,000 |
| Jul 26, 2010 | Completed final sign-off Mar 2011 | 1349 Steiner St | Portrait Homes Inc | unit 83: convert 1 existing unit to accessible. new kitchen, bath cabinets, raise elec, new bath layout, upgrade finishesDetails
unit 83: convert 1 existing unit to accessible. new kitchen, bath cabinets, raise elec, new bath layout, upgrade finishes | $22,000 |
| Jul 26, 2010 | Completed final sign-off Jan 2011 | 1303 Steiner St | Portrait Homes Inc | unit 62: convert 1 existing unit to accessible. new kitchen, bath cabinets, raise elec, new bath layout, upgrade finishesDetails
unit 62: convert 1 existing unit to accessible. new kitchen, bath cabinets, raise elec, new bath layout, upgrade finishes | $22,000 |
| Jul 26, 2010 | Completed final sign-off Mar 2011 | 1755 Ellis St | Portrait Homes Inc | convert two existing units to accessible (1755 ellis unit 32 & 93), new kitchen & bath cabients, raise electrical, new bathroom layout, upgrade finishes.Details
convert two existing units to accessible (1755 ellis unit 32 & 93), new kitchen & bath cabients, raise electrical, new bathroom layout, upgrade finishes. | $44,000 |
| Jul 12, 2010 | Completed final sign-off Mar 2011 | 1355 Steiner St | Portrait Homes Inc | convert 2 existing units to accessible (units 63 & 92). new kitchen, bath cabinets, raise elec, new bath layout, upgrade finishesDetails
convert 2 existing units to accessible (units 63 & 92). new kitchen, bath cabinets, raise elec, new bath layout, upgrade finishes | $44,000 |
| Jul 6, 2010 | Completed final sign-off Dec 2013 | 1250 Pierce St | Portrait Homes Inc | 1250 pierce, unit 53: convert 1 existing unit to accessible. new kitchen and bath cabinets. raise electrical, new bathroom layout, ugprade finishesDetails
1250 pierce, unit 53: convert 1 existing unit to accessible. new kitchen and bath cabinets. raise electrical, new bathroom layout, ugprade finishes | $22,000 |
| Jul 6, 2010 | Completed final sign-off Dec 2013 | 1769 Ellis St | Portrait Homes Inc | 1775 ellis, unit 52: convert 1 existing unit to accessible. new kitchen and bath cabinets, raise electrical, new bathroom layout, upgrade finishesDetails
1775 ellis, unit 52: convert 1 existing unit to accessible. new kitchen and bath cabinets, raise electrical, new bathroom layout, upgrade finishes | $22,000 |
| May 14, 2010 | Completed final sign-off Feb 2013 | 150 Otis St | Cahill Contractors Inc | conversion of former juvenie detention center to 76 apts low income seismic upgrade, mep,finishes upgrade. new fire & sprinkler system, new pg&e vod vault, new elevator tower and new decks at back of the bldg, existing high rise.Details
conversion of former juvenie detention center to 76 apts low income seismic upgrade, mep,finishes upgrade. new fire & sprinkler system, new pg&e vod vault, new elevator tower and new decks at back of the bldg, existing high rise. | $6,500,000 |
| Mar 9, 2010 | Completed final sign-off Sep 2010 | 44 Mcallister St | D.F.P.F Corp Dba Fine Line Construction | revision to permit 2007/0124/2425-s3. revise ducted air supply to plenum air supply at grid 4-e, floor 3-8..Details
revision to permit 2007/0124/2425-s3. revise ducted air supply to plenum air supply at grid 4-e, floor 3-8.. | |
| Mar 8, 2010 | Completed final sign-off Mar 2011 | 1624 Eddy St | Portrait Homes Inc | enclosed 1 (e) deck (balcony) into attic space, no lighting work & non-habitable space, work at bldg 1.3 - 1624 eddy st. (unit #11).Details
enclosed 1 (e) deck (balcony) into attic space, no lighting work & non-habitable space, work at bldg 1.3 - 1624 eddy st. (unit #11). | $4,000 |
| Mar 8, 2010 | Completed final sign-off Mar 2011 | 1775 Ellis St | Portrait Homes Inc | building 3.1-1775 ellis st. (unit #30). enclose 1-(e) balcony into attic. non-habitable space, no lighting.Details
building 3.1-1775 ellis st. (unit #30). enclose 1-(e) balcony into attic. non-habitable space, no lighting. | $4,000 |
| Mar 8, 2010 | Completed final sign-off Mar 2011 | 1755 Ellis St | Portrait Homes Inc | enclosed two existing balconies into attic space, non habitable space, no lighting. work at bldg 2.1 - 1755 ellis st only. units #21 & 26.Details
enclosed two existing balconies into attic space, non habitable space, no lighting. work at bldg 2.1 - 1755 ellis st only. units #21 & 26. | $8,000 |
| Mar 1, 2010 | Completed final sign-off Feb 2011 | 1675 Eddy St | Portrait Homes Inc | enclose (e) balconies at 8-locations.Details
enclose (e) balconies at 8-locations. | $32,000 |
| Mar 1, 2010 | Completed final sign-off Feb 2011 | 1150 Pierce St | Portrait Homes Inc | enclose (e) balconies at 6-locationsDetails
enclose (e) balconies at 6-locations | $24,000 |
| Mar 1, 2010 | Completed final sign-off Feb 2011 | 1625 Eddy St | Portrait Homes Inc | enclose (e) balcony at 8-locations.Details
enclose (e) balcony at 8-locations. | $32,000 |
| Mar 1, 2010 | Completed final sign-off Feb 2011 | 1225 Steiner St | Portrait Homes Inc | enclose (e) balconies at 10-locations.Details
enclose (e) balconies at 10-locations. | $40,000 |
| Mar 1, 2010 | Completed final sign-off Apr 2011 | 1520 Turk St | Portrait Homes Inc | enclouse (e) balcony at 6-locations.Details
enclouse (e) balcony at 6-locations. | $24,000 |
| Mar 1, 2010 | Completed final sign-off Feb 2011 | 1560 Turk St | Portrait Homes Inc | enclosed (e) balconies at 10 locations.Details
enclosed (e) balconies at 10 locations. | $40,000 |
| Jan 19, 2010 | Completed final sign-off Jan 2010 | 2301 Mission St | Oliver & Company Inc. | add second stair (wood frame) from ground floor to basement. revision to 2008/0822/9871-s1.Details
add second stair (wood frame) from ground floor to basement. revision to 2008/0822/9871-s1. | $500 |
| Jan 19, 2010 | Completed final sign-off Jan 2011 | 44 Mcallister St | D.F.P.F Corp Dba Fine Line Construction | provide structural sidewalk slab for pg&e vault. revision to 2007/01242425-s4/r2.Details
provide structural sidewalk slab for pg&e vault. revision to 2007/01242425-s4/r2. | $500 |
| Jan 19, 2010 | Completed final sign-off Oct 2010 | 44 Mcallister St | D.F.P.F Corp Dba Fine Line Construction | add partitin wall/mech. at ground floor, per pg&e request for gas meter room. revision to 2007/0124/2425-s4/r2.Details
add partitin wall/mech. at ground floor, per pg&e request for gas meter room. revision to 2007/0124/2425-s4/r2. | $500 |
| Jul 16, 2009 | Completed final sign-off Sep 2009 | 169 06th St | Amone Corp | new fan in 1-hour soffit for heat exhaust at ground floor. new louvers in existing garage doorsDetails
new fan in 1-hour soffit for heat exhaust at ground floor. new louvers in existing garage doors | $750 |
| May 4, 2009 | Never finaled issued May 2009, no final | 112 Columbus Av | Delta Builders Inc. | to complete work and obtain final inspection for work approved under appl#200610135025.Details
to complete work and obtain final inspection for work approved under appl#200610135025. | $50,000 |
| Apr 28, 2009 | Completed final sign-off Jan 2010 | 2301 Mission St | Oliver & Company Inc. | revision to application 200808229871. structural revisions only due to field conditions (delta 3 & 4 only, clouded), no architectural changes.Details
revision to application 200808229871. structural revisions only due to field conditions (delta 3 & 4 only, clouded), no architectural changes. | $25,000 |
| Jan 15, 2009 | Completed final sign-off Jun 2009 | 35 Lillian St | Rubecon General Contracting Inc | reduced scop0e of work to previous approved pa# 2007/08/07/0611. work to include only new siding repair & replacement. replacement of (e) windows to match size of (e) opening & accessibility per 20% rule. new interior patition walls for new offices. no square footage added.Details
reduced scop0e of work to previous approved pa# 2007/08/07/0611. work to include only new siding repair & replacement. replacement of (e) windows to match size of (e) opening & accessibility per 20% rule. new interior patition walls for new offices. no square footage added. | $105,000 |
| Dec 24, 2008 | Completed final sign-off Jun 2009 | 5 Commer Ct | reduce scope of work to previous pa# 2007/05/07/0609. work to include only new siding repair and replacement. replacement of (e) windows to match size of (e) openings & accessibility per 20% rule. no interior work proposed except for 20% access.Details
reduce scope of work to previous pa# 2007/05/07/0609. work to include only new siding repair and replacement. replacement of (e) windows to match size of (e) openings & accessibility per 20% rule. no interior work proposed except for 20% access. | $95,000 | |
| Dec 4, 2008 | Completed final sign-off Dec 2010 | 44 Mcallister St | D.F.P.F Corp Dba Fine Line Construction | revision to 200701242425: work consists of ultrafine cement/permeation grouting of the sands for the new elevator pit and part of the adjacent retaining wall footing.Details
revision to 200701242425: work consists of ultrafine cement/permeation grouting of the sands for the new elevator pit and part of the adjacent retaining wall footing. | $80,000 |
| Nov 7, 2008 | Completed final sign-off Jun 2013 | 480 Ellis St | Swinerton Builders | addition of bathroom, kitchenettes to (e) sro congregate bedrooms, plumbing, electrical, mechanical upgrade, (n) partition walls, voluntary seismic upgrade, finish upgrades. 82 tourist room + 91 residential bedrooms to be revised to 154 residential bedrooms. no tourist rooms.Details
addition of bathroom, kitchenettes to (e) sro congregate bedrooms, plumbing, electrical, mechanical upgrade, (n) partition walls, voluntary seismic upgrade, finish upgrades. 82 tourist room + 91 residential bedrooms to be revised to 154 residential bedrooms. no tourist rooms. | $3,500,000 |
| Sep 8, 2008 | Completed final sign-off Mar 2009 | 63 Navy Rd | correct unpermitted work & return 65 navy road to residential use. scope of work: reinstall cabinets & tie to (e) plumbing, remove partition wall. scn case # 02-404010.Details
correct unpermitted work & return 65 navy road to residential use. scope of work: reinstall cabinets & tie to (e) plumbing, remove partition wall. scn case # 02-404010. | $35,000 | |
| May 14, 2008 | Expired or cancelled expired Mar 2013 | 1409 Mckinnon Av | replace existing retaining wall with new retaining wall.Details
replace existing retaining wall with new retaining wall. | $5,100 | |
| May 8, 2008 | Expired or cancelled cancelled Nov 2009 | 35 Lillian St | construct new 6'- 0" tall concrete block wall, gate, conc. slab on grade, new electrical. demo (e) trash enclosure block walls. amco (case# scn 02-404010). his complaint# 200121151.Details
construct new 6'- 0" tall concrete block wall, gate, conc. slab on grade, new electrical. demo (e) trash enclosure block walls. amco (case# scn 02-404010). his complaint# 200121151. | $35,000 |