Nibbi Bros Inc.
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Nov 2019
- Last 24 months
- 0 permits filed
80 permits since 2000: 51 completed, 8 never finaled, 21 expired or cancelled.
Of the 8 never-finaled permits, 6 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 5, 2019 | Completed final sign-off Feb 2020 | 2675 Geary Bl | building #a: addition of 2-hour shaft separation to existing elevator shaft. to correct citation #1907-0229Details
building #a: addition of 2-hour shaft separation to existing elevator shaft. to correct citation #1907-0229 | $2,500 |
| Mar 19, 2019 | Never finaled issued Mar 2019, no final | 2675 Geary Bl | revision to pa 201709158742. revision to incl mep only. (n) fan and updates to schedule w/ ductworkDetails
revision to pa 201709158742. revision to incl mep only. (n) fan and updates to schedule w/ ductwork | |
| Feb 14, 2019 | Completed final sign-off Nov 2020 | 188 Hooper St | revision to 201807114315 to reflect field conditions and revised calculationsDetails
revision to 201807114315 to reflect field conditions and revised calculations | |
| Jan 16, 2019 | Completed final sign-off Jan 2022 | 420 Taylor St | remodel existing basement and ground fl levels; addition of new mezzanine into office with small retail component. raise ground floor slab and infill existing openings onto the street with windows & doors & provision of stairs. maher naDetails
remodel existing basement and ground fl levels; addition of new mezzanine into office with small retail component. raise ground floor slab and infill existing openings onto the street with windows & doors & provision of stairs. maher na | $5,000,000 |
| Jan 9, 2019 | Never finaled issued Jan 2019, no final | 1150 03rd St | street space w/mtaDetails
street space w/mta | |
| Nov 21, 2018 | Completed final sign-off Oct 2019 | 2675 Geary Bl | original change of use under #201709158742. interior tenant improvement to incorporate miscellaneous fit plan changes. f f and e adding occpancy change to 1-4 maher not reqDetails
original change of use under #201709158742. interior tenant improvement to incorporate miscellaneous fit plan changes. f f and e adding occpancy change to 1-4 maher not req | |
| Nov 21, 2018 | Never finaled issued Dec 2018, no final | 2675 Geary Bl | exterior playground for childrens daycareDetails
exterior playground for childrens daycare | $25,000 |
| Oct 25, 2018 | Never finaled issued Nov 2018, no final | 2675 Geary Bl | bldg a - exterior cold formed steel framing. deferred submittal associated with pa 2017-0915-8742.Details
bldg a - exterior cold formed steel framing. deferred submittal associated with pa 2017-0915-8742. | $75,000 |
| Sep 6, 2018 | Completed final sign-off Apr 2021 | 188 Hooper St | storm water control system in connection with construction of five story bldg #2018/0216/1503Details
storm water control system in connection with construction of five story bldg #2018/0216/1503 | |
| Mar 30, 2018 | Never finaled issued Apr 2018, no final | 2675 Geary Bl | relocate one fire hydrant and add one (n) fire hydrant both along o'farrel st. no construction work.Details
relocate one fire hydrant and add one (n) fire hydrant both along o'farrel st. no construction work. | |
| Mar 14, 2018 | Completed final sign-off Sep 2018 | 1760 Bush St | revision to 201810270955 revise main entry rampDetails
revision to 201810270955 revise main entry ramp | |
| Feb 20, 2018 | Completed final sign-off Jul 2018 | 128 King St | 3rd flr: demo non bearing partitions, construct new non bearing partitions, ceiling, doors & finishes, new lighting & electrical, hvac modifications, new plumbing & coffee area. (e) restrooms to remain maher naDetails
3rd flr: demo non bearing partitions, construct new non bearing partitions, ceiling, doors & finishes, new lighting & electrical, hvac modifications, new plumbing & coffee area. (e) restrooms to remain maher na | $1,000,000 |
| Jan 12, 2018 | Never finaled issued Apr 2018, no final | 2698 California St | revision to 201510301341-s, change unit r03 t0 full mobility unit, including change layout of bathroom, kitchen, closet, unit enry to meet accessibility requirements for mobility unitsDetails
revision to 201510301341-s, change unit r03 t0 full mobility unit, including change layout of bathroom, kitchen, closet, unit enry to meet accessibility requirements for mobility units | $20,000 |
| Dec 20, 2017 | Completed final sign-off Nov 2018 | 2451 Sacramento St | revision to app#201509025917. upgrade of 5 apartments to mobility/ada accessibility including reconfigured kitchens and bathrooms. also to resolve n.o.v. 201700491(fire damaged repiar in kind), in units 908 & 909 (plans not included in drawing set)Details
revision to app#201509025917. upgrade of 5 apartments to mobility/ada accessibility including reconfigured kitchens and bathrooms. also to resolve n.o.v. 201700491(fire damaged repiar in kind), in units 908 & 909 (plans not included in drawing set) | $75,000 |
| Sep 15, 2017 | Completed final sign-off Oct 2019 | 2675 Geary Bl | change of use to e occupancy (daycare). horizontal addition of 7500 sq ft extension of (1) egress stair to the 4th level from (e) west stair. re-striping of parking lot. addition of (6) class 1 bike lockers & (14) class 2 bicyle parking spaces. ** maher: n/a **Details
change of use to e occupancy (daycare). horizontal addition of 7500 sq ft extension of (1) egress stair to the 4th level from (e) west stair. re-striping of parking lot. addition of (6) class 1 bike lockers & (14) class 2 bicyle parking spaces. ** maher: n/a ** | $2,100,000 |
| Mar 1, 2016 | Completed final sign-off Sep 2020 | 210 Arkansas St | to erect 4 stories, 1 basement, type va & ia, 154 units residential with commercial & parking.Details
to erect 4 stories, 1 basement, type va & ia, 154 units residential with commercial & parking. | $50,000,000 |
| Nov 5, 2014 | Completed final sign-off Sep 2015 | 555 Mission Rock St | repair/replacement of most existing exterior materials along the west elevation of the building as well as select nearby portions of the north & south elevations.these areas were exposed to heat and damaged on 3-11-14 during a fire at under construction mega blocks 360 apartments (mb360) project; toDetails
repair/replacement of most existing exterior materials along the west elevation of the building as well as select nearby portions of the north & south elevations.these areas were exposed to heat and damaged on 3-11-14 during a fire at under construction mega blocks 360 apartments (mb360) project; to | $6,520,000 |
| Jul 11, 2014 | Completed final sign-off Sep 2015 | 555 Mission Rock St | demolition of most extg exterior finishes materials along west elevation as well as select portions of north and south elevations of bldg due to damages from a fire at the under contruction project located across 4th street. replacement in-kind under separate permit.Details
demolition of most extg exterior finishes materials along west elevation as well as select portions of north and south elevations of bldg due to damages from a fire at the under contruction project located across 4th street. replacement in-kind under separate permit. | $50,000 |
| Dec 24, 2008 | Expired or cancelled expired Jul 2010 | 240 04th St | renew pa# 9210747s to obtain final inspection. building final subject to final approval by electrical inspection, plumbing inspection, sf fire dep. & bureau of streets & mapping.Details
renew pa# 9210747s to obtain final inspection. building final subject to final approval by electrical inspection, plumbing inspection, sf fire dep. & bureau of streets & mapping. | |
| Sep 28, 2006 | Never finaled issued Sep 2006, no final | 1300 Bryant St | electrical upgrade to (e) pa# 2006/07/26/7668.Details
electrical upgrade to (e) pa# 2006/07/26/7668. | $15,000 |
| Oct 1, 2004 | Completed final sign-off Jul 2005 | 1 Zoo Rd | renew:200308283251, 20030985174,20111153278, 200111153289, 200111153285, 200309225391 for final *Details
renew:200308283251, 20030985174,20111153278, 200111153289, 200111153285, 200309225391 for final * | |
| Feb 26, 2004 | Expired or cancelled expired Sep 2010 | 1840 Market St | renew and revise pa#2000/01/14/159-structural rev. to 2000/01/14/159Details
renew and revise pa#2000/01/14/159-structural rev. to 2000/01/14/159 | |
| Apr 9, 2003 | Expired or cancelled cancelled Dec 2003 | 501 Tunnel Av | fire alarm plans complete integrated system to new buildingDetails
fire alarm plans complete integrated system to new building | $8,980 |
| Dec 24, 2002 | Completed final sign-off Mar 2003 | 3101 Moraga St | change foundation from drilled piers to mat slab w/compaction groutingDetails
change foundation from drilled piers to mat slab w/compaction grouting | |
| Sep 23, 2002 | Completed final sign-off May 2003 | 1320 Bryant St | basic fire alarm system sprinkler monitoring with volunteer strobes/horns throughoutDetails
basic fire alarm system sprinkler monitoring with volunteer strobes/horns throughout | $15,000 |
| Sep 11, 2002 | Completed final sign-off Oct 2002 | 2085 03rd St | some interior demo, new offices.Details
some interior demo, new offices. | $50,000 |
| Feb 13, 2002 | Completed final sign-off Jun 2002 | 3151 Kamille Ct | rev to 9806358 ; roof truss (bldg 3, project 1)Details
rev to 9806358 ; roof truss (bldg 3, project 1) | |
| Feb 13, 2002 | Completed final sign-off Jun 2002 | 3128 Kamille Ct | roof truss (rev to 9806367) bldg 12, project 3Details
roof truss (rev to 9806367) bldg 12, project 3 | |
| Feb 13, 2002 | Completed final sign-off Jun 2002 | 3165 26th St | roof truss (rev to 9806361 bldg 6Details
roof truss (rev to 9806361 bldg 6 | |
| Feb 13, 2002 | Completed final sign-off Aug 2002 | 3115 26th St | rev. 9806365 (bldg 10)Details
rev. 9806365 (bldg 10) | |
| Feb 13, 2002 | Completed final sign-off Jun 2002 | 3195 26th St | roof truss (rev to 9806360) bldg 5Details
roof truss (rev to 9806360) bldg 5 | |
| Feb 13, 2002 | Completed final sign-off Jun 2002 | 3111 Kamille Ct | rev to 9806370/roof truss (bdlg 15 project 4)Details
rev to 9806370/roof truss (bdlg 15 project 4) | |
| Feb 13, 2002 | Completed final sign-off Jun 2002 | 3051 Folsom St | roof truss (rev to 9806356) bldg 1Details
roof truss (rev to 9806356) bldg 1 | |
| Feb 13, 2002 | Completed final sign-off Jun 2002 | 3168 Cesar Chavez St | revision to9806359 for roof truss (bldg 4 project 1)Details
revision to9806359 for roof truss (bldg 4 project 1) | |
| Feb 13, 2002 | Completed final sign-off Jun 2002 | 3149 26th St | roof truss (rev to 9806364) bldg 9, project 3Details
roof truss (rev to 9806364) bldg 9, project 3 | |
| Feb 13, 2002 | Completed final sign-off Jun 2002 | 3138 Kamille Ct | roof truss (rev to 9806368) bldg 13, project 3Details
roof truss (rev to 9806368) bldg 13, project 3 | |
| Feb 13, 2002 | Completed final sign-off Jun 2002 | 3050 Harrison St | rev to 9806372/roof truss (bdlg 16 project 4)Details
rev to 9806372/roof truss (bdlg 16 project 4) | |
| Feb 13, 2002 | Completed final sign-off Jun 2002 | 3148 Kamille Ct | rev to 9806369/roof truss (bdlg 14 project 4)Details
rev to 9806369/roof truss (bdlg 14 project 4) | |
| Feb 13, 2002 | Completed final sign-off Jun 2002 | 3161 Kamille Ct | roof truss ; rev to 9806357 (bldg 2)Details
roof truss ; rev to 9806357 (bldg 2) | |
| Feb 13, 2002 | Expired or cancelled cancelled Nov 2024 | 3118 Cesar Chavez St | rev to 9806371/roof truss (bdlg 17 project 4)Details
rev to 9806371/roof truss (bdlg 17 project 4) | |
| Feb 13, 2002 | Completed final sign-off Jun 2002 | 3155 26th St | roof truss (rev to 9806362) bldg 7Details
roof truss (rev to 9806362) bldg 7 | |
| Feb 13, 2002 | Completed final sign-off Jun 2002 | 3101 26th St | roof truss (rev to 9806366) bldg 11, project 3Details
roof truss (rev to 9806366) bldg 11, project 3 | |
| Feb 13, 2002 | Completed final sign-off Jun 2002 | 3118 Cesar Chavez St | rev to 9806371/roof truss (bdlg 17 project 4)Details
rev to 9806371/roof truss (bdlg 17 project 4) | |
| Feb 13, 2002 | Completed final sign-off Jun 2002 | 3168 Kamille Ct | roof truss (rev to 9806363) bldg 8Details
roof truss (rev to 9806363) bldg 8 | |
| Jul 20, 2001 | Expired or cancelled expired Nov 2001 | 2501 Pine St | one-stop:p. burns:correction of occupancy class. 99125875 s & s1 issued 2/29/2000Details
one-stop:p. burns:correction of occupancy class. 99125875 s & s1 issued 2/29/2000 | |
| May 7, 2001 | Expired or cancelled expired May 2002 | 400 Bay St | construct new partitions upgrade baths for hc access new elec,lt fixt to fluorecentDetails
construct new partitions upgrade baths for hc access new elec,lt fixt to fluorecent | $5,000 |
| Apr 3, 2001 | Completed final sign-off Mar 2003 | 3101 Moraga St | one-stop:c.hom:erect a three story school buildingDetails
one-stop:c.hom:erect a three story school building | $4,000,000 |
| Apr 3, 2001 | Never finaled issued Jul 2001, no final | 3101 Moraga St | demolish a 3 story school buildingDetails
demolish a 3 story school building | |
| Jan 29, 2001 | Completed final sign-off Oct 2001 | 1687 Market St | fire repair to n. part of 2/fl., new windows, hvac, ele./lighting, new basement exit stairDetails
fire repair to n. part of 2/fl., new windows, hvac, ele./lighting, new basement exit stair | $150,000 |
| Jan 8, 2001 | Expired or cancelled expired Jan 2002 | 1045 Mission St | improvements to (e) vacant space to be used as leasing officeDetails
improvements to (e) vacant space to be used as leasing office | $50,000 |
| Nov 16, 2000 | Expired or cancelled expired Apr 2001 | 3165 26th St | keystone retaining walls at rear yardDetails
keystone retaining walls at rear yard | |
| Nov 16, 2000 | Expired or cancelled expired Apr 2001 | 3168 Cesar Chavez St | keystone retaining walls at rear yardDetails
keystone retaining walls at rear yard | |
| Nov 16, 2000 | Expired or cancelled expired Apr 2001 | 3138 Kamille Ct | keystone retaining walls at rear yard/concrete retaining wall and ramp at rear yardDetails
keystone retaining walls at rear yard/concrete retaining wall and ramp at rear yard | |
| Nov 16, 2000 | Expired or cancelled expired Apr 2001 | 3149 26th St | keystone retaining wall at rear yardDetails
keystone retaining wall at rear yard | |
| Nov 16, 2000 | Expired or cancelled expired Apr 2001 | 3151 Kamille Ct | keystone retaining walls at rear yardDetails
keystone retaining walls at rear yard | |
| Nov 16, 2000 | Expired or cancelled expired Apr 2001 | 3195 26th St | keystone retaining walls at rear yardDetails
keystone retaining walls at rear yard | |
| Nov 16, 2000 | Expired or cancelled expired Apr 2001 | 3118 Cesar Chavez St | keystone retaining walls at rear yardDetails
keystone retaining walls at rear yard | |
| Nov 16, 2000 | Expired or cancelled expired Apr 2001 | 3050 Harrison St | keystone retaining walls at rear yardDetails
keystone retaining walls at rear yard | |
| Nov 16, 2000 | Expired or cancelled expired Apr 2001 | 3148 Kamille Ct | keystone retaining walls at rear yardDetails
keystone retaining walls at rear yard | |
| Nov 16, 2000 | Expired or cancelled expired Apr 2001 | 3101 26th St | keystone retaining wall at rear yardDetails
keystone retaining wall at rear yard | |
| Nov 16, 2000 | Expired or cancelled expired Apr 2001 | 3128 Kamille Ct | keystone retaining wall at rear yard/ concrete retaininw wall and ramp at rear yardDetails
keystone retaining wall at rear yard/ concrete retaininw wall and ramp at rear yard | |
| Nov 16, 2000 | Expired or cancelled expired Apr 2001 | 3115 26th St | keystone retaining wall at rear yardDetails
keystone retaining wall at rear yard | |
| Nov 15, 2000 | Expired or cancelled expired Apr 2001 | 3161 Kamille Ct | keystone retaining walls at rear yardDetails
keystone retaining walls at rear yard | |
| Nov 6, 2000 | Expired or cancelled expired Apr 2001 | 3051 Folsom St | retaining walls @ real yards of block 1 2 3 & 4, revise concrete retaining wall with ramp at rearDetails
retaining walls @ real yards of block 1 2 3 & 4, revise concrete retaining wall with ramp at rear | |
| Oct 24, 2000 | Completed final sign-off Mar 2001 | 1660 Church St | provide new accessible ramp to sanchtuary. revision to 9922119.Details
provide new accessible ramp to sanchtuary. revision to 9922119. | $1,000 |
| May 23, 2000 | Completed final sign-off Jul 2002 | 3195 26th St | add outside air duct to forced air furnace to comply w/environ noise study, rev #9806360Details
add outside air duct to forced air furnace to comply w/environ noise study, rev #9806360 | |
| May 23, 2000 | Completed final sign-off Sep 2002 | 3101 Kamille Ct | revision to application 9806372Details
revision to application 9806372 | |
| May 23, 2000 | Completed final sign-off Jul 2002 | 3175 26th St | revision to application 9806361Details
revision to application 9806361 | |
| May 23, 2000 | Completed final sign-off Sep 2002 | 3138 Cesar Chavez St | Details
| |
| May 23, 2000 | Completed final sign-off Aug 2002 | 3148 Kamille Ct | revision to appliation 9806364Details
revision to appliation 9806364 | |
| May 22, 2000 | Completed final sign-off Jul 2002 | 3168 Cesar Chavez St | add outside air duct to forced air furnace to comply w/environ noise study, rev #9806359Details
add outside air duct to forced air furnace to comply w/environ noise study, rev #9806359 | |
| May 22, 2000 | Completed final sign-off Jul 2002 | 3133 26th St | revision to application 9806366Details
revision to application 9806366 | |
| May 22, 2000 | Completed final sign-off Jul 2002 | 3151 Kamille Ct | revision to application 9806358Details
revision to application 9806358 | |
| May 22, 2000 | Completed final sign-off Aug 2002 | 3101 26th St | add outside air duct to forced air furnace to comply w/environmental noise study, rev #9806366Details
add outside air duct to forced air furnace to comply w/environmental noise study, rev #9806366 | |
| May 22, 2000 | Completed final sign-off Jul 2002 | 3051 Folsom St | add outside air duct to forced air furnace to comply w/environ noise study,rev #9806356Details
add outside air duct to forced air furnace to comply w/environ noise study,rev #9806356 | |
| May 22, 2000 | Completed final sign-off Sep 2002 | 3148 Kamille Ct | revision to application 9806369Details
revision to application 9806369 | |
| May 22, 2000 | Completed final sign-off Jul 2002 | 3155 26th St | add outside air duct to forced air furnace to comply w/environmental noise sstudy for mechanical venDetails
add outside air duct to forced air furnace to comply w/environmental noise sstudy for mechanical ven | |
| May 4, 2000 | Completed final sign-off Aug 2000 | 680 Filbert St | occupancy class correction from a2.1 to a3Details
occupancy class correction from a2.1 to a3 | |
| May 1, 2000 | Completed final sign-off Aug 2000 | 680 Filbert St | addition of an accessible toilet rm at g/f of gym modification of (e)fire alarm sym under sep applnDetails
addition of an accessible toilet rm at g/f of gym modification of (e)fire alarm sym under sep appln | $10,000 |
| Mar 27, 2000 | Completed final sign-off Oct 2000 | 1800 Market St | plaster demo &remove non-bearing partitionsDetails
plaster demo &remove non-bearing partitions | $15,000 |