Jaime B. Neilson
- Listed as
- architect, engineer
- Based in
- Fremont
- On San Francisco permits
- Mar 2017 to Dec 2023
29 permits since 2000 (engineer on 25 permits, architect on 4 permits): 28 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 7, 2023 | Completed final sign-off Apr 2026 | 2339 Jones St | The 519 Corp/Dba:Janet Moyer Landscaping | to comply with notice of violation nov 202313934. remove and rebuild existing retaining wall along the side property line in the backyard.Details
to comply with notice of violation nov 202313934. remove and rebuild existing retaining wall along the side property line in the backyard. | $10,000 |
| Jun 1, 2023 | Completed final sign-off Jun 2023 | 1130 Filbert St | Jeurieb Construction | replace in-kind existing roof top deck structure, existing deck under pa# 437142 & 8902558Details
replace in-kind existing roof top deck structure, existing deck under pa# 437142 & 8902558 | $13,000 |
| May 4, 2023 | Completed final sign-off Nov 2023 | 300 Ocean Av | Blackline Construction | revision to bpa#202301099856, replace wood framing @ facade & windows facing streetDetails
revision to bpa#202301099856, replace wood framing @ facade & windows facing street | $15,000 |
| Jul 13, 2022 | Completed final sign-off Jul 2023 | 2677 Larkin St | Brighter Bay Builders Inc | unit #803: convert (e) kitchen to study, relocate kitchen, rehab (e) bathroom, inst washer/dryer inst 2nd bathroomDetails
unit #803: convert (e) kitchen to study, relocate kitchen, rehab (e) bathroom, inst washer/dryer inst 2nd bathroom | $34,000 |
| Aug 11, 2021 | Completed final sign-off Apr 2023 | 2676 Folsom St | Blackline Construction | remove interior walls and reloc/replace with post and beams in units 2678b, 2678a, 2676b.Details
remove interior walls and reloc/replace with post and beams in units 2678b, 2678a, 2676b. | $5,000 |
| Jun 15, 2020 | Completed final sign-off Nov 2022 | 3225 24th St | Evra Construction | priority processing - 100% affordable housing. convert (e) ground level garage space to create (2) new accessory dwelling units per ordinance 162-17, including foundation replacement and other necessary structural, mechanical, electrical and plumbing scope.Details
priority processing - 100% affordable housing. convert (e) ground level garage space to create (2) new accessory dwelling units per ordinance 162-17, including foundation replacement and other necessary structural, mechanical, electrical and plumbing scope. | $100,000 |
| May 21, 2020 | Completed final sign-off Jun 2020 | 348 Precita Av | Amone Corp | rev to pa#202002204930. revise the new foundation details (sheet s-3 detail 5).Details
rev to pa#202002204930. revise the new foundation details (sheet s-3 detail 5). | |
| May 7, 2020 | Completed final sign-off Nov 2020 | 2260 Mission St | Future General Construction Inc | voluntary structural strenthening of exterior stair case & parapet wallDetails
voluntary structural strenthening of exterior stair case & parapet wall | $8,500 |
| Mar 4, 2020 | Completed final sign-off Jun 2020 | 344 Precita Av | Amone Corp | removal of (e) roofdeck to replace (e) flatroof, reinstall (e) deck mat'l after roofwork, work less than 50% of new mat'l, roof under separate permit, exploratory demo of exterior wood siding for structural investigatives, replace (13) aluminum clad wood windows in-kind.Details
removal of (e) roofdeck to replace (e) flatroof, reinstall (e) deck mat'l after roofwork, work less than 50% of new mat'l, roof under separate permit, exploratory demo of exterior wood siding for structural investigatives, replace (13) aluminum clad wood windows in-kind. | $10,000 |
| Feb 20, 2020 | Completed final sign-off Sep 2020 | 3154 Mission St | Amone Corp | voluntary seismic retrofit of first story and ada improvements n/a maherDetails
voluntary seismic retrofit of first story and ada improvements n/a maher | $50,000 |
| Feb 20, 2020 | Completed final sign-off Sep 2020 | 3158 Mission St | Amone Corp | voluntary seismic retrofit of first story and ada improvements n/a maherDetails
voluntary seismic retrofit of first story and ada improvements n/a maher | $50,000 |
| Feb 20, 2020 | Never finaled issued Apr 2020, no final | 348 Precita Av | Amone Corp | voluntary improvement to rebuild a portion of the building foundationDetails
voluntary improvement to rebuild a portion of the building foundation | $20,000 |
| Oct 31, 2019 | Completed final sign-off Jun 2022 | 3182 24th St | Amone Corp | rev to pa201809130103: structural drawings for electrical room, finished floor, beam/footer replacement.Details
rev to pa201809130103: structural drawings for electrical room, finished floor, beam/footer replacement. | $10,000 |
| Oct 30, 2019 | Completed final sign-off Jun 2020 | 3544 Taraval St | Amone Corp | voluntary structural improvementsDetails
voluntary structural improvements | $100,000 |
| Jul 18, 2019 | Completed final sign-off Feb 2020 | 520 Shrader St | Amone Corp | voluntary structural improvements - seismic improvement, framing repair. voluntary structural improvements not to a specific code standard. property is not on the sfdbi soft story ordinance list.Details
voluntary structural improvements - seismic improvement, framing repair. voluntary structural improvements not to a specific code standard. property is not on the sfdbi soft story ordinance list. | $120,000 |
| Jan 18, 2019 | Completed final sign-off May 2019 | 65 Woodward St | A A Pacific Builders | rev. to pa 201809130106 to replace 5 footing and post in kind.Details
rev. to pa 201809130106 to replace 5 footing and post in kind. | $26,116 |
| Jan 2, 2019 | Completed final sign-off Feb 2019 | 3800 Mission St | Amone Corp | residential: revision to app#201708255927 for soft story retrofitDetails
residential: revision to app#201708255927 for soft story retrofit | |
| Jan 2, 2019 | Completed final sign-off Feb 2019 | 3800 Mission St | Amone Corp | commercial: revision to app#201708255929 for soft story retrofitDetails
commercial: revision to app#201708255929 for soft story retrofit | |
| Sep 13, 2018 | Completed final sign-off May 2019 | 65 Woodward St | A A Pacific Builders | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. and additional voluntary structural improvements.Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. and additional voluntary structural improvements. | $400,000 |
| Sep 13, 2018 | Completed final sign-off Jun 2022 | 3182 24th St | Amone Corp | soft story retrofit for residential portion (2nd and 3rd floors) per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. ref: 2018-0913-0103 (commercial).Details
soft story retrofit for residential portion (2nd and 3rd floors) per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. ref: 2018-0913-0103 (commercial). | $200,000 |
| Sep 13, 2018 | Completed final sign-off Jun 2022 | 3182 24th St | Amone Corp | per sfebc chapter 4d engineering criteria 2016 cebc appendix a4 -soft story retrofit for commercial portion (1st floor) and associated interior ada improvements at (e) first floor. ref #2018-0913-0101 (residential)Details
per sfebc chapter 4d engineering criteria 2016 cebc appendix a4 -soft story retrofit for commercial portion (1st floor) and associated interior ada improvements at (e) first floor. ref #2018-0913-0101 (residential) | $200,000 |
| Feb 2, 2018 | Completed final sign-off Oct 2019 | 19 Precita Av | Guzman Construction Group Inc. | voluntary structural improvements.Details
voluntary structural improvements. | $80,000 |
| Feb 2, 2018 | Completed final sign-off Sep 2019 | 29 Fair Av | Guzman Construction Group Inc. | voluntary structural improvements.Details
voluntary structural improvements. | $80,000 |
| Sep 12, 2017 | Completed final sign-off Feb 2018 | 4042 Fulton St | Arana Group, Inc. | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4 | $253,000 |
| Aug 25, 2017 | Completed final sign-off Feb 2019 | 3802 Mission St | Amone Corp | residential - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial/retail soft story ref pa#201708255929Details
residential - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial/retail soft story ref pa#201708255929 | $91,500 |
| Aug 25, 2017 | Completed final sign-off Nov 2018 | 271 Richland Av | Amone Corp | voluntary structural improvements to rear building, units #271b & #271c.Details
voluntary structural improvements to rear building, units #271b & #271c. | $137,000 |
| Aug 25, 2017 | Completed final sign-off Feb 2019 | 3800 Mission St | Amone Corp | retail - soft story retrofit mandatory, interior t.i. ada improvements at existing 1st fl. tenant space occupied by an existing beauty salon; lower floor slab; ref pa # 201708255927-residentialDetails
retail - soft story retrofit mandatory, interior t.i. ada improvements at existing 1st fl. tenant space occupied by an existing beauty salon; lower floor slab; ref pa # 201708255927-residential | $96,500 |
| Apr 4, 2017 | Completed final sign-off Feb 2018 | 1353 Folsom St | Rhapsody Painting And Environmental Svc | voluntary retrofit and replace slab on grade at garage. replace in-kind, no architectural changes. n/a ordinance #155-13Details
voluntary retrofit and replace slab on grade at garage. replace in-kind, no architectural changes. n/a ordinance #155-13 | $25,000 |
| Mar 17, 2017 | Completed final sign-off Jun 2017 | 380 San Jose Av | Rhapsody Painting And Environmental Svc | voluntary retrofit at ground floor.Details
voluntary retrofit at ground floor. | $5,000 |