Jeurieb Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2017 to Oct 2024
- Last 24 months
- 1 permit filed
23 permits since 2000: 22 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 28, 2024 | Completed final sign-off Jan 2025 | 3975 24th St | replace (6)wood windows in kind -facing street & vinyl at back (not visible from street). add (3)exhaust bathroom fans & (2)exhaust kitchen fans-all 3 units, remodel kitchen in kind(unit #1). add gfci in bathrooms & kitchen as needed. no wall removal. interior common areas painting. new water heaterDetails
replace (6)wood windows in kind -facing street & vinyl at back (not visible from street). add (3)exhaust bathroom fans & (2)exhaust kitchen fans-all 3 units, remodel kitchen in kind(unit #1). add gfci in bathrooms & kitchen as needed. no wall removal. interior common areas painting. new water heater | $213,000 |
| Jun 27, 2024 | Completed final sign-off Jun 2024 | 138 Everson St | revision to pa# 202403298883: kitchen cabinet repaint, replace counter tops, and sink and replace receptacles.Details
revision to pa# 202403298883: kitchen cabinet repaint, replace counter tops, and sink and replace receptacles. | $6,000 |
| Jun 25, 2024 | Completed final sign-off Dec 2024 | 274 Funston Av | remodel 2 full bathrooms relocate toilet at upper units, no removal of wallsDetails
remodel 2 full bathrooms relocate toilet at upper units, no removal of walls | $22,000 |
| Mar 29, 2024 | Completed final sign-off Jun 2024 | 138 Everson St | remodel bathroom, remove closet to add shower. relocate toilet, add shower, relocate lights. exhaust fan to remain.Details
remodel bathroom, remove closet to add shower. relocate toilet, add shower, relocate lights. exhaust fan to remain. | $18,000 |
| Aug 7, 2023 | Completed final sign-off Sep 2023 | 964 Florida St | paint 3 sides of the 2250 sqft approx surface to be paint and replace any siding if dry rot is found 20 to 50 sqft of sidingDetails
paint 3 sides of the 2250 sqft approx surface to be paint and replace any siding if dry rot is found 20 to 50 sqft of siding | $12,000 |
| Jul 3, 2023 | Completed final sign-off Dec 2023 | 117 Topaz Wy | remodel kitchen in kind, one full bathroom, 1 powder room, add 31 ceiling can lights and m.bath replace bathtub for steam shower.Details
remodel kitchen in kind, one full bathroom, 1 powder room, add 31 ceiling can lights and m.bath replace bathtub for steam shower. | $60,000 |
| Jun 1, 2023 | Completed final sign-off Jun 2023 | 1130 Filbert St | replace in-kind existing roof top deck structure, existing deck under pa# 437142 & 8902558Details
replace in-kind existing roof top deck structure, existing deck under pa# 437142 & 8902558 | $13,000 |
| May 11, 2023 | Completed final sign-off Nov 2023 | 1287 Alabama St | revision (1) to 201905291917 (residential), mandatory soft story retrofit. add a new steel frame connection detail. add new stud wall with concrete beam.Details
revision (1) to 201905291917 (residential), mandatory soft story retrofit. add a new steel frame connection detail. add new stud wall with concrete beam. | $10,000 |
| May 11, 2023 | Completed final sign-off Nov 2023 | 3026 25th St | revision (1) to 201905291919 (commercial), mandatory soft story retrofit. add a new steel frame connection detail. add new stud wall with concrete beam.Details
revision (1) to 201905291919 (commercial), mandatory soft story retrofit. add a new steel frame connection detail. add new stud wall with concrete beam. | |
| Mar 31, 2023 | Completed final sign-off Aug 2026 | 2208 Mission St | unit#201: renovation of existing condo including demo of non-structural interior partitions, new interior finishes and kitchen cabinetry and new enlarged opening at existing kitchen window and new sliding door to provide access to exiting lightwell deck.Details
unit#201: renovation of existing condo including demo of non-structural interior partitions, new interior finishes and kitchen cabinetry and new enlarged opening at existing kitchen window and new sliding door to provide access to exiting lightwell deck. | $40,000 |
| Dec 23, 2022 | Completed final sign-off Jun 2023 | 1130 Filbert St | unit 1: replace (17) wood windows, (4) wood in-kind street facing to preserve historical, (13) vinyl not visible from street. same size, same location, max u-factor 0.30. kitchen remodel in-kindDetails
unit 1: replace (17) wood windows, (4) wood in-kind street facing to preserve historical, (13) vinyl not visible from street. same size, same location, max u-factor 0.30. kitchen remodel in-kind | $18,000 |
| Dec 23, 2022 | Completed final sign-off Jun 2023 | 1130 Filbert St | unit 3: replace (18) wood windows, (4) wood in-kind street facing to preserve historical, (14) vinyl not visible from street; kitchen remodel in-kind. same size, same location, max u-factor 0.30Details
unit 3: replace (18) wood windows, (4) wood in-kind street facing to preserve historical, (14) vinyl not visible from street; kitchen remodel in-kind. same size, same location, max u-factor 0.30 | $9,500 |
| Dec 23, 2022 | Completed final sign-off Jun 2023 | 1130 Filbert St | unit 2: replace (20) wood windows, (4) wood in-kind street facing to preserve historical, (16) vinyl not visible from street; kitchen remodel in-kind. same size, same location, max u-factor 0.30Details
unit 2: replace (20) wood windows, (4) wood in-kind street facing to preserve historical, (16) vinyl not visible from street; kitchen remodel in-kind. same size, same location, max u-factor 0.30 | $12,000 |
| Sep 16, 2022 | Completed final sign-off Jun 2023 | 1130 Filbert St | voluntary seismic stregnthening of ground floor shear walls/foundations, 2/f deck structure. work in common area & ground floor.Details
voluntary seismic stregnthening of ground floor shear walls/foundations, 2/f deck structure. work in common area & ground floor. | $80,000 |
| Sep 9, 2022 | Expired or cancelled withdrawn Nov 2022 | 4483 Mission St | to remove the (e) convience stair to rear yard.Details
to remove the (e) convience stair to rear yard. | $500 |
| Aug 24, 2021 | Completed final sign-off Oct 2022 | 672 Teresita Bl | replace extg windows to sliding doors at 2nd floor. new rear deck at 7'-0" above ground.Details
replace extg windows to sliding doors at 2nd floor. new rear deck at 7'-0" above ground. | $15,000 |
| May 20, 2021 | Completed final sign-off Dec 2021 | 5555 Mission St | replace 12 windows at front of building and paint the entire building window as they are u factor .30 max - windows to be wood hung with og lugs and having matching divided lites per google photo 2019Details
replace 12 windows at front of building and paint the entire building window as they are u factor .30 max - windows to be wood hung with og lugs and having matching divided lites per google photo 2019 | $30,000 |
| Aug 5, 2020 | Completed final sign-off Jan 2021 | 600 Capp St | replace (e) front stairs due to dry rot damage. demo (e) concrete columns at front stairs and replaced w/wood pilars and bring hand rails to code. new railing to be balusters.Details
replace (e) front stairs due to dry rot damage. demo (e) concrete columns at front stairs and replaced w/wood pilars and bring hand rails to code. new railing to be balusters. | $12,000 |
| Nov 20, 2019 | Completed final sign-off Dec 2019 | 2081 Mission St | replace and install new door at back of commercial space. match (e) fire rating, if rated door.Details
replace and install new door at back of commercial space. match (e) fire rating, if rated door. | $1,000 |
| May 29, 2019 | Completed final sign-off Nov 2023 | 1287 Alabama St | residential soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a4. commercial soft story under pa201905291919Details
residential soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a4. commercial soft story under pa201905291919 | $75,000 |
| Mar 18, 2019 | Completed final sign-off Aug 2019 | 654 Capp St | revision to pa #201903054461. reduce work scope to: paint ext bldg. replace (e) 10 windows existing wood to be replaced for vinyl not facing st. north side only.Details
revision to pa #201903054461. reduce work scope to: paint ext bldg. replace (e) 10 windows existing wood to be replaced for vinyl not facing st. north side only. | |
| Mar 5, 2019 | Completed final sign-off Aug 2019 | 654 Capp St | 62 windows replace in kind; all windows facing street to be aluminum; paint exterior buildingDetails
62 windows replace in kind; all windows facing street to be aluminum; paint exterior building | $80,000 |
| Sep 12, 2017 | Completed final sign-off May 2019 | 654 Capp St | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $65,000 |