Future General Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2016 to Sep 2026
- Last 24 months
- 5 permits filed
56 permits since 2000: 48 completed, 2 in progress, 6 never finaled.
Of the 6 never-finaled permits, 2 are 3 to 5 years old, 4 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 18, 2026 | In progress issued Sep 2026 | 737 Guerrero St | to obtain final inspection for work approved under pa# 202207148508. all work is complete.Details
to obtain final inspection for work approved under pa# 202207148508. all work is complete. | |
| Aug 20, 2026 | Completed final sign-off Sep 2026 | 824 Vallejo St | new interior partitions and door to enclose existing stair, only interior work, no structuralDetails
new interior partitions and door to enclose existing stair, only interior work, no structural | $5,000 |
| Jun 5, 2026 | In progress issued Jun 2026 | 4490 Mission St | rev to pa# 2026-0430-0436 scope includes shelves and checkout counter. grocery, general use.Details
rev to pa# 2026-0430-0436 scope includes shelves and checkout counter. grocery, general use. | $5,000 |
| Apr 30, 2026 | Completed final sign-off May 2026 | 4490 Mission St | new utility sink in e) restroom, interior only. relocate exsiting gfi outlet to a new location.Details
new utility sink in e) restroom, interior only. relocate exsiting gfi outlet to a new location. | $400 |
| Apr 24, 2025 | Completed final sign-off Nov 2025 | 3562 Sacramento St | interior renovation (t.i.) of one commercial unit, new furniture, fixtures, non structural partitions and new sinkDetails
interior renovation (t.i.) of one commercial unit, new furniture, fixtures, non structural partitions and new sink | $10,000 |
| May 14, 2024 | Completed final sign-off Jul 2024 | 2133 Lincoln Wy | new half bath and closet, only interior work, no demolition or structural work.Details
new half bath and closet, only interior work, no demolition or structural work. | $10,000 |
| Dec 15, 2023 | Completed final sign-off Feb 2024 | 332 Fell St | unit 2, 4, 6; fix dry-rot at exterior rear area of unit 4 porch. install drywall at interior over existing wood framing @ units 2, 4 and 6. dryrot repair to one 4x4 post and a 4 sq ft area of flooring (unit 4). each porch approx. 40 sq ft.Details
unit 2, 4, 6; fix dry-rot at exterior rear area of unit 4 porch. install drywall at interior over existing wood framing @ units 2, 4 and 6. dryrot repair to one 4x4 post and a 4 sq ft area of flooring (unit 4). each porch approx. 40 sq ft. | $8,000 |
| Nov 2, 2023 | Completed final sign-off Dec 2023 | 1675 Eddy St | #308: adding in a washer and dryer into a condo unit.Details
#308: adding in a washer and dryer into a condo unit. | $7,000 |
| Sep 22, 2023 | Completed final sign-off Mar 2024 | 651 37th Av | interior remodel of existing house. new mudroom on 1st fl. 2.5 bathroom remodel. non structural partition removal and additions.Details
interior remodel of existing house. new mudroom on 1st fl. 2.5 bathroom remodel. non structural partition removal and additions. | $60,000 |
| Apr 17, 2023 | Completed final sign-off Sep 2023 | 2863 24th St | new retail market tenant at existing ground flr retail unit, interior work only (finishes and furniture), no change of use, no electrical, mechanical or plumbing work (existing to remain), no structural work.Details
new retail market tenant at existing ground flr retail unit, interior work only (finishes and furniture), no change of use, no electrical, mechanical or plumbing work (existing to remain), no structural work. | $35,000 |
| Apr 12, 2023 | Completed final sign-off May 2023 | 4625 Mission St | revision to bpa#202302272646, add food prep sink to sculleryDetails
revision to bpa#202302272646, add food prep sink to scullery | |
| Feb 27, 2023 | Completed final sign-off May 2023 | 4625 Mission St | interior remodel of e office space. change of use to bar.Details
interior remodel of e office space. change of use to bar. | $80,000 |
| Jul 14, 2022 | Never finaled issued Jun 2023, no final | 737 Guerrero St | add a state-mandated adu per ca government code section 65852.2. new two bedroom,two bathrooms,kitchen and living room accessory dwelling unit on 1st fl. mandatory seismic strenfgthening per sfbc approved under buidlng appl# 2022-0601-5362.Details
add a state-mandated adu per ca government code section 65852.2. new two bedroom,two bathrooms,kitchen and living room accessory dwelling unit on 1st fl. mandatory seismic strenfgthening per sfbc approved under buidlng appl# 2022-0601-5362. | $80,000 |
| Apr 29, 2022 | Completed final sign-off Dec 2022 | 5392 Mission St | to comply with complaint# 202286559. legalization of unauthorized (n) commercial kitchen hood & cooler. create new vent opening on ottowa ave wall, painted. adding ada automatic door opener.Details
to comply with complaint# 202286559. legalization of unauthorized (n) commercial kitchen hood & cooler. create new vent opening on ottowa ave wall, painted. adding ada automatic door opener. | $15,000 |
| Apr 26, 2022 | Completed final sign-off Jan 2023 | 2667 21st St | renovation of 2/f & 3/f kitchens. remodel 3/f bathroom. 3/f ktichen to add and remoe non-structural partiions, doors, fixtures and finishes.Details
renovation of 2/f & 3/f kitchens. remodel 3/f bathroom. 3/f ktichen to add and remoe non-structural partiions, doors, fixtures and finishes. | $40,000 |
| Mar 15, 2022 | Completed final sign-off Jul 2022 | 566 Natoma St | 4 kitchen and 4 bathroom full remodeling at units 566, 566a, 566b, and 566c natoma st. upgrade electrical as per code req at each unit, soft story retrofit separate permits, window replacements under separate permits, all remodeling in kind, no changes or moving walls.Details
4 kitchen and 4 bathroom full remodeling at units 566, 566a, 566b, and 566c natoma st. upgrade electrical as per code req at each unit, soft story retrofit separate permits, window replacements under separate permits, all remodeling in kind, no changes or moving walls. | $90,000 |
| Mar 1, 2022 | Completed final sign-off Jul 2022 | 566 Natoma St | replace 40 (e) damaged windows single hung with double hung, including street facing windows (15) aluminum clad and (25) vinyl windows not visible. u = .30 mxDetails
replace 40 (e) damaged windows single hung with double hung, including street facing windows (15) aluminum clad and (25) vinyl windows not visible. u = .30 mx | $20,000 |
| Jan 27, 2022 | Completed final sign-off Jun 2022 | 739 Guerrero St | unit 739: remodel (e) kitchen & (e) bathroom on 1st fl (739 guerrero st). remove sheetrock to update electrical.Details
unit 739: remodel (e) kitchen & (e) bathroom on 1st fl (739 guerrero st). remove sheetrock to update electrical. | $20,000 |
| Jan 4, 2022 | Completed final sign-off Jan 2022 | 133 Santa Rosa Av | replace existing damaged siding in kind about 120 sqft. build a canopy with translucent roofing onto rear of house w/ plans to comply with nov 202035737. build a new ground deck 6" high on existing rear patio.Details
replace existing damaged siding in kind about 120 sqft. build a canopy with translucent roofing onto rear of house w/ plans to comply with nov 202035737. build a new ground deck 6" high on existing rear patio. | $3,500 |
| Dec 22, 2021 | Never finaled issued Jan 2022, no final | 1688 Grove St | full facade windows replacement/replace 16 alum windows with alum clad double hung windows at all floors. visible from street.Details
full facade windows replacement/replace 16 alum windows with alum clad double hung windows at all floors. visible from street. | $14,500 |
| Aug 31, 2021 | Completed final sign-off Nov 2022 | 49 Capp St | fire repair 2 unit dwelling: unit 49: replace wall framing footings. interior finishes, elec. windows and doors. water heater, plumbing fixt in kind. replace damaged floor/sheathing in kind . unit 51, wtr htr,plumb fixt in kind,fire rated ceiling utility rm, repair foundationDetails
fire repair 2 unit dwelling: unit 49: replace wall framing footings. interior finishes, elec. windows and doors. water heater, plumbing fixt in kind. replace damaged floor/sheathing in kind . unit 51, wtr htr,plumb fixt in kind,fire rated ceiling utility rm, repair foundation | $50,000 |
| Aug 11, 2021 | Completed final sign-off Jul 2022 | 411 Panorama Dr | addition of deck and stair on rear of building and remove of extg window and replace with new door.Details
addition of deck and stair on rear of building and remove of extg window and replace with new door. | $30,000 |
| Aug 2, 2021 | Completed final sign-off Feb 2022 | 737 Guerrero St | remodel kitchen, bath, laundry room on 2nd fl. remodel laundry room 1st. dryrot joist, studs, floor sheathing replacement in laundry room on 1st and 2nd fl per plans. repair e siding stair and landing, not to exceed 50% at rearDetails
remodel kitchen, bath, laundry room on 2nd fl. remodel laundry room 1st. dryrot joist, studs, floor sheathing replacement in laundry room on 1st and 2nd fl per plans. repair e siding stair and landing, not to exceed 50% at rear | $45,000 |
| Jul 14, 2021 | Completed final sign-off Mar 2022 | 2515 Mission St | abe compliance plans. remove (e) doors, extend jamb, install new doors, power actuators. da-004 use of power doors in lieu of level landing.Details
abe compliance plans. remove (e) doors, extend jamb, install new doors, power actuators. da-004 use of power doors in lieu of level landing. | $10,000 |
| Jul 14, 2021 | Completed final sign-off Dec 2021 | 2513 Mission St | abe compliance plans/barrier removal. remove extg step, constuct ramp, install poiver actuators da.004. use of poiver doors inlieu of level landing.Details
abe compliance plans/barrier removal. remove extg step, constuct ramp, install poiver actuators da.004. use of poiver doors inlieu of level landing. | $5,000 |
| Jun 2, 2021 | Completed final sign-off Jan 2023 | 566 Natoma St | priority: renovate (e) 1st floor unit and convert portion of (e) laundry and storage space into (n) habitable space.Details
priority: renovate (e) 1st floor unit and convert portion of (e) laundry and storage space into (n) habitable space. | $75,000 |
| May 19, 2021 | Completed final sign-off Jun 2021 | 38 Theresa St | fix/repair front exterior wall stucco/frame/drywall damaged by a run away car, about 50 sq ft. to comply with nov 202176161Details
fix/repair front exterior wall stucco/frame/drywall damaged by a run away car, about 50 sq ft. to comply with nov 202176161 | $2,580 |
| Mar 16, 2021 | Completed final sign-off May 2021 | 163 Ripley St | remodel existing bath in-kind, replace shower valve,ceiling fan,tub,one toilet and vanity sink,medicine cabinet and top of mirror light.Details
remodel existing bath in-kind, replace shower valve,ceiling fan,tub,one toilet and vanity sink,medicine cabinet and top of mirror light. | $8,000 |
| Oct 22, 2020 | Completed final sign-off Feb 2021 | 4046 Fulton St | hand rail improvement. provide exterior handrail for elderly tenant access & safety to incl removing 2 (e) handrails at entry porch stairway & replace in-kind & add (n) handrail at center of entry porch & add 2 (n) handrails at sidewalk stairwayDetails
hand rail improvement. provide exterior handrail for elderly tenant access & safety to incl removing 2 (e) handrails at entry porch stairway & replace in-kind & add (n) handrail at center of entry porch & add 2 (n) handrails at sidewalk stairway | $2,500 |
| Oct 5, 2020 | Completed final sign-off Jan 2021 | 369 03rd Av | amendment to permit 202005067330, replace 28 non-street facing aluminum windows with retrofit vinyl windows in kind size/shape, at interior units and common areas.Details
amendment to permit 202005067330, replace 28 non-street facing aluminum windows with retrofit vinyl windows in kind size/shape, at interior units and common areas. | $25,000 |
| Jul 28, 2020 | Never finaled issued Jul 2020, no final | 1152 Valencia St | siding replacement 100 sf at rear not visible from streetDetails
siding replacement 100 sf at rear not visible from street | $5,000 |
| Jun 16, 2020 | Completed final sign-off Nov 2020 | 2260 Mission St | all 6 kitchens + 6 bathrooms remodel in-kind. replace 6 water heaters in-kind. replace 6 room heaters in kind. upgrading electrical and plumbing. replacing kitchens cabinets with granite countertops and new surface mount ceiling light. bathrooms replacing new bathtub/shower pan. all work in kind.Details
all 6 kitchens + 6 bathrooms remodel in-kind. replace 6 water heaters in-kind. replace 6 room heaters in kind. upgrading electrical and plumbing. replacing kitchens cabinets with granite countertops and new surface mount ceiling light. bathrooms replacing new bathtub/shower pan. all work in kind. | $250,000 |
| May 7, 2020 | Completed final sign-off Nov 2020 | 2260 Mission St | voluntary structural strenthening of exterior stair case & parapet wallDetails
voluntary structural strenthening of exterior stair case & parapet wall | $8,500 |
| May 6, 2020 | Completed final sign-off Jan 2021 | 369 03rd Av | replace a total of 29 electric wall heaters throughout the bldg aprtmnts. 7 bathrm remodeling (units 1,3,5,6,7,8,11). 5 kitchen remodeling(units 3,5,6,8,11). replace 28 aluminum street facing windows with standard aluminum, 1280h, hva, standard z-bar, extr. bronze anodized/interior bronzed in kindDetails
replace a total of 29 electric wall heaters throughout the bldg aprtmnts. 7 bathrm remodeling (units 1,3,5,6,7,8,11). 5 kitchen remodeling(units 3,5,6,8,11). replace 28 aluminum street facing windows with standard aluminum, 1280h, hva, standard z-bar, extr. bronze anodized/interior bronzed in kind | $150,000 |
| May 1, 2020 | Completed final sign-off Jun 2020 | 3225 24th St | unit 2 & unit 4: kitchen remodelsDetails
unit 2 & unit 4: kitchen remodels | $15,000 |
| Feb 11, 2020 | Completed final sign-off Aug 2020 | 63 Melrose Av | revision to 201909303117: cancel e door that leads to garage fro lr, install n pocket door at lr, close e door from lr to stairway, install reg door instead of 1 hr sep wall at storage room. install new utility sink, replace ceiling lights, cover 220 v outlet, build new backyard handrailDetails
revision to 201909303117: cancel e door that leads to garage fro lr, install n pocket door at lr, close e door from lr to stairway, install reg door instead of 1 hr sep wall at storage room. install new utility sink, replace ceiling lights, cover 220 v outlet, build new backyard handrail | $3,500 |
| Nov 7, 2019 | Completed final sign-off Dec 2019 | 1684 Grove St | comply with nov 201975291 kitchen: r/r in kind kitchen cabinets + counter tops with 4in backsplash. no structural work.Details
comply with nov 201975291 kitchen: r/r in kind kitchen cabinets + counter tops with 4in backsplash. no structural work. | $4,500 |
| Sep 30, 2019 | Completed final sign-off Aug 2020 | 63 Melrose Av | legalize rooms down in unauthorized dwelling unit by removing kitchen, lower floors in bedroom and living rea to min 7'6 hgt, add new door at e windows location in bedroom, work to comply with nov 201968631Details
legalize rooms down in unauthorized dwelling unit by removing kitchen, lower floors in bedroom and living rea to min 7'6 hgt, add new door at e windows location in bedroom, work to comply with nov 201968631 | $40,000 |
| Sep 5, 2019 | Never finaled filed Sep 2019, never issued | 1684 Grove St | kitchen: r/r in-kind kitchen cabinets and countertops with 4in backsplash to comply with nov201975291.Details
kitchen: r/r in-kind kitchen cabinets and countertops with 4in backsplash to comply with nov201975291. | $4,500 |
| Sep 5, 2019 | Never finaled issued Sep 2019, no final | 122 Maynard St | revision to pa #201904238660. no four foundations on 1st fl, no steel beams on 2nd fl, relocation of steal beam on 3rd fl.Details
revision to pa #201904238660. no four foundations on 1st fl, no steel beams on 2nd fl, relocation of steal beam on 3rd fl. | |
| May 23, 2019 | Completed final sign-off Jun 2019 | 4839 Mission St | removing deck and stair in the backyard. in filling a back door with wall.Details
removing deck and stair in the backyard. in filling a back door with wall. | $3,000 |
| Apr 23, 2019 | Completed final sign-off Jan 2020 | 122 Maynard St | kitchen remodel remove 2nd stair and convert to closet. new bridge connection 2nd flr bedrooms to rear yardDetails
kitchen remodel remove 2nd stair and convert to closet. new bridge connection 2nd flr bedrooms to rear yard | $100,000 |
| Feb 25, 2019 | Completed final sign-off Mar 2019 | 4839 Mission St | replace 6 windows facing street. wood clad aluminum, single hung, in kind.Details
replace 6 windows facing street. wood clad aluminum, single hung, in kind. | $3,000 |
| Feb 15, 2019 | Completed final sign-off Jun 2019 | 2097 Mission St | replace e wood floor (dry rot) in the corner commercial unit with a new concrete slab and remodel e office and restroomDetails
replace e wood floor (dry rot) in the corner commercial unit with a new concrete slab and remodel e office and restroom | $50,000 |
| Jan 29, 2019 | Completed final sign-off May 2019 | 4839 Mission St | to comply w/ nov 201917592 remove dirt and a pile of concrete from the back yard stabilize an (e) retaining wall and poor a concrete slab with rain drainDetails
to comply w/ nov 201917592 remove dirt and a pile of concrete from the back yard stabilize an (e) retaining wall and poor a concrete slab with rain drain | $12,000 |
| Dec 11, 2018 | Never finaled issued Dec 2018, no final | 305 San Carlos St | street spaceDetails
street space | |
| Sep 17, 2018 | Completed final sign-off Mar 2021 | 369 03rd Av | soft story upgrade per sfebc chapter 4d-residential. pa 201809170535 commercial.Details
soft story upgrade per sfebc chapter 4d-residential. pa 201809170535 commercial. | $50,000 |
| Sep 17, 2018 | Completed final sign-off Mar 2021 | 369 03rd Av | soft story upgrade per sfebc chapter 4d-commercial. pa 201809170534 residential.Details
soft story upgrade per sfebc chapter 4d-commercial. pa 201809170534 residential. | $50,000 |
| Sep 12, 2018 | Completed final sign-off Nov 2020 | 2260 Mission St | seismic retrofit of soft story comply with sfebc 4d mandatory seismic retrofit per 2016 cebc appendix a4 (commercial). residential soft story under pa 2018-0912-9913Details
seismic retrofit of soft story comply with sfebc 4d mandatory seismic retrofit per 2016 cebc appendix a4 (commercial). residential soft story under pa 2018-0912-9913 | $30,000 |
| Sep 12, 2018 | Completed final sign-off Sep 2020 | 2260 Mission St | seismic retrofit of soft story comply with sfebc 4d mandatory seismic per 2016 cebc appendix a4 (residential). commercial soft story under pa 2018-0912-9916Details
seismic retrofit of soft story comply with sfebc 4d mandatory seismic per 2016 cebc appendix a4 (residential). commercial soft story under pa 2018-0912-9916 | $60,000 |
| Aug 30, 2018 | Completed final sign-off Dec 2018 | 4839 Mission St | 2nd fl: new half bath. remodel existing full bath.Details
2nd fl: new half bath. remodel existing full bath. | $20,000 |
| Aug 7, 2018 | Completed final sign-off Nov 2018 | 60 28th St | new drawings revision - 201804166421: structural correctionsDetails
new drawings revision - 201804166421: structural corrections | |
| Jul 12, 2018 | Completed final sign-off Sep 2018 | 60 28th St | rev to pa 2018 0601 0835- unit 3 -dry rot repair in 1 bathroom and light well, replace like by like framing, less than 50%.Details
rev to pa 2018 0601 0835- unit 3 -dry rot repair in 1 bathroom and light well, replace like by like framing, less than 50%. | $3,000 |
| Jun 1, 2018 | Completed final sign-off Sep 2018 | 60 28th St | 6 kitchen & 6 remodel, paint all apartments, 11 window replacement not visible from st. to comply with #201792361 item 1, 2, 4, 5, 6, 7, 8, 9. #201780731 items 2, 3, 4. #201637281 item 2, 3. #201654801 item 2, 3. #201773521, 201768031, 201636091.Details
6 kitchen & 6 remodel, paint all apartments, 11 window replacement not visible from st. to comply with #201792361 item 1, 2, 4, 5, 6, 7, 8, 9. #201780731 items 2, 3, 4. #201637281 item 2, 3. #201654801 item 2, 3. #201773521, 201768031, 201636091. | $250,000 |
| Mar 22, 2017 | Completed final sign-off Feb 2019 | 305 San Carlos St | ada bathroom upgrade, two unisex bathrooms in commercial space. soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4 (commercial). soft story for residential under pa 201607283620Details
ada bathroom upgrade, two unisex bathrooms in commercial space. soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4 (commercial). soft story for residential under pa 201607283620 | $6,000 |
| Jul 28, 2016 | Completed final sign-off Mar 2019 | 305 San Carlos St | soft story upgrade per 2012 iebc appendix a-4 (residential). commercial soft story under pa 201703222076Details
soft story upgrade per 2012 iebc appendix a-4 (residential). commercial soft story under pa 201703222076 | $80,000 |