Howard Blecher
- Listed as
- architect, designer
- Firm
- Blecher Bldg & Urban Design
- Based in
- 3343 22nd Street
- On San Francisco permits
- Dec 2014 to Aug 2026
46 permits since 2000 (architect on 41 permits, designer on 5 permits): 22 completed, 5 in progress, 8 never finaled, 11 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 28, 2026 | In progress filed Aug 2026, not yet issued | 64 Woodland Av | legalize existing ground-floor finished space as a state adu under san francisco planning code section 207.2. work required for adu code compliance is limited to items shown in the drawings and related compliance documents, including field verification and documentation of existing floor/ ceilingDetails
legalize existing ground-floor finished space as a state adu under san francisco planning code section 207.2. work required for adu code compliance is limited to items shown in the drawings and related compliance documents, including field verification and documentation of existing floor/ ceiling | $1,000 | |
| Aug 18, 2026 | In progress issued Sep 2026 | 1012 Grant Av | Deleon Builders Inc | unit #31 top floor: interior remodel (e) studio apartment. includes new kitchen in-kind, remodel of (e) bathroom, new interior wall/partition, incorporation of (e) common-area laundry space into apt 31. new roof-mounted mini-split heat-pump system, reroute (e) dryer vent from common area laundry...Details
unit #31 top floor: interior remodel (e) studio apartment. includes new kitchen in-kind, remodel of (e) bathroom, new interior wall/partition, incorporation of (e) common-area laundry space into apt 31. new roof-mounted mini-split heat-pump system, reroute (e) dryer vent from common area laundry... | $70,000 |
| Dec 29, 2025 | Expired or cancelled cancelled Jan 2026 | 2787 Bryant St | add 1 state adu per ord 162-16, 95-17,162-1. new exit passageway.remove bath at attic.remove stairs 3/f attic.replace attic ladder.improve ext stairs at rear.handrail at front stairs.protective bollards at garage. new trash enclosure.Details
add 1 state adu per ord 162-16, 95-17,162-1. new exit passageway.remove bath at attic.remove stairs 3/f attic.replace attic ladder.improve ext stairs at rear.handrail at front stairs.protective bollards at garage. new trash enclosure. | ||
| Dec 29, 2025 | In progress issued May 2026 | 36 Aladdin Tr | Rivera Builders | basement of 36 aladdin terr: proposed media room to satisfy nov 201890782. replace 4 burner cooktop with 2 burner cooktop. restricted use- no bedroom or sleeping area in basement. this space to be used only in conjuction with dwelling unit at 2nd story. no udu determined by planning dept.Details
basement of 36 aladdin terr: proposed media room to satisfy nov 201890782. replace 4 burner cooktop with 2 burner cooktop. restricted use- no bedroom or sleeping area in basement. this space to be used only in conjuction with dwelling unit at 2nd story. no udu determined by planning dept. | $1,000 |
| Jan 13, 2025 | In progress issued Jan 2025 | 939 Castro St | Reliable Construction Inc | revision to pa#: 202311211263, 202409181060, 202411074607. revised layout of garage, 1st level hall 1, hall 2 + office, (e) to remain stair supports. structural revised ceiling framing at 1st level entry ceiling.Details
revision to pa#: 202311211263, 202409181060, 202411074607. revised layout of garage, 1st level hall 1, hall 2 + office, (e) to remain stair supports. structural revised ceiling framing at 1st level entry ceiling. | $1,900 |
| Sep 17, 2024 | Completed final sign-off Feb 2026 | 259 07th Av | Wilko Builders Llc. | voluntry structural strenthening. new walls windows & doors at garage remove e) brick chimney. ref pa 202401244517Details
voluntry structural strenthening. new walls windows & doors at garage remove e) brick chimney. ref pa 202401244517 | $1,000 |
| Jan 24, 2024 | Completed final sign-off Mar 2026 | 259 07th Av | Wilko Builders Llc. | to establish state adu on ground floor and interior alterations/facade modifications, with electrical, plumbing and structural work. (2 residential units + adu)Details
to establish state adu on ground floor and interior alterations/facade modifications, with electrical, plumbing and structural work. (2 residential units + adu) | $142,000 |
| Nov 21, 2023 | Completed final sign-off Feb 2026 | 939 Castro St | Reliable Construction Inc | proposed remodel with electrical, plumbing, and structural work. new 1st floor living space and new roof deck. automatic fire sprinkler only entire ground floor according with nfpa13d under deferred submittalDetails
proposed remodel with electrical, plumbing, and structural work. new 1st floor living space and new roof deck. automatic fire sprinkler only entire ground floor according with nfpa13d under deferred submittal | $80,000 |
| Nov 21, 2023 | In progress issued Aug 2024 | 6 San Pablo Av | G B U Construction Development | altered site permit. revision to bpa#2022-0805-0034 related to variance case 2022-007994var. proposed stairs, landing and roof deck at rear, plus additional interior alterations and additional exterior facade changes.Details
altered site permit. revision to bpa#2022-0805-0034 related to variance case 2022-007994var. proposed stairs, landing and roof deck at rear, plus additional interior alterations and additional exterior facade changes. | $5,000 |
| Jun 7, 2023 | Completed final sign-off Dec 2023 | 1851 Noriega St | W C S S Dba Solid Build Construction | restore walls after water damage. double layer of 5/8" drywall in women's bathroom. double layer at 5/8" drywall in wall adjacent to kitchen. double layer at 5/8" drywall in wall adjacent to storage. all interior.Details
restore walls after water damage. double layer of 5/8" drywall in women's bathroom. double layer at 5/8" drywall in wall adjacent to kitchen. double layer at 5/8" drywall in wall adjacent to storage. all interior. | $7,200 |
| Apr 19, 2023 | Completed final sign-off Apr 2025 | 2685 California St | Rivera Builders | proposed adu unit under state program w/ structural, plumbing & electrical work to comply w/ nov# 201711673.Details
proposed adu unit under state program w/ structural, plumbing & electrical work to comply w/ nov# 201711673. | $100,000 |
| Dec 30, 2022 | Never finaled filed Dec 2022, never issued | 2619 25th Av | proposed accessory dwelling unit (adu) addition of dwelling unit. new exit passageway for adu. replacement of garage door to comply with nov #201976204. remove interior stairs and new bath at 2nd fl. new rear decks and stairs at 1st & 2nd floors.Details
proposed accessory dwelling unit (adu) addition of dwelling unit. new exit passageway for adu. replacement of garage door to comply with nov #201976204. remove interior stairs and new bath at 2nd fl. new rear decks and stairs at 1st & 2nd floors. | $5,000 | |
| Dec 30, 2022 | Expired or cancelled cancelled Jan 2026 | 2782 24th St | comply with accessible business entrace program abe 202211295367Details
comply with accessible business entrace program abe 202211295367 | $5,000 | |
| Nov 28, 2022 | Never finaled issued Jul 2023, no final | 111 Congdon St | Rivera Builders | interior remodel w/ replacement & new plumbing fixtures + electrical work. new deck and awning on rear facade. new deck for hot tub less than 30" above grade. new and removed windows on sides + rear.Details
interior remodel w/ replacement & new plumbing fixtures + electrical work. new deck and awning on rear facade. new deck for hot tub less than 30" above grade. new and removed windows on sides + rear. | $20,000 |
| Nov 2, 2022 | Completed final sign-off Oct 2024 | 690 Spruce St | Lema Construction | unit 102 - bathroom remodel with new shower on 2/f.Details
unit 102 - bathroom remodel with new shower on 2/f. | $8,000 |
| Oct 25, 2022 | Expired or cancelled withdrawn Mar 2026 | 36 Aladdin Tr | to comply with nov# 201890782. addition of adu (accessory to 36 aladdin ter) per ordinance no 162-16, 95-17 & 162-17. improvements to basement level passageway to public way. convert basement storage (34 aladdin ter) to media room.Details
to comply with nov# 201890782. addition of adu (accessory to 36 aladdin ter) per ordinance no 162-16, 95-17 & 162-17. improvements to basement level passageway to public way. convert basement storage (34 aladdin ter) to media room. | $100,000 | |
| Aug 22, 2022 | Completed final sign-off Feb 2023 | 257 Romain St | Red House Construction | replacement skylight with lighting. new attic access panel.Details
replacement skylight with lighting. new attic access panel. | $25,000 |
| Aug 5, 2022 | Never finaled issued Jun 2023, no final | 6 San Pablo Av | G B U Construction Development | proposed remodel & horizontal addition with structural,plumbing & electrical work. replacement & new windows on front,sides and rear.Details
proposed remodel & horizontal addition with structural,plumbing & electrical work. replacement & new windows on front,sides and rear. | $815,000 |
| Dec 30, 2021 | Completed final sign-off Oct 2022 | 386 27th Av | A L V Construction Inc | proposed interior remodel w/ plumbing & electrical work. replacement of windows on side & rear, (1)(n) bathroom. remodel 2 bathrooms in kind, add 1 laundry room.Details
proposed interior remodel w/ plumbing & electrical work. replacement of windows on side & rear, (1)(n) bathroom. remodel 2 bathrooms in kind, add 1 laundry room. | $200,000 |
| Aug 9, 2021 | Completed final sign-off Sep 2023 | 3434 18th St | Nibbi Bros Assoc Inc. | proposed conversion of garage (6 parking spaces) into 3 accessory dwelling units. includes structural, mechanical, electrical, & plumbing work. addition of dwelling units per ordinance nos. 162-16, 95-17 & 162-17.Details
proposed conversion of garage (6 parking spaces) into 3 accessory dwelling units. includes structural, mechanical, electrical, & plumbing work. addition of dwelling units per ordinance nos. 162-16, 95-17 & 162-17. | $600,000 |
| Aug 4, 2021 | Completed final sign-off Sep 2023 | 3434 18th St | Nibbi Bros Assoc Inc. | interior remodels of units 1, 2, 3, 4, 5, 6, 7 & 8 and common areas. includes mechanical, electrical and plumbing work. no structural work. executive directive 13-01 (100% affordable priority process) privately funded.Details
interior remodels of units 1, 2, 3, 4, 5, 6, 7 & 8 and common areas. includes mechanical, electrical and plumbing work. no structural work. executive directive 13-01 (100% affordable priority process) privately funded. | $360,000 |
| Jul 9, 2021 | Completed final sign-off Nov 2022 | 1416 Taylor St | G M Building And Construction Inc | proposed juice bar with plumbing and electrical work. no customer seating provided. all service is take out. nearest named ncd is pacific ave ncd per section 726 of the planning code. a limited restaurant is a permitted use in the pacific ave ncdDetails
proposed juice bar with plumbing and electrical work. no customer seating provided. all service is take out. nearest named ncd is pacific ave ncd per section 726 of the planning code. a limited restaurant is a permitted use in the pacific ave ncd | $50,000 |
| Jun 28, 2021 | Expired or cancelled withdrawn Apr 2023 | 2685 California St | proposed accessory dwelling unit (adu) under state program with structural, plumbing, and electrical work to comply with nov 201711673Details
proposed accessory dwelling unit (adu) under state program with structural, plumbing, and electrical work to comply with nov 201711673 | $20,000 | |
| Oct 20, 2020 | Never finaled filed Oct 2020, never issued | 1222 Masonic Av | proposed remodel & addition to (e) 4th level including replacement interior stairs between 3rd & 4th level, 1 new bathroom & remodeled bedroom & replacement of (e) front rood. electrical, plumbing, & structural work.Details
proposed remodel & addition to (e) 4th level including replacement interior stairs between 3rd & 4th level, 1 new bathroom & remodeled bedroom & replacement of (e) front rood. electrical, plumbing, & structural work. | $20,000 | |
| Oct 3, 2020 | Completed final sign-off Oct 2024 | 554 Moultrie St | replace in-kind entry door, exterior stairs (replacement of finishes on deck only) porch and railing replacement.Details
replace in-kind entry door, exterior stairs (replacement of finishes on deck only) porch and railing replacement. | $2,000 | |
| Sep 16, 2020 | Completed final sign-off Oct 2021 | 471 14th St | proposed interior remodel with plumbing and electrical wokr. replacement windows on side and rear.Details
proposed interior remodel with plumbing and electrical wokr. replacement windows on side and rear. | $20,000 | |
| Feb 21, 2020 | Completed final sign-off Apr 2020 | 559 21st Av | legalization of bedroom at 1st fl storage ref 201908128593 legalize bath/closetDetails
legalization of bedroom at 1st fl storage ref 201908128593 legalize bath/closet | $2,000 | |
| Dec 31, 2019 | Never finaled issued Jun 2021, no final | 400 Rolph St | conversion of garage into accessory dwelling unit (adu) per ordinance 162-16Details
conversion of garage into accessory dwelling unit (adu) per ordinance 162-16 | $150,000 | |
| Nov 7, 2019 | Completed final sign-off Jul 2020 | 400 Rolph St | Salgo Constructions | rev to pa# 201904107598: replacement of foundation walls at sideDetails
rev to pa# 201904107598: replacement of foundation walls at side | $30,000 |
| Aug 12, 2019 | Completed final sign-off Jan 2020 | 559 21st Av | legalization of existing closets and full bath at ground floor, rear garage. to comply with comlaint 20552644.Details
legalization of existing closets and full bath at ground floor, rear garage. to comply with comlaint 20552644. | ||
| Jul 9, 2019 | Completed final sign-off Jul 2020 | 400 Rolph St | Salgo Constructions | revision to 201904107598. remove bathroom at garage level, remove interior stairs, change at vestibule 2nd flDetails
revision to 201904107598. remove bathroom at garage level, remove interior stairs, change at vestibule 2nd fl | $5,000 |
| May 21, 2019 | Never finaled filed May 2019, never issued | 2108 Golden Gate Av | horizontal addition. remodel 3/fl -new interior stairs btw 2nd&3rd fl. 1 new bath, 2 new bedrms, partial replrear roof. expansion (e)roof deck&new small dormer. proposed removal (e)posts&repl beam in garage. elec,plumb & structural work.Details
horizontal addition. remodel 3/fl -new interior stairs btw 2nd&3rd fl. 1 new bath, 2 new bedrms, partial replrear roof. expansion (e)roof deck&new small dormer. proposed removal (e)posts&repl beam in garage. elec,plumb & structural work. | $150,000 | |
| Apr 12, 2019 | Expired or cancelled cancelled Jan 2026 | 213 Noe St | replacement of exising balcony & door (3rd fl). new balcony & door (2nd fl) all work on rear of bldg.Details
replacement of exising balcony & door (3rd fl). new balcony & door (2nd fl) all work on rear of bldg. | $20,000 | |
| Apr 10, 2019 | Completed final sign-off Oct 2020 | 400 Rolph St | Salgo Constructions | proposed interior remodel with structural. plm & ele work. replacement windows and doors on side and rear. new stairs at rear. kitchen remodel.Details
proposed interior remodel with structural. plm & ele work. replacement windows and doors on side and rear. new stairs at rear. kitchen remodel. | $40,000 |
| Mar 7, 2019 | Expired or cancelled withdrawn Dec 2019 | 1832 Lyon St | proposed interior remodel at kitechn dining wall and stairs. no plm/eleDetails
proposed interior remodel at kitechn dining wall and stairs. no plm/ele | $10,000 | |
| Sep 21, 2018 | Never finaled issued Oct 2021, no final | 1055 Ingerson Av | horizontal additon to an existing single family residence with a proposed accessory dwelling unit (adu)@ 3rd fl. incluedes electrical, plumbing,excavation & structural work. ordiance 95-17 (add 5 bathrooms, 1 bedroom)Details
horizontal additon to an existing single family residence with a proposed accessory dwelling unit (adu)@ 3rd fl. incluedes electrical, plumbing,excavation & structural work. ordiance 95-17 (add 5 bathrooms, 1 bedroom) | $150,000 | |
| Sep 4, 2018 | Completed final sign-off Jun 2020 | 1832 Lyon St | Tran Design Dba Perfection Construction | proposed interior remodel with (n) non-structural partititons and electrical work. replacement in-kind of 1 lavatory, 1 (n) lavatory. legalize (e) bedroom and office at basement. ref pa 9700791.Details
proposed interior remodel with (n) non-structural partititons and electrical work. replacement in-kind of 1 lavatory, 1 (n) lavatory. legalize (e) bedroom and office at basement. ref pa 9700791. | $30,000 |
| Sep 1, 2017 | Never finaled issued Sep 2017, no final | 297 Glenview Dr | L A S A L Construction Inc | revision to app#201705045690. change (n) bedroom to (n) office. change door swing.Details
revision to app#201705045690. change (n) bedroom to (n) office. change door swing. | |
| Jul 21, 2017 | Expired or cancelled expired Mar 2022 | 1637 Lombard St | Saint Lazarus General Construction | rev 201612054193, 2015-12-24-5912, 2015-04-07-2954:new roof deck with stairs in kind. rebuild entry stairs in kind. revise gr fl plan, addl gr fl area, bonus rm, media rm, relocate water heatersDetails
rev 201612054193, 2015-12-24-5912, 2015-04-07-2954:new roof deck with stairs in kind. rebuild entry stairs in kind. revise gr fl plan, addl gr fl area, bonus rm, media rm, relocate water heaters | $30,000 |
| Sep 26, 2016 | Completed final sign-off Feb 2017 | 878 32nd Av | The Construction Guy Inc | demolish extg wall on 2nd floor. new posts and footings.Details
demolish extg wall on 2nd floor. new posts and footings. | $4,000 |
| Jul 11, 2016 | Expired or cancelled expired Sep 2021 | 1637 Lombard St | new partition and voluntary structural upgrades on ground floor, ref pa 2015 0407 2954 & 2015 1224 5912, includes shear walls & foundation at mechanical roomDetails
new partition and voluntary structural upgrades on ground floor, ref pa 2015 0407 2954 & 2015 1224 5912, includes shear walls & foundation at mechanical room | $20,000 | |
| Apr 13, 2016 | Expired or cancelled withdrawn Apr 2016 | 878 32nd Av | new stairs connecting ground floor and 2nd floor. replace 2nd floor door to window. new lighting and electrical outlets on ground floor.Details
new stairs connecting ground floor and 2nd floor. replace 2nd floor door to window. new lighting and electrical outlets on ground floor. | $5,000 | |
| Dec 24, 2015 | Expired or cancelled expired Sep 2021 | 1637 Lombard St | additional work to pa# 201504072954. vol structural upgrades, demo (e) bearing walls, replace with beams & posts. non structural ceiling elements & revised lighting layoutDetails
additional work to pa# 201504072954. vol structural upgrades, demo (e) bearing walls, replace with beams & posts. non structural ceiling elements & revised lighting layout | $50,000 | |
| Jun 23, 2015 | Completed final sign-off Oct 2016 | 1598 Sanchez St | E B W Builders Inc | change of use: retail to restaurant. (n) equipment in service & wash area (counter oven, refrigerator), (n) dining area (tables, seating, counters). mep under separate permitDetails
change of use: retail to restaurant. (n) equipment in service & wash area (counter oven, refrigerator), (n) dining area (tables, seating, counters). mep under separate permit | $2,000 |
| Apr 7, 2015 | Expired or cancelled expired Mar 2022 | 1637 Lombard St | conversion of dental office to residential unit. all interior work change of occupancy r-3/b to r-3Details
conversion of dental office to residential unit. all interior work change of occupancy r-3/b to r-3 | $30,000 | |
| Dec 19, 2014 | Completed final sign-off Jul 2015 | 3770 Cesar Chavez St | Thomas Lau Construction | bathroom enlargement at g/fDetails
bathroom enlargement at g/f | $5,000 |