Saint Lazarus General Construction
- Based in
- Hayward
- On San Francisco permits
- Jul 2010 to Dec 2023
- Last 24 months
- 0 permits filed
13 permits since 2000: 9 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 6, 2023 | Completed final sign-off Jun 2024 | 1459 Oak St | grout permeation foundation on west side to stabilize soil for excavation of new footingDetails
grout permeation foundation on west side to stabilize soil for excavation of new footing | $5,000 |
| Dec 5, 2023 | Completed final sign-off Jun 2024 | 1465 Oak St | grout permeation foundation east side to stabilize soil for excavation of new footing in adjacent propertyDetails
grout permeation foundation east side to stabilize soil for excavation of new footing in adjacent property | $15,000 |
| Aug 14, 2023 | Completed final sign-off Jun 2024 | 1459 Oak St | replace e brick foundation in westside for new concrete foundation (33 linear feet)Details
replace e brick foundation in westside for new concrete foundation (33 linear feet) | $30,000 |
| Feb 6, 2023 | Never finaled issued Feb 2023, no final | 1459 Oak St | concrete removal and trenching for sewer line replacement from back of sidewalk to master bedroom. 60 linear ft.Details
concrete removal and trenching for sewer line replacement from back of sidewalk to master bedroom. 60 linear ft. | $25,000 |
| Aug 24, 2021 | Completed final sign-off Dec 2021 | 267 Prague St | in-kind remodeling of 1 kitchen(s) in 1st fl alteration of service equipment.Details
in-kind remodeling of 1 kitchen(s) in 1st fl alteration of service equipment. | $44,000 |
| Dec 3, 2018 | Never finaled issued Dec 2018, no final | 1637 Lombard St | street space. sidewalk only for m963387.Details
street space. sidewalk only for m963387. | |
| Aug 30, 2018 | Completed final sign-off Dec 2018 | 524 28th St | cripple wall bracing, partial foundation replacement 60 ft work limited to basement/crawl space onlyDetails
cripple wall bracing, partial foundation replacement 60 ft work limited to basement/crawl space only | $40,000 |
| Jul 21, 2017 | Expired or cancelled expired Mar 2022 | 1637 Lombard St | rev 201612054193, 2015-12-24-5912, 2015-04-07-2954:new roof deck with stairs in kind. rebuild entry stairs in kind. revise gr fl plan, addl gr fl area, bonus rm, media rm, relocate water heatersDetails
rev 201612054193, 2015-12-24-5912, 2015-04-07-2954:new roof deck with stairs in kind. rebuild entry stairs in kind. revise gr fl plan, addl gr fl area, bonus rm, media rm, relocate water heaters | $30,000 |
| Nov 21, 2016 | Completed final sign-off Jan 2019 | 878 32nd Av | all work at 878 - 32nd ave - reallocate ground floor social hall into media room & family room. new stairs conecting(e)media room on ground floor to 2nd floor. remove 2nd floor laundry. new lighting & electrical outlets on ground floor & stairs.Details
all work at 878 - 32nd ave - reallocate ground floor social hall into media room & family room. new stairs conecting(e)media room on ground floor to 2nd floor. remove 2nd floor laundry. new lighting & electrical outlets on ground floor & stairs. | $25,000 |
| May 20, 2015 | Never finaled issued May 2015, no final | 3079 Broderick St | siding repair/replacement approx 100 sq ft. exterior painting of north side, visible from street. n/a maher ordinanceDetails
siding repair/replacement approx 100 sq ft. exterior painting of north side, visible from street. n/a maher ordinance | $11,000 |
| May 11, 2015 | Completed final sign-off Oct 2016 | 1510 Pacific Av | 1st flr: construct storage rooms & 1/2 bath at back of garage 2nd flr: reconfigure plan to includ liv, din, kit, 2 bathrm, study, laundrm 2 bedtooms 3rd flr: reconfigure plan to includ liv, din, kit, 2 bathrm, study, laundrm 2 bedtooms. new stairs to new roof deck roof: new hatch, deck & 2 skylightsDetails
1st flr: construct storage rooms & 1/2 bath at back of garage 2nd flr: reconfigure plan to includ liv, din, kit, 2 bathrm, study, laundrm 2 bedtooms 3rd flr: reconfigure plan to includ liv, din, kit, 2 bathrm, study, laundrm 2 bedtooms. new stairs to new roof deck roof: new hatch, deck & 2 skylights | $350,000 |
| Sep 3, 2014 | Completed final sign-off Dec 2014 | 52 Bernard St | roof deck and waterproofing including one window replacement, drywall and stucco repairs related to this repair. replace window in kind with orginal aluminum window. stucco repair and roof deck repair in kind. u factor .32Details
roof deck and waterproofing including one window replacement, drywall and stucco repairs related to this repair. replace window in kind with orginal aluminum window. stucco repair and roof deck repair in kind. u factor .32 | $29,000 |
| Jul 30, 2010 | Completed final sign-off Sep 2010 | 1044 Pine St | repair of fire escape stair string at 3rd level. no change in configuration.Details
repair of fire escape stair string at 3rd level. no change in configuration. | $300 |