L A S A L Construction Inc
- Based in
- Foster City
- On San Francisco permits
- Jan 2014 to Jun 2019
- Last 24 months
- 0 permits filed
8 permits since 2000: 7 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 25, 2019 | Completed final sign-off Mar 2020 | 11 Glenview Dr | revision to pa 201507091010 modular sunroom added to deckDetails
revision to pa 201507091010 modular sunroom added to deck | $20,000 |
| Aug 30, 2018 | Completed final sign-off Oct 2020 | 11 Glenview Dr | provide shoring on north sitde of the bld for new addition. ref pa#201507091010.Details
provide shoring on north sitde of the bld for new addition. ref pa#201507091010. | $2,100 |
| Sep 1, 2017 | Never finaled issued Sep 2017, no final | 297 Glenview Dr | revision to app#201705045690. change (n) bedroom to (n) office. change door swing.Details
revision to app#201705045690. change (n) bedroom to (n) office. change door swing. | |
| May 4, 2017 | Completed final sign-off Sep 2017 | 297 Glenview Dr | ground floor: interior addition w/ full bath and two bedrooms, two new windows on south elevation and enlarge (1) existing window on east elevation.Details
ground floor: interior addition w/ full bath and two bedrooms, two new windows on south elevation and enlarge (1) existing window on east elevation. | $25,000 |
| Dec 28, 2016 | Completed final sign-off Dec 2017 | 106 Frederick St | unit 106a: interior remodel including kitchen, electrical and plumbing. replace gas wall heater. new kitchen exhaust duct/hood.Details
unit 106a: interior remodel including kitchen, electrical and plumbing. replace gas wall heater. new kitchen exhaust duct/hood. | $20,000 |
| Jul 9, 2015 | Completed final sign-off Mar 2020 | 11 Glenview Dr | horizontal extension. 1 storage basement room with electric and plmg work. one sunroom with roof, electrical work will be done.Details
horizontal extension. 1 storage basement room with electric and plmg work. one sunroom with roof, electrical work will be done. | $100,000 |
| Apr 20, 2015 | Completed final sign-off Aug 2015 | 3467 Jackson St | remodel (e) master bathroom, relocate toilet, remove all plumbing fixtures, install new tile & new electrical/plumbing fixtures. no exterior changes. compliance with maher ordinance no 155-13 not required.Details
remodel (e) master bathroom, relocate toilet, remove all plumbing fixtures, install new tile & new electrical/plumbing fixtures. no exterior changes. compliance with maher ordinance no 155-13 not required. | $18,500 |
| Jan 15, 2014 | Completed final sign-off Sep 2014 | 297 Glenview Dr | remodeling bathroom and kitchen, update ceiling lighting. no exterior changes.Details
remodeling bathroom and kitchen, update ceiling lighting. no exterior changes. | $35,980 |