45 permits since 2000 (architect on 45 permits): 22 completed, 7 in progress, 14 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 18, 2026 | In progress issued Aug 2026 | 1000 Harrison St | Wayne Perry Inc | remove & replace (6) dispensers, wayne ovation 2. remove incon tank monitoring panel. replace tls 350 tank monitoring planel w/ tls 450 panel. install dplld transducers, tank over fill alarm, cat 6 upgarde from card readers to cashier, wire intercom upgrade. replace submersible turbine pump @ superDetails
remove & replace (6) dispensers, wayne ovation 2. remove incon tank monitoring panel. replace tls 350 tank monitoring planel w/ tls 450 panel. install dplld transducers, tank over fill alarm, cat 6 upgarde from card readers to cashier, wire intercom upgrade. replace submersible turbine pump @ super | $20,000 |
| May 19, 2026 | In progress filed May 2026, not yet issued | 30 Onondaga Av | remove & install 4,000 gallon above ground storage tank. connect (e) underground double wall piping to new ast. upgrade tank monitoring panel.Details
remove & install 4,000 gallon above ground storage tank. connect (e) underground double wall piping to new ast. upgrade tank monitoring panel. | $200,000 | |
| Mar 16, 2026 | In progress filed Mar 2026, not yet issued | 360 Spear St | install temp generator base tank alongside building adjacent to tapp access box. r/r 200 gallon day tank.Details
install temp generator base tank alongside building adjacent to tapp access box. r/r 200 gallon day tank. | $200,000 | |
| Jul 29, 2025 | Completed final sign-off Oct 2025 | 145 Jefferson St | Mjm Construction(Michael Mendoza Const I | interior remodel to include new finishes & furniture in front of house, including dining area, lighting to remain. limited demolition, limited plumbing & electrical work. limited (n)equipment in kitchen & back of house. boh wall, floor and ceiling finishes to remain. boh lighting remain.Details
interior remodel to include new finishes & furniture in front of house, including dining area, lighting to remain. limited demolition, limited plumbing & electrical work. limited (n)equipment in kitchen & back of house. boh wall, floor and ceiling finishes to remain. boh lighting remain. | $150,000 |
| Feb 27, 2025 | In progress filed Feb 2025, not yet issued | 6000 Geary Bl | revision to approved bpa #202212299421. remodel 1,989 a2 convinience store. new building signage, new trash and mechanical enclosure. accessible parking. scope remains same as approved b.p. there is a complete redesign of the layout. reconfigure interior area of convinience store.Details
revision to approved bpa #202212299421. remodel 1,989 a2 convinience store. new building signage, new trash and mechanical enclosure. accessible parking. scope remains same as approved b.p. there is a complete redesign of the layout. reconfigure interior area of convinience store. | ||
| May 2, 2024 | In progress issued Nov 2025 | 430 Bush St | Roebbelen Contracting Inc | install (1) standby packaged 2mw 4160 volt diesel generator #3 (gen-3) & its associated after treatment system on the roof of 430 bush. provide & install fuel piping which transfer between the two buildings. provide & install piping for the equip. mentioned above. all misc. arch, mech, elec, & ...Details
install (1) standby packaged 2mw 4160 volt diesel generator #3 (gen-3) & its associated after treatment system on the roof of 430 bush. provide & install fuel piping which transfer between the two buildings. provide & install piping for the equip. mentioned above. all misc. arch, mech, elec, & ... | $400,000 |
| Dec 29, 2022 | In progress issued Feb 2025 | 6000 Geary Bl | Kc Partners Corp Dba B &T Service Statio | extg cheveron gasoline station with the following work: remodel 1989 sq ft convenient store. new building signage. new trash and mechanical enclosure. accessible parkingDetails
extg cheveron gasoline station with the following work: remodel 1989 sq ft convenient store. new building signage. new trash and mechanical enclosure. accessible parking | $500,000 |
| Nov 10, 2022 | In progress issued Nov 2025 | 555 Pine St | Roebbelen Contracting Inc | install 540 gal urea tank on the 1st floor of 555 pine. provide & install fuel piping & associated fuel pumps at 555 pine which transfer between the two buildings. provide & install piping for the equipment mentioned above. all misc. arch, mech, elec, & controls work required to complete the projectDetails
install 540 gal urea tank on the 1st floor of 555 pine. provide & install fuel piping & associated fuel pumps at 555 pine which transfer between the two buildings. provide & install piping for the equipment mentioned above. all misc. arch, mech, elec, & controls work required to complete the project | $100,000 |
| Jun 13, 2022 | Completed final sign-off Jul 2023 | 1501 Van Ness Av | Jones/Convey Group Incorportaed | rev to bpa#202106233062. minor changes.install heavy duty concrete pavement w/in property line. reonfig floor plan per sales, storage, cashier areas. new ceiling speaker throughout sales fl, new platforms on roof w/insulation cricket attached. paint ext/int. structural pad for tanks, new landscapingDetails
rev to bpa#202106233062. minor changes.install heavy duty concrete pavement w/in property line. reonfig floor plan per sales, storage, cashier areas. new ceiling speaker throughout sales fl, new platforms on roof w/insulation cricket attached. paint ext/int. structural pad for tanks, new landscaping | |
| Jun 23, 2021 | Completed final sign-off Jul 2023 | 1501 Van Ness Av | Jones/Convey Group Incorportaed | remove kiosk - modify (e) canopy colums - (n) 727 sq ft under canopy kiosk. remove (e) underground fuel tank and piping, install (n) underground fuel tank and piping. paining (e) restroom & storage to match kiosk.Details
remove kiosk - modify (e) canopy colums - (n) 727 sq ft under canopy kiosk. remove (e) underground fuel tank and piping, install (n) underground fuel tank and piping. paining (e) restroom & storage to match kiosk. | $1,700,000 |
| Jun 14, 2021 | Completed final sign-off Jul 2022 | 609 Market St | Holt Construction Inc | main floor dining and front counter remodel.no increase in occupant load.relocation of existing non-grease kitchen equipment.replacement of existing split system hvac unit-like for like.install (n) gender neutral bath in bsmt.remove (e) dining fixtures in basement. convert dining to storage in bsmt.Details
main floor dining and front counter remodel.no increase in occupant load.relocation of existing non-grease kitchen equipment.replacement of existing split system hvac unit-like for like.install (n) gender neutral bath in bsmt.remove (e) dining fixtures in basement. convert dining to storage in bsmt. | $325,000 |
| Feb 8, 2018 | Never finaled issued Feb 2018, no final | 2950 San Jose Av | installation of co2 tanks & alert sensor & horn system. compressed gas systemDetails
installation of co2 tanks & alert sensor & horn system. compressed gas system | $800 | |
| Feb 8, 2018 | Never finaled issued Feb 2018, no final | 1000 Harrison St | installation of co2 tanks & alert sensor & horn system. compressed gas systemDetails
installation of co2 tanks & alert sensor & horn system. compressed gas system | $800 | |
| Feb 8, 2018 | Never finaled issued Feb 2018, no final | 1288 19th Av | installation of co2 tanks & alert sensor & horn system. compressed gas systemDetails
installation of co2 tanks & alert sensor & horn system. compressed gas system | $800 | |
| Feb 8, 2018 | Never finaled issued Feb 2018, no final | 1790 Lombard St | installation of co2 tanks & alert sensor & horn system. compressed gas systemDetails
installation of co2 tanks & alert sensor & horn system. compressed gas system | $800 | |
| Feb 8, 2018 | Never finaled issued Feb 2018, no final | 3675 Geary Bl | installation of co2 tanks & alert sensor & horn system. compressed gas systemDetails
installation of co2 tanks & alert sensor & horn system. compressed gas system | $800 | |
| Apr 27, 2017 | Completed final sign-off Jun 2018 | 1256 Market St | Rudolph Commercial Interiors Inc, Rci | tenant improvement to make 2nd fl space accessible including removel of (e) stairs, replacement of restrooms and installation of elevator. 2nd flr interior work only.Details
tenant improvement to make 2nd fl space accessible including removel of (e) stairs, replacement of restrooms and installation of elevator. 2nd flr interior work only. | $185,000 |
| Apr 12, 2017 | Completed final sign-off Sep 2017 | 611 Folsom St | North American Power & Controls Inc | basement- remove (e) threaded piping which provides fuel to the standby generator, install new welded piping in the same orientation and location as (e), paint & label all piping, relocate tank monitoring panel to outside of engine room. n/a ordinance #155-13Details
basement- remove (e) threaded piping which provides fuel to the standby generator, install new welded piping in the same orientation and location as (e), paint & label all piping, relocate tank monitoring panel to outside of engine room. n/a ordinance #155-13 | $70,000 |
| Apr 10, 2017 | Never finaled issued Mar 2018, no final | 1256 Market St | Rudolph Commercial Interiors Inc, Rci | tenant improvement exterior minor remodel includes relocating storefront door and adding (2) new hvac units on (2) curbs at (e) roofDetails
tenant improvement exterior minor remodel includes relocating storefront door and adding (2) new hvac units on (2) curbs at (e) roof | $85,000 |
| Jan 25, 2017 | Completed final sign-off Oct 2017 | 2345 Pine St | Gettler-Ryan Inc | revise pa 2016-0624-0828 - fire department wants the proposed piping changed to steel where above ground inside of the building. no changes to electrical or structuralDetails
revise pa 2016-0624-0828 - fire department wants the proposed piping changed to steel where above ground inside of the building. no changes to electrical or structural | |
| Jun 24, 2016 | Never finaled issued Oct 2016, no final | 2345 Pine St | Gettler-Ryan Inc | replace underground fuel piping from (e) underground storage tank to (e) generators in basement. install new 75 gallon day tank & pump in basement. ** maher: n/a **Details
replace underground fuel piping from (e) underground storage tank to (e) generators in basement. install new 75 gallon day tank & pump in basement. ** maher: n/a ** | $225,000 |
| Dec 17, 2015 | Completed final sign-off Mar 2017 | 1501 Van Ness Av | Gettler-Ryan Inc | making repairs and alteration to restroom structure.Details
making repairs and alteration to restroom structure. | $15,000 |
| Sep 16, 2015 | Completed final sign-off Apr 2016 | 145 Jefferson St | Ybj Construction Services | decore upgrade, ada barrier removal, store front alteration. n/a ordinance #155-13Details
decore upgrade, ada barrier removal, store front alteration. n/a ordinance #155-13 | $190,000 |
| Jul 7, 2015 | Completed final sign-off May 2016 | 235 Front St | Ybj Construction Services | decor upgrades, ada removal from dining and restrooms. kitchen upgrade. exterior work under separate permit. n/a for maherDetails
decor upgrades, ada removal from dining and restrooms. kitchen upgrade. exterior work under separate permit. n/a for maher | $300,000 |
| May 14, 2015 | Completed final sign-off May 2016 | 235 Front St | Ybj Construction Services | upgrade existing facade. ** maher: compliance with ordinance no# 155-13 not required **Details
upgrade existing facade. ** maher: compliance with ordinance no# 155-13 not required ** | $100,000 |
| Apr 30, 2015 | Completed final sign-off Apr 2016 | 255 Winston Dr | Ybj Construction Services | upgrade existing facades, upgrade existing dining area with new decor, upgrade restrooms to meet ada requirements, minor kitchen updates.Details
upgrade existing facades, upgrade existing dining area with new decor, upgrade restrooms to meet ada requirements, minor kitchen updates. | $150,000 |
| Jan 28, 2014 | Completed final sign-off Jul 2014 | 665 Market St | Hilbers Inc. | t.i. for new restaurant, new kitchen, adding 2 new restrooms, partitions stair case, electrical, plumbing & mechanical. sprinkler & fire alarm under separate permits. no change to exterior. compliance with ord #155-13 not required.Details
t.i. for new restaurant, new kitchen, adding 2 new restrooms, partitions stair case, electrical, plumbing & mechanical. sprinkler & fire alarm under separate permits. no change to exterior. compliance with ord #155-13 not required. | $500,000 |
| Aug 15, 2013 | Completed final sign-off Nov 2013 | 3201 Divisadero St | Walgreen Company | install new produce rack and reach in coolerDetails
install new produce rack and reach in cooler | $8,000 |
| Jul 15, 2013 | Completed final sign-off Nov 2013 | 5455 Geary Bl | G L C Construction Company Inc | minor t.i. consisting of remodel of walls & ceiling, new furnture & finishes including some electrical scope.Details
minor t.i. consisting of remodel of walls & ceiling, new furnture & finishes including some electrical scope. | $75,000 |
| Mar 8, 2012 | Completed final sign-off Jan 2013 | 1200 Geneva Av | Wolff's Sign Maintenance | erect elect, wall single faced sign (2 new "arco" canopy signs illuminated on canopy face) (3 new logos canopy- illuminated (on conopy face (replaced 3 existing)Details
erect elect, wall single faced sign (2 new "arco" canopy signs illuminated on canopy face) (3 new logos canopy- illuminated (on conopy face (replaced 3 existing) | $1,600 |
| Mar 8, 2012 | Never finaled issued Nov 2012, no final | 1200 Geneva Av | Wolff's Sign Maintenance | exterior image upgrade of (e) service station: install new canopy signs; replaced under-canopy lights w/energy efficient led's reface (e) gas dispensers, paint building exterior, repair as needed.Details
exterior image upgrade of (e) service station: install new canopy signs; replaced under-canopy lights w/energy efficient led's reface (e) gas dispensers, paint building exterior, repair as needed. | $15,800 |
| Mar 8, 2012 | Never finaled issued Oct 2012, no final | 1798 Mission St | Wolff's Sign Maintenance | erect total 5 electric, wall single faced signDetails
erect total 5 electric, wall single faced sign | $1,600 |
| Mar 8, 2012 | Never finaled issued Oct 2012, no final | 5898 Mission St | Wolff's Sign Maintenance | erect electric, wall single faced signDetails
erect electric, wall single faced sign | $1,000 |
| Mar 8, 2012 | Never finaled issued Oct 2012, no final | 1798 Mission St | Wolff's Sign Maintenance | exterior image upgrade of (e) service station: install new canopy signs; replaced under-canopy lights w/energy efficient led's reface (e) gas dispensers, paint building exterior, repair as needed.Details
exterior image upgrade of (e) service station: install new canopy signs; replaced under-canopy lights w/energy efficient led's reface (e) gas dispensers, paint building exterior, repair as needed. | $16,600 |
| Mar 8, 2012 | Completed final sign-off Nov 2012 | 2190 Carroll Av | Wolff's Sign Maintenance | erect elect, wall single faced signDetails
erect elect, wall single faced sign | $2,700 |
| Mar 8, 2012 | Completed final sign-off Jan 2013 | 5898 Mission St | Wolff's Sign Maintenance | exterior image upgrade of (e) service station: install new canopy signs; replaced under-canopy lights w/energy efficient led's reface (e) gas dispensers, paint building exterior, repair as needed.Details
exterior image upgrade of (e) service station: install new canopy signs; replaced under-canopy lights w/energy efficient led's reface (e) gas dispensers, paint building exterior, repair as needed. | $14,200 |
| Mar 8, 2012 | Expired or cancelled cancelled Feb 2014 | 2190 Carroll Av | Wolff's Sign Maintenance | exterior image upgrade of (e) service station: install new canopy signs; replaced under-canopy lights w/energy efficient led's reface (e) gas dispensers, paint building exterior, repair as needed.Details
exterior image upgrade of (e) service station: install new canopy signs; replaced under-canopy lights w/energy efficient led's reface (e) gas dispensers, paint building exterior, repair as needed. | $18,500 |
| Mar 8, 2012 | Never finaled issued Nov 2012, no final | 1175 Fell St | Wolff's Sign Maintenance | erect elect, wall single faced signDetails
erect elect, wall single faced sign | $2,700 |
| Mar 8, 2012 | Never finaled issued Nov 2012, no final | 1175 Fell St | Wolff's Sign Maintenance | exterior image upgrade of (e) service station: install new canopy signs; replaced under-canopy lights w/energy efficient led's reface (e) gas dispensers, paint building exterior, repair as needed.Details
exterior image upgrade of (e) service station: install new canopy signs; replaced under-canopy lights w/energy efficient led's reface (e) gas dispensers, paint building exterior, repair as needed. | $16,900 |
| Jan 30, 2009 | Completed final sign-off Jul 2009 | 345 Bay Shore Bl | Stevens-Hemingway-Stevens | new drive thru layout & branding, board, new cashier addition, new trash enclosure, remove & replace non-conforming walls to make compliance on men's & women's restroom. information signage.Details
new drive thru layout & branding, board, new cashier addition, new trash enclosure, remove & replace non-conforming walls to make compliance on men's & women's restroom. information signage. | $60,000 |
| Aug 8, 2008 | Never finaled issued Aug 2008, no final | 5 03rd St | installation of new brewer & new countertop for brewer. removal of old counter and new brewer location minor plumbing & electric for brewer. relocate 2 merchandise units.Details
installation of new brewer & new countertop for brewer. removal of old counter and new brewer location minor plumbing & electric for brewer. relocate 2 merchandise units. | $6,900 | |
| Apr 9, 2007 | Completed final sign-off Jul 2007 | 2101 Lombard St | revision to an issued permit 3200608189847 & 200608189849 add urinal to men's restroom , add additional f;oor sinks, modify equipment, modify plumbing & electrical oper new changesDetails
revision to an issued permit 3200608189847 & 200608189849 add urinal to men's restroom , add additional f;oor sinks, modify equipment, modify plumbing & electrical oper new changes | $500 | |
| Nov 29, 2006 | Completed final sign-off Jul 2007 | 2101 Lombard St | All Around Renovations Inc. | demolish one story restaurant.Details
demolish one story restaurant. | |
| Jun 14, 2005 | Completed final sign-off Mar 2006 | 660 Polk St | submit hardship requestfor automatic door openner.modify exisitng buld. permit200405204397Details
submit hardship requestfor automatic door openner.modify exisitng buld. permit200405204397 | ||
| Oct 20, 2004 | Expired or cancelled expired Jan 2009 | 490 Bay St | Jeff Hortick Construction Co. | painted non-structural signDetails
painted non-structural sign | $5,000 |