G L C Construction Company Inc
- Based in
- Novato
- On San Francisco permits
- Nov 2005 to Jun 2023
- Last 24 months
- 0 permits filed
72 permits since 2000: 58 completed, 12 never finaled, 2 expired or cancelled.
Of the 12 never-finaled permits, 4 are 3 to 5 years old, 1 is 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 21, 2023 | Completed final sign-off Jul 2024 | 333 Market St | 1/f annex: new pantry area w/new finishes/lighting, new tv wall @ (e) collaboration area. hvac upgrade for new remodelDetails
1/f annex: new pantry area w/new finishes/lighting, new tv wall @ (e) collaboration area. hvac upgrade for new remodel | $135,000 |
| Jun 7, 2023 | Completed final sign-off Jul 2024 | 333 Market St | interior renov of (e) wells fargo bank, exterior walk-up atm/night drop, new interior wall partitions, ext atm wall, millwork/teller line, breakroom, it room, work room, new restroom, new finishes, ceiling fixtures to be installedDetails
interior renov of (e) wells fargo bank, exterior walk-up atm/night drop, new interior wall partitions, ext atm wall, millwork/teller line, breakroom, it room, work room, new restroom, new finishes, ceiling fixtures to be installed | $446,280 |
| May 9, 2023 | Completed final sign-off Oct 2024 | 292 Battery St | remove 2 atm exterior storefront and replace with solid storefront panels with new tinted glazing to match existing.Details
remove 2 atm exterior storefront and replace with solid storefront panels with new tinted glazing to match existing. | $5,000 |
| Sep 14, 2022 | Never finaled issued Sep 2022, no final | 303 02nd St | removal of (1 of 2) (e) atm's @ wells fargo bank exterior storefront and replacing solid storefront panels with new tinted glazing to match existing. (inside property line)Details
removal of (1 of 2) (e) atm's @ wells fargo bank exterior storefront and replacing solid storefront panels with new tinted glazing to match existing. (inside property line) | $2,000 |
| Aug 5, 2022 | Never finaled issued Nov 2022, no final | 333 Market St | 15th flr - new recording studio 4 editing room w/ (n) lighting fixtures, ceiling, finishes. conversion of (e) offices, finishes; (n) conference, huddle rooms, and focus rooms remodelDetails
15th flr - new recording studio 4 editing room w/ (n) lighting fixtures, ceiling, finishes. conversion of (e) offices, finishes; (n) conference, huddle rooms, and focus rooms remodel | $500,000 |
| Jun 15, 2022 | Completed final sign-off Oct 2022 | 303 02nd St | revision to pa 2021-1117-2614 1 supply & return grille added. no new fsd are being added. add lighting and power to first floor.Details
revision to pa 2021-1117-2614 1 supply & return grille added. no new fsd are being added. add lighting and power to first floor. | |
| Jun 1, 2022 | Completed final sign-off Jul 2022 | 303 02nd St | revision to pa# 202111172614. existing restroom to remain unchanged.Details
revision to pa# 202111172614. existing restroom to remain unchanged. | |
| Feb 11, 2022 | Completed final sign-off Oct 2022 | 550 California St | to comply w/nov #202286616. repairs to sub-sidewalk basement roof slabDetails
to comply w/nov #202286616. repairs to sub-sidewalk basement roof slab | $200,000 |
| Feb 4, 2022 | Never finaled issued Feb 2022, no final | 460 Sutter St | intall 2 new atm units. structural work only.Details
intall 2 new atm units. structural work only. | $3,000 |
| Feb 4, 2022 | Completed final sign-off Oct 2022 | 303 02nd St | intall 2 new atm units. structural work only.Details
intall 2 new atm units. structural work only. | $3,000 |
| Feb 4, 2022 | Never finaled issued Feb 2022, no final | 292 Battery St | intall 2 new atm units. structural work only.Details
intall 2 new atm units. structural work only. | $3,000 |
| Dec 10, 2021 | Completed final sign-off Mar 2022 | 333 Market St | 30th floor: conversion of (e) office to (n) supply room. all (e) fixtures to remain. hvac upgrade for area of construction only.Details
30th floor: conversion of (e) office to (n) supply room. all (e) fixtures to remain. hvac upgrade for area of construction only. | $50,000 |
| Nov 17, 2021 | Completed final sign-off Jun 2022 | 460 Sutter St | ground fl - remove furniture - equipment and flooring in existing wells fargo bank; install new interrior wall partitions (non bearing); provide new furniture and interior finishesDetails
ground fl - remove furniture - equipment and flooring in existing wells fargo bank; install new interrior wall partitions (non bearing); provide new furniture and interior finishes | $136,000 |
| Nov 17, 2021 | Completed final sign-off Jul 2022 | 303 02nd St | ground fl remove furniture, mill work, equipment and flooring in (e) wells fargo bank; install new interior finishes and new wall partitions (non bearing) new furnitureDetails
ground fl remove furniture, mill work, equipment and flooring in (e) wells fargo bank; install new interior finishes and new wall partitions (non bearing) new furniture | $136,000 |
| Nov 17, 2021 | Completed final sign-off Jun 2022 | 292 Battery St | remove furniture,equipment & flooring in existing well fargo bank.install new interior walls partition(non-bearing)provide new furniture & interior finishes.. no exterior work.Details
remove furniture,equipment & flooring in existing well fargo bank.install new interior walls partition(non-bearing)provide new furniture & interior finishes.. no exterior work. | $136,000 |
| Feb 23, 2021 | Completed final sign-off Jul 2021 | 333 Market St | 28th fl: add 1 new heat pump for additional power/ data/ wiremolds required for equipment in storage room 2813. no new smoke dampers being added. mechanical & electrical work only.Details
28th fl: add 1 new heat pump for additional power/ data/ wiremolds required for equipment in storage room 2813. no new smoke dampers being added. mechanical & electrical work only. | $27,000 |
| Dec 9, 2020 | Expired or cancelled cancelled May 2021 | 550 California St | 7th flr. conversion of (e) offices / finishes / lighting. (n) conference rooms, huddle and focus rooms remodel. upgrade all fixtures to new led lighting. hvac upgrade for new remodel.Details
7th flr. conversion of (e) offices / finishes / lighting. (n) conference rooms, huddle and focus rooms remodel. upgrade all fixtures to new led lighting. hvac upgrade for new remodel. | $1,540,000 |
| Oct 17, 2020 | Completed final sign-off Jul 2021 | 333 Market St | 29th floor: conversion of (e) offices, finishes, lighting. (n) conference rooms, huddle rooms & breakroom remodel. upgrade all fixtures to new led lighting. hvac upgrade for new remodel.Details
29th floor: conversion of (e) offices, finishes, lighting. (n) conference rooms, huddle rooms & breakroom remodel. upgrade all fixtures to new led lighting. hvac upgrade for new remodel. | $790,150 |
| Oct 10, 2020 | Completed final sign-off Jul 2021 | 333 Market St | 28th flr. demo 9 existing office and constructing 8 new focus rooms. remodel of (e) conference rooms, huddle rooms, break room.provide new finishes & upgrade of all fixtures t onew led lighting. upgrade hvac due to remodel.Details
28th flr. demo 9 existing office and constructing 8 new focus rooms. remodel of (e) conference rooms, huddle rooms, break room.provide new finishes & upgrade of all fixtures t onew led lighting. upgrade hvac due to remodel. | $780,150 |
| Oct 2, 2020 | Completed final sign-off Jul 2021 | 333 Market St | 27/f suite b: t.i. change of (e) furniture in areas of work, covert (e) offices to (n) conference rooms. (n) mechanical & (n) electrical work in affected area of work. maher n/a.Details
27/f suite b: t.i. change of (e) furniture in areas of work, covert (e) offices to (n) conference rooms. (n) mechanical & (n) electrical work in affected area of work. maher n/a. | $175,000 |
| Sep 24, 2020 | Completed final sign-off Jul 2021 | 333 Market St | 21/f: conversion of (e) offices/finishes/lighting; (n) conference rooms, huddle and focus rooms remodel. upgrade all fixtures to new led lghting. hvac upgrade for new remodel. maher n/a.Details
21/f: conversion of (e) offices/finishes/lighting; (n) conference rooms, huddle and focus rooms remodel. upgrade all fixtures to new led lghting. hvac upgrade for new remodel. maher n/a. | $1,530,000 |
| Nov 5, 2019 | Completed final sign-off Jul 2020 | 333 Market St | 25th floor: total floor area 15,335 sq.ft. total effected area 4,735 sq.ft. office remodel of new huddle rooms, focus rooms & break room. new furniture & finishes. upgrade fixture to new led lighting. hvac upgrade for new remodel.Details
25th floor: total floor area 15,335 sq.ft. total effected area 4,735 sq.ft. office remodel of new huddle rooms, focus rooms & break room. new furniture & finishes. upgrade fixture to new led lighting. hvac upgrade for new remodel. | $516,115 |
| Oct 2, 2019 | Completed final sign-off Jan 2020 | 333 Market St | install movable gas partition. (electrical door)Details
install movable gas partition. (electrical door) | $50,000 |
| Jun 5, 2019 | Never finaled issued Jun 2019, no final | 333 Market St | 33/f: office remodel of new conf rm, huddle rm, focus rm, break rm, new furniture & finishes. upgrade all fixture to new led lighting. hvac upgrade for new remodel. maher n/a.Details
33/f: office remodel of new conf rm, huddle rm, focus rm, break rm, new furniture & finishes. upgrade all fixture to new led lighting. hvac upgrade for new remodel. maher n/a. | $1,962,000 |
| Jun 5, 2019 | Completed final sign-off Jul 2020 | 333 Market St | 26/f, office remodel. (n) conference rooms, huddle rooms, focus rooms, 1 breakroom, new furniture and finishes. upgrade all fixtures to (n) led lighting, hvac upgrade for new remodel. maher n/a.Details
26/f, office remodel. (n) conference rooms, huddle rooms, focus rooms, 1 breakroom, new furniture and finishes. upgrade all fixtures to (n) led lighting, hvac upgrade for new remodel. maher n/a. | $1,962,000 |
| Mar 8, 2019 | Completed final sign-off Jul 2019 | 333 Market St | suite 200. remodel of (e) office space into (n) waiting room, (n) observation room & (n) interview room. upgrae all lights fixtures in suite to (n) led lighting. hvac upgrade for (n) remodel.Details
suite 200. remodel of (e) office space into (n) waiting room, (n) observation room & (n) interview room. upgrae all lights fixtures in suite to (n) led lighting. hvac upgrade for (n) remodel. | $75,000 |
| Jan 3, 2019 | Completed final sign-off Jul 2020 | 333 Market St | 8th flr. office remodel of (n) conference rooms, huddle rooms, focus rooms and break rooms. new furniture and finishes. upgrade all fixtures to new led lighting. hvac upgrade for new remodelDetails
8th flr. office remodel of (n) conference rooms, huddle rooms, focus rooms and break rooms. new furniture and finishes. upgrade all fixtures to new led lighting. hvac upgrade for new remodel | $729,000 |
| Aug 28, 2018 | Completed final sign-off Mar 2019 | 333 Market St | 30th flr - demo (e) offices/finishes. new conference rooms, huddle focus rm and breakroom. remodel, upgrade all light fixtures to led lighting. hvac upgrade for new remodel. maher naDetails
30th flr - demo (e) offices/finishes. new conference rooms, huddle focus rm and breakroom. remodel, upgrade all light fixtures to led lighting. hvac upgrade for new remodel. maher na | $1,400,000 |
| Aug 28, 2018 | Completed final sign-off Mar 2019 | 333 Market St | 27th flr - demo (e) offices/finishes. new conference rooms, huddle focus rm and breakroom. remodel, upgrade all light fixtures to led lighting. hvac upgrade for new remodel. partial remodel of 27th flr maher naDetails
27th flr - demo (e) offices/finishes. new conference rooms, huddle focus rm and breakroom. remodel, upgrade all light fixtures to led lighting. hvac upgrade for new remodel. partial remodel of 27th flr maher na | $750,000 |
| Jun 27, 2018 | Completed final sign-off Sep 2018 | 550 California St | install bi - fold door. reference 201803083150. n/a for maher.Details
install bi - fold door. reference 201803083150. n/a for maher. | $50,000 |
| Mar 8, 2018 | Completed final sign-off Jan 2019 | 550 California St | 5th floor: remodel of (e) office space: (n) conference rooms, copy areas, mother's room & new studio. new finishes and new led lighting in affected areasDetails
5th floor: remodel of (e) office space: (n) conference rooms, copy areas, mother's room & new studio. new finishes and new led lighting in affected areas | $1,550,000 |
| Aug 2, 2017 | Completed final sign-off Mar 2019 | 333 Market St | remodel of 22nd floor - 3 (n) focus rooms, 1 (n) huddle room, (n) small conference room, (n) copy room, (n) furniture/finishes. upgrade all lights to led (n) mechanical & electrical for new spaces.Details
remodel of 22nd floor - 3 (n) focus rooms, 1 (n) huddle room, (n) small conference room, (n) copy room, (n) furniture/finishes. upgrade all lights to led (n) mechanical & electrical for new spaces. | $275,000 |
| Jun 22, 2017 | Completed final sign-off Mar 2019 | 333 Market St | (tower) 11th fl remodel: add (2) new focus rms, 4(n) small conf. rooms, enlarge existing breakroom, (n) furniture and (n) finishes. add 1 (n) drinking fountain. upgrade existing lighting to (n) led lighting. provide (n) electrical, mechanical and plumbing in areas of work.Details
(tower) 11th fl remodel: add (2) new focus rms, 4(n) small conf. rooms, enlarge existing breakroom, (n) furniture and (n) finishes. add 1 (n) drinking fountain. upgrade existing lighting to (n) led lighting. provide (n) electrical, mechanical and plumbing in areas of work. | $195,000 |
| Jun 22, 2016 | Completed final sign-off Dec 2016 | 333 Market St | remodel 4th floor - add (5) new focus rooms, (2) new conference rooms, (1) new break room. new furniture, finishes & led lighting upgrade. new mep and lighting work for new spaces. no new toilets. fire alarm/life safety under separate permit.Details
remodel 4th floor - add (5) new focus rooms, (2) new conference rooms, (1) new break room. new furniture, finishes & led lighting upgrade. new mep and lighting work for new spaces. no new toilets. fire alarm/life safety under separate permit. | $245,000 |
| Jun 2, 2016 | Completed final sign-off Dec 2016 | 333 Market St | ground floor: remodel of (e) office tenant imporvement with new finishes/power/lighting/hvac ref pa 2014 0521 6369Details
ground floor: remodel of (e) office tenant imporvement with new finishes/power/lighting/hvac ref pa 2014 0521 6369 | $148,000 |
| Jan 25, 2016 | Never finaled issued Feb 2016, no final | 343 Sansome St | 3rd floor: replace extg entry doors and remodel of extg toilet rooms. no change in # of toilet fixtures. n/a for maher.Details
3rd floor: replace extg entry doors and remodel of extg toilet rooms. no change in # of toilet fixtures. n/a for maher. | $45,000 |
| Jan 25, 2016 | Completed final sign-off Nov 2016 | 343 Sansome St | 2nd floor: add one new floor core in main conf. room, replace extg entry doors and remodel of extg toilet rooms. add 1 new urinal to fixture count. n/a for maher.Details
2nd floor: add one new floor core in main conf. room, replace extg entry doors and remodel of extg toilet rooms. add 1 new urinal to fixture count. n/a for maher. | $45,000 |
| May 19, 2015 | Completed final sign-off Oct 2015 | 333 Market St | relocation of existing ducts and grills. add (1) ac condensing unit (4 tons). add (4) vav boxes. add (1) exhaust fan. for t.i. appl. 2015.0305.0022 mechancial work. revision to pa# 201503050022, electrical and structural. n/a maher ord # 155-13Details
relocation of existing ducts and grills. add (1) ac condensing unit (4 tons). add (4) vav boxes. add (1) exhaust fan. for t.i. appl. 2015.0305.0022 mechancial work. revision to pa# 201503050022, electrical and structural. n/a maher ord # 155-13 | $50,000 |
| Mar 12, 2015 | Completed final sign-off Nov 2015 | 286 King St | wells fargo atm vestibule. barrier removal project 185 sf. replace existing non-accessible atms with new atm vestibule and accessible atms inside vestibule. relocate existing night deposit onto exterior wall at king street.Details
wells fargo atm vestibule. barrier removal project 185 sf. replace existing non-accessible atms with new atm vestibule and accessible atms inside vestibule. relocate existing night deposit onto exterior wall at king street. | $80,000 |
| Mar 5, 2015 | Completed final sign-off Oct 2015 | 333 Market St | 2065 sq.ft. of remodel of existing tenant improvement space- partial 1st floor for new retail bank financial services facility; maher n/aDetails
2065 sq.ft. of remodel of existing tenant improvement space- partial 1st floor for new retail bank financial services facility; maher n/a | $218,000 |
| Feb 4, 2015 | Never finaled issued Feb 2015, no final | 464 California St | to obtain final inspection for work approved under pa# 201208177678. all work is complete.Details
to obtain final inspection for work approved under pa# 201208177678. all work is complete. | |
| Oct 3, 2014 | Completed final sign-off Aug 2015 | 45 Fremont St | 9th flr: remodel of existing offices on 9th flr, add 2 new offices, new tread mill rm, relocate breakroom & 2 (n) conference rooms, new finishes & new lighting at affected areas; maher n/aDetails
9th flr: remodel of existing offices on 9th flr, add 2 new offices, new tread mill rm, relocate breakroom & 2 (n) conference rooms, new finishes & new lighting at affected areas; maher n/a | $140,000 |
| May 21, 2014 | Completed final sign-off Aug 2014 | 333 Market St | 30/f - ti remodel of (e) office space to add mediascape room, tel. room & storage room; add new finishes and furniture. na for maher ordiance.Details
30/f - ti remodel of (e) office space to add mediascape room, tel. room & storage room; add new finishes and furniture. na for maher ordiance. | $100,000 |
| Apr 29, 2014 | Completed final sign-off Jun 2014 | 343 Sansome St | 3 floor ti - remodel of existing offices. 4 new offices, new furniture and finishes for open office area. new lighting. no toilet work. fire alarm and sprinkler under separate permit.Details
3 floor ti - remodel of existing offices. 4 new offices, new furniture and finishes for open office area. new lighting. no toilet work. fire alarm and sprinkler under separate permit. | $45,000 |
| Jan 22, 2014 | Completed final sign-off May 2014 | 343 Sansome St | remodel existing offices. 5 new offices, copy area, new furniture and finishes for open area. new lighting. no toilet workDetails
remodel existing offices. 5 new offices, copy area, new furniture and finishes for open area. new lighting. no toilet work | $325,000 |
| Oct 2, 2013 | Completed final sign-off Nov 2013 | 45 Fremont St | demo, frame new walls, millwork, paint. remodel existing conference room into training labDetails
demo, frame new walls, millwork, paint. remodel existing conference room into training lab | $30,000 |
| Jul 15, 2013 | Completed final sign-off Nov 2013 | 5455 Geary Bl | minor t.i. consisting of remodel of walls & ceiling, new furnture & finishes including some electrical scope.Details
minor t.i. consisting of remodel of walls & ceiling, new furnture & finishes including some electrical scope. | $75,000 |
| Jul 15, 2013 | Completed final sign-off Dec 2013 | 490 Brannan St | minor t.i. consisting of remodel of portion of wall and ceiling, new funiture and finishes including some electrical scope.Details
minor t.i. consisting of remodel of portion of wall and ceiling, new funiture and finishes including some electrical scope. | $45,000 |
| Jul 9, 2013 | Completed final sign-off Sep 2013 | 45 Fremont St | remodel 2/f & 10/f: 1250 sq.ft. infill open ceiling area with new suspended ceiling, grid and tile, add lighting. no structural work, no walls, no change in furniture. f/a, sprinklers and mep under separate permit.Details
remodel 2/f & 10/f: 1250 sq.ft. infill open ceiling area with new suspended ceiling, grid and tile, add lighting. no structural work, no walls, no change in furniture. f/a, sprinklers and mep under separate permit. | $75,000 |
| Mar 8, 2013 | Completed final sign-off Jul 2013 | 333 Market St | 27th floor-create 2 seperate suites, add rated corridor, reduce copy room, add telephone rooms. no restroom work except automatic door opener @mens ada stall. 2 heat pumps and 2 fsd.Details
27th floor-create 2 seperate suites, add rated corridor, reduce copy room, add telephone rooms. no restroom work except automatic door opener @mens ada stall. 2 heat pumps and 2 fsd. | $71,700 |
| Sep 19, 2012 | Completed final sign-off Dec 2012 | 420 Montgomery St | removal of existing office. demo (1) one wall, new furniture & finishes for new open office area. mep, life safety sep. permitsDetails
removal of existing office. demo (1) one wall, new furniture & finishes for new open office area. mep, life safety sep. permits | $35,000 |
| Sep 19, 2012 | Completed final sign-off May 2013 | 343 Sansome St | suite 450: remodel of existing space: 11 new offices, new furniture & finishes for open office area, new lighting. life safety sep. permits suite 400: remodel of exist space: 3 new offices, new furniture / finishes, n lightingDetails
suite 450: remodel of existing space: 11 new offices, new furniture & finishes for open office area, new lighting. life safety sep. permits suite 400: remodel of exist space: 3 new offices, new furniture / finishes, n lighting | $125,000 |
| Aug 17, 2012 | Never finaled issued Sep 2012, no final | 464 California St | 300 sf partial remodel of e wells fargo branch. behind tellerline, demo existing glass wall/frame behind tellerline.demo existing ceiling grid lights above tellerline. new wall,ceiling, lighting behind tellerline. no hvac. relocate e sprinkler/life safety as requiredDetails
300 sf partial remodel of e wells fargo branch. behind tellerline, demo existing glass wall/frame behind tellerline.demo existing ceiling grid lights above tellerline. new wall,ceiling, lighting behind tellerline. no hvac. relocate e sprinkler/life safety as required | $20,000 |
| Jul 26, 2012 | Completed final sign-off Oct 2012 | 45 Fremont St | 173 sq ft remodel. demo extg door/sidelight at extg confrence room to convert to new test lab. extend extg partial ht. walls to full ht. for new test lab. add new door, add fire/alarm strobe for new conf. room. new power/data for conf. room/office extg lighting to remain. new hvac upgrade forDetails
173 sq ft remodel. demo extg door/sidelight at extg confrence room to convert to new test lab. extend extg partial ht. walls to full ht. for new test lab. add new door, add fire/alarm strobe for new conf. room. new power/data for conf. room/office extg lighting to remain. new hvac upgrade for | $25,000 |
| Jun 25, 2012 | Completed final sign-off Oct 2012 | 333 Market St | 3rd floor - remodel of (e) office space (only partial floor): add 10 new offices, new lighting, new finishes, new furniture.Details
3rd floor - remodel of (e) office space (only partial floor): add 10 new offices, new lighting, new finishes, new furniture. | $100,000 |
| May 21, 2012 | Never finaled issued Aug 2012, no final | 464 California St | add new non structural wall fascia in front of atm's. demo extg atm and partial demo of atm room. re install bldg closure. design build electrical work for new lighting for atm fascia.Details
add new non structural wall fascia in front of atm's. demo extg atm and partial demo of atm room. re install bldg closure. design build electrical work for new lighting for atm fascia. | $20,000 |
| May 16, 2012 | Completed final sign-off Nov 2012 | 120 Kearny St | interior tenant improvement, replace (e) atm surrounds, remove (e) night deposit box & install new atm machine. update lightingDetails
interior tenant improvement, replace (e) atm surrounds, remove (e) night deposit box & install new atm machine. update lighting | $20,000 |
| May 1, 2012 | Expired or cancelled expired Oct 2014 | 468 Columbus Av | exterior work only, non structural atm surround to be replaced, upgrade light fixturesDetails
exterior work only, non structural atm surround to be replaced, upgrade light fixtures | $30,000 |
| Feb 29, 2012 | Completed final sign-off May 2012 | 490 Brannan St | exterior work only. revise existing canopy/awning, replace existing atm surrounds, lighting upgrade.Details
exterior work only. revise existing canopy/awning, replace existing atm surrounds, lighting upgrade. | $25,000 |
| Feb 29, 2012 | Never finaled issued Mar 2012, no final | 303 02nd St | exterior work only-replace (e) atm, surround, upgrade lighting. adding 22-1/2" deep projecting soffit above atm machines.Details
exterior work only-replace (e) atm, surround, upgrade lighting. adding 22-1/2" deep projecting soffit above atm machines. | $20,000 |
| Feb 16, 2012 | Completed final sign-off Jun 2012 | 1 California St | add new non structural wall fascia to (e) atm'sDetails
add new non structural wall fascia to (e) atm's | $50,000 |
| Feb 16, 2012 | Never finaled issued Mar 2012, no final | 292 Battery St | add new non structural wall fascia to extg atms.Details
add new non structural wall fascia to extg atms. | $50,000 |
| Jul 15, 2010 | Never finaled issued Aug 2010, no final | 292 Battery St | create an opening in non structural wall. add automatic door opener to main entry door.Details
create an opening in non structural wall. add automatic door opener to main entry door. | $5,000 |
| Nov 16, 2009 | Completed final sign-off Dec 2009 | 433 California St | 5th floor. minor demolition patch & repair, join 2 suites.Details
5th floor. minor demolition patch & repair, join 2 suites. | $30,000 |
| Nov 25, 2008 | Completed final sign-off Feb 2009 | 420 Montgomery St | 12th floor mechanical/electrical work only - heat pump w/distribution ductwork, air outlets, circulating pumps, condenser water piping to be provided.Details
12th floor mechanical/electrical work only - heat pump w/distribution ductwork, air outlets, circulating pumps, condenser water piping to be provided. | $10,000 |
| Apr 25, 2008 | Completed final sign-off Jun 2008 | 343 Sansome St | 11th floor: demo one partial wall & door and add one new wall.Details
11th floor: demo one partial wall & door and add one new wall. | $5,000 |
| Aug 30, 2007 | Completed final sign-off Dec 2007 | 343 Sansome St | 2/f- life safety, strobes, horns including 3 smoke detectors, 1 duct detector, 34 speaker storbes, 9 speakers, 2 sync modules, 1 relay module.Details
2/f- life safety, strobes, horns including 3 smoke detectors, 1 duct detector, 34 speaker storbes, 9 speakers, 2 sync modules, 1 relay module. | $65,000 |
| Aug 30, 2007 | Completed final sign-off Dec 2007 | 343 Sansome St | 2/f mechanical work, 8 fan power boxes, duct work, grills, t-stats, hvac, 1 fsd.Details
2/f mechanical work, 8 fan power boxes, duct work, grills, t-stats, hvac, 1 fsd. | $50,000 |
| Jul 26, 2006 | Completed final sign-off Sep 2006 | 343 Sansome St | oti 2-11th floor, el, me, ls.Details
oti 2-11th floor, el, me, ls. | $35,000 |
| Jan 18, 2006 | Completed final sign-off Apr 2006 | 343 Sansome St | oti-1 11th floor el ls sp meDetails
oti-1 11th floor el ls sp me | $75,000 |
| Dec 20, 2005 | Completed final sign-off Feb 2006 | 343 Sansome St | oti-2 10 floor el meDetails
oti-2 10 floor el me | $250,000 |
| Nov 30, 2005 | Completed final sign-off Feb 2006 | 343 Sansome St | oti-1 10th floor el, me, l/s, sp. remodel (e) 7061 s.f. of office space.Details
oti-1 10th floor el, me, l/s, sp. remodel (e) 7061 s.f. of office space. | $250,000 |