Gettler-Ryan Inc
- Based in
- Dublin
- On San Francisco permits
- Nov 2000 to Nov 2024
- Last 24 months
- 2 permits filed
86 permits since 2000: 54 completed, 2 in progress, 16 never finaled, 14 expired or cancelled.
Of the 16 never-finaled permits, 2 are 3 to 5 years old, 4 are 5 to 10 years old, 10 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 7, 2024 | In progress issued Nov 2024 | 1200 Geneva Av | barricade and secure work area. saw cut and demo a base of vent risers. hand excavate riser swing joints. remvoe and salvage existing vent caps. remove and replace flexes if needed. reinstall vent caps, backfill with existing materials. dowel and back patch concrete.Details
barricade and secure work area. saw cut and demo a base of vent risers. hand excavate riser swing joints. remvoe and salvage existing vent caps. remove and replace flexes if needed. reinstall vent caps, backfill with existing materials. dowel and back patch concrete. | $15,000 |
| Oct 15, 2024 | In progress issued Oct 2024 | 6032 Geary Bl | removal of waste oil tank and backfill of the tank holeDetails
removal of waste oil tank and backfill of the tank hole | $45,000 |
| Aug 13, 2024 | Completed final sign-off Dec 2024 | 3675 Geary Bl | replace (6) dispensers with (6) new ovation.Details
replace (6) dispensers with (6) new ovation. | $28,000 |
| Dec 14, 2023 | Completed final sign-off Feb 2024 | 1175 Fell St | accessible business entrance program per ordinance 51-16, providing an accessible route from public row, route to entrance of bldg, accessible entrance, abe# 20191299464.Details
accessible business entrance program per ordinance 51-16, providing an accessible route from public row, route to entrance of bldg, accessible entrance, abe# 20191299464. | |
| Nov 2, 2023 | Completed final sign-off May 2024 | 2950 San Jose Av | site improvement showing currect ada 2022 cbc 11a path of traval, replacing gasoline dispensers & udc's. ref to 202306069345 (shared plans)Details
site improvement showing currect ada 2022 cbc 11a path of traval, replacing gasoline dispensers & udc's. ref to 202306069345 (shared plans) | $25,000 |
| Jun 6, 2023 | Completed final sign-off May 2024 | 2998 San Jose Av | replace 4 (e) gasoline dispensers & uds's w/4 new. convert (e) premium gasoline underground storage tank to diesel. convert ust reg to ust premium. minor electrical permitDetails
replace 4 (e) gasoline dispensers & uds's w/4 new. convert (e) premium gasoline underground storage tank to diesel. convert ust reg to ust premium. minor electrical permit | $38,000 |
| Mar 21, 2023 | Completed final sign-off May 2023 | 1200 Geneva Av | saw cut portion of the (e) tank top slab to replace lids, manways, spill bucket and drop tubes.Details
saw cut portion of the (e) tank top slab to replace lids, manways, spill bucket and drop tubes. | $28,000 |
| Aug 30, 2022 | Never finaled issued Aug 2022, no final | 1790 Lombard St | site improvements with minor concrete flatwork provide a path of travel thru planter. provide new striping for new air/water location.Details
site improvements with minor concrete flatwork provide a path of travel thru planter. provide new striping for new air/water location. | $15,000 |
| Jun 28, 2022 | Expired or cancelled withdrawn Mar 2023 | 1200 Geneva Av | remove existing underground tank. replace all paving and driveway related to the tank removal.Details
remove existing underground tank. replace all paving and driveway related to the tank removal. | $15,000 |
| Jun 28, 2022 | Completed final sign-off Sep 2022 | 1200 Geneva Av | remove & replace (e) pole sign. (electric sign, double faced)Details
remove & replace (e) pole sign. (electric sign, double faced) | $15,000 |
| May 26, 2022 | Never finaled issued May 2022, no final | 2190 Carroll Av | saw cutting 7'x7' portion of the existing underground storage tanks slab to replace lids, manways, spill buckets and drop tubes.Details
saw cutting 7'x7' portion of the existing underground storage tanks slab to replace lids, manways, spill buckets and drop tubes. | $28,000 |
| Dec 15, 2020 | Completed final sign-off Nov 2021 | 1100 Junipero Serra Bl | replacement of 3 underground single wall storage tanks w/ 3 new double wall ust, 5 new dispensers/ udc's. all associated piping w/ new. minor electrical.Details
replacement of 3 underground single wall storage tanks w/ 3 new double wall ust, 5 new dispensers/ udc's. all associated piping w/ new. minor electrical. | $80,000 |
| Jul 18, 2018 | Completed final sign-off Mar 2019 | 1175 Fell St | remove & replace 4 gas pump dispensers & associated minor electrical / mechanical equipment with identical look / styling. ** maher: n/a **Details
remove & replace 4 gas pump dispensers & associated minor electrical / mechanical equipment with identical look / styling. ** maher: n/a ** | $38,000 |
| Jul 18, 2018 | Completed final sign-off Oct 2018 | 6000 Geary Bl | remove & replace 4 gas pump dispensers & associated electrical / mechanical equipment with identical look / styling. ** maher: n/a **Details
remove & replace 4 gas pump dispensers & associated electrical / mechanical equipment with identical look / styling. ** maher: n/a ** | $38,000 |
| Mar 30, 2018 | Never finaled issued Mar 2018, no final | 1298 Howard St | removal of (2) 20,000 gallon underground storage tanks & related/piping associated, one diesel, one gasolineDetails
removal of (2) 20,000 gallon underground storage tanks & related/piping associated, one diesel, one gasoline | $20,000 |
| Nov 30, 2017 | Never finaled issued Nov 2017, no final | 101 Bay Shore Bl | remove & replace 4 dispensers. minor electrical. maher naDetails
remove & replace 4 dispensers. minor electrical. maher na | $38,000 |
| Sep 28, 2017 | Completed final sign-off Oct 2017 | 2345 Pine St | revision to app#201701257906 to modify day tank anchorage. n/a for maherDetails
revision to app#201701257906 to modify day tank anchorage. n/a for maher | $300 |
| Aug 8, 2017 | Completed final sign-off Aug 2018 | 1298 Howard St | demolition of carwash (bldg 3) for gas station.Details
demolition of carwash (bldg 3) for gas station. | $25,000 |
| Aug 8, 2017 | Completed final sign-off Aug 2018 | 1298 Howard St | demolition of restaurant (bldg 1) at gas station.Details
demolition of restaurant (bldg 1) at gas station. | $45,000 |
| Aug 8, 2017 | Completed final sign-off Aug 2018 | 1298 Howard St | demolition of canopy (bldg 2) for gas station.Details
demolition of canopy (bldg 2) for gas station. | $35,000 |
| Apr 18, 2017 | Never finaled issued Apr 2017, no final | 1175 Fell St | install one new breaker in (e) panel, install one 4 gang wall outlet. n/a for maher.Details
install one new breaker in (e) panel, install one 4 gang wall outlet. n/a for maher. | $6,800 |
| Jan 25, 2017 | Completed final sign-off Oct 2017 | 2345 Pine St | revise pa 2016-0624-0828 - fire department wants the proposed piping changed to steel where above ground inside of the building. no changes to electrical or structuralDetails
revise pa 2016-0624-0828 - fire department wants the proposed piping changed to steel where above ground inside of the building. no changes to electrical or structural | |
| Jun 24, 2016 | Never finaled issued Oct 2016, no final | 2345 Pine St | replace underground fuel piping from (e) underground storage tank to (e) generators in basement. install new 75 gallon day tank & pump in basement. ** maher: n/a **Details
replace underground fuel piping from (e) underground storage tank to (e) generators in basement. install new 75 gallon day tank & pump in basement. ** maher: n/a ** | $225,000 |
| Feb 29, 2016 | Completed final sign-off Mar 2016 | 2190 Carroll Av | replace extg dispensers with new ovation. convert vacuum assist system to balance system. no new/add. disp. no new signage. n/a for maherDetails
replace extg dispensers with new ovation. convert vacuum assist system to balance system. no new/add. disp. no new signage. n/a for maher | $38,000 |
| Feb 29, 2016 | Completed final sign-off Jun 2016 | 1200 Geneva Av | replace extg dispensers with new ovation. convert vacuum assist system to balance system. no new/add pumps.disp and no new signage . n/a for maherDetails
replace extg dispensers with new ovation. convert vacuum assist system to balance system. no new/add pumps.disp and no new signage . n/a for maher | $38,000 |
| Dec 17, 2015 | Completed final sign-off Mar 2017 | 1501 Van Ness Av | making repairs and alteration to restroom structure.Details
making repairs and alteration to restroom structure. | $15,000 |
| Jul 14, 2015 | Completed final sign-off Jul 2016 | 1198 Valencia St | demolish 1-story gas station n/a for maher ordinance.Details
demolish 1-story gas station n/a for maher ordinance. | $28,000 |
| Jul 28, 2014 | Completed final sign-off Nov 2014 | 6000 Geary Bl | remove/replace 22'x26' concrete drive at accessibile space, re-stripe van accessible parking area, remove and replace 3'x6' concrete walk and 5'x5' concrete walk, remove and replace 5'x5' level area near air/water station. n/a ordinance #155-13.Details
remove/replace 22'x26' concrete drive at accessibile space, re-stripe van accessible parking area, remove and replace 3'x6' concrete walk and 5'x5' concrete walk, remove and replace 5'x5' level area near air/water station. n/a ordinance #155-13. | $31,000 |
| May 15, 2014 | Completed final sign-off Sep 2014 | 1698 Fell St | remodel extg restroom to comply with cbc 2013 codes. ref app#201309126655 and 201401025443. n/a for the maher ordinance #155-13Details
remodel extg restroom to comply with cbc 2013 codes. ref app#201309126655 and 201401025443. n/a for the maher ordinance #155-13 | $32,000 |
| Mar 18, 2014 | Completed final sign-off May 2014 | 1288 19th Av | remove and dispose and install new fuel dispensers in kind. install new udc. minor electrical for the new dispensers. n/a for the maher ordinance #155-13Details
remove and dispose and install new fuel dispensers in kind. install new udc. minor electrical for the new dispensers. n/a for the maher ordinance #155-13 | $45,000 |
| Mar 18, 2014 | Completed final sign-off Jun 2014 | 1000 Harrison St | remove and dispose and install new fuel dispensers in kind. install new udc. minor electrical for the new dispensers. n/a for the maher ordinance #155-13Details
remove and dispose and install new fuel dispensers in kind. install new udc. minor electrical for the new dispensers. n/a for the maher ordinance #155-13 | $45,000 |
| Jan 2, 2014 | Completed final sign-off Mar 2014 | 1698 Fell St | remove and replace concrete to perform repiping. revision to app#201309126655. add vent riser and underground piping.Details
remove and replace concrete to perform repiping. revision to app#201309126655. add vent riser and underground piping. | $30,000 |
| Sep 12, 2013 | Never finaled issued Sep 2013, no final | 1698 Fell St | remove & replace 4 dispensers. remove & replace 4 udc's. convert 1 gasoline tank to diesel.Details
remove & replace 4 dispensers. remove & replace 4 udc's. convert 1 gasoline tank to diesel. | $40,000 |
| Sep 12, 2013 | Completed final sign-off Nov 2013 | 1790 Lombard St | remove 4 dispensers & islands & replace with 4 new dispensers on grade, 4 new udc's. convert 1 gasoline tank to diesel.Details
remove 4 dispensers & islands & replace with 4 new dispensers on grade, 4 new udc's. convert 1 gasoline tank to diesel. | $45,000 |
| Jan 9, 2013 | Completed final sign-off Mar 2013 | 1501 Van Ness Av | remove & replace (5) dispensers w/ada compliance. replacing 5 fuel nozzles. convert one gasoline tank to diesel.Details
remove & replace (5) dispensers w/ada compliance. replacing 5 fuel nozzles. convert one gasoline tank to diesel. | $25,000 |
| May 18, 2012 | Completed final sign-off Jan 2013 | 1515 19th Av | provide secondary containment at standby generator & day tank, and partial fuel lines. add additonal floor sensors.Details
provide secondary containment at standby generator & day tank, and partial fuel lines. add additonal floor sensors. | $25,000 |
| Dec 20, 2011 | Completed final sign-off Aug 2012 | 1501 Van Ness Av | remove portion of landscaping ot install 4' concrete walk w 6" curbs.truncated domes on new hc landing. replace concrete drive slabs.relocate (2) toilets in restroom.Details
remove portion of landscaping ot install 4' concrete walk w 6" curbs.truncated domes on new hc landing. replace concrete drive slabs.relocate (2) toilets in restroom. | $20,000 |
| Dec 20, 2011 | Completed final sign-off Apr 2012 | 1298 Howard St | install new hand rails on both sides of extg ramps.replace 22'x26' cibcrete druve skab at hc parking. install truncated domes on ramp. relocate (2) water closet in restrooms.Details
install new hand rails on both sides of extg ramps.replace 22'x26' cibcrete druve skab at hc parking. install truncated domes on ramp. relocate (2) water closet in restrooms. | $25,000 |
| Dec 20, 2011 | Completed final sign-off Mar 2012 | 3675 Geary Bl | extend extg concrete landing at hc ramp 1'(1x6). install truncated domes on new hc landing. relocate (1) water closet in restroom.Details
extend extg concrete landing at hc ramp 1'(1x6). install truncated domes on new hc landing. relocate (1) water closet in restroom. | $5,000 |
| Dec 20, 2011 | Completed final sign-off Feb 2012 | 2950 San Jose Av | replace concrete walk at side extg door. install truncated domes (2) places. relocate (2) water closet in restrooms.Details
replace concrete walk at side extg door. install truncated domes (2) places. relocate (2) water closet in restrooms. | $7,500 |
| Dec 20, 2011 | Completed final sign-off Feb 2012 | 1288 19th Av | replace concrete drive at side of bldg. relocate hc parking space. install truncated domes relocate (2) water closet in restrooms.Details
replace concrete drive at side of bldg. relocate hc parking space. install truncated domes relocate (2) water closet in restrooms. | $15,000 |
| Dec 20, 2011 | Completed final sign-off Mar 2012 | 1000 Harrison St | replace 10'x12' concrete drive slab at handy cap zone. replace handicap ramp. install truncated domes.relocate (1) water closet in restroom.Details
replace 10'x12' concrete drive slab at handy cap zone. replace handicap ramp. install truncated domes.relocate (1) water closet in restroom. | $15,000 |
| Apr 20, 2011 | Completed final sign-off May 2013 | 430 Bush St | upgrades to (e) standby generator fueling system: (n) fuel supply and return lines from/to 555 pine st. basementDetails
upgrades to (e) standby generator fueling system: (n) fuel supply and return lines from/to 555 pine st. basement | $75,000 |
| Oct 19, 2010 | Never finaled issued Oct 2010, no final | 1515 19th Av | remove extg 2000 gallon underground storage bank and piping (diesel)Details
remove extg 2000 gallon underground storage bank and piping (diesel) | $25,000 |
| Mar 17, 2010 | Completed final sign-off May 2010 | 1 Sansome St | replacement of spill bucket (life for like) opw- 5 gallons.Details
replacement of spill bucket (life for like) opw- 5 gallons. | |
| Sep 24, 2009 | Never finaled issued Oct 2009, no final | 1890 19th Av | revision to 200806245158: install veeder root carbon cannister in lieu of healy clean air separatorDetails
revision to 200806245158: install veeder root carbon cannister in lieu of healy clean air separator | |
| Sep 15, 2009 | Completed final sign-off Jun 2010 | 360 Spear St | remove (e)400 gal generator base fuel tank from roof,replace w/ (n) 200 gal.dw steel day tank, dw piping from day tank to (e)generator within (e) 15ft high metal enclosure. (n)veeder root tls-350 tank monitoring panel/sensors for all (e) & (n)at&t owned fuel sys sensors/probes. sffd permit requiredDetails
remove (e)400 gal generator base fuel tank from roof,replace w/ (n) 200 gal.dw steel day tank, dw piping from day tank to (e)generator within (e) 15ft high metal enclosure. (n)veeder root tls-350 tank monitoring panel/sensors for all (e) & (n)at&t owned fuel sys sensors/probes. sffd permit required | $100,000 |
| Sep 2, 2009 | Completed final sign-off Apr 2010 | 1501 Van Ness Av | evr phase ii upgrade with healy clean air separator (cas) and in station diagnostics. 3 new guard posts with cal craft enclosure. upgrade liquid condensate trap. project contact liddy mckenzie (gettler ryan inc) 925-551-7555.Details
evr phase ii upgrade with healy clean air separator (cas) and in station diagnostics. 3 new guard posts with cal craft enclosure. upgrade liquid condensate trap. project contact liddy mckenzie (gettler ryan inc) 925-551-7555. | $65,000 |
| Sep 2, 2009 | Completed final sign-off Apr 2010 | 101 Bay Shore Bl | evr phase ii upgrade with healy clean air separator (cas) and in station diagnostics. upgrade liquid condensate trap. project contact liddy mckenzie (gettler-ryan inc) 925-551-7555.Details
evr phase ii upgrade with healy clean air separator (cas) and in station diagnostics. upgrade liquid condensate trap. project contact liddy mckenzie (gettler-ryan inc) 925-551-7555. | $65,000 |
| Sep 2, 2009 | Completed final sign-off Apr 2010 | 1000 Harrison St | evr phase ii upgrade with healy clean air separator cas and in station diagnostics. 3 new guard posts with calcraft enclosure. upgrade liquid condensate trap. project contact liddy mckenzie, gettler ryan 925-551-7555.Details
evr phase ii upgrade with healy clean air separator cas and in station diagnostics. 3 new guard posts with calcraft enclosure. upgrade liquid condensate trap. project contact liddy mckenzie, gettler ryan 925-551-7555. | $65,000 |
| Sep 2, 2009 | Completed final sign-off Mar 2010 | 1100 Junipero Serra Bl | evr phase ii upgrade with healy clean air separator with in station diagnostics 3 new guard posts with cal craft enclosure. underground fuel pipe upgrade and disposer upgrade, relocate tank vents. upgrade liquid condensate trap. project contact liddy mckenzie (gottlor-ryan) 925-551-7555Details
evr phase ii upgrade with healy clean air separator with in station diagnostics 3 new guard posts with cal craft enclosure. underground fuel pipe upgrade and disposer upgrade, relocate tank vents. upgrade liquid condensate trap. project contact liddy mckenzie (gottlor-ryan) 925-551-7555 | $85,000 |
| Jul 21, 2008 | Expired or cancelled expired Sep 2011 | 2465 Van Ness Av | enhance vapor recovery phase 11 upgrade.install new healy clean air separater on a concrete pad. install new dispensers in extg locationDetails
enhance vapor recovery phase 11 upgrade.install new healy clean air separater on a concrete pad. install new dispensers in extg location | $30,000 |
| Jul 8, 2008 | Expired or cancelled expired Apr 2014 | 1288 19th Av | relocate handicapp ramp on the ground floor/revision to app#200803257882Details
relocate handicapp ramp on the ground floor/revision to app#200803257882 | $4,000 |
| Jun 24, 2008 | Never finaled issued Jun 2008, no final | 1890 19th Av | enhanced vapor recovery phase ii upgrade. install new healy clean air separator on a concrete pad.Details
enhanced vapor recovery phase ii upgrade. install new healy clean air separator on a concrete pad. | $25,000 |
| Jun 9, 2008 | Completed final sign-off Sep 2008 | 6000 Geary Bl | enhanced vapor recovery phase 2 upgrade. install new healy clean air separator on a concrete padDetails
enhanced vapor recovery phase 2 upgrade. install new healy clean air separator on a concrete pad | $25,000 |
| Jun 9, 2008 | Never finaled issued Jun 2008, no final | 1698 Fell St | enhanced vapor recovery phase 2 upgrade. install new healy clean air separator on a concrete padDetails
enhanced vapor recovery phase 2 upgrade. install new healy clean air separator on a concrete pad | $25,000 |
| Mar 25, 2008 | Completed final sign-off Aug 2008 | 1288 19th Av | install new clean air separator (heavy), new isd sensors at existing dispensers & enclosure.Details
install new clean air separator (heavy), new isd sensors at existing dispensers & enclosure. | $30,000 |
| Feb 1, 2008 | Expired or cancelled withdrawn Jun 2009 | 1198 Valencia St | demolition of an existing gas station, including canopy, kiosk lights, concrete slabs, pavement. protect all existing monitor wells, repair or replace if damaged during construction.Details
demolition of an existing gas station, including canopy, kiosk lights, concrete slabs, pavement. protect all existing monitor wells, repair or replace if damaged during construction. | |
| Feb 1, 2008 | Expired or cancelled withdrawn Jun 2009 | 1198 Valencia St | install new chainlink fence gate and new landscape/planting and hydro seed after approval and issuance of demolition of (e) gas station under pa# 2008.02.01.3775.Details
install new chainlink fence gate and new landscape/planting and hydro seed after approval and issuance of demolition of (e) gas station under pa# 2008.02.01.3775. | $8,000 |
| Nov 28, 2007 | Expired or cancelled expired Sep 2011 | 1198 Valencia St | remove exisitng dispensers, excavate to remove three underground storage tanks (3-10,000 gallon tanks) backfill excavations with pea gravel. removal of exisitng product, vent and vapor recovery piping and associcated equipment.Details
remove exisitng dispensers, excavate to remove three underground storage tanks (3-10,000 gallon tanks) backfill excavations with pea gravel. removal of exisitng product, vent and vapor recovery piping and associcated equipment. | $25,000 |
| Oct 11, 2007 | Completed final sign-off Nov 2007 | 1790 Lombard St | install new healy clean air separator and new isd sensor @ existing dispenserDetails
install new healy clean air separator and new isd sensor @ existing dispenser | $30,000 |
| Aug 15, 2007 | Expired or cancelled expired Sep 2008 | 6000 Geary Bl | reface existing signs with updated logos. electric, double faced, existing sign.Details
reface existing signs with updated logos. electric, double faced, existing sign. | |
| Oct 24, 2006 | Never finaled issued Dec 2006, no final | 601 Montgomery St | pull new coflox piping thru existing cases. no alteration 2 existing generator. no breaking of concrete.Details
pull new coflox piping thru existing cases. no alteration 2 existing generator. no breaking of concrete. | $2,500 |
| Oct 24, 2006 | Completed final sign-off Jan 2007 | 425 Market St | pull new coflex piping thru existing cases. no alteration 2 existing generator. no breaking of concrete.Details
pull new coflex piping thru existing cases. no alteration 2 existing generator. no breaking of concrete. | $2,500 |
| Jun 27, 2006 | Expired or cancelled expired May 2007 | 45 Fremont St | remove extg bricksidewalk around spill bucket. remove and replace spill containment bucket on underground deisel storage tank. replace bricks for sidewalk 2 match extgDetails
remove extg bricksidewalk around spill bucket. remove and replace spill containment bucket on underground deisel storage tank. replace bricks for sidewalk 2 match extg | $3,500 |
| Jun 27, 2006 | Expired or cancelled expired Nov 2007 | 90 New Montgomery St | remove 4 flags of concrete surrouning spill bucket/remove and replace spill containment bucket on extg underground storage tank. replace concrete 2 match extgDetails
remove 4 flags of concrete surrouning spill bucket/remove and replace spill containment bucket on extg underground storage tank. replace concrete 2 match extg | $3,500 |
| Mar 11, 2005 | Completed final sign-off Apr 2005 | 2380 San Bruno Av | adds undergrouhd product piping petroleum piping w/3 additiona 48"sumpDetails
adds undergrouhd product piping petroleum piping w/3 additiona 48"sump | $60,000 |
| Jan 28, 2005 | Never finaled issued Jan 2005, no final | 3700 California St | pulling new 2" western fiberglass co-flex double wall piping thru existing 4" chase excavation willDetails
pulling new 2" western fiberglass co-flex double wall piping thru existing 4" chase excavation will | $10,000 |
| Jan 28, 2005 | Completed final sign-off Apr 2005 | 2380 San Bruno Av | repair (e)tank spill buckets,replace (e)concrete tank slab as required,install new dispenserDetails
repair (e)tank spill buckets,replace (e)concrete tank slab as required,install new dispenser | $60,000 |
| Nov 16, 2004 | Completed final sign-off Dec 2004 | 3550 Mission St | replace gasoline dispensers replace spill buckers on underground storage tanks and repair existingDetails
replace gasoline dispensers replace spill buckers on underground storage tanks and repair existing | $60,000 |
| Nov 15, 2004 | Completed final sign-off Jan 2005 | 551 03rd St | revision to appl#200410227552 for underground product piping addition.Details
revision to appl#200410227552 for underground product piping addition. | $60,000 |
| Nov 10, 2004 | Expired or cancelled cancelled Mar 2007 | 1860 Van Ness Av | demolish 1 story restroom/storageDetails
demolish 1 story restroom/storage | |
| Nov 10, 2004 | Expired or cancelled cancelled Nov 2005 | 899 Valencia St | demolish canopy cover gasoline island.Details
demolish canopy cover gasoline island. | |
| Nov 10, 2004 | Expired or cancelled cancelled Nov 2005 | 899 Valencia St | demolish canopy for cover gasoline islands.Details
demolish canopy for cover gasoline islands. | |
| Nov 10, 2004 | Expired or cancelled cancelled Mar 2007 | 1860 Van Ness Av | demolish canopy which cover gasoline islands.Details
demolish canopy which cover gasoline islands. | |
| Oct 28, 2004 | Never finaled issued Oct 2004, no final | 1860 Van Ness Av | pumping out & triple rinse of the tanks. remove the (2) 15000 gallon tanks & relocated piping.Details
pumping out & triple rinse of the tanks. remove the (2) 15000 gallon tanks & relocated piping. | $30,000 |
| Oct 22, 2004 | Completed final sign-off Jan 2005 | 551 03rd St | replace (e)gasoline dispensers,repair (e)tank slab,repair underground storage tanksDetails
replace (e)gasoline dispensers,repair (e)tank slab,repair underground storage tanks | $60,000 |
| Oct 22, 2004 | Never finaled issued Oct 2004, no final | 388 Potrero Av | revision to app #200408171797Details
revision to app #200408171797 | $60,000 |
| Aug 17, 2004 | Completed final sign-off Oct 2004 | 388 Potrero Av | repair existing underground storage tanks, tank slab, dispenser containment sump & new dispensersDetails
repair existing underground storage tanks, tank slab, dispenser containment sump & new dispensers | $60,000 |
| Jun 28, 2004 | Completed final sign-off Jul 2004 | 2200 Alemany Bl | repair of (e) concrete tank slab. slab on grade only under this permit.Details
repair of (e) concrete tank slab. slab on grade only under this permit. | $5,400 |
| May 31, 2002 | Expired or cancelled expired Apr 2005 | 598 Bryant St | removal of underground product pipe/install nw dbl wall fiberglass pipeDetails
removal of underground product pipe/install nw dbl wall fiberglass pipe | $100,000 |
| May 31, 2002 | Completed final sign-off Nov 2002 | 2399 19th Av | removal of underground product pipe/install nw double wall fiberglass product pipeDetails
removal of underground product pipe/install nw double wall fiberglass product pipe | $100,000 |
| May 31, 2002 | Never finaled issued Oct 2002, no final | 3035 Geary Bl | removal of underground product pipe/installation of nw dbl wall fiberglass product pipe/rnstl dispnDetails
removal of underground product pipe/installation of nw dbl wall fiberglass product pipe/rnstl dispn | $100,000 |
| May 7, 2001 | Completed final sign-off May 2001 | 3800 03rd St | ada ramp mocifications. revision to 2000/11/16/5973.Details
ada ramp mocifications. revision to 2000/11/16/5973. | $2,000 |
| Nov 30, 2000 | Completed final sign-off Dec 2000 | 1661 Tennessee St | remove existing lube canopy and building shop baaqmd#5781Details
remove existing lube canopy and building shop baaqmd#5781 | $15,000 |
| Nov 16, 2000 | Completed final sign-off May 2001 | 3800 03rd St | underground piping & dispenser replacement/remoce/replace drive slabsDetails
underground piping & dispenser replacement/remoce/replace drive slabs | $90,000 |