Erin Uesugi
- Listed as
- architect, authorized agent-others, designer
- Firm
- Uesugi & Associates
- Based in
- San Francisco
- On San Francisco permits
- Jul 2002 to Dec 2025
166 permits since 2000 (architect on 158 permits, designer on 7 permits, authorized agent-others on 1 permit): 142 completed, 3 in progress, 13 never finaled, 8 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 166.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 30, 2025 | In progress filed Dec 2025, not yet issued | 333 Market St | replace existing electrical fire pump with new in basement. fp-eor under sep cover as deferred submittal. new pge electrical service with electric gear in a dedicated electrical closet.Details
replace existing electrical fire pump with new in basement. fp-eor under sep cover as deferred submittal. new pge electrical service with electric gear in a dedicated electrical closet. | $600,000 | |
| Oct 20, 2025 | In progress issued Sep 2026 | 555 California St | Skyline Construction | 23rd floor: ti consisting of new office remodel with new offices, workroom, & coffee station. new led lighting and finishes throughout. mechanical work: new duct distribution, 2 new constant air volume boxes, 1 new heat pump, 2 new transforfans, 4 new smoke dampers, 4 new fire/smoke dampers.Details
23rd floor: ti consisting of new office remodel with new offices, workroom, & coffee station. new led lighting and finishes throughout. mechanical work: new duct distribution, 2 new constant air volume boxes, 1 new heat pump, 2 new transforfans, 4 new smoke dampers, 4 new fire/smoke dampers. | $1,500,000 |
| Aug 11, 2025 | In progress filed Aug 2025, not yet issued | 333 Market St | City Building Inc. | 335 sqft. area of work water roofing remediation of basement wall structure due to water intrusion. remove (e) pavers/slab/soil to access and repair/replace waterproofing membrane. provide temporary shoring of during excavation. restore (e) sidwald pavers andDetails
335 sqft. area of work water roofing remediation of basement wall structure due to water intrusion. remove (e) pavers/slab/soil to access and repair/replace waterproofing membrane. provide temporary shoring of during excavation. restore (e) sidwald pavers and | $175,000 |
| Jun 9, 2025 | Completed final sign-off Oct 2025 | 555 California St | Skyline Construction | 24th floor: revision to pa #202410213343 to add new 20 min. rated hold open doors, separation of hi-10 drinking fountains and relocation of semi-ambulatory stall in women's toilet room due to existing conditions. ref #202410213343 & 202504073822Details
24th floor: revision to pa #202410213343 to add new 20 min. rated hold open doors, separation of hi-10 drinking fountains and relocation of semi-ambulatory stall in women's toilet room due to existing conditions. ref #202410213343 & 202504073822 | |
| Jun 4, 2025 | Completed final sign-off Dec 2025 | 333 Market St | Rudolph Commercial Interiors Inc, Rci | 8th floor: office remodel to add a new large and new medium conference room and 2 huddle rooms. new furniture and finishes, convert 2 existing conference rooms into offices. associated hvac and electrical work for area of remodel. 1169 sq ft area of work.Details
8th floor: office remodel to add a new large and new medium conference room and 2 huddle rooms. new furniture and finishes, convert 2 existing conference rooms into offices. associated hvac and electrical work for area of remodel. 1169 sq ft area of work. | $175,000 |
| May 28, 2025 | Completed final sign-off Jan 2026 | 333 Market St | Rudolph Commercial Interiors Inc, Rci | basement: 10 s.f demo of existing door and partial cmu wall to install new double doors. relocate existing equipment as necessary. no mechanical/plumbing work. low voltage work for relocated card reader and electrified door. new steel angle headers for cmu wall support.Details
basement: 10 s.f demo of existing door and partial cmu wall to install new double doors. relocate existing equipment as necessary. no mechanical/plumbing work. low voltage work for relocated card reader and electrified door. new steel angle headers for cmu wall support. | $15,000 |
| Apr 7, 2025 | Completed final sign-off Sep 2025 | 555 California St | Skyline Construction | revision to pa # 2024-1021-3343 revised lobby area fl plan. deleted focus room, relocated reception desk and closet. revision to conference room. mech and electrical revisionsDetails
revision to pa # 2024-1021-3343 revised lobby area fl plan. deleted focus room, relocated reception desk and closet. revision to conference room. mech and electrical revisions | $20,000 |
| Oct 21, 2024 | Completed final sign-off Oct 2025 | 555 California St | Skyline Construction | t.i. consists of office remodel with new office, meeting room,work rooms, break room, and pantry. new led lighting & finises throughout. d.a. upgrades to restrooms. mechanical work, duct redistribution and addition of equipment electrical work: new led lighting & controls, new isms system.Details
t.i. consists of office remodel with new office, meeting room,work rooms, break room, and pantry. new led lighting & finises throughout. d.a. upgrades to restrooms. mechanical work, duct redistribution and addition of equipment electrical work: new led lighting & controls, new isms system. | $2,500,000 |
| Sep 25, 2024 | Completed final sign-off Apr 2025 | 333 Market St | Rudolph Commercial Interiors Inc, Rci | 9th floor. partial remodel of existing office. hvac upgrade for new remodel. upgrade to led lighting in floor. common areas and new rooms. area of work: 307 sf, aread of suite 4093 sqft. no adding sqft.Details
9th floor. partial remodel of existing office. hvac upgrade for new remodel. upgrade to led lighting in floor. common areas and new rooms. area of work: 307 sf, aread of suite 4093 sqft. no adding sqft. | $150,000 |
| Sep 25, 2024 | Completed final sign-off Jul 2025 | 333 Market St | Rudolph Commercial Interiors Inc, Rci | 1/fl office ti, conversion of (e) storage space to mail room, no public facing space, remodel (e) unisex toilet room, addition of drinking fountain, hvac upgrade, (n) exhaust fan and vav box w/reheat added, no new fsd's. lighting upgrade . remodel of existing unisex toilet and room andDetails
1/fl office ti, conversion of (e) storage space to mail room, no public facing space, remodel (e) unisex toilet room, addition of drinking fountain, hvac upgrade, (n) exhaust fan and vav box w/reheat added, no new fsd's. lighting upgrade . remodel of existing unisex toilet and room and | $150,000 |
| Aug 26, 2024 | Completed final sign-off May 2025 | 333 Market St | Skyline Construction | (at garage) providing 10 electric bike stations (future n.i.c.), 6 e-bike dual parking docks and 52 vertical standard bike racks in new wire mesh enclosure in the garage. power to electric bike charging stations as required.Details
(at garage) providing 10 electric bike stations (future n.i.c.), 6 e-bike dual parking docks and 52 vertical standard bike racks in new wire mesh enclosure in the garage. power to electric bike charging stations as required. | $100,000 |
| Jul 15, 2024 | Completed final sign-off Aug 2025 | 333 Market St | Skyline Construction | 2nd fl - upgrade all lighting to led. millwork refresh; relocated 7 new hvac with new ceiling areas. new finishes in area of work 1268 sq ft. area of workDetails
2nd fl - upgrade all lighting to led. millwork refresh; relocated 7 new hvac with new ceiling areas. new finishes in area of work 1268 sq ft. area of work | $25,000 |
| Jul 15, 2024 | Completed final sign-off Feb 2025 | 333 Market St | Rudolph Commercial Interiors Inc, Rci | 9th floor: new remodel consisting of new conference room, 6 offices, pantry, and a copy room, revise lighting, finishes and hvac upgrade in area of work.Details
9th floor: new remodel consisting of new conference room, 6 offices, pantry, and a copy room, revise lighting, finishes and hvac upgrade in area of work. | $220,000 |
| Feb 12, 2024 | Completed final sign-off Jul 2024 | 333 Market St | Rudolph Commercial Interiors Inc, Rci | 9th fl remodel of existing office. demo 2 offices, new led lghting in areas of construction only, paint for affected spaces, new furniture where noted. new mechanical & electrical work for affected spaces. duct distribution being modified per new space plan.Details
9th fl remodel of existing office. demo 2 offices, new led lghting in areas of construction only, paint for affected spaces, new furniture where noted. new mechanical & electrical work for affected spaces. duct distribution being modified per new space plan. | $175,000 |
| Aug 23, 2023 | Completed final sign-off Jul 2024 | 333 Market St | Rudolph Commercial Interiors Inc, Rci | ground fl loading dock. infill existing loading dock ramp.Details
ground fl loading dock. infill existing loading dock ramp. | $225,000 |
| Aug 21, 2023 | Completed final sign-off Aug 2023 | 550 California St | Rudolph Commercial Interiors Inc, Rci | (parking structure) consisting only of barrier removal: provide designated accessible parking spaces for new ev charging stations. ev charger installation was previously approved under separate electrical permit# ew202306232040.Details
(parking structure) consisting only of barrier removal: provide designated accessible parking spaces for new ev charging stations. ev charger installation was previously approved under separate electrical permit# ew202306232040. | $5,000 |
| Jun 21, 2023 | Completed final sign-off Dec 2023 | 333 Market St | Rudolph Commercial Interiors Inc, Rci | 5th fl - office remodel consisting of adding 3 (n) offices w/new furniture & finishes & copy area. new lighting & hvac associated to new constructionDetails
5th fl - office remodel consisting of adding 3 (n) offices w/new furniture & finishes & copy area. new lighting & hvac associated to new construction | $125,000 |
| Jun 21, 2023 | Completed final sign-off Jul 2024 | 333 Market St | G L C Construction Company Inc | 1/f annex: new pantry area w/new finishes/lighting, new tv wall @ (e) collaboration area. hvac upgrade for new remodelDetails
1/f annex: new pantry area w/new finishes/lighting, new tv wall @ (e) collaboration area. hvac upgrade for new remodel | $135,000 |
| May 17, 2023 | Completed final sign-off Jan 2024 | 333 Market St | Rudolph Commercial Interiors Inc, Rci | 9th fl. conversion of (e) training rooms to copy/print center, new led lighting in areas of construction only, new paint and carpet for new spaces new furniture where noted, mechanical scope new fsds, fan powered boxes, transfer fans,heat pupmps addedDetails
9th fl. conversion of (e) training rooms to copy/print center, new led lighting in areas of construction only, new paint and carpet for new spaces new furniture where noted, mechanical scope new fsds, fan powered boxes, transfer fans,heat pupmps added | $162,000 |
| May 3, 2023 | Completed final sign-off Mar 2024 | 333 Market St | Gci, Inc | conversion of existing copy rooms to new focus rooms. change of furniture in area of work only and workstations. relocating led lighting in area of work to fit new layout. new mech and elc. work for converted spacesDetails
conversion of existing copy rooms to new focus rooms. change of furniture in area of work only and workstations. relocating led lighting in area of work to fit new layout. new mech and elc. work for converted spaces | $175,000 |
| Oct 6, 2022 | Never finaled filed Oct 2022, never issued | 420 Montgomery St | interior t.i. to the 3rd fl. scope of work includes interior demo, partitions, doors, ceilings, mech, elec, plumbing, structural work (no structural demo) kitchenette for employee self use, no outside catering will be provided, no change of useDetails
interior t.i. to the 3rd fl. scope of work includes interior demo, partitions, doors, ceilings, mech, elec, plumbing, structural work (no structural demo) kitchenette for employee self use, no outside catering will be provided, no change of use | $3,120,000 | |
| Sep 27, 2022 | Expired or cancelled cancelled Jan 2026 | 420 Montgomery St | remodel of partial 1st fl conversion of e office space to new mail room, production center, and delivery area. new lighting in areas of costruction onlyl. new paint and carpet for new spaces. new mech, plumb, elec for new spacesDetails
remodel of partial 1st fl conversion of e office space to new mail room, production center, and delivery area. new lighting in areas of costruction onlyl. new paint and carpet for new spaces. new mech, plumb, elec for new spaces | $550,000 | |
| Aug 18, 2022 | Completed final sign-off Sep 2023 | 333 Market St | Rudolph Commercial Interiors Inc, Rci | 2/f ste 217: remodel of (e) breakroom & upgrade to new led lighting, new ceiling, new appliances - sink, power, new finishes. new exhaust fan, new vav box, no new fsd's. fire alarm/sprinklers under sep permits. maher n/aDetails
2/f ste 217: remodel of (e) breakroom & upgrade to new led lighting, new ceiling, new appliances - sink, power, new finishes. new exhaust fan, new vav box, no new fsd's. fire alarm/sprinklers under sep permits. maher n/a | $250,000 |
| Aug 5, 2022 | Never finaled issued Nov 2022, no final | 333 Market St | G L C Construction Company Inc | 15th flr - new recording studio 4 editing room w/ (n) lighting fixtures, ceiling, finishes. conversion of (e) offices, finishes; (n) conference, huddle rooms, and focus rooms remodelDetails
15th flr - new recording studio 4 editing room w/ (n) lighting fixtures, ceiling, finishes. conversion of (e) offices, finishes; (n) conference, huddle rooms, and focus rooms remodel | $500,000 |
| Jul 1, 2022 | Expired or cancelled withdrawn Mar 2024 | 333 Market St | 27th fl: join 2 separate suites. remove demising walls and common corridors. conversion of (e) offices/ finishes for (n) conference rooms, huddle, and activity rooms remodel. no ceiling work.Details
27th fl: join 2 separate suites. remove demising walls and common corridors. conversion of (e) offices/ finishes for (n) conference rooms, huddle, and activity rooms remodel. no ceiling work. | $350,000 | |
| May 6, 2022 | Completed final sign-off Mar 2023 | 333 Market St | Rudolph Commercial Interiors Inc, Rci | 25th fl: conversion of existing office & finishes for new conference rooms, huddle, and focus rooms.Details
25th fl: conversion of existing office & finishes for new conference rooms, huddle, and focus rooms. | $150,000 |
| Dec 10, 2021 | Completed final sign-off Mar 2022 | 333 Market St | G L C Construction Company Inc | 30th floor: conversion of (e) office to (n) supply room. all (e) fixtures to remain. hvac upgrade for area of construction only.Details
30th floor: conversion of (e) office to (n) supply room. all (e) fixtures to remain. hvac upgrade for area of construction only. | $50,000 |
| Dec 6, 2021 | Completed final sign-off Nov 2022 | 333 Market St | Richlen Construction | installation of 4 steel bollards in front of e rolling grilles for safety precautions. bollards are inside property line and does not impact public path of travel.Details
installation of 4 steel bollards in front of e rolling grilles for safety precautions. bollards are inside property line and does not impact public path of travel. | $16,000 |
| Oct 22, 2021 | Completed final sign-off Mar 2023 | 333 Market St | Skyline Construction | 31st fl - conversion of (e) offices/finishes/lighting; (n) conference rooms, huddle, and focus rooms remodel. upgrade all fixtures to new led lighting. hvac upgrade for new remodelDetails
31st fl - conversion of (e) offices/finishes/lighting; (n) conference rooms, huddle, and focus rooms remodel. upgrade all fixtures to new led lighting. hvac upgrade for new remodel | $1,530,000 |
| Oct 1, 2021 | Completed final sign-off Mar 2023 | 333 Market St | Skyline Construction | 19/f: conversion of (e) offices/finishes/lighting, new conference rooms, huddle, focus rooms remodel. upgrade all fixtures to new led lighting. hvac upgrade for new remodelDetails
19/f: conversion of (e) offices/finishes/lighting, new conference rooms, huddle, focus rooms remodel. upgrade all fixtures to new led lighting. hvac upgrade for new remodel | $1,530,000 |
| Sep 23, 2021 | Completed final sign-off Mar 2023 | 333 Market St | Skyline Construction | 24/f: conversion of (e) offices/finishes/lighting; (n) conference rooms, huddle and focus rooms. remodel. upgrade all fixtures to new led lighting. hvac upgrade for new remodel.Details
24/f: conversion of (e) offices/finishes/lighting; (n) conference rooms, huddle and focus rooms. remodel. upgrade all fixtures to new led lighting. hvac upgrade for new remodel. | $1,530,000 |
| Sep 17, 2021 | Completed final sign-off Mar 2023 | 333 Market St | Skyline Construction | conversion of (e) offices/finishes/lighting. new conference rooms, huddle, focus rooms remodel. upgrade all fixtures to new led lighting. hvac upgrade for new remodel. add one new heat pump. mep included. fire alarm/sprinklers under sep permits.Details
conversion of (e) offices/finishes/lighting. new conference rooms, huddle, focus rooms remodel. upgrade all fixtures to new led lighting. hvac upgrade for new remodel. add one new heat pump. mep included. fire alarm/sprinklers under sep permits. | $1,530,000 |
| Aug 9, 2021 | Completed final sign-off Jun 2022 | 333 Market St | 17/f: non structural interior office remodel. convert select offices to meeting rooms, add large breakroom. update hvac led lighting for affected rooms only.Details
17/f: non structural interior office remodel. convert select offices to meeting rooms, add large breakroom. update hvac led lighting for affected rooms only. | $250,000 | |
| Jul 16, 2021 | Completed final sign-off Nov 2022 | 333 Market St | Rudolph Commercial Interiors Inc, Rci | 20/f: office remodel of new conference rooms, huddle rooms, focus rooms and break room. new furniture and finishes. upgrade all fixtures to new led lighting. hvac upgrade for new remodel. fire alarm and sprinklers under sep permit.Details
20/f: office remodel of new conference rooms, huddle rooms, focus rooms and break room. new furniture and finishes. upgrade all fixtures to new led lighting. hvac upgrade for new remodel. fire alarm and sprinklers under sep permit. | $1,530,000 |
| Apr 19, 2021 | Completed final sign-off Jan 2022 | 333 Market St | Rudolph Commercial Interiors Inc, Rci | 9/f: conversion of (e) offices/finishes/lighting: new conference rooms, huddle, and focus rooms remodel. upgrade fixtures to new led lighting and hvac modification in areas of construction.Details
9/f: conversion of (e) offices/finishes/lighting: new conference rooms, huddle, and focus rooms remodel. upgrade fixtures to new led lighting and hvac modification in areas of construction. | $466,000 |
| Dec 9, 2020 | Expired or cancelled cancelled May 2021 | 550 California St | G L C Construction Company Inc | 7th flr. conversion of (e) offices / finishes / lighting. (n) conference rooms, huddle and focus rooms remodel. upgrade all fixtures to new led lighting. hvac upgrade for new remodel.Details
7th flr. conversion of (e) offices / finishes / lighting. (n) conference rooms, huddle and focus rooms remodel. upgrade all fixtures to new led lighting. hvac upgrade for new remodel. | $1,540,000 |
| Oct 17, 2020 | Completed final sign-off Jul 2021 | 333 Market St | G L C Construction Company Inc | 29th floor: conversion of (e) offices, finishes, lighting. (n) conference rooms, huddle rooms & breakroom remodel. upgrade all fixtures to new led lighting. hvac upgrade for new remodel.Details
29th floor: conversion of (e) offices, finishes, lighting. (n) conference rooms, huddle rooms & breakroom remodel. upgrade all fixtures to new led lighting. hvac upgrade for new remodel. | $790,150 |
| Oct 17, 2020 | Completed final sign-off Jul 2022 | 333 Market St | Richlen Construction | 1st floor: partail demo of (e) walls& flooring for (n) security doors. partial demo of (e) rcp at areas of demo and provide (n) led lighting. (n) power/data where required. (n) 1 hour rated exit corridor at ground floor. (n) ada door operatiors at lobby door & annex entry door.Details
1st floor: partail demo of (e) walls& flooring for (n) security doors. partial demo of (e) rcp at areas of demo and provide (n) led lighting. (n) power/data where required. (n) 1 hour rated exit corridor at ground floor. (n) ada door operatiors at lobby door & annex entry door. | $325,000 |
| Oct 10, 2020 | Completed final sign-off Jul 2021 | 333 Market St | G L C Construction Company Inc | 28th flr. demo 9 existing office and constructing 8 new focus rooms. remodel of (e) conference rooms, huddle rooms, break room.provide new finishes & upgrade of all fixtures t onew led lighting. upgrade hvac due to remodel.Details
28th flr. demo 9 existing office and constructing 8 new focus rooms. remodel of (e) conference rooms, huddle rooms, break room.provide new finishes & upgrade of all fixtures t onew led lighting. upgrade hvac due to remodel. | $780,150 |
| Oct 2, 2020 | Completed final sign-off Jul 2021 | 333 Market St | G L C Construction Company Inc | 27/f suite b: t.i. change of (e) furniture in areas of work, covert (e) offices to (n) conference rooms. (n) mechanical & (n) electrical work in affected area of work. maher n/a.Details
27/f suite b: t.i. change of (e) furniture in areas of work, covert (e) offices to (n) conference rooms. (n) mechanical & (n) electrical work in affected area of work. maher n/a. | $175,000 |
| Sep 24, 2020 | Completed final sign-off Jul 2021 | 333 Market St | G L C Construction Company Inc | 21/f: conversion of (e) offices/finishes/lighting; (n) conference rooms, huddle and focus rooms remodel. upgrade all fixtures to new led lghting. hvac upgrade for new remodel. maher n/a.Details
21/f: conversion of (e) offices/finishes/lighting; (n) conference rooms, huddle and focus rooms remodel. upgrade all fixtures to new led lghting. hvac upgrade for new remodel. maher n/a. | $1,530,000 |
| Sep 15, 2020 | Completed final sign-off Apr 2021 | 550 California St | Rudolph Commercial Interiors Inc, Rci | 11th flr. office remodel of new break room, change of existing furnitures in areas of work w/ new conference rooms, new focus rooms, and new finishes. new mechanical and electrical work for new spaces.Details
11th flr. office remodel of new break room, change of existing furnitures in areas of work w/ new conference rooms, new focus rooms, and new finishes. new mechanical and electrical work for new spaces. | $137,000 |
| Sep 15, 2020 | Expired or cancelled cancelled Jan 2026 | 420 Montgomery St | remodel of 3rd fl: add new conference rooms, focus rooms, huddle rooms, break rooms & mother's room. new lighting in areas of construction. new paint & carpet for new open office area. new furniture where noted. new mech, plum, elec work for new spaces.Details
remodel of 3rd fl: add new conference rooms, focus rooms, huddle rooms, break rooms & mother's room. new lighting in areas of construction. new paint & carpet for new open office area. new furniture where noted. new mech, plum, elec work for new spaces. | ||
| Sep 14, 2020 | Completed final sign-off Feb 2021 | 375 Brannan St | Rudolph Commercial Interiors Inc, Rci | barrier removal only -ada toilet upgrade of (e) toilet rooms, partial demo of men's toilet room, janitor's room & women's toilet room. new design/build hvac, elec & plumbing s required. mep: design/build (in area of work onlyDetails
barrier removal only -ada toilet upgrade of (e) toilet rooms, partial demo of men's toilet room, janitor's room & women's toilet room. new design/build hvac, elec & plumbing s required. mep: design/build (in area of work only | $137,000 |
| Feb 13, 2020 | Expired or cancelled cancelled Jan 2026 | 333 Market St | 2nd fl - add 3 telephone booths (furniture) & required power outlets. new gwb soffit & bracingDetails
2nd fl - add 3 telephone booths (furniture) & required power outlets. new gwb soffit & bracing | $10,000 | |
| Nov 26, 2019 | Completed final sign-off Feb 2021 | 420 Montgomery St | Skyline Construction | rev to pa# 201805048292; add 1 hour rated partiton at lower level storage 1 hour rated corridorDetails
rev to pa# 201805048292; add 1 hour rated partiton at lower level storage 1 hour rated corridor | $10,000 |
| Nov 5, 2019 | Completed final sign-off Jul 2020 | 333 Market St | G L C Construction Company Inc | 25th floor: total floor area 15,335 sq.ft. total effected area 4,735 sq.ft. office remodel of new huddle rooms, focus rooms & break room. new furniture & finishes. upgrade fixture to new led lighting. hvac upgrade for new remodel.Details
25th floor: total floor area 15,335 sq.ft. total effected area 4,735 sq.ft. office remodel of new huddle rooms, focus rooms & break room. new furniture & finishes. upgrade fixture to new led lighting. hvac upgrade for new remodel. | $516,115 |
| Nov 5, 2019 | Completed final sign-off Jun 2020 | 333 Market St | Rudolph Commercial Interiors Inc, Rci | 15th floor: office remodel of new huddle rooms, focus rooms & break room. new furniture & finishes. upgrade fixture to new led lighting. hvac upgrade for new remodel.Details
15th floor: office remodel of new huddle rooms, focus rooms & break room. new furniture & finishes. upgrade fixture to new led lighting. hvac upgrade for new remodel. | $715,803 |
| Oct 18, 2019 | Completed final sign-off Sep 2023 | 635 Sacramento St | Honeywell International, Inc | 6th floor: 635 sacramento town. f/a modification: add 1 strobe booster; 16 spker/strbs; 1 spkr; 7 control relay module; 10 pilot relays; 6 duct detectors; 5 monitor modules; 10 aux relays; 3 smoke detectors and 3 pull stations; demo f/a devices per sheet f7.1. ref app#201907125734Details
6th floor: 635 sacramento town. f/a modification: add 1 strobe booster; 16 spker/strbs; 1 spkr; 7 control relay module; 10 pilot relays; 6 duct detectors; 5 monitor modules; 10 aux relays; 3 smoke detectors and 3 pull stations; demo f/a devices per sheet f7.1. ref app#201907125734 | $38,193 |
| Oct 2, 2019 | Completed final sign-off Sep 2020 | 343 Sansome St | Paradigm General Contractors | 11th floor: office remodel of (n) conference rooms, huddle rooms, focus rooms, & break room, new furniture & finishes, upgrade all fixtures to new led lighting hvac upgrade for new remodelDetails
11th floor: office remodel of (n) conference rooms, huddle rooms, focus rooms, & break room, new furniture & finishes, upgrade all fixtures to new led lighting hvac upgrade for new remodel | $950,000 |
| Sep 6, 2019 | Completed final sign-off Jun 2020 | 333 Market St | Rudolph Commercial Interiors Inc, Rci | 14th fl - area of work 14561 sf. office remodel of (n) conference rooms, huddle rooms, focus rooms, breakroom & mother's room. including new finishes. upgrade all light fixtures to new led, hvac upgrade for new remodel. includes mep/mech.Details
14th fl - area of work 14561 sf. office remodel of (n) conference rooms, huddle rooms, focus rooms, breakroom & mother's room. including new finishes. upgrade all light fixtures to new led, hvac upgrade for new remodel. includes mep/mech. | $850,000 |
| Sep 6, 2019 | Completed final sign-off Jun 2020 | 333 Market St | Rudolph Commercial Interiors Inc, Rci | 18th fl - area of work 1614 sf. office remodel of (n) conference rooms, huddle rooms, focus rooms & breakroom & mother's room. including new finishes. upgrade all light fixtures to new led, hvac upgrade for new remodel. incl mep/mech.Details
18th fl - area of work 1614 sf. office remodel of (n) conference rooms, huddle rooms, focus rooms & breakroom & mother's room. including new finishes. upgrade all light fixtures to new led, hvac upgrade for new remodel. incl mep/mech. | $350,000 |
| Aug 2, 2019 | Completed final sign-off Jun 2020 | 550 California St | Rudolph Commercial Interiors Inc, Rci | remodel of (e) video library: (n) audio control rm. & (n) audio suite upgrade all light fixture in suite to new led lighting, hvac upgrade for (n) remodelDetails
remodel of (e) video library: (n) audio control rm. & (n) audio suite upgrade all light fixture in suite to new led lighting, hvac upgrade for (n) remodel | $25,000 |
| Jul 12, 2019 | Completed final sign-off Jun 2020 | 635 Sacramento St | Rudolph Commercial Interiors Inc, Rci | retail remodel of (e) office on 6th flr in 3 suites add demisinf wall btw suite 625 & 650. upgrade pantry /copy rm in suite 625m 650 & 675. new offices, new pantry, new meeting rooms. new mech & new ele work for new spaces. min work in (e) toilet rm. no change in plm fix countDetails
retail remodel of (e) office on 6th flr in 3 suites add demisinf wall btw suite 625 & 650. upgrade pantry /copy rm in suite 625m 650 & 675. new offices, new pantry, new meeting rooms. new mech & new ele work for new spaces. min work in (e) toilet rm. no change in plm fix count | $250,000 |
| Jul 12, 2019 | Completed final sign-off Jun 2020 | 635 Sacramento St | Rudolph Commercial Interiors Inc, Rci | 1st floor: 4,119 sq ft area of work. remodel of extg office space on 1st floor with new meeting room, breakroom/finishes/lighting. new exit door to exterior. new mep work. minimal work in extg toilet rooms for ada and finishes upgrade. n/a for maherDetails
1st floor: 4,119 sq ft area of work. remodel of extg office space on 1st floor with new meeting room, breakroom/finishes/lighting. new exit door to exterior. new mep work. minimal work in extg toilet rooms for ada and finishes upgrade. n/a for maher | $450,000 |
| Jun 5, 2019 | Never finaled issued Jun 2019, no final | 333 Market St | G L C Construction Company Inc | 33/f: office remodel of new conf rm, huddle rm, focus rm, break rm, new furniture & finishes. upgrade all fixture to new led lighting. hvac upgrade for new remodel. maher n/a.Details
33/f: office remodel of new conf rm, huddle rm, focus rm, break rm, new furniture & finishes. upgrade all fixture to new led lighting. hvac upgrade for new remodel. maher n/a. | $1,962,000 |
| Apr 5, 2019 | Completed final sign-off Jun 2020 | 550 California St | Rudolph Commercial Interiors Inc, Rci | 3/f: remodel of (e) office space on 3rd fl with (n) conference rooms, (n) focus rooms, (n) breakroom, (n) finishes and (n) led lighting in affected areas. mep included. maher na.Details
3/f: remodel of (e) office space on 3rd fl with (n) conference rooms, (n) focus rooms, (n) breakroom, (n) finishes and (n) led lighting in affected areas. mep included. maher na. | $1,500,000 |
| Oct 17, 2018 | Completed final sign-off Feb 2020 | 601 Market St | Eric F Anderson Incorporated | minor permit to alter. exterior work to include replace entry doors & hardware, remove 2nd fl mechanical louvers on market st & replace with glazing to match adjacent. replace inside new louvers on 2nd street elevationDetails
minor permit to alter. exterior work to include replace entry doors & hardware, remove 2nd fl mechanical louvers on market st & replace with glazing to match adjacent. replace inside new louvers on 2nd street elevation | $75,000 |
| May 4, 2018 | Completed final sign-off Nov 2018 | 333 Market St | Swinerton Builders | remodel of 3rd flr - add conference room, huddle room, focus room, remodel break room, new funiture & finishes, upgrage all lighting to led, upgrade mech & ele of spaceDetails
remodel of 3rd flr - add conference room, huddle room, focus room, remodel break room, new funiture & finishes, upgrage all lighting to led, upgrade mech & ele of space | $250,000 |
| May 4, 2018 | Completed final sign-off Oct 2018 | 635 Sacramento St | Rudolph Commercial Interiors Inc, Rci | 8th fl: partial remodel 430 sq ft of 8th fl amep: focus room, open office, breakroom. upgrade mechanical and elec of space maher not req, fire under separate permit(s). no new fsdsDetails
8th fl: partial remodel 430 sq ft of 8th fl amep: focus room, open office, breakroom. upgrade mechanical and elec of space maher not req, fire under separate permit(s). no new fsds | $50,000 |
| May 3, 2018 | Completed final sign-off Nov 2018 | 420 Montgomery St | Rudolph Commercial Interiors Inc, Rci | remodel of 6th floor: huddle room, focus room, upgrade mechanical and electrical of space. n/a for maherDetails
remodel of 6th floor: huddle room, focus room, upgrade mechanical and electrical of space. n/a for maher | $50,000 |
| Mar 8, 2018 | Completed final sign-off Jan 2019 | 550 California St | G L C Construction Company Inc | 5th floor: remodel of (e) office space: (n) conference rooms, copy areas, mother's room & new studio. new finishes and new led lighting in affected areasDetails
5th floor: remodel of (e) office space: (n) conference rooms, copy areas, mother's room & new studio. new finishes and new led lighting in affected areas | $1,550,000 |
| Oct 11, 2017 | Completed final sign-off Nov 2018 | 333 Market St | Swinerton Builders | partial remodel of 10th fl add small converence room, huddle and focus rooms. remodel breakroom. new furniture and finishes. upgrade all lighting to led new mech and elec work for new space maher naDetails
partial remodel of 10th fl add small converence room, huddle and focus rooms. remodel breakroom. new furniture and finishes. upgrade all lighting to led new mech and elec work for new space maher na | $140,000 |
| Aug 22, 2017 | Never finaled issued Oct 2017, no final | 333 Market St | Skyline Construction | 7/f- two (n) focus rooms, (n) finishes, upgrade of lighting to led, (n) mechanical and electrical work for new spaces. n/a ordinance #155-13Details
7/f- two (n) focus rooms, (n) finishes, upgrade of lighting to led, (n) mechanical and electrical work for new spaces. n/a ordinance #155-13 | $225,000 |
| Aug 2, 2017 | Completed final sign-off Mar 2019 | 333 Market St | G L C Construction Company Inc | remodel of 22nd floor - 3 (n) focus rooms, 1 (n) huddle room, (n) small conference room, (n) copy room, (n) furniture/finishes. upgrade all lights to led (n) mechanical & electrical for new spaces.Details
remodel of 22nd floor - 3 (n) focus rooms, 1 (n) huddle room, (n) small conference room, (n) copy room, (n) furniture/finishes. upgrade all lights to led (n) mechanical & electrical for new spaces. | $275,000 |
| Jun 23, 2017 | Completed final sign-off May 2019 | 333 Market St | T C B Builders Inc | 3/f- amep plans - work to remodel existing offices, add training facilities and meeting rooms for business training purposes. connect core areas with corridor to access toilets and exit stairs. n/a ordinance #155-13, fire under separate permits.Details
3/f- amep plans - work to remodel existing offices, add training facilities and meeting rooms for business training purposes. connect core areas with corridor to access toilets and exit stairs. n/a ordinance #155-13, fire under separate permits. | $1,500,000 |
| Jun 22, 2017 | Completed final sign-off Mar 2019 | 333 Market St | G L C Construction Company Inc | (tower) 11th fl remodel: add (2) new focus rms, 4(n) small conf. rooms, enlarge existing breakroom, (n) furniture and (n) finishes. add 1 (n) drinking fountain. upgrade existing lighting to (n) led lighting. provide (n) electrical, mechanical and plumbing in areas of work.Details
(tower) 11th fl remodel: add (2) new focus rms, 4(n) small conf. rooms, enlarge existing breakroom, (n) furniture and (n) finishes. add 1 (n) drinking fountain. upgrade existing lighting to (n) led lighting. provide (n) electrical, mechanical and plumbing in areas of work. | $195,000 |
| Apr 28, 2017 | Completed final sign-off Jan 2019 | 420 Montgomery St | T C B Builders Inc | remodel 9th fl, add new offices, new led lighging, finsihes for new offices area, offices, conference rooms, copy rooms, breakroom, restrooms no new plumbing fixtures added, elevator lobby. new mech plumbing, elec work new spaces. fire alarm/ls and fire sprinkelr under sep permit maher not reqDetails
remodel 9th fl, add new offices, new led lighging, finsihes for new offices area, offices, conference rooms, copy rooms, breakroom, restrooms no new plumbing fixtures added, elevator lobby. new mech plumbing, elec work new spaces. fire alarm/ls and fire sprinkelr under sep permit maher not req | $575,300 |
| Mar 29, 2017 | Never finaled issued Jun 2017, no final | 333 Market St | Skyline Construction | 16th flr: add 22 new offices, 5 new focus rooms, 1 new huddle room, new conference room and new copy area. upgrade all lighting to led. new mech work and electrical work for new spaces. maher naDetails
16th flr: add 22 new offices, 5 new focus rooms, 1 new huddle room, new conference room and new copy area. upgrade all lighting to led. new mech work and electrical work for new spaces. maher na | $484,750 |
| Aug 9, 2016 | Completed final sign-off Jan 2017 | 420 Montgomery St | T C B Builders Inc | install new granite clad concrete planter within property line and landscaping upgrade, replace existing sidewalk planters with new granite clad precast concrete planters, planters not attached to sidewalk. total area of work: 45 sq.ft. n/a ordinance #155-13Details
install new granite clad concrete planter within property line and landscaping upgrade, replace existing sidewalk planters with new granite clad precast concrete planters, planters not attached to sidewalk. total area of work: 45 sq.ft. n/a ordinance #155-13 | $20,000 |
| Jun 22, 2016 | Completed final sign-off Dec 2016 | 333 Market St | G L C Construction Company Inc | remodel 4th floor - add (5) new focus rooms, (2) new conference rooms, (1) new break room. new furniture, finishes & led lighting upgrade. new mep and lighting work for new spaces. no new toilets. fire alarm/life safety under separate permit.Details
remodel 4th floor - add (5) new focus rooms, (2) new conference rooms, (1) new break room. new furniture, finishes & led lighting upgrade. new mep and lighting work for new spaces. no new toilets. fire alarm/life safety under separate permit. | $245,000 |
| Jun 8, 2016 | Completed final sign-off Aug 2017 | 333 Market St | Paradigm General Contractors | open collaboration meeting space for existing retail bank. pantry, meeting rooms at gr and existing mezzanine. revise e stair, provide ada upgrades to restrooms and elevatorDetails
open collaboration meeting space for existing retail bank. pantry, meeting rooms at gr and existing mezzanine. revise e stair, provide ada upgrades to restrooms and elevator | $500,000 |
| Jun 2, 2016 | Completed final sign-off Dec 2016 | 333 Market St | G L C Construction Company Inc | ground floor: remodel of (e) office tenant imporvement with new finishes/power/lighting/hvac ref pa 2014 0521 6369Details
ground floor: remodel of (e) office tenant imporvement with new finishes/power/lighting/hvac ref pa 2014 0521 6369 | $148,000 |
| Apr 13, 2016 | Completed final sign-off Mar 2017 | 420 Montgomery St | Skyline Construction | provide the existing life safety fire pump with emergency power. extend power from existing generator to feed existing fire pump. expand existing fire pump room to accomodate new controller with ats.Details
provide the existing life safety fire pump with emergency power. extend power from existing generator to feed existing fire pump. expand existing fire pump room to accomodate new controller with ats. | $300,000 |
| Mar 24, 2016 | Completed final sign-off Jul 2016 | 420 Montgomery St | T C B Builders Inc | installation of new turnstiles on ground floor. minor relocation of existing lighting/museum displays. maher naDetails
installation of new turnstiles on ground floor. minor relocation of existing lighting/museum displays. maher na | $50,000 |
| Mar 24, 2016 | Completed final sign-off Mar 2017 | 550 California St | Rudolph Commercial Interiors Inc, Rci | 8th fl: remodel of existing 18,345 sq ft of office space. new conference rooms, new open office, finishes. new lighting in affected areas. upgrade toilet rooms. no change in # of toilet fixtures. maher na. life safety deferred.Details
8th fl: remodel of existing 18,345 sq ft of office space. new conference rooms, new open office, finishes. new lighting in affected areas. upgrade toilet rooms. no change in # of toilet fixtures. maher na. life safety deferred. | $400,000 |
| Jan 15, 2016 | Completed final sign-off Nov 2017 | 45 Fremont St | Rudolph Commercial Interiors Inc, Rci | remodel of 8th fl. add 4 new offices, 3 new conference rooms/focus rooms, 1 new 1df room and 1 new breakroom. new furniture, paint. new mech, plumb, elec for new space. no new toilets. n/a for maher.Details
remodel of 8th fl. add 4 new offices, 3 new conference rooms/focus rooms, 1 new 1df room and 1 new breakroom. new furniture, paint. new mech, plumb, elec for new space. no new toilets. n/a for maher. | $175,000 |
| Oct 13, 2015 | Completed final sign-off Nov 2016 | 635 Sacramento St | W. Bradley Electric | installing securtiy devices, exit signage, smoke detectors o all floor as reqd due to installation of new card readers. maher naDetails
installing securtiy devices, exit signage, smoke detectors o all floor as reqd due to installation of new card readers. maher na | $50,000 |
| Oct 13, 2015 | Completed final sign-off Nov 2016 | 550 California St | W. Bradley Electric | installing securtiy devices, exit signage, smoke detectors o all floor as reqd due to installation of new card readers. maher naDetails
installing securtiy devices, exit signage, smoke detectors o all floor as reqd due to installation of new card readers. maher na | $60,000 |
| Jul 14, 2015 | Never finaled issued Sep 2015, no final | 1 Montgomery St | C C I Commercial Construction & Improv | grnd/mez:hvac mech remodel incl new duct distribtuion 3 new fan coil units,2new roof top condensing units,&new mechanical room on mezzanine level, elec lighting revisions are included due to ceiling drop for new duct distributions & new mech rm,structural support included for mech unit support.Details
grnd/mez:hvac mech remodel incl new duct distribtuion 3 new fan coil units,2new roof top condensing units,&new mechanical room on mezzanine level, elec lighting revisions are included due to ceiling drop for new duct distributions & new mech rm,structural support included for mech unit support. | $140,000 |
| Jun 5, 2015 | Completed final sign-off Sep 2015 | 333 Market St | Ayoob & Peery Plumbing Co Inc | 1st floor sprinkler t.i.:add and relocate fire sprinklers. add 6, relo 19 ref. app. # 2015.0305.0022. compliance with maher ordinance no. 155-13 not required.Details
1st floor sprinkler t.i.:add and relocate fire sprinklers. add 6, relo 19 ref. app. # 2015.0305.0022. compliance with maher ordinance no. 155-13 not required. | $12,850 |
| May 19, 2015 | Completed final sign-off Oct 2015 | 333 Market St | G L C Construction Company Inc | relocation of existing ducts and grills. add (1) ac condensing unit (4 tons). add (4) vav boxes. add (1) exhaust fan. for t.i. appl. 2015.0305.0022 mechancial work. revision to pa# 201503050022, electrical and structural. n/a maher ord # 155-13Details
relocation of existing ducts and grills. add (1) ac condensing unit (4 tons). add (4) vav boxes. add (1) exhaust fan. for t.i. appl. 2015.0305.0022 mechancial work. revision to pa# 201503050022, electrical and structural. n/a maher ord # 155-13 | $50,000 |
| Apr 1, 2015 | Completed final sign-off Oct 2015 | 420 Montgomery St | Restec Contractors Inc | 10th flr: partial demo - (e) walls, floor and ceiling of tenant space. plumb fixtures to be removed/salvaged for bld. cap plumb for new future plumb in demo area. ref pa# 2015 03330 2232Details
10th flr: partial demo - (e) walls, floor and ceiling of tenant space. plumb fixtures to be removed/salvaged for bld. cap plumb for new future plumb in demo area. ref pa# 2015 03330 2232 | $130,000 |
| Mar 30, 2015 | Completed final sign-off Feb 2016 | 420 Montgomery St | T C B Builders Inc | 10th floor: total area of work is 10140 sq ft. remodel of extg office space. including new lighting, finishes for new open office area, offices, conference rooms, copy room, breakroom elevator lobby. new toilet rms without addn' fixtures. new mep work. n/a for maher. demo permit # 2015-0401-2502Details
10th floor: total area of work is 10140 sq ft. remodel of extg office space. including new lighting, finishes for new open office area, offices, conference rooms, copy room, breakroom elevator lobby. new toilet rms without addn' fixtures. new mep work. n/a for maher. demo permit # 2015-0401-2502 | $320,000 |
| Mar 5, 2015 | Completed final sign-off Oct 2015 | 333 Market St | G L C Construction Company Inc | 2065 sq.ft. of remodel of existing tenant improvement space- partial 1st floor for new retail bank financial services facility; maher n/aDetails
2065 sq.ft. of remodel of existing tenant improvement space- partial 1st floor for new retail bank financial services facility; maher n/a | $218,000 |
| Jan 15, 2015 | Completed final sign-off Oct 2015 | 550 California St | Rudolph Commercial Interiors Inc, Rci | 4th floor - 568 sq ft rear of work - remodel (e) office space, (n) conf. room, huddle room, open office space, new finishes/lighting in affected areas. upgrade toilet rooms. n/a maher ordinanceDetails
4th floor - 568 sq ft rear of work - remodel (e) office space, (n) conf. room, huddle room, open office space, new finishes/lighting in affected areas. upgrade toilet rooms. n/a maher ordinance | $85,000 |
| Nov 17, 2014 | Completed final sign-off Dec 2014 | 550 California St | Paradigm General Contractors | reconfigure womens toilet room due to non-compliant ada stall. remove 1 stall & relocate ada stall, reconfigure standard stalls. remove urinal in mens toilet room. plan revision to permit #20140627969. compliance with maher ordinance no. 155-13 not required.Details
reconfigure womens toilet room due to non-compliant ada stall. remove 1 stall & relocate ada stall, reconfigure standard stalls. remove urinal in mens toilet room. plan revision to permit #20140627969. compliance with maher ordinance no. 155-13 not required. | |
| Nov 10, 2014 | Completed final sign-off Oct 2015 | 550 California St | Rudolph Commercial Interiors Inc, Rci | 2nd floor - remodel of (e) office space: (n) conf. room & (n) open office area, new furniture, new finishes, (n) lighting in affected areas, upgrade toilet rooms. no change in # of fixtures. n/a maher ordinanceDetails
2nd floor - remodel of (e) office space: (n) conf. room & (n) open office area, new furniture, new finishes, (n) lighting in affected areas, upgrade toilet rooms. no change in # of fixtures. n/a maher ordinance | $250,000 |
| Oct 3, 2014 | Completed final sign-off Aug 2015 | 45 Fremont St | G L C Construction Company Inc | 9th flr: remodel of existing offices on 9th flr, add 2 new offices, new tread mill rm, relocate breakroom & 2 (n) conference rooms, new finishes & new lighting at affected areas; maher n/aDetails
9th flr: remodel of existing offices on 9th flr, add 2 new offices, new tread mill rm, relocate breakroom & 2 (n) conference rooms, new finishes & new lighting at affected areas; maher n/a | $140,000 |
| Sep 11, 2014 | Completed final sign-off Nov 2014 | 505 Sansome St | Skyline Construction | 18th flr: demo (e) 5 offices to expand (e) open office area, new workstations & (n) finishes for open office area, 1 new conference room, 1 meeeting (focus) room, toilet no new fixtures; maher n/aDetails
18th flr: demo (e) 5 offices to expand (e) open office area, new workstations & (n) finishes for open office area, 1 new conference room, 1 meeeting (focus) room, toilet no new fixtures; maher n/a | $50,000 |
| Aug 8, 2014 | Never finaled issued Aug 2014, no final | 420 Montgomery St | T C B Builders Inc | revision to 201404294415. area of work 120 sq ft. relocation of proposed electrical room 653 a. provide fire/smoke dampers. 1 hr rated walls and 20 min door/frame. 2 relocated light fixtures. revise millwork at copy room 653. revision to closet door 6008. maher not reqDetails
revision to 201404294415. area of work 120 sq ft. relocation of proposed electrical room 653 a. provide fire/smoke dampers. 1 hr rated walls and 20 min door/frame. 2 relocated light fixtures. revise millwork at copy room 653. revision to closet door 6008. maher not req | $2,000 |
| Jul 30, 2014 | Completed final sign-off Apr 2016 | 1 Montgomery St | C C I Commercial Construction & Improv | basement floor - ada toilet upgrade to full compliance; remodel of (e) toilet rooms, demolitoin of (e) men's & women's toilet rooms. new hvac, elec & plumbing as required. remodle break room, finishes millwork & lighting.Details
basement floor - ada toilet upgrade to full compliance; remodel of (e) toilet rooms, demolitoin of (e) men's & women's toilet rooms. new hvac, elec & plumbing as required. remodle break room, finishes millwork & lighting. | $160,000 |
| Jun 27, 2014 | Completed final sign-off Dec 2014 | 550 California St | Paradigm General Contractors | remodel of e office space. new offices, huddle rooms, collaboration of space and copy room. new furniture, finishes, lighting in new offices. mech and elec work, remodel toilet rooms, no addition fixtures added. maher 155-13 not reqDetails
remodel of e office space. new offices, huddle rooms, collaboration of space and copy room. new furniture, finishes, lighting in new offices. mech and elec work, remodel toilet rooms, no addition fixtures added. maher 155-13 not req | $250,000 |
| Jun 18, 2014 | Completed final sign-off Dec 2014 | 333 Market St | Skyline Construction | remodel of existing office 14,140 s.f. new offices, new conference room, new copy room, new finishes/furniture. alter hvac/lighting to accomodeate remodelled area. relocate existing light fixtures to new rooms. fire alarm, life safety and sprinkler under separate permit. maher n/a.Details
remodel of existing office 14,140 s.f. new offices, new conference room, new copy room, new finishes/furniture. alter hvac/lighting to accomodeate remodelled area. relocate existing light fixtures to new rooms. fire alarm, life safety and sprinkler under separate permit. maher n/a. | $650,000 |
| Jun 18, 2014 | Completed final sign-off Dec 2014 | 333 Market St | Skyline Construction | remodel of existing office 14,435 sq. ft. new offices, new conference rooms, new finishes. alternation of hvac/electrical to accomodate remodelled areas. relocate (e) light fixtures and add new fixtures to new rooms. maher n/a.Details
remodel of existing office 14,435 sq. ft. new offices, new conference rooms, new finishes. alternation of hvac/electrical to accomodate remodelled areas. relocate (e) light fixtures and add new fixtures to new rooms. maher n/a. | $550,000 |
| Jun 17, 2014 | Completed final sign-off Sep 2014 | 550 California St | Rudolph Commercial Interiors Inc, Rci | 1st flr: renovation of existing office break/lunchroom on 1st flr of building, demo and replacement of metal stud walls; (new) couner and cabinets, existing suspended ceiling and lights to remain (no new lights added); compliance with ord 155-13 not requiredDetails
1st flr: renovation of existing office break/lunchroom on 1st flr of building, demo and replacement of metal stud walls; (new) couner and cabinets, existing suspended ceiling and lights to remain (no new lights added); compliance with ord 155-13 not required | $35,000 |
| Apr 29, 2014 | Completed final sign-off Nov 2014 | 420 Montgomery St | T C B Builders Inc | remodel (e) full floor office space, new lighting, & finishes for new open office area, offices, conference rooms, copy room, break room, & elevator looby, new mechanical, plumbing & electrical, work for new spaces, new toilet rooms with no additional fixtures. compliance with ord #155-13 not req.Details
remodel (e) full floor office space, new lighting, & finishes for new open office area, offices, conference rooms, copy room, break room, & elevator looby, new mechanical, plumbing & electrical, work for new spaces, new toilet rooms with no additional fixtures. compliance with ord #155-13 not req. | $2,404,000 |
| Apr 29, 2014 | Completed final sign-off Jun 2014 | 343 Sansome St | G L C Construction Company Inc | 3 floor ti - remodel of existing offices. 4 new offices, new furniture and finishes for open office area. new lighting. no toilet work. fire alarm and sprinkler under separate permit.Details
3 floor ti - remodel of existing offices. 4 new offices, new furniture and finishes for open office area. new lighting. no toilet work. fire alarm and sprinkler under separate permit. | $45,000 |
| Apr 2, 2014 | Completed final sign-off Dec 2014 | 45 Fremont St | Rudolph Commercial Interiors Inc, Rci | remodel of existing office, restroom, lighting, elevator lobby upgrade. n/a ordinance #155-13Details
remodel of existing office, restroom, lighting, elevator lobby upgrade. n/a ordinance #155-13 | $350,000 |
| Apr 2, 2014 | Completed final sign-off Dec 2014 | 45 Fremont St | Rudolph Commercial Interiors Inc, Rci | 8/f: restroom ada upgrade, lighting upgrade, elevator lobby upgrade. 13/f: elevator lobby upgrade. n/a ordinance #155-13.Details
8/f: restroom ada upgrade, lighting upgrade, elevator lobby upgrade. 13/f: elevator lobby upgrade. n/a ordinance #155-13. | $125,000 |