David Rodriguez
- Listed as
- architect, engineer
- On San Francisco permits
- Feb 2020 to Sep 2025
8 permits since 2000 (engineer on 7 permits, architect on 1 permit): 7 completed, 1 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 19, 2025 | Completed final sign-off Jan 2026 | 1 Lombard St | Metcon Ti, Inc | deferred mep for pa# 202407085966: mechanical- demo (e) ductwork, registers, and fan coils where shown. relocate (e) registers to new location, install (n) registers/t-stats. comfort balance. electrical-upgrade/replace lighting throughout half of the 1/f. title-24 compliant. plumbing-provide and...Details
deferred mep for pa# 202407085966: mechanical- demo (e) ductwork, registers, and fan coils where shown. relocate (e) registers to new location, install (n) registers/t-stats. comfort balance. electrical-upgrade/replace lighting throughout half of the 1/f. title-24 compliant. plumbing-provide and... | $40,000 |
| May 28, 2025 | Completed final sign-off Apr 2026 | 3838 California St | The Boldt Company | revision to pa#202409100433.revisions include: added exhaust for the nitrogen tank on level 3.added afan coil unit for the processing lab on level 4. level 3 lobby - install new finishes, new ceiling, and lighting.Details
revision to pa#202409100433.revisions include: added exhaust for the nitrogen tank on level 3.added afan coil unit for the processing lab on level 4. level 3 lobby - install new finishes, new ceiling, and lighting. | $10,000 |
| Sep 14, 2023 | Completed final sign-off Aug 2024 | 1800 Owens St | Dome Construction Corp | revision to pa 202208019663 for 5th fl tenant work includes revisions to level 5 only, including non structural partition & associated mep sector 1, floor 5Details
revision to pa 202208019663 for 5th fl tenant work includes revisions to level 5 only, including non structural partition & associated mep sector 1, floor 5 | |
| Aug 27, 2021 | Completed final sign-off Jun 2022 | 156 Lombard St | Centric Building Inc. | revision to pa 2021-0415-8647 & 2021-0910-3837 scope includes backing up all emergency egress lighting with new ul924 listed emergency lighting inverters with minimum 90 min battery backup at 100% load; re-circuiting of select light fixtures in residential corridors to (e) emergency lighting circuitDetails
revision to pa 2021-0415-8647 & 2021-0910-3837 scope includes backing up all emergency egress lighting with new ul924 listed emergency lighting inverters with minimum 90 min battery backup at 100% load; re-circuiting of select light fixtures in residential corridors to (e) emergency lighting circuit | |
| Apr 15, 2021 | Completed final sign-off Jun 2022 | 154 Lombard St | Centric Building Inc. | arch work under pa# 202009144095. electrical: back-up of all emergency egress lighting w/ new ul listed emergency lighting inverters w/ minimum 90-min battery back-up at 100% load. re-circuit of select light fixtures in residential corridors to (e) emergency lighting circuit serving respective areasDetails
arch work under pa# 202009144095. electrical: back-up of all emergency egress lighting w/ new ul listed emergency lighting inverters w/ minimum 90-min battery back-up at 100% load. re-circuit of select light fixtures in residential corridors to (e) emergency lighting circuit serving respective areas | $20,000 |
| Apr 15, 2021 | Completed final sign-off Jun 2022 | 156 Lombard St | Centric Building Inc. | arch work under pa# 202009103837. electrical: back-up of all emergency egress lighting w/ new ul listed emergency lighting inverters w/ minimum 90-min battery back-up at 100% load. re-circuit of select light fixtures in residential corridors to (e) emergency lighting circuit serving respective areasDetails
arch work under pa# 202009103837. electrical: back-up of all emergency egress lighting w/ new ul listed emergency lighting inverters w/ minimum 90-min battery back-up at 100% load. re-circuit of select light fixtures in residential corridors to (e) emergency lighting circuit serving respective areas | $20,000 |
| Apr 27, 2020 | In progress issued Nov 2023 | 3501 Cesar Chavez St | The Boldt Company | erect a five story type ib construction building with medical office, retail, amnd parking on 4 below ground levels.Details
erect a five story type ib construction building with medical office, retail, amnd parking on 4 below ground levels. | $27,500,000 |
| Feb 26, 2020 | Completed final sign-off Oct 2020 | 270 Brannan St | Novo Construction Inc | 3rd fl - mechanical work for ti & electrical relocation and new installation of restroom grilles & ductwork to accomodate restroom renovation. ref pa 2019-1125-8055Details
3rd fl - mechanical work for ti & electrical relocation and new installation of restroom grilles & ductwork to accomodate restroom renovation. ref pa 2019-1125-8055 | $3,000 |